Alternative 1 · 2020. 10. 28. · Alternative 1 Consolidates dedicated Eastbound thru & Eastbound...

2

Transcript of Alternative 1 · 2020. 10. 28. · Alternative 1 Consolidates dedicated Eastbound thru & Eastbound...

Page 1: Alternative 1 · 2020. 10. 28. · Alternative 1 Consolidates dedicated Eastbound thru & Eastbound left turn lanes into a single shared thru / left lane 10-foot median along east
Page 2: Alternative 1 · 2020. 10. 28. · Alternative 1 Consolidates dedicated Eastbound thru & Eastbound left turn lanes into a single shared thru / left lane 10-foot median along east

Alternative 1 Consolidates dedicated Eastbound thru & Eastbound left

turn lanes into a single shared thru / left lane 10-foot median along east leg of MD 410 Maintains parking along east leg of MD 410, including for

apartments on south side Accommodates bicycles, except for Westbound movement

along east leg of MD 410

Crosswalk Lengths Summary Chart Design Scenario

North Leg (MD 650)

South Leg (MD 650)

East Leg (MD 410)

West Leg (Ethan Allen)

Existing 95’ 104’ 120’ 90’ Alternative 1 92’ 89’ 70’ 70’ Alternative 2 90’ 89’ 59’ 64’ Alternative 3 90’ 89’ 61’ 69’

Additional Public Space Gained Design Scenario

East Leg (MD 650)

West Leg (MD 650)

Medians Channelization Islands

Alternative 1 9,765 SF 3,550 SF 3,960 SF 610 SF Alternative 2 10,735 SF 4,300 SF 4,190 SF 1,200 SF Alternative 3 11,825 SF 4,050 SF 4,600 SF 1,200 SF