Aluminium channel fitting instruction multi lingual

1
Unit 12 The Sidings Business Park Whalley, Clitheroe Lancashire United Kingdom BB7 9SE Tel: +44 1254 825594 Fax: +44 1254 823062 Email: [email protected] Aluminium Channel Fitting Instructions - SMUK Solutions Limited - 2012 Aluminium Channel Fitting Instructions English Place the Base Shoes on the bottom of the glass spaced at approx 250mm centres as shown in the diagram. Apply a little bit of washing up liquid on the inside of the channel and on the ribs at the bottom of the base shoes. Lift the glass into position and with a little pressure from above the glass should drop into the channel. Use extra base shoes on the edges of the glass panels to stop any contact with walls or other glass. Once in the channel you should be able to move the glass up and down until in the correct position. Insert the wedges at either side of the base shoes with the ribs towards the base shoe. Using a 4” bolster chisel knock the wedges down until they are approx 6mm (1/4”) lower than the base shoe (ensuring adequate protection between the glass and bolster chisel). Insert the finishing strip into the remaining gap at either side of the glass with the lip facing the outside of the channel, do not stretch the gasket or it will shrink back to its original size after installation (using the sealent smother tool provided). Please ensure there is no moisture/lubricant present on either the glass, channel or finishing strip or it will not stay in position.

description

http://www.elitebalustrade.com/skin/frontend/smuk/default/pdfs/aluminium-channel-fitting-instruction-multi-lingual.pdf

Transcript of Aluminium channel fitting instruction multi lingual

Page 1: Aluminium channel fitting instruction multi lingual

Unit 12 The Sidings Business Park Whalley, Clitheroe

Lancashire United Kingdom

BB7 9SE Tel: +44 1254 825594 Fax: +44 1254 823062

Email: [email protected]

Aluminium Channel Fitting Instructions - SMUK Solutions Limited - 2012

Aluminium Channel Fitting Instructions –English

Place the Base Shoes on the bottom of the glass spaced at approx

250mm centres as shown in the diagram.

Apply a little bit of washing up liquid on the inside of the channel

and on the ribs at the bottom of the base shoes.

Lift the glass into position and with a little pressure from above the

glass should drop into the channel.

Use extra base shoes on the edges of the glass panels to stop any

contact with walls or other glass.

Once in the channel you should be able to move the glass up and

down until in the correct position.

Insert the wedges at either side of the base shoes with the ribs towards

the base shoe.

Using a 4” bolster chisel knock the wedges down until they are approx

6mm (1/4”) lower than the base shoe (ensuring adequate protection

between the glass and bolster chisel).

Insert the finishing strip into the remaining gap at either side of the

glass with the lip facing the outside of the channel, do not stretch the

gasket or it will shrink back to its original size after installation (using

the sealent smother tool provided).

Please ensure there is no moisture/lubricant present on either the

glass, channel or finishing strip or it will not stay in position.