Alone in Kyoto Consulting Project Evaluation of Improving ......2. Evaluation Objectives, Scope and...

44
Project Evaluation – ICREEC II in Samlout District, Battambang Province – February 2018 – AiKC Consulting 33 Project Evaluation of Improving Child Rights and Enhancing Education for Children Project (ICREEC) in Samlout District, Battambang Province February – March 2018 Report Date: 21st March, 2018 Alone in Kyoto Consulting Contact Details John Fenech [email protected] (AU)+61 404 038 544, (TH) +66 932 853 435

Transcript of Alone in Kyoto Consulting Project Evaluation of Improving ......2. Evaluation Objectives, Scope and...

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 33

    ProjectEvaluationofImprovingChildRightsandEnhancingEducationforChildrenProject(ICREEC)inSamloutDistrict,

    BattambangProvinceFebruary–March2018

    ReportDate:21stMarch,2018

    Alone in Kyoto

    Consulting

    [email protected](AU)+61404038544,(TH)+66932853435

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 2

    i.AcknowledgementsTheevaluationwouldliketothankthefollowingparticipantsintheevaluation:

    o Allteachers,directors,SSCmembers,andparents,fromthetargetschoolswhograciouslymetwiththeevaluatorandgaveupvaluabletimeinordertocontributetheirperceptions,knowledgeandexperiencetotheevaluation.

    o Mostimportantly,allthestudentsfromtheseventargetschoolsvisited;childrenarethefocusofChildFundandKHEN’sworkanditwasaprivilegetospendsomecollectingtheideasandexperiencesfromstudentsinvolvedintheproject.

    o KeyofficialsfromtheDepartmentofEducationwhomadetimetomeettheevaluatorandgaveforthopenandvaluableinsights.TheseincludeMr.HingKimhouern,PrimaryEducationOfficeChief,andMs.MeasPirun,DeputyDirectorofPOE(Primarysector)attheProvincialDepartmentofEducation,aswellasMr.TochVuthy,DirectoroftheDistrictDepartmentofEducationinSamloutDistrict.

    o AllChildFundstaffinbothPhnomPenhandBattambangoffices,whoseadministrative,logisticalandtechnicalsupportwasoutstanding.Staffwereextremelyefficient,interestedinhelping,andgenerouswiththeirtimetosupporttheevaluation.

    o ThestaffatKHENwhodemonstratedanopennessandgenuinedesiretoengagewiththeevaluationinaconstructiveandmeaningfulway.

    Specificmentionofappreciationgoestothefollowingindividuals:FromKHEN:

    o Mr.KhunBunlee:Managing/ExecutiveDirectoro Ms.AnKimsan:ProgramSupportCoordinatoro Ms.SandosMonika:M&EOfficero Mr.HoemNak:ProjectCoordinatoro Mr.HemRoth:ProjectStaff

    FromChildFund:

    o Mr.OumVongnarith:HeadofOperationso Mr.ChanNarin:ProgrammeManagero Mr.SanSothearo:EducationSpecialisto Ms.DyMany:BattambangProvincialManagero Ms.LunSorphea:EducationProjectCoordinatoro Mr.PhengSokheap:SponsorshipCoordinatoro Mr.HuomSarey:Driver/OfficeAssistant

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 3

    TableofContents PageNumberi. Acknowledgements 2ii. ProjectSummary 4iii. Listofacronymsandabbreviations 5iv. ExecutiveSummary 61.Background 72.EvaluationObjectives,ScopeandTimeframe 82.1Objectives 82.2LocationandscopeoftheEvaluation 82.3Timeframe 93.Methodology 103.1Deskreviewofprojectdataandrelevant,externaleducationdata

    10

    3.2Datagathering 103.3Limitationstotheevaluation 133.4EvaluationFramework 134.FieldWorkFindings 145.EvaluationAnalysis 215.1Impact 225.2Effectiveness 225.3Sustainability 235.4Relevance 255.5Efficiency 255.6Qualityofprojectdesign 265.7Integrityoftheprojectdata 265.8Verifiedreportedresults 275.9Humanimpact 275.10AlignmentwiththeCFSframework 276.Recommendations 287.Annexes 33Annex1-DraftFieldworkSchedule 33Annex2-ExampleToolforChildconsultations 33Annex3-EvaluationSteps 34Annex4–Samplequestionnaire 35Annex5–OriginalTermofReference(abridgedversion) 39Annex6–BeneficiaryActivityMap 42

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 4

    ii.ProjectSummaryProjectName ProjectEvaluationofImprovingChildRightsandEnhancing

    EducationforChildrenProject(ICREEC)inSamloutDistrict,BattambangProvince

    StartDate October2014

    CompletionDate September2017(+3-monthcosted-extensionuntilDecember2017)

    TotalFundingUSD294,989.50

    FundingSources EducoDeliveryOrganisation KHEN

    ImplementingPartner(s) MinistryofEducationandSports(MoES)–POE,DOE,and25individualstateandcommunityschools

    Country/Region CambodiaPrimarySector Education

    ProjectGoal That“remote/ruralchildrenandtheircommunitiesintheoutreachareasofSamlout,tovalue,participateinandactivelysupport&advocateforeducationandotherChildRights.”

    NumberofProjectObjectives 5ObjectivesAchieved(asdefined

    bytheproject’sresultsframework

    4Objectives2,3,4&5

    ObjectivesUnachieved Objective1couldnotbecorrectlymeasuredandwasclassifiedas‘undetermined’

    NumberofProjectOutputs/KeyResults

    12

    ProjectOutputs/KeyResultsachieved(asdefinedbytheproject’sresultsframework

    8Results:1.2,2.1,2.2,2.3,3.2,4.1,5.1,5.2

    ProjectOutputs/KeyResultsUnachieved

    3Results1.1,3.1&4.3wereevaluatedasnotachievedrelativetoplannedtargetsResult4.3wasevaluatedas‘undetermined’

    *Furtherdetailscanbefoundinthemainreport

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 5

    iii.ListofacronymsandabbreviationsBwD Boywithadisability

    CC CommuneCouncil

    CCWC CommuneCommitteeforWomenandChildren

    CFEC ChildFund-EducoCambodia

    CFS Child-friendlyschoolframework

    CRV ChildRightsConvention

    DFAT DepartmentofForeignAffairsandTrade

    DoE DistrictOfficeofEducation

    DTMT DistrictTrainingandMonitoringTeam

    FGD FocusGroupDiscussions

    GwD Girlwithadisability

    ICREECII ImprovingChildRights&EnhancingEducationforChildrenProject(ICREEC)PhaseI

    KHEN KhmerNGOforEducation

    KII KeyInformantInterviews

    MoEYS MinistryofEducation,YouthandSports

    POE ProvincialOfficeofEducation

    PTR Pupil-TeacherRatios

    RoGC RoyalGovernmentofCambodia

    SSC SchoolSupportCommittee

    SDP/SIP Schooldevelopmentplan/schoolimprovementplan

    UNICEF UnitedNationsInternationalChildren'sEmergencyFund

    UXO Landmine/UXOs(UnexplodedOrdnance)

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 6

    iv.ExecutiveSummaryTheEducationMinistry’s2016Mid-termreviewstatesthat“eventhoughaccesstoprimaryschoolisrelativelyhigh,childrenarenotlearningsufficiently”,andthisisagoodreflectionofthestateoftheschoolsinSamloutDistrictandthosesupportedthroughthisproject.Theprojecthasbenefittedschoolsandchildreninmultipleways,mostnoticeablyimprovedaccessandchildrenareattendingschool.WhenKHEN’sstartedworkinginSamloutwhentherewereeithernoschoolsinexistence,orverybasiccommunity-runschoolsandthestartinglevelofeducationqualitywasverylow.Theprojectmodeltargetsthoseareasthatareremote,isolatedandun-serviced,andinthiscontext,theachievementsofeasieraccesstoschoolingandbetterresourcesarecommendable.Therearealsomanyexamplesofgoodeducatorperformanceinschools,orappropriateandchild-friendlylearningenvironments.However,theoveralleducationqualityavailableinthetargetschools(materials,teachingcompetency,managementquality,anddurability)isweak.Thelinksbetweenschoolsandcommunitiescouldbestrongerandmoremeaningful,especiallyinthestateschools.AndtheevidencesuggestsachildwillnotreceiveaneducationofthestandarddesiredbyRoGCstandards,andtheirlearningoutcomeswillbeweak.

    MajorAchievementsoftheProject KeyStrengthsoftheProject5%increaseinstudentsinstateschools Enrolmentcampaignactivitiesarestrongandincreasing

    schoolaccess,especiallyforgirls20%increaseinstudentsincommunityschools GoodexampleofWASHhardwareinschools10%ininthenumberofgirlsinstateschools Childrightsawarenessraisinghasbeeneffectivein

    strengtheningchildprotectioninschools/communities27%increaseinthenumberofgirlsincommunityschools

    Relationshipsbetweenparents/communitiesand‘Communityschools’ispositiveexample

    7of11‘CommunityschoolsformallytransferredtoPOE/DOE–verybigachievement

    Relationshipwithgovernmentthattranslateintogovernmenttakingownershipofcommunityschools

    Enrolmentcampaignscompletedeveryyear Projectmodeltargetsthoseareasthatareremote,isolatedandun-serviced-verycommendable

    100%ofKidsfeelsafeintheirschools Theprojectwasanalysedinfivemajorareas-impact,sustainabilityrelevance,effectiveness,andefficiency-usingasimpletrafficlightsystem,theresultsaresummarisedbelow:

    Effectiveness-Satisfactoryperformance(borderline) Efficiency-AcceptableperformanceImpact-Acceptableperformance Sustainability-AcceptablePerformance(borderline)Relevance-Satisfactoryperformance

    ICREECIIhascontinuedinvestmentin25ruralschoolsandhasbeenabletograduallyimprovethematerialconditions,whilstalsoundertakingattemptsatstrengtheningandreformingteaching,schoolmanagementandcommunityrelations.Duringthisperiod,therehasbeensignificantreformandadvancementintheeducationsectors,whichhighlightsomeofthedeficienciesintheKHENmodel,butalsotheopportunitiesforthemexploreinordertogrowasaneducation-focusedNGO.Theseadvancementsmakeupthebulkoftheevaluation’srecommendationsforfutureeducation-focusedprojectwork,andareasfollows:

    1. Foreducationprojects,shiftthefocusonlearningoutcomesforkids,ratherthanmaterialsgains2. KHENtogainmoreeducationtechnicalexpertiseifitwantstogrowasaneducation-focusedNGO

    (kookatorgssuchasSeeBeyondBorderssuccessfulfortechnicalhelp)3. Increaseandtargetinvestmentinpre-primaryandGrades1-3.4. Avoidcascadetrainingmodelsandshifttoamodelbuiltaroundregularsupport,mentoring,

    progressiveandintervaled,andin-service.5. Increaseengagementandsupportfromprojectstakeholders,andmanagementandmaintenanceof

    results,inordertoimprovesustainability.6. Investinqualitysolutions/activities,evenifmeansfewertargetschools/beneficiaries-Qualityover

    Quantity!7. Trytonarrowthatgapbetweenstrong,durableresultsandweak,fragileresults–improvethe

    consistencyofresultsbetweenlocationandcontexts

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 7

    1.BackgroundChildFundCambodiaistherepresentativeofficeofChildFundAustralia–anindependentandnon-religiousinternationaldevelopmentorganizationthatworkstoreducepovertyforchildreninthedevelopingworld.ChildFundCambodia’scommunitydevelopmentprogramsareintheareasofchildprotectionandresilience,qualityeducation,sustainablelivelihoods,improvedlocalgovernance,andyouthempowerment.ChildFundinCambodiaimplementsarangeofprogramsincollaborationwithlocalcivilsocietyorganizations,andinpartnershipwiththerelevantministriesandgovernmentdepartments,intheruralprovincesofSvayRieng,KratiéandBattambang,aswellasPhnomPenh,andfocusesonworkingwiththevulnerable,excludedormarginalizedsectionsofsociety.SpanishNGOEDUCOisaglobaldevelopmentagencywithover25years’experienceinchildrights,particularlytherighttoequitableandqualityeducation.EducodeliversprojectsthatsocialjusticeanddevelopmentprojectsinSpain,Africa,AmericaandAsia,withareachofmorethan550,000childrenand150,000adultsinpromotingjustandequitablesocietiesthatguaranteetheirrightsandwellbeing.Educoenvisagesaworldwhereallchildrenfullyenjoytheirrightsandleadalifeofdignity.EducoisamemberoftheChildFundAlliance,oneoftheforemostinternationalnetworksofNGOSworkinginfavourofchildprotectiononfivecontinents.AmanagementtransferoccurredinJuly2017inwhichEDUCOandChildFundCambodiamergedandinJuly2017andbecameajointentityknownasChildFund-EducoCambodia.TheImprovingChildRightsandEnhancingEducationforChildrenProject(ICREEC)PhaseII,implementedbylocalpartnerKHEN(KhmerNGOforEducation),wasanexistingprojectoriginallystartedbyEducowhilstitwasworkinginBattambangProvinceasanindividualdevelopmententity.KHENisalocalNGOandcertifiedChildSafeOrganisationbasedinBattambangProvince.Theyhaveafocusonchildrights,accessible,inclusive&qualityeducationandchildprotection.Theireducationprojectsfocusonruralandremoteareaswheresignificantbarrierstochildeducationexist.ICREECIIoperatedacross4communesinSamloutDistrict,whichisapproximately100kmfromBattambangTown.SamloutwasaformerKhmerRougestrongholdandstillhaslargeareasoflandcontaminatedbylandmine/UXOs(UnexplodedOrdnance).Accesstobasic(letalonequality)educationislimitedinSamlout,withdistancestoschools,resourceshortages,andweakeducatortrainingandcapacity,allnegativelyimpactingtheeducationsystem.SamloutDistrictDepartmentofEducation(DoE)hasexperiencedresourcesandskillsshortagesovertheyears,whichhasfurtherisolatedtheschoolsinthearea.AdultliteracyinSamloutislow,especiallyamongstolderparents(whoseowneducationwasimpactedthelengthofKhmerRougecontrolinthearea)andthishasaddedanotherbarriertoimprovedschoolinginthearea.ICREECIIcommencedin2014,andaimedtocontinuesupportingandbuilduponthegainsmadeinaPhase11,in25schools(state’schoolsandcommunity/annex’2schools).Theproject’sgoalwasthat“remote/ruralchildrenandtheircommunitiesintheoutreachareasofSamlout,tovalue,participateinandactivelysupport&advocateforeducationandotherChildRights.”Itsobjectivesfocusedonincreasingschoolaccessandattendance,improvingteacherqualityandschoolmanagement,andstrengtheningtheunderstandingandapplicationofchildrightswithinschoolsandcommunities.ItwasduetoconcludeinSeptember2017butundertookathree-monthno-cost-extension,inlargepartduetoimplementationdelaysresultingfromtheEduco-ChildFundmergerandthesupportuncertaintythiscreatedforatime.

    1ICREECIIisanextensionofaPhase1Project,whichfinishedsometimein2014.Thisearlierversionhadsimilarfocusareasinfrastructure,teacherquality,school-communityrelations,andchildrights.PhaseIcommencedin1stOctober2012andfinishedSeptember2014(twoyears).2 Schoolsnotyetrecognizedandinthegovernmentsystemandunderthemanagementofanearbystateschool

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 8

    2.EvaluationObjectives,ScopeandTimeframe2.1ObjectivesTheevaluation’saimwastoconductapostevaluationoftheICREECPhaseIIandtoproduceareportreflectingontheimpactandresultsthatwereachievedintheproject,aswellasidentifyingtheeffectivenessofitsimplementation,risksandchallenges,potentiallessonslearned,andfinallytoputforthrecommendationsandsuggestedsolutionsforsimilarfutureinterventions.TheTermsofReferenceareincludedasAnnex5inthisreport,butinshort,themainareasofinvestigationwereasfollows:Impact

    • Identifyandanalyseanysignificantchangetheprojecthasbroughttodisadvantagedchildren.• Assesstheextentofoverallprogresstowardstheintendedimpactoftheproject(assetoutinthe

    projectobjectives)• Provideevidenceofchangeandimpactatapersonallevelthroughsuccessstories(shortcase

    studies)aboutindividualsinvolvedintheproject.Effectiveness

    • Identifyforeachexpectedoutcomeandoutput(result)whathasbeenaccomplishedinrelationtowhathasbeenstatedintheprojectdocument,logicalframeworkandKHENprogrammeplan.

    • Hasthemonitoringandresultsbasedmanagementsystem(includingM&EandMEALFramework)contributedtotheeffectivenessoftheproject?Haveprojectstafflearnedfromtheirexperiencesandimprovedtheprojectandtheirpracticeasaresult?

    • Determinetheincreaseinthenumberofdisadvantagedchildrengettingaccesstoinclusiveeducationbecauseoftheproject.

    • DescribethequalityoflearningenvironmentsandwhethertheyreachMoEYSstandards.• Identifyanystrategiesthathaveprovenparticularlyeffectiveforachievingtheoutcomes.• Describehowtheviewsofchildrenweretakenintoaccountatthedifferentlevelsoftheproject

    cycleandnoteanyspecificexamplesofusefulinputSustainability

    • Assessthesustainabilityoftheresultsoftheinclusiveeducationwork,including:o whichresultsaremostlikelytobesustained?o whichresultsarethemostfragile?o Whichmajorfactors(ifany)arecontributingto,orhindering,sustainability?

    • Describeinwhatwaysandtowhatextenttheinclusiveeducationprojecthasincreasedtheaccountabilityandcapacityofparents,governmentbodiesandtheschoolcommunity.

    • Describeandprovideexamplesasevidenceofthelevelsofownershipandinvolvementofdifferentgovernmentbodiesatdifferentlevels,andotherkeystakeholders.

    Relevance

    • Assesstowhatextenttheprojecthasreacheddisadvantagedchildrenandthemostusefulstrategies,

    • AssesstherelevanceoftheprojecttothecontextandchildrightssituationinCambodia.• AssesstherelevanceoftheprojecttotheKHENstrategies.

    Efficiency

    • Assesshowefficientlyprojectresourceshavebeenused.• ThecooperationandlearningamongpartnersandwithinKHEN.

    2.2LocationandscopeoftheEvaluationTheanalysiswillfocusonthegeographiclocationof4communesinSamloutDistrict,BattambangProvince,Cambodia.Theprojectareacoversagroupingof20villages,withapopulationofjustover18,000people(seeTable1below)

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 9

    Table1.TargetCommunesandassociatedvillages

    Thefocustargetgroupwasthe25schoolssupportedintheproject,including14official‘state’schoolsand11‘community/annex’schools,whicharedefinedasschoolsnotyetrecognizedbygovernmentasaformalstateschool,butwhichareunderthesupervisionofanearbystateschool.Thesecommunity/annexschoolsaresemi-formal,remoteandoperateinisolated,ruralareas,andwherethelocalchildrenhavereducedaccesstostateschoolsduetothedistancesanddifficultyoftravel.Theywereeitherinitiatedbycommunities,and/orbyKHEN.Theyoperatewithminimalgovernmentfinancialormaterialsupport,butdoreceiveoversightandsomesupportfromastateschoolthattheyare‘annexed’too.WiththesupportoforganisationslikeKHEN,thecommunityschoolsaimtostrengthenandimprovetoapointwheretheirlevelofinfrastructureandteachingqualityisgoodenoughtobeofficiallyrecognisedasastateschool.

    Table2.TargetSchoolstudentdataasof2014Baseline.

    Table3.TargetSchoolstudentdataasof2017Endline.4

    2.3TimeframeTheevaluationresearch,dataconsolidationandreportingoccurredoveraperiodof13dayscommencingonFebruary16thandfinishingonMarch1,2018.TheImplementationPlanwasasfollows:

    3Thedistricthas31registeredvillages,20ofwhicharereachedviathisproject.4Asummaryofthechangesinstudentnumbersofthedurationoftheprojectisincludedinthefindingssection.

    Communes Villages TotalPopulation FemalePopulation%%

    Sanh 3villages 5,054 2,556KampongL’pov 8villages 7,296 3,735

    TaToak 6villages 3,013 1,456

    Sung 3villages 2,830 1,401 20villages3 18,193 9,148

    StateSchools

    TotalStudentNumbers TotalFemales Totalgirlswithadisability Totalboyswithadisability

    2,088(1101M-53%) 987(47%) 31(1%) 41(2%)CommunitySchools

    TotalStudentNumbers TotalFemales Totalgirlswithadisability Totalboyswithadisability

    444(247M-56%) 197(44%) 5(1%) 18(4%)

    StateSchools

    TotalStudentNumbers TotalFemales Totalgirlswithadisability Totalboyswithadisability

    2,157(1060M-49%) 1,097(51%) 76(4%) 86(4%)CommunitySchools

    TotalStudentNumbers TotalFemales Totalgirlswithadisability Totalboyswithadisability

    557(286M-51%) 271(49%) 11(2%) 24(4%)

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 10

    Table4.AssignmentImplementationPlan

    3.Methodology3.1Deskreviewofprojectdataandrelevant,externaleducationdataKHENProjectdatawascollectedandreviewedpriortothefieldresearch,includingallavailabledesigndocuments,baselineandendlinedata,regularmonitoringreports,andotherreportingmechanismssuchasPowerPointresultssummaries,andindividualcasestudies.Thishelpedprovideabroadoverviewoftheproject’sintentandreportedresults,anditalsoallowedtheconsultanttocreateaconsolidateddatasummarythatwillbeusedandreferencedthroughoutthisreport(thesummarysheetisanaccompanyingdocumenttothisreport,titled‘EvaluationMaster’).ItshouldbenotedthatanumberofKHEN’sdatacollectiontoolswere,understandably,onlyinKhmerandtherewasinsufficienttimewithintheconsultancyorwithinKHENtohavethesetranslatedforreview.Andimportantpointtonote,itwasnotpossibletoconductanydatareviewofstudenttestscoresintheschoolsasthisinformationwasa:notavailableinanymeaningfulwayinschools(thiswillbediscussedmoreinthefindingssection,andb:notbeingcollectedbyKHEN.Although,testscoresinthemselveswerenotpartoftheproject’sevaluation/resultsframework,itwouldhavebeenaveryvaluablepieceofdatatohaveforthisreviewinordertotryandcorrelatetheproject’sinvestmentwithanincreaseinstudentperformance.Otherpertinentinformationreviewedinordertoinformthisanalysisinclude:• MinistryofEducationYouthandSportMid-TermReviewReportin2016oftheEducationStrategicPlan

    2014-2018andProjectionto2020(2016).• TheSeeBeyondBorder“AnAssessmentofEarlyGradeTeachingQualityinCambodia”Report(2016).• RoGC&UNICEF’sJointEvaluationofChild-FriendlySchoolPolicyImplementationinCambodia(2016)

    3.2DatagatheringAmixofqualitativeandquantitativeresearchmethodswereusedtocollectdata,butallofwhichinvolvedinterviewingsixkeygroups:1.Students 2.Teachers 3.Directors 4.SSCmembers 5.Parents 6.POE/DOEstaffAdesiredinterviewschedulewasagreedinadvancebetweentheconsultant,KHENandChildFundCambodia(includedasAnnex2),butultimately,thefinalarrangementswereleftuptoChildFundandKHEN.Theplaninplacewastoalternatebetweencommunityschoolinthemorningandstateschoolintheafternoon,andconductinterviews/groupdiscussionswithasmanyofgroups1-5aspossible.SeparateindividualsessionswereorganisedwithPOE/DOEattheirrespectiveoffices.Afullscheduleofintervieweesaspertheplanwasnotpossibleintheendduetoamixofinterviewsrunningovertime,certaingroupsrepresentativenotshowingup,andtheneedtoprioritisecertaingroupsoverothersduetothetoneoftheresearch.Asummaryoftheinterviewsinthetablesbellows:

    # Deliverables/Outputs Days

    February/March

    16

    17-18

    19

    20

    21

    22

    23

    24-25

    26

    27

    28

    1

    1. Deskreviewanddevelopingtheframeworkfortheevaluation

    2

    2. Districtvisittogathertoconductfieldresearchwithschools,POE/DOE,parents,CCsandKHENpartnerorganisation

    5

    Dataconsolidationandanalysis 1

    3. InitialdraftreportingatProvincialLevel 1 4. FinalReportsubmission,including

    presentationoffindingsinPhnomPenh3

    12

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 11

    Table5.EvaluationSchedulebydayandtype

    Total M F

    Director 6 4 2

    Teachers 16 3 13

    Students 37 18 19

    SSCmembers 3 2 1

    Parents 5 0 5

    POE/DOE 3 2 1

    Table6.EvaluationParticipantNumberbySchool5

    Table7.EvaluationSchedulebydayandtype Monday Tuesday Wednesday Thursday Friday

    AM KHENOffices PhnomRussyCommunity/AnnexSchool

    PhumKandalCommunity/AnnexSchool

    KHENoffices OuDermchiekCommunity/AnnexSchool

    KHENStaffMeeting

    Children(18pax)-Games

    Teachers(2pax-1xstate,1xcontract)-FGD

    KHENM&EOffice,ProgramSupportstaff,andDirector

    SSCmembers(2xpax)-FGD

    Teachers(3pax-1xstate,2xcontract)-FGD

    Parents(3pax)-FGD

    Parents(2pax-FGD

    Director-KII Director-KII Director-KII

    Classroomobservation(1hr)

    Classroomobservation(30min)

    Teacher(1pax)-KII

    PM DounTroetStateSchool

    AksorTeStateSchool

    POEOffice OuNoNorngStateSchool

    SungIIStateSchool

    Director-KII Children(6pax)-Games

    POE-DirectorandDeputy-KII

    ContractTeacher-(1pax)-KII

    Children(2pax)-FGD

    Children(11pax)-Games

    -Classroomobservation(1hr)

    Director-KII Teachers(3pax)-FGD

    Teachers(3pax-1xstate,2xcontract)-FGD

    SSCMember(1pax)-KII

    DOE-DirectorSamloutDistrict-KII

    Stateteachers(2pax)-FGD

    Libraryandclassroomobservation

    Director-KII

    5Notethatasthisdocumentmayendupinthepublicsphere,intervieweenameshavebeenwithheldforconfidentiallyreasons.

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 12

    InterviewsandQuestionnaires:Foradultinterviewees,individualKeyInformantInterviews(KII)andFocusGroupDiscussions(FGD),methodswereused,butbasedonbroad,individualisedquestionnairesthatwaspreparedforeachgroupandadministeredbythebytheconsultantteam6Thequestionnairesweredevelopedforeachgroupandconsistedofmultiplechoiceanswerswithfree-responsesectionforfurtherdetail;thisallowedforusefulinformationnotcapturedinthequestionset,orperhapsnotnecessarilyaprojectfocusandusefulinotherareassuchascross-cuttingissues,tobegathered.Thequestionnairesweredevelopedbasedontheproject’sdesignandthereportedinvolvementofeachgroupincertainactivities;meaningcertainquestionswereincludedtocheckif,andtowhatdegree,peoplewereinvolvedinprojectactivitiesasdescribedbytheprojectdocuments.Numerousquestionswerereplicatedacrossgroupingsinordertotriangulateinformationandalsoexploredifferentperspectives.Thequestionnairesweredesignedwithamaximumnumberofquestionsbutalsowithflexibilitytogooffscriptandfollowtheinterviewlineofenquiry,ifthesituationdemanded.So,multiplequestionsintheendwerenotused,butotherusefulinformationwasgatheredregardless.Gamesandcreativeactivities:Forchildreninterviewees,game-anddrawing-basedexerciseswereprimarilyused(basedontheprincipalsandfoundationsofchild-andyouth-participationtheory)7foryoungergradesandlargergroupsofchildren.Groupdiscussionwerealsousedwithsmallergroupsofthreechildrenorless(thisonlyhappenedonetime).Aseriesofquestionswereaskedusinggames,drawingandgroupworktools,forexamplethisquestiondesignedtoinvestigateissuesofschoolaccessandattendance:Question:Thelasttimeyoumissedschool,whatwasthereason?Activity:Childrenaskedtoplaceastickeronacorrespondingpicturethatillustratesavarietyofcommonissueschildrenwouldfacewithschoolaccessibility.ThetoolswerecreateddesignedtocheckthevoracityofprojectclaimsaswellasgiveinsightsintocriticalissuesthatChildFundandKHENwouldneedtobeawareof,forexample,issuesofsafety,orpoorteacherperformance.8Forthemostpartthesegamesandactivitiesworkedwellandyieldedveryusefulinformation,buttheconsultantdidnotethat,especiallyinthecommunityschools,childrenarenotthatfamiliarwithbeingaskedtoexpressthemselvesdirectlyinacreativewayandtherewereobviousexamplesofchildrendeferringtheiranswertoanotherchild’sanswerasthechildrengotupandengagedwiththeactivity.Forthemostpartthiswasvisibleandmanageable,butitanareaforimprovementwiththesetechniques.Duetotimeconstraints,thetoolswerenotproperlyfieldtestedbeforeuseandthisisnotedbelowin‘limitations’.DirectObservation:thiswasusedtoassessthestateoftheschools,student-teacherrelationship,andtosomeextent,community-schoolrelationship.TheConsultancyteamconducted3classroomobservations,rangingindurationfrom30minutestooveronehours,andwithgrades1,4and5,aswellasgeneralobservationoftheschoolgrounds,director’soffices,unused/emptyclassrooms,playgroundandWASHfacilities.ThebasisoftheobservationwasMoEYS’‘MonitoringandEvaluationChecklistClassroomObservation(forBasicEducation)’.Thisfour-pagechecklistcoversoff58keyindicatorsthatassessalignmentwiththeNationalChild-friendlySchoolsFramework.Thechecklistwasusedasroughguideforreviewingthedynamicsandbehaviourswithintheclassroom,aswellasthegeneralstateoftheschool.However,thechecklistswerenot‘completed’infull,ascertainindicatorscouldnotbetestedwithinthetime,andthetoolitselfrequiresfullcompletionbeforea‘score’canbeproduced.Hence,thechecklistsarenotincorporatedinthedatacollectionofthisreport,buttheinsightsfromtheclassroomobservationsarereferredtolateron.

    6Notethatanexternal,independenttranslatorwasonhandtoperformtranslation.Inaddition,ChildFundstaffmember,Mr.PhengSokheap(SponsorshipCoordinator),whowasassignedtomanagelogisticsfortheevaluation,alsoconductedinterviewsandadministeredthequestionnaire,afterhavingbeeninductedinitsuse.7Basedon‘UnderstandingandEnablingChildandYouthParticipation’,ChildFundAustraliaandUniversityofMelbourne,20168 AsampleofthetoolsisincludedinthisreportasAnnex2–thefulllistisavailablewiththefinalreportpackagehandedovertoChildFund.

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 13

    3.3LimitationstotheevaluationThefollowinglimitationsneedtobeconsideredininterpretingthefindingsoftheevaluation.Theevaluationwasrestrictedtovisitingalimitednumberofschools–7or25(28%)–andafractionoftheteachersinvolved–16of119(13%).Also,onlyfiveparentswereconsultedduetotimeandnon-appearance,whichimpactedtheabilityoftheconsultancytoassessandanalyseschool-communityrelations.Inaddition,thereweretimeconstraintsacrosseverysessionmeaningthatanswersoftenhadtobeacceptedatfacevalue,ratherthanverifiedfurtherthroughsecondaryquestionsinordertoensurenoconfusionormisinterpretation.Thegame-basedresearchwithchildrennotedanareaofweaknessinthatsomechildren,especiallyinthecommunityschools,seemedalittleunsurehowtorespondtobeingaskedtoexpressthemselvessodirectlyinacreativeway.Forthemostpartthiswasvisibleandmanageable,butisanareaforimprovementwiththesetechniques.Duetotimeconstraints,atestingprocesswasnotundertakentoassesstheworkabilityofthetoolswithintheCambodiancontext.Similarly,notimewasavailableforfieldtestingthequestionnairesandtheinterviewteamneededtobeflexiblewiththedatagatheringasaresult.3.4EvaluationFramework9Theevaluationframeworkhasmultipleparts,butatitscoreistheneedtoaddressthekeyevaluationquestionposedbyChildFund(aspertheToR),aswellasinvestigatinganddocumentingtowhatextenttheprojecthasincreasedparticipationinschoolingbychildren,increasedcommunitysupportforeducation,andfinally,improvedlearningoutcomesforstudents.Thebasicevaluationmatrixwillbetoconsolidateandgroupthedatagatheredthroughthefivekeyevaluationareasasdefinedearlier(Impact,sustainabilityrelevance,effectiveness,andefficiency),andthenprovideabroadanalysisforeachofthesesections,aswellasansweringthedifferentquestionsposedineacharea.Thebroadanalysiswillbeintheformofanoverall‘quality’assessment,withadescriptionoftheanalysis(forexamplehighlightingkeyopportunitiesandchallenges),aswellasaclear‘measurement’.Foreaseofuse,toCFEC,KHENandanyotherreader,asimpletrafficlightsystemwillbeemployedtoprovideasassessment‘measurement’.Anexampleofhowthiswilllookisprovidedbelow.Greenforsatisfactoryperformance-(withstrengthshighlightedaswellanyareasforrefinement)

    Yellowforacceptableperformance-butneedingimprovementinhighlightedareas

    Redforconcerningperformance-inneedofsignificantimprovementinhighlightedareas

    Evidencewillbeprovidedforeachassessment,andthesub-questionsposedwithin,willbeanswered.Furthermore,thefollowingareaswillalsobereviewedandashortanalysisforeachprovided:

    o Qualityoftheprojectdesigno Qualityoftheprojectdatao Verifyreportedresultsagainstplannedresults-throughfieldresearchcheckandtestthevoracityof

    theresultsreportedo Evidenceoftheproject’simpactonpeople/children-capturesthehumandimensionand

    particularlytheviewpointandexperienceofchildreninvolved–totelltheirstoryandusethatasapointofreflectionontheoverallsuccess,ornot,oftheproject.

    o Theproject’sresultsandsuccessmeasuredagainsttheCambodianGovernment’sChild-friendlyschoolframework(CFS).

    9Asummaryoftheevaluation‘steps’isincludedasAnnex4

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 14

    4.FieldWorkFindingsTheEducationMinistry’s2016Mid-termreviewofitsstrategicplanstatesthat“eventhoughaccesstoprimaryschoolisrelativelyhigh,childrenarenotlearningsufficiently”10,andthisisagoodreflectionofthestateoftheschoolsinSamloutDistrictandthosesupportedthroughthisproject.Theprojecthasbenefittedschoolsandchildreninmultipleways,mostnoticeablyimprovedaccess;thatischildrenareattendingschool,whichisundoubtedlybeneficialinmultipleways.Itisverypossiblethatmanychildrenwouldsimplynotgotoschoolatallifthesefacilitieswerenotthere.Furthermore,KHENasagrassrootsNGO,isoperatinginremote,tryingconditions,incommunitieswhereeducationisnotprovidedorignoredbygovernment,andwitharelativelysmallpooloffinancialandhumanresources.Thelogicoftheirprojectmodelaimsforgradualimprovementsineducationquality–stepbystep–andKHEN’sstartedworkinginSamloutwhentherewereeithernoschoolsinexistence,orverybasiccommunity-runschools(e.g.runoutofaprivatehome),andhencethestartinglevelofeducationqualitywasverylow.Inthiscontext,theachievementsofeasieraccesstoschoolingandbetterresourcesarecommendable.Therearemanyindividualexamplesofeducatorgoodperformanceorattitudesinschools,orappropriatelearningenvironments,andthusthereexistsafoundationuponwhichfutureactivitiescanbeundertakentofurtherimprovetheeducationprospectsofchildren.However,asanindependentreviewoftheeducationqualityavailableinthetargetschools,thisassessmentfindsthequalitytobeatanunsatisfactorylevel.Keyareassuchasmaterials,teachingcompetency,managementquality,andoveralldurabilityoftheschools,areweakandinneedtostrengthening.Andultimately,theevidencesuggestsachildwillnotreceiveaneducationofthestandarddesiredbyRoGCstandards,andtheirlearningoutcomeswillbeweak.Aquicksummaryoftheproject’smajorstrengthsandweaknessislistedbelow,andwillbefurtherdiscussedinthefindingssection.

    Table8.ICREECMajorstrengthsandweaknessessummaryStrengths WeaknessesKidsfeelsafeinschools–andstrongawarenessofchildrightsincommunities

    Thedurabilityofresults(e.g.materialmaintenance,applyingtraining)isquestionable

    Communityschoolsarebenefittingkidsandbetterownershipinthose–SSCseemmoreactive

    Inconsistentstatebetweenschools,andbetweencommunityandstateschools

    Schoolsarebeingaccessed–kidsareenrolledandattendingschools

    Thetechnicalapproachtoimprovingeducationinschools–projectisreliantonPoEcascadetrainingwithlittlefollowuptoimproveeducatorcompetencyinbasicssuchasclassroompractice,curriculumimplementation,studentassessment,etc.

    Evidenceofallprojectactivitieshavingbeenimplemented

    Basicchildsafetyinschools–preventingchildinjuriesatschool

    Manyindividualexamplesofgoodeducatorbehaviours

    Overallqualityofteachingislow,highlightedinparticularbythedysfunctionalstudentassessmentpractices

    GoodexamplesofWASHinschools–primarilyhardwarebutaofgoodhandwashingbehaviourstoo

    Educatormotivation/discipline(causeandeffectofotherissues)

    KHENhasgoodpresenceinschoolsandstrongrelationships

    Studentparticipationinschoolsissubmissiveandstudent-teacherrelationshipsveryhierarchical

    7of11Communityschoolstransferredtostatemanagement-greatachievement

    Highriskofunsustainability/ongoingweaknesswithcommunityschoolsgivenqualityofDOEintheDistrict

    10MoEYSMid-TermReviewReportin2016oftheEducationStrategicPlan2014-2018andProjectionto2020(2016),pp.7.

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 15

    Akeyobjectiveoftheprojects(Objective1)wastoimproveaccesstoschoolsforruralchildren.Throughacombinationofdirectobservation,reviewingtheofficialattendancelists(whichareadmittedly,notreliablyorcorrectlyused),andthroughspeakingtochildrenaswell,theconsultancycanverifythataccessandattendance,forthemostpart,seemtobestronginthetargetgroupofschools.Verysimply,therearemorechildreninschoolnowthanatthestartoftheproject,particularlyinthecommunityannexschools.11

    Impressively,therehasbeenasignificantincreaseinthenumberofgirlsenrolledinbothschools(seeStatBox.1).Thefiguresalsorevealmorechildrenwithadisabilityareenrolled,butitcan’tbedeterminedifthisisanactualincreaseormoreidentificationofchildrenwithadisability.Eitherwayimprovedunderstandingoftheissueishelpful.75%ofteachersand100%ofdirectorsinterviewedstatedtheywereinvolvedintheenrolmentcampaignsatthestartoftheyear,andsothereisasolidsystemforenrollingruralchildreninschool,andgoodcommitmentfromeducators(directorsandteachers)tothatprocess.ItshouldalsobenotedthatKHEN’ssupportforcommunityschoolscommencedinthePhase1/pilotofthis

    projectandthisincludedtargetedenrolmentofruralchildrenoutofschool.

    Onthedownside,83%ofteachersstatedthattheenrolmentactivitiesDONOTspecificallytargetchildrenthataremorevulnerabletomissingschool,suchastheveryremoteorverypoor,andthatenrolmentprocessesonlyfocuson‘eligible’children,definedasthosereachingtherightagebrackets.12Regularattendanceisanotherissue.Thiswasalsopartoftheproject’sresultsframeworkbuttheevaluationidentifiedanobviousgapbetween‘official’reportedresults,andavisiblereality.Teachersarekeepingrecords,albeitincorrectly(seephoto1).Theyfollowuponstudentsthatrepeatedlymissschoolbutthemostcommonresponsetothisistoeithertosendalettertotheparents,orrecordtheabsenteeisminthe

    student’s‘RecordBook’andagainsendthistotheparents(seeGraph1).Theteacher’sattendancelistsgenerallypresentapositivepictureofattendance,andindeedthechildreninterviewedindicatedthatasstudentstheydon’twanttomissschoolanddosoonlyforvalidreasonssuchasbeingsick(48%)orhavingtohelpfamily(24%).But47%ofchildrenalsoknowachildintheirvillageNOTcomingtoschool,meaningthattherearestillissuesofaccessforsomechildren,andthatschoolstaffareratherpassiveintheirresponsetothis,whichisanareaforfutureimprovement.Positively,thereislittleevidenceofsignificantout-of-pocketexpensesbeingincurredby

    11Theenrolmentdatapresentedearlierinsection2.2123-5forpre-primary,and6+forprimary

    5%increaseinstudentsinstateschools20%increaseinstudentsincommunityschools10%ininthenumberofgirlsinstateschools27%increaseinthenumberofgirlsincommunityschoolsEnrolmentcampaignsdoneeachyear

    StatBox.1

    Photo1:Onlyabsentstudentsaremarkeddown-anincorrectprocess-butpositivelytheyarefollowinguponstudentsmissingrepeatedly,asindicatedbythehighlightedline.

    Sendparentbook,40%

    TellDirector,5%

    TellSSC,5%

    Callparents,35%

    Askotherkidsforinfo,

    15%

    Graph1:Responsetorepeatedstudentabsence(Teachers)

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 16

    families,orteachersconductingexcessiveprivatelessons,andmostschools13areopenforbothAM/PMshifts;meaningthatsomecommonaccessbarriersarenotmajorconcernsintheprojectarea.Pre-primarywasonlyavailableinonestateschoolvisited(andalsoinacommunity-runpre-school),likelyindicatingthatkindergarten-agedchildrenaremoredisadvantagedintermsofaccess.Itwasnotpossibletoobtaindataontheactualnumberofkindergarten-agedchildreninthedistrict,butundoubtedlythelackofpre-primaryeducationopportunitiesisaconcern,butalsoanopportunityforfutureactivities.Classroomobservationsbytheconsultancyrevealedthatboththestateandcommunityschoolsoperateinaverytraditionalwayinthatteachersarethedominantforceintheroomandthereisverylittle,meaningfulengagementfromstudents.Teachingmostlyconsisted(asperobservations)offollowingthecurriculumguides,alotofcontentrepetitioneitherontheboardsorinstudentbooks,andaskingstudentstoreadthesectionsfromtheirtextbooks.Thereappearedtobeverylittleopportunityforindependent,self-learning,forstudent’squestionsandsubsequentdiscussion,norforstudentsinputintotheclasses.Only2out6(pre-primarynotincluded),hadanactivechildren’scouncilorchildren’sclub(therewasconfusionaboutthedifferencebetweenthetwo).Twoschoolsstatedthatthechildren’scouncilhadnotbeenrenewedinthenewschoolyearastheyhadconsistedfullyofgrade6students,whohadallgraduatedandlefttheschool.AnotherschoolmentionedthattheyreliedonKHENtofacilitatethisandwiththeproject’sendthecouncilstoppedbeingactive.Astowhatthechildren’scouncildo,teachersanddirectorscouldonlynamethreethings:discusschildrights,learnabouthygiene,organiseclean-upactivitiesinschool.Therewasverylittleevidencethatthecouncil’sthemselvesplayameaningfulroleindecisionsabouttheschoolmanagement,orprovideachild’sperspectiveintoschoolmanagement.Children’sthoughtsandfeelingsabouttheirschoolarenotonlyimportanttoacknowledgeandrespect,butalsoextremelyinsightfulandthususefulforschoolmanagement.Graph2illustratesthewiderangeofinsightstheyhaveabouttheschoolexperience.Thegeneraldismissalofstudentparticipationinschoolmanagementisamissedopportunitybytheschools.ForKHEN,itwouldbebeneficialtoreviewtheirapproachtochildren’sclubsandadoptamorechild-centredmodelthatvalueschildren’sinputandamodelthathasclearlinkstoharnessingtheirknowledgeforschoolmanagement.Pupil-TeacherRatio(PTR)wasapositiveelementinalltheschoolsvisited.Noclassobservedlookedtobesurpassinga1:25(officialpolicy)figure.Thecommunityschools,whicharebynaturesmaller,generallyhadaPTRrangingfrom1:4/5upto1:15.Thestateschoolsthatarelargerandservicesignificantlymorechildren,didhaveclasseswithPTRsofaroundthe1:25,butonthewhole,thisdidnotseemanareaofconcern,andifanything.MostschoolswereabletospreadafullsetofgradesacrossAM/PMshifts,andnothavedoubleup,eveninthecommunityschoolswhereindividualclasssizeswereverysmall.Andonlyonschoolwasutilisingmulti-gradeteaching–acombinedgrade4and5class–whichaccordingtotheteacherwasduetotherebeingaverysmallnumberofG4studentsenrolledintheschool.SomeverysmallPTRsof1:5and1:6werenoticedinstateschools,and,ifthosearethegenuinenumberofeligiblestudentsforthatgrade,thenitispossiblethathavingadedicatedteacherforsuchsmallgroupsisnotthemostefficientuseofresources.Communitysupportforandparticipationinthetargetschoolsappearsgood,butprimarilywithregardstofinancialandmaterialsupport.Everyschoolhasaschool-supportcommittee,and100%ofschoolhad

    13Onlyonecommunitypre-primaryschoolwasnotopenbothshifts.

    Schoollabour(cutgrass),9%

    Trashinthecampus,38%

    Studentsfighting,9%

    Faraway,3%

    TooHot,13%

    Groundunkept(prickly

    foiliage),6%

    Bullying,6%

    Holesincampus,3%

    DirtyToilets,6%

    Lackofwater,6%

    Graph2:Leastfavoritepartofschool(perchildren)

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 17

    receivedsomeform‘contribution’fromthecommunityandstudentparents,beitmoney,orbuildingmaterials,orin-kindlabour.ThesupportfromthelocalCommuneCouncils–80%oftheschoolshavenotreceivedanythingfromtheCC,accordingtodirectors-isinstarkrelieftothatofthecommunity.Bothteachersanddirectors,describedtheSSCsinthecommunityschoolsintermsthatindicatetheyaremorepro-activeandengaged,whichislogicalconsideringtheyoftensprangupasacommunityinitiative.ButtheSSCsseemtoasaresourcemobilizationbody.WhenaskedwhatwasthelastactivitytheSSCwasinvolvedwithattheschool,onlythreeresponsescameback:woodcollection,generallabourandschoolrepairs,andeveningtheground.Again,thisappearstobeamissedopportunitytogetmorepeopleinvolvedwithaspectsoftheschoolsthatareunder-resourced,suchasteachersupportorkid’sclubs.Theengagementwithparents,initiatedfromschoolsisamixedresult;noteacherindicatedorganisinganyformalone-on-onemeetingswithparentsatschool,rathertherearelotsofinformalmeetingsinwhichthegeneraltopicswereeither“studentprogress”or“contributions”.Therearealsogroupmeetings/parentforumsheldonceortwiceayearinwhichstudentprogressmightbediscussed.SimilartotheSSCs,parentsseemtobeoverwhelminglyviewedbyschoolstaffastheretohelpwithtwothings,homework,andhelpingtopayforschoolrepairsorupgrades.Thisnotunexpectedbutaweaknessandmissedopportunityinschoolmanagementapproaches.Aninterestingcontradictioninthefindingsisthat80%ofdirectorsbelievethatparentsare“generallyhappy”withtheschool,buttheyalsoallclaimparentscomplaintoomuchabouttheschool;clearly,thebondsbetweenparentsandschoolmanagementcanbeimproved.Theevaluationwasunfortunatelynotabletospeaktoasmanyparentsaswouldhavebeenideal.However,thesmallsampleinterviewedshowedaninterestingbut(anecdotal)division–theyoungerparentswhocouldreaddemonstratedmoreenthusiasmforschoolmattersandmoreknowledgeabouttheirchildreninschool,thantheolderparents,whoalsohappenedtobeilliterate.Again,thisisnotunexpectedbutimportanttopointout-forfutureactivities-astheyoungerparentscouldbegivenmeaningfulroleswithschools,andtheolderparentscouldbesupportedmoredirectlysothattheycanformastrongerunderstandingandthenconnectionwithwhathappensintheschools,andtheirchildren’seducation.Overallschoolmanagementappearsinconsistent,weakattimes,andinneedofmorestructure.Forexample,thedirectoratDounTroetStateSchooldemonstratedarealenthusiasmforhisjob,wasabletoproducerecordsandmaterialsquickly,thosematerialsweresecureandkeptinanorderlymanner,andthegeneralstateoftheschools’groundsandclassroomindicatedgoodinternalattitudesandpractices(seephoto2).Ontheotherhand,twoofthecommunityschools,whichhavebeentransferredandareofficiallynowstateschools,sharetheirdirectorwithanotherstateschool;thedirectoronlyvisitsforamonthlymeetingwithteachers,oronspecialoccasions(liketheevaluation).Mostschoolscoulddemonstrateaprocessofmonthlymeetingsbetweenthedirectorandteachers,butthiswasconcernedwithurgentissuesandsometraining–itwasnotstructured‘schoolmanagementcommittee’perse.Assuch,teachersseemedtohavelittleinfluenceinschoolmanagementotherthanpassingonfeedbackviainformalmeetingswiththedirectors.Therewasaclearhierarchybetweenstateteachersandcontractteachersandschooldirectorsdidutilisethisasalayerofmiddlemanagement/support:stateteacherswereexpectedtohelpandmentorcontractteachers,particularlyinthecommunityschools.

    z

    Photo2:DounTroetStateSchool–originallyanannexschoolthematerialinvestmenthasbeenmaintainedandsteadilyexpanded-apositiveexampleofvaluingandtakingadvantageofexternalsupportratherthanlettingitdegrade.

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 18

    Only20%14ofschoolshadacurrentschooldevelopment(SDP)plan,orschoolimprovementplan(SIP).Onedirectorstatedhewas“waitingforKHENtohelpwithit”.Furthermore,prioritisationofresourcesbyschoolmanagementwasverynarrowandfocusedonthehardwareneedsofaschoolonly(seeGraph3).Itisunclearifthisisaninabilitytodifferentiatebetweenmaterialsandsoftwareneeds(withallschoolsneedingmoresoftsupport);abeliefininvestinginmaterialsleadstoimprovedstudentperformance;alackofconfidenceintheirownideas,orsomethingelse.Whatisclearisthatsupportforeducatorsonhowtoidentify(andthenaddress)criticalneedsversusnon-criticalneedswouldbebeneficialforfutureactivities.Encouragingly,100%ofschooldirectorsarefamiliarwiththeCFSframework,canremembergoingtotrainingonCFS(providedbyPOEandKHEN),and80%haveseenaDTMTCFSchecklist.Butastronganddetailedunderstandingofthepolicyandthenhowtoapplyitmeaningfullyandsuccessfullyseemslacking,withonly40%ofbeingabletonameaspecificexampleofusingtheCFSindailyschoolwork.Directorsconductteacherperformancemanagementviaformalprocessesonly50%ofthetime,and60%ofdirectorsstatedthereisnosystemforfollowingupareasofweaknessidentified,otherthansomethinglike“verballypointingoutweakareasanddiscussingwaystoimprove.”

    1420%hadaplan;20%claimeditbeingprepared:60%hasnoplanasyet.

    Photo3:DounTroetStateSchool–integratedmodel,wellmaintained

    Photo4:SungIIStateSchool–handwashingstationinheritedfromanotherNGO–poorlymanaged–thestationis‘padlocked’frombeingused

    Photo5:OuDermchiekAnnexSchool–goodaccessandlatrinestructure,withaclosabledoorandwater,gooddistancefromthemainschoolstructure

    Photo6:PhumKandalAnnexSchool–poorstructuresandpoorlymanaged

    Graph3:ThelastSDP/SIPitemachievedinschool

    Buildingupgrade,33%

    Toilet,33%

    Garden,17%

    Groundleveled,17%

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 19

    WASHinschoolsisgenerallyanareathatwasverypositivefromschooltoschool.Theruralcommunityschoolshaveaccesstobasicstoiletsandsomeformofwatercollectionandstorage.Waterfiltrationdeviceswereavailableinsomeclassroomsandtherewerefunctioninghandwashingstations,aswellashygienepromotionmaterialsvisible.ThesysteminDounTroetStateSchoolisaveryeffective,integratedmodel,withwatercollectioncapacitysufficienttolastthedryseason,accordingtothedirector.Butaswithanumberofaspectsoftheproject,inconsistencyandpoormaintenanceblightotherschools.Multiplelatrineswereseenwithnoflushingwateravailableonhand,despitetherebeingwaterattheschool,andtheirgeneralcleanlinessandmaintenancewasquitepoorin4outof7schools.Seeselectedphotos3-6abovetoillustratetheinconsistency.Studentswereseenwashinghandsinschoolsandinterviewedteachesspokeofencouragingthisduringbreakstime.Teacherperformanceintheschoolsisalsoamixedsetofresults.Theprojectsponsoredapproximately15contractteacherstobeinvolvedintheproject,butonly50%ofthecontractteachersinterviewedhadparticipatedintheproject,theothershadleftorbeenremoved.15Thenewcontractteachershadreceivednoneofthelevelofsupportastheoriginalsplacingthematasignificantdisadvantagetotheboththefieldresearchquestions,butmoreimportantlytheirworkintheclassroom.Only44%ofteacherscouldproperlynameoneofthesixkeydimensionoftheCFSframework,andonly25%wereabletorememberanyCFStrainingoverthelastyear.83%hadnotseentheG1-G3nationalreadingbenchmarkguides.92%saidtheyhadnomentortogotoforhelp/orwerenothelpinganyotherteacherwithissues,and54%saidtheyonlypreparetheirlessonsforthenextclass,thedaybefore,andtheyusuallyonlyplanforKhmerandmaths.Finally,60%ofteacherskeeptheirmaterialsinanuntidyandinsecuremanner,primarilyinalaptopbag,andtheprevailingapproachisforteacherstokeepstudentrecordsattheirhome,withnoduplicates;raisingthequestionwhatwouldhappentoachildifthoserecordswerelost?

    Therewasquiteawiderangeofresponsetothequestionofwhatisthebiggestchallengeintheclassroom(seeGraph4),indicatingthatthereareweaknessesacrossallthebasicsofteachingandclassroommanagement;but‘slowlearner’wasrecordedasthelargestchallenge,indicatingteachersdon’tfeelknowledgeableonhowtodealwithlearningvariability,butalsojusthowtoughthewholesystemisastheyarenotgettingtheadditionalsupport,especiallyin-service,supporttheyneed.54%statedthattheDTMThadnotvisitedinthelastthreemonths.Theskillsgapintheclassroomsisalsoreflectedinresponsesbychildren–95%studentsnamedtheirfavouritesubjectaseitherKhmerormaths,indicatingjusthowdominantthesesubjectsare,andhowlittle,andhowpoorly,othersubjectsaredelivered.Another

    veryinterestingobservationfromtheevaluationwasthebehaviourofmoststudentswheninvolvedwithoneoftheresearchtools;inadrawingexercise,whengiventhechoiceofmany,manydifferentcolouredpencils,andasmallnumberofgrey,leadpencils,thechildrenalwayschosetheleadpencilsfirst;possiblyindicatingadiscomfortorunfamiliaritywithcreativeexpression,butanoticeablepatternofbehaviour.Asgloomyasthatsounds,theevaluationactuallyfoundcauseforhopeandpositivity.Despitemostoftheteachersbeingill-trainedandunder-supported,thereweremanyexamplesofreallygoodteachinginstincts,orapplicationofsomethinglearnedatatraining,including:

    • themakingofadditionalclassroomlearningmaterialsoutsideofschool;• preparinglessonwellinadvance(oneweekbefore)andforafullweek;

    15AnRoGClawrequiringcontractteacherstohavefinishedatleastyear12wasoneofthemajordriversofthisandoutofthehandsoftheproject

    Graph4:Biggestchallengeintheclassroom(teachers)

    Slowlearners,25%

    Materials,25%Parentsupport,

    13%

    G1kidswithnopre-schoolfoundation,

    13%

    Discipline,13%

    Keepingattentionofkids,13%

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 20

    • realisingthatstudentsareboredtheystopusingthetextbookandswitchtoanotheractivity;• mixingthelessonswithphysicalactivitytootokeepkidenergised;and,• 36%ofteachers,includingcontractteachers,knowingthatslowlearnersneedmoresupport

    (seeGraph5)• schoolscomplyingwithministryregulationsbynotputtingcontractteachersintheimportantG1-3

    (forstateteachersaresignificantlymoreskilled).

    Alltold,thereweremanyexampleofgoodpracticesandinstinctswithinteachers,theyarejustnotseenconsistentlyenoughfromschooltoschool,orasacompletesetofskillsfromteachertoteacher.Butthefacttheyexistmeanstheycanbefurtherdevelopedandutilisedtocreatepeer-to-peerlearning.Testingintheschoolsispoorandamajorareaofconcernfortheschoolgroups.100%ofteachersaredevelopingtheirowntesttemplatesattheschool,ratherthanusingformalmaterialsoreveninformalmaterialknowntowork.Oneteacherdescribedtheprocessofassigningresultstoareadingexamas‘thebestscoresgothechildrenwhoretellthestoryexactlyasItoldit’.ThelackofawarenessoftheG1-3readingbenchmarksisanimmediateopportunityforfutureworkintheseschools;introducethesetotheschools,traintheteachersanddirectorsonthem,andsupportthemin-situtobeusethemcorrectlyandeffectively.Withregardstoifproject’sactivitieshavehadanyimpactonlearningoutcomesforstudents,theevaluationcannotmakeanydeterminationaboutthisforthereasons:itwasnotpossibletoconductanydatareviewofstudenttestscoresonaccountoftheinformationisnotavailableinanymeaningfulwayinschoolsorwithPOE.Testingmethodsofteachersareweakandveryvariabletothepointthatthescoresthemselveslikelyhaveverylittlerelevancetoastudent’sactualability.Andsecondly,theprojectdidnothavetheresourcestotryandcollectthedataindependentlyfromtheschoolsystem.ThepromotionofchildrightsisanintegralpartofKHEN’sidentityandalongwithastrongchildprotectionapproach(thatcanbeutilisedinschools),hasbeenasuccessoftheproject.Teachers,students,anddirectorsalikedemonstratedgoodknowledgeabouttheconceptsofchildrightsandchildprotection.100%ofstudentsfeelsafeatschool,and76%feelsafeintheirvillage–theother24%identifiedlocalhazardsastheroadorriverasdangers.Themajorityofschoolshasachild-protectionresponseposter,providedbyKHEN,readilyavailableandvisible.Aspositiveasthisis,theresearchalsoshowedthereissignificantinconsistencyintheresponsesbyteachersanddirectorsastohowtheywouldhandleapossiblechildprotectioncase.Only20%ofdirectorsindicatedtheywoulduseKHEN’sreferralsystem,and25%ofteachersstatedtheywouldcontacttheparentsfirst,ifinthecaseoftheparentbeingtheperpetrator,isconcerning.Theseresultsareaslightlyskewedasthenewcontractteachershavenothadthesametrainingasothersanditslikelytheirresponsesareweaker.Theseresultsarealsoatoddswiththeapparenthollownessofthechildren’sclubsandanylackofinputfromthemintoschool-decision-making.However,theknowledgeor

    MiniCaseStudyAcontractteacheratOuNoNornStateschool,whohasbeenthereforlessthanthreemonths,whoreceivedonly2daystrainingwiththedirector,andhasyetnotbeenpaid,wastheonlyteachertosaythatshewasinstructingafullrangeofsubjectsthroughtheweek(notjustKhmerandmaths)andwasusingfungamesinclasstohelpthechildrenwhenshecanseetheyaregettingbored/inattentive.Hernaturalinstinctsforteachingweregoodandshehasthepotentialtobeagoodcommunityteacher.

    Graph5:Howdoyouapproachslowlearners?(teachers)

    Moreattention,

    36%

    Getstudenthelp,5%

    Getstaffhelp,0%Getparent

    help,14%

    GetSSChelp,0%

    Givemorehomework,

    36%

    Moreclasses,5%

    Other,5%

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 21

    one’srightsisanimportantstartingpoint,andfoundationfromwhichchildrencanmoreconfidentlydemandbetterservicefromtheirschoolsandleaders.Akeyfindingfromtheevaluationistheneedforimprovedchildsafeguardingpracticesintheschoolwithregardstocommonrisks,orinotherwords,theabilitytospotthingsinandaroundtheschoolsthatchildrencouldinjurethemselveson.Theevaluationsawanumberofwayschildrencouldhavebeeninjured,whichschoolstaffdon’tseemtobeabletoidentify(seephotos7,8and9).Thisisarecommendationforthefuture,especiallyfortwochild-focusedorganisations.

    Finally,akeyobjectiveofthisprojectwastohaveapproximately60%ofthe11communityschoolsconnectedtotheproject,transferredovertomanagementbytheDOE/CommuneCouncilandrecognisedasofficialstateschools.Thetablebelowsummarisesthatresult.Thecommunityschoolmodelisverygoodconceptuallyforlocalownershipandsustainability,andthetransferof7of11schoolstothestateisveryimpressive.Theevaluationdoeswanttoacknowledgethisachievement,astheschoolsarekeptgoingthroughamixofDOE/communecouncilandcommunityinputs.Inparticular,thelandusedforthecommunitypre-primaryschoolshasbeendonatedbycommunecouncils,andthisisaverysignificantcontributionandbasisforanenduringschool.

    Table9.Summaryofcommunity-schooltransferstoPOE/DOE/CCPrimarySchools Pre-primary/CommunityKindergarten3schoolsfullyandformallytransferredtoDOEmanagement2schoolsintheprocessoftransfer.2notreadyfortransfer

    All4havebeensuccessfultransferredovertomanagementbytheCommuneCouncil

    5. EvaluationAnalysisAsperthetermofreferenceforthisevaluation,therearefivemajorareasofanalysis,asoutlinedbelow.Asimpletrafficmodelwillbeusedtoevaluatetheperformanceineacharea,usingathree-categoryscoringrange:

    • Greenforsatisfactoryperformance-withstrengthshighlightedaswellanyareasforrefinement• Yellowforacceptableperformance-acceptablebutneedingimprovementinhighlightedareas• Redforconcerningperformance-inneedofsignificantimprovementinidentifiedareas

    Evidenceanddatawillbeincludedtosupporteachassessment,andtohelpanswerthesub-questions.

    Photo7:Rustyandsharpoldschoolswing–alsoveryhotintheglaringheatoftheday

    Photo9:Childplayingwithbricksleftinschoolyard

    Photo8:Heavycementbagsleftinclassroom

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 22

    (5.1)Impact• Changefordisadvantagedchildren• Progresstowardsintendedimpact

    • Changeandimpactatapersonallevel

    AcceptablePerformance

    SummaryAnalysis:Overalltheevaluationassessesthisas‘AcceptablePerformance’.Thereisclearevidencethatmorechildren,andchildrenwholiveinremoteareas,areinschoolasaresultofthisproject’scollaborationwiththetargetschoolsandDOE.Thisimprovedaccessisofsignificantbenefittochildren,evenifaqualitylearningenvironmentandexperiencecannotalwaysbeguaranteed.Theopportunitiestheygettosocialise,play,learnatschoolarestillveryvaluable.Classobservationsrevealedthatbasiclanguageandmathsskillsarebeingtaught,andevenifthequalityisnotstrong,thisishelpingtopreventthepossibilityofgrowingupilliterate.Theobservationsalsoshowthatchildrenaregenerallyactiveintheclassandwiththeteacher,asmuchastheteacher’smodelofinstructionallows,buttheyareattending,andbytheirownaccountenjoycomingtoschoolandtrynottomissschoolifpossible.So,thechildrenthemselvesvaluetheopportunitytocometoschoolandthisisapositiveimpactonapersonallevel.Therehasalsobeenanimpressiveincreaseinthenumberofgirlsenrolledinbothstateandcommunityschools,andalsothenumberofchildrenclassifiedas‘withadisability’16enrolled–sointhisregardtheprojecthasdoneasolidjobofpositivelyimpactingvulnerablechildren.Theprojecthashadlessimpactarewithregardstolearningoutcomes,andcommunity-schoolrelations.Learningoutcomescouldnotbetestedinanymeaningfulway,asmentionedearlier,sonoassessmentcanbemadeoftheproject’simpactonstudenteducationprogress.However,classroomobservationsofteachingapproachesandteacher’sself-descriptionsofhowtheyprepareanddelivercontent,wouldleadtheevaluationtobelievethatchildrenwouldlikelynotscorewellwhentestedagainstnationalstandards.Andalthoughcommunities’schoolsdohavestronglinkswithparentsandthecommunitiestheyexistin,theirinputisreallylimitedtofinancialandmaterialcontribution,attendingschool‘publicforum’onceortwiceayear,andpossiblyhelpingwithhomework.Therewerefewexamplesofparentsinvolvedinclasses,helpingteachers,helpingintheschoolyard,orbeinginvolvedinanyschoolmanagementdecisions.Insomuchasthey“value,participateinandactivelysupport&advocateforeducationandotherChildRights”theevaluationcan’tsaywithconfidencethishasbeenachievedtohighlevelorconsistentlevel.

    (5.2)Effectiveness• Outcomeandoutput(result)accomplishedinrelationtotheprojectdesign• EffectiveM&Esystem/evidenceofstafflearningandimprovedprojectpractice• Thequalityofthelearningenvironmentininclusiveclassrooms/reachedMoEYSstandards.• Effectivestrategiesthathaveprovenparticularlyeffectiveforachievingtheoutcomes.• Howtheviewsofchildrenwerecapturedinprojectcycle

    SatisfactoryPerformance(borderline)

    SummaryAnalysis:Overalltheevaluationassessesthisas‘SatisfactoryPerformance’butborderingononly‘Acceptable’duetotheresultsachievedfor‘qualityofthelearningenvironment/reachingMoEYSstandards’.Generally,KHEN’ssystemsandprojectcyclemanagementaresolidandarebeingapplied.TheyusedtechnicalapproachesthatwerestandardforCambodia(andarestillusedwidely),forexamplecascade

    16Enrolledstudentdata:StateschoolBaseline-31GwD&41BwD CommunityschoolBaseline–5GwD&18BwD StateschoolEndline-76GwD&86BwD CommunityschoolBaseline-11GwD&24BwD

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 22

    training,butdoneedhelpinthisareatoimproveandcatchuptoadvancementsmadeoverthelastfewyearsineducationprojectwork.Table9:Theproject’sachievementsasperitslogframe(plannedversusactual)PlannedObjectives(#)

    ObjectivesAchieved(definedasmeetingindicatorssetoutinthelogframe)

    ObjectivesnotAchieved/Undetermined

    Comments

    5 4 1Objective1couldnotbecorrectlymeasuredandwasclassifiedas‘undetermined’

    PlannedOutputs/Results(#)

    OutputsAchieved(definedasmeetingtheindicatorssetoutinthelogframe)

    OutputsnotAchieved/Undetermined

    Comments

    12

    8-Results:1.2,2.1,2.2,2.3,3.2,4.1,5.1,5.2

    4-Results1.1,3.1,4,2&4.3

    Result4.2&4.3wasevaluatedas‘undetermined’

    TheinformationaboverepresentsasatisfactoryresultandisusefulforanorganisationsuchasChildFund,whichisfundinglocalNGOs,tohaveanoverviewofplannedresultsversusachievements.However,‘achievement’hereissimplydefinedasrealisingthesuccessindicatorssetoutinthelogframe,withoutadeeperreviewofthequalityoftheresults,andsoitoffersonlyalittleanalyticalvalue.Inaddition,ananalysisofthelogicwithinthelogframe,therelevantindicators,andthedatacollectionbehindtheindicators,showsthatstructurallythelogframedesigncouldhavebeenstrongerandthatsomeindicators,inandofthemselves,didnotreallyprovideapropermeasureofsuccess.Twoexamplesinclude:

    o Objective3:TofacilitatecollaborationwithP/DOEandSSCstoachievesustainableimprovementinthestandardofschoolmanagementinaccordancewithCFSstandards

    o Indicator1:63%ofcommunityschoolsaremanagedbyDOEby2017.Thisindicatordoesnotreallytellusanythingabout‘achievingsustainableimprovement’inschoolmanagement–it’ssimplyacountingofschoolsthathavebeenreclassifiedfromcommunitytostateschool.

    o Output2.1:Teachingpracticeshaveimprovedandincorporateachild-centredapproachasmeasuredbytheMoEYSCFSdimensions

    o Indicator:75%ofCFS/DOEteachingstandardsareconsistentlymetin14stateschoolsand11community(primary&pre-)by2017.

    Thisindicatorwasmeasuredusingself-assessmentformsansweredbyteachersanddirectors,andalthough‘self-assessments’arecommoninCambodia,theyarenotthebesttoolduetoobviousconflictsofinterestinsayingwhataninterviewerwantstohear.Willteachersactuallyadmittonot‘consistently’meetingstandards?Inaddition,thesomeofthequestionscouldhavebeenbettercrafted.Forexample,intheinterviewformswithchildren,itwasasked“Doyouthinkyourteachergivesyouenoughattention?”Willachildknowwhat“enough”isiftheyonlyhaveoneexperiencedonestyleofteaching?KHEN’scommitmenttodatacollectionthoughandtheircoresystemsfordatagatheringareverygoodandeffective,especiallyforalocalNGOoperatingonarelativelysmallbudget.Theyhaveaccessibledataanddatacollectiontools,andaclearoverarchingM&Eframework.ThisseemslikeanareatheyhavereallyinvestedinandareuncompromisingintheirM&Ecommitment,andKHENistobecommendedforthis.Inthisproject,theirbaselineandendlinesurveysweresignificantpiecesofworkandveryimpressive.TherearehoweverafewwaysinwhichtheirM&Esystem,andspecificallydataanalysis,couldbeimproved(seesection5.2/5.3formoredetails).Thequalityofthelearningenvironmentsisinconsistentfromschooltoschoolandthat,resultinginpartfromteachercapacity,isanoverallweaknessoftheproject’seffectiveness.TheevaluationteamusedtheMoEYSCFSchecklistaspartoftheirfieldvisitsandallschoolsfailedmultiplesections;reallyDounTroetStatewastheonlyonethatcameclosetomeetingMoEYSstandards.Thedataistoomuchtoincludehere,butthekeypointisthatschooldirectors,teachersandcommunitymemberallhaveageneralsensethatthe

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 23

    CFSframeworkexistsandthatitincludestheserequirementofinclusive,safe,friendly,andnurturingschoolenvironments,yettheyarenotskilledenough,orresourcedwellenough,tobeabletocreatethem.TheCFSframeworkisanambitiousagendaandinthecommunityschools,inparticular,itisunrealistictoexpectthemtofullycomply.Butitisalsotruethatthefundamentalslikegoodrecordkeeping,lessonpreparation,neatandtidyclassrooms,andchild-safeenvironmentsarenotbeingmet.Thedeliveryandapplicationoftrainingviathecascadetrainingapproachseemstohavebeenineffectiveasthereappearstobelittleevidenceofthetraininginfluencingthedailysituationinschools.Infutureprojects,trainingactivitiesneedstobestructuredtoincludeopportunitiesforregularapplication,andfollowupsupporttoengrainlearning.Thetwomosteffectivestrategiesintheprojectweretheannualenrolmentcampaigns,supportedbycommunesandDOEstaff,andthecommunityschoolmodel.Bothhavecontributedtoincreasingenrolmentsforruralchildren.Thecommunityschoolmodelintheoryisaverygoodone–itreacheschildrenintheveryisolatedpocketswhootherwisemightbetemptedtoskipschoolbecauseofthedistances,andaimstotransfertheschoolstostatemanagementatsomepoint,whichisastrongconceptoflocalownershipandsustainability.Andthisprojecthasseen9out11communityschools‘transfer’tothestate,whichisgreatsuccess.However,continued,sufficientresourcingoftheschoolsbygovernmentcan’tbeguaranteed(obviously),whichisaclearrisk.Asisthefactthatthecommunityschoolsarenotabletoprovidethesameteachingstandardasstateschools–theyarejustnotresourcedwellenough–andthereisadangerofcreatingagroupofstudentswhowillmoveintootherstateschoolsinlatergradesandbesignificantlybehindtheotherstudents.Thisiswhyafocusonteachingqualityandin-servicesupportforallschools,communityorstate,isreallyimportant.Lastly,regardingchildren’sinputintotheproject.KHENwasverythoroughandsensitivewhencollectingbaselineandendlinedatafromchildrenandistobecommendedforthis.However,theexampleofthechildren’scouncil/childclubs–eithernotfunctioningoractingsolelyasaplacetolearnabout‘childrights’and‘hygiene’-indicatesthatmoreregularandmeaningfulinputfromchildreninduringtheprojectcycleissomethingtoaimforinfutureactivities.

    (5.3)Sustainability• Sustainabilityoftheresults(thosemost

    likelytobesustained,mostfragile,factorscontributingto,orhindering,sustainability)

    • Accountabilityandcapacityofparents,governmentbodiesandschoolcommunity

    • Ownershipbyprojectstakeholders

    AcceptablePerformance(borderline)

    SummaryAnalysis:Overalltheevaluationassessesthisas‘AcceptablePerformance”butborderingon‘ConcerningPerformance’.ThisisthemostchallengingareafortheprojectandKHEN.Themajorissuesinclude:

    - Inconsistencyofresultsfromschooltoschoolandteachertoteacher:It’shardtohavelastingimpactinacommunityifresultsaresovariablefromonegroupofstakeholderstoanother.

    - Maintenanceofmaterialinputs:linkedtoinconsistency,andthereisawiderangeofhowwellthingslikelibrarycorners,schooltextbooks,andWASHinfrastructure,areorarenotmangedandmaintainedinschools.Thisgapneedstobenarrowed.

    - Thedeliveryandapplicationoftraining:thecascadetrainingmodelseemstohavesomewhatineffectiveintheprojectastherewasverylittlespecificrecallbythoseinvolved,meaningtherehasbeenlittlebenefitfromthetrainingtothedailysituationinschools.Itappearsmuchofthetrainingtopicswouldhavetobedeliveredagain,whichisessentiallyaresultthathasnotbeensustained.Futuretrainingneedsopportunitiesforregularapplication,andfollowupsupporttoengrainlearning.

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 24

    Asmentionedabove,thecommunityschoolmodelisconceptuallyverygoodforlocalownershipandsustainability,andthetransferof7of11schoolstothestateisveryimpressive.Theevaluationdoeswanttoacknowledgethisachievement,astheschoolsarekeptgoingthroughamixofDOE/communecouncilandcommunityinputs.However,theseschoolsarealongwaybehindotherstateschoolsintermsofinfrastructure,materials,teacherqualityandschoolmanagement–forexampletheyhavenopermanentschooldirectorandtheteachersreceiveamonthlyvisitfromthedirectoratthenearbystateschooltheyareannexedto.Thisseemslikeafragilemodelthatcouldcollapse,orcreateaschoolthatdoesnothaveapropermanagementcapacityandthusleadingweakerlearningenvironmentsandoutcomes.TheagreementswithDOE/POEthatgovernthetransferareveryloose,asdescribedbyPOE/DOEdirectly,anddonotcontainspecificprovisionsofmaterialorteachersupport.Thereisnoformal‘communityschool’policyorframeworktoapply,rather,theynowfallundertheCFSframework,butaresignificantlyshortofmeetingminimumstandardsinthisregard.Soasmuchasthetransferitselfisagoodexampleofsustainabledevelopmentandgovernment/communitycollaboration,thelong-termviabilityofthecommunityschools,withoutexternalhelp,isquestionable.Theenrolmentactivitiesareasustainableapproachandeffective.Therewashighcommitmenttothetheseoccurringannually,withgoodinvolvementbyteachers,parentsandexistingstudents.Thesearedeliveredbylocally-conceivedpublicannouncementactivities,whichseemeffective,andeasilyimplementedbydifferentpeople.Onthedownside,thelocalmanagementofkeyprojectinputs,forexamplethelibrarycornersorlatrines,wasinconsistentfromschooltoschool.Inthoseweakerschools,theobviousdriversofthepoorerqualityincluded:

    - theabsenceofamanagementsystem–forexample,theschoolswithdirtyandrun-downlatrineshadnoclearprocessandnosystemofsharingresponsibility,suchasaroster,forcleaningthelatrinesdailyandprovidingflushwater,leadingtotheirneglect.

    - Andalackofleadershipandownershipbyteachersanddirectors.Graph2–leastfavouritepartofschoolasperchildreninterviewees,revealsthateasilymanageableissuesuchastrashcollectionanddisposal,isnotbeingdonewell.Multipleteachersalsocomplainedthatchildrenaretoo‘naughtyandbreakthingstoomuch’,whichisacommonandconvenientexcuseforinactivity.Thisisnotacrosseveryschoolbutthislackofpositiveandaccountableleadershipatsomeschoolsisanareaneedingaddressinfutureactivities.

    Asreflectedinthecommentaboveabouttheinconsistencybetweenschools,thereisinconsistencyinownershipbyprojectstakeholders.Activeandengagedteachers,directors,SSCmembersandparentsdoexist,butnotacrosseachgroupandforeachschool.KHENknowsthevalueofharnessingnaturalleadersor‘models’‘forsoftware-focusedwork,17andthatiswhatitsmissingwithcohortofteachers,directorsandcommunitymembersinSamlout;adedicatedefforttogivesuchpeopleopportunitiestobeinvolvedmore,supportandhelpthemwhentheencounterchallenges,andhelpthemsharetheirdevelopmentwithothers.18Contractteacherswerealsooneofproject’smostfragileelements.Thehighturnoverofthosecontractteacherswhoparticipatedinthethree-yearprojectmeanstheinvestmentinthatareawasnotsuccessfulandunsustained(dueinlargeparttothegovernment’slawchangeregardingeligibility).Theideaofthecontractteacherissoundandhasdemonstratedsuccessinotherprojects,andshouldcontinuetobepursued.However,thefactthattheDOE/schoolsinthisprojectarenotabletoadequatelyreplace,trainandsupportnewcontractteacher,indicatestheneedforarevisedapproachinfutureKHENactivities

    17Thereisamodelparentsgroupintheprojectbasedonthatconcept18SeeChildFund/KAPE’sworkontheEasy2LearnModel,orSeeBeyondBordersMentoringprogrammeinitswork,forsuccessfulexamplesofthis.

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 25

    (5.4)Relevance• ProjectrelevancetothecontextandchildrightssituationinCambodia.• ProjectrelevancetoKHENstrategies.

    Satisfactoryperformance SummaryAnalysis:Overalltheevaluationassessesthisas‘SatisfactoryPerformance”.ByRoGC’sownadmission,educationandlearningprogressinCambodiaisstillverychallengedandtherighttoqualityeducationnotrealisedformostchildren.Hence,thisprojectisveryrelevantforCambodia.ItisalsocompletelyinalignmentwithKHEN’sownstrategicpriorities.Itsfirstobjectiveunderitscurrentstrategicplan(2015-2017)isto“contributetoacontinuingimprovementintheeducationandwell-beingofallChildren.”Therearetwoimportantinsightsrelatedtorelevance.Firstly,thetechnicaleducationapproachesusedinthisprojectwereprettystandardforwhenthisprojectwasdesignedandstartedthreeyearsago.Someverypromisingdevelopmentworkineducationhassincetakenplace,partlydrivenbystrongperformancebyNGOs19andpartlybyagenuinereformagendafromtheMinistry.ThatcontextisimportanttounderstandthatKHEN’sapproachinthisprojectwasacceptableforthattime,butlookingforward,itwouldhavetotechnicallyshifttowardadoptingthesesuccessfulinterventions(assuggestedin‘Recommendations).Secondly,partofKHEN’sidentityasanorganisationiscommitmenttochildrightsanditssuccessfulpromotionofthisinitsprojectsandwithprojectstakeholders.Thereisclearevidenceinthisprojectalsoofchildrightawarenessraisingbeingconductedandgoodrecognitionofchildrights.However,whatisnotsoclearisthetangible,personalbenefitthisbringschildreninruralSamloutDistrict.Goodschools,goodteachers,andsafecommunitiesareofmoredirectbenefitforthosechildren.Therighttoaqualityeducationisanimportantmessagetosendthroughaneducationprojectandthatcanbethenbackedupanddemonstratedthroughhighqualityeducationsupportinschoolsandcommunities.Buteducationprojectsshouldfocusonthat,andashappenedinthisproject,activitiesfocusedonlearningthefullsetofchildrightsarenotthewisestuseofresourcesintheopinionofthisevaluation.

    (5.5)Efficiency• Efficientuseofprojectresources.• CooperationandlearningamongpartnersandwithinKHEN

    Acceptableperformance SummaryAnalysis:Overalltheevaluationassessesthisas‘AcceptablePerformance”.Linkedtoissuesraisedearlieraboutsustainabilityandtechnicalapproaches,theprojectcanonlybeassessedas‘acceptable’,withregardstoefficientuseofresources.Thereisnodoubtsomeactivitiesinthisprojectwillsurvivethetestoftime,butsomewillnot,andsointhatsensetheywerenotaneffectiveuseofresources.KHEN’sinternalbudgetingalsohassomeunusuallineitemsandpossiblyandperhapsamoreefficientbudgetcouldhavebeendeveloped,butthisisnotaseriousconcern.Roughly25%ofthebudgetand15%werespentonhardwareandsoftwarerespectively.Thesearenotbadratios,butinordertomovetowardsbettersustainabilityandmorequalityoverquantity,KHENshouldlooktoinvestasmuchaspossibleintraining,supportandmentoringforthoseeducationduty-bearerswhoultimatelyneedtomanageandmaintainanyfuturematerialsinvestment.

    19Asabove

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 26

    KHENhasgoodrelationshipwiththeschoolsandDOE/POEandthiswasastrengthoftheproject.TheevidencealsosuggeststhatreportingtobothEDUCOandChildFundwastimelyandinfull.Asmentionedinotherareas,therearesomeareasforimprovedreportingbyKHEN,particularlywithregardtotrackingandreportingonoutputsinaclearway.5.6QualityoftheprojectdesignThetechnicalapproachesintheprojectarebasicallysound,asatthetimeofdesign,andallofthemajorstakeholdersinanygoodeducationproject(schools,communities,students,government)areincludedinprojectactivities.Ithasagoodbalancebetweenmaterialinvestmentandsoftwareactivities–definedhereasanyofthetraining,awarenessraisingorpromotionwork.Italsousesthenationalsystemsasabasisforitsdesign,includingactivitiesonCFSframework,withteachers,directorsandschoolclustergroups,andSSCmembers,andplanningtoutilisetheDTMTbodyfortechnicalsupportafollowup.Themajorflawsinthedesignare:

    - TooheavyrelianceonPOE/DOEfortrainingviaacascademodelthatonlyhadtheDTMTbodyasitswayofprovidingfollowupsupportaftertraining.DTMTsacrossCambodiaareweakandthisisnotexceptioninSamlout.

    - It’sbusyandcrowdeddesignthatspreadstoomanyactivitiesacrosstoomanystakeholders(seeAnnex6–BeneficiaryMap)–thequantityofactivitieshaslikelybeenalargeworkloadandburdenforstaffjusttocoordinate,letalonedelveintothequalityofeach.

    - Therewasnoattempttounderstandandtracklearningoutcomes.ThisisaprospectmucheasiernowwiththedevelopmentofthingsliketheG1-3Khmerreadingbenchmarks,sothisunderstandable,butshouldbementionedasapriorityforfutureactivities.

    - Andtoomanytokeneventsthatarenotvaluableuseofresource,suchas‘exposurevisits’or‘promotingofeducationworkshops’.

    Fromalogframeperspective,theplannedactivitiesintheprojectdoflowwell,sequentiallyandlogically.However,therearetwoareasforimprovement.Firstly,ensurethatthereareclearlinksbetweeneachlayerofthelogframe.Forexample,

    o objective,o xnumberofoutputsthatcombinetoachievetheobjective,and;

    § xnumberofactivitiesthatcombinetoachievetheoutputTherewassomedisorderinthelogframewithoutputsgroupedunderthewrongobjective(forexampleresult2.8,wasactuallymorenaturallyconnectedtoobjective3).Secondly,andverysimply,thetemplatetheyusedforthelogframegroupedallobjectivestogether,outputstogether,andactivitiestogether,ratherthanallowingaflowfromobjective,tooutput,toactivity.It’sveryeasytogetlostwiththistemplateasseemtobethecase,butthisiseasilyremedied.5.7IntegrityoftheprojectdataKHENdidanoutstandjobcollectinginformationfromalltheschoolstakeholders,andpossiblytoogood;thatisperhapstheyhadtoobigasamplesizeandcollectedtoomuchinformation.Asimilarorfutureprojectcouldbemoretargetedwiththeinformationsought,andthenrelyonasmallersamplesize.InthiscaseKHENhasadmittedthattheywouldhavelikedtocollectstudenttestscores,butitwasjusttoomuchwitheverythingelsebeingcollected.So,ensuringtheyarecollectingtherightdatashouldbeapriorityforthefuture.Inaddition,focusontheindividualunitofanalysisandnotjusttheaggregatescore.Forexample,inthisproject,aschool’scomplianceagainstCFSstandardswasmeasuredusingaseriesofquestionsbasedontheCFSframework.The‘result’ofthiswasthenreportedasanaveragepercentageforall25schools,ratherthangivingaschool-by-schoolscorebreakdownandanalysis.Measuringandreviewingthecoreunit,inthiscasetheschool,ismoreappropriateinordertolookforwaystotargetactivities,forexamplegivemoresupporttoweakerschoolsorleveragestrongerschoolsforlearningabouthowtheydosothingssowell.Thisisjustarefinementoftheirdataanalysis.

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 27

    Finally,KHENshouldlearntoadapttheirdataasneeded.Forobjective2,theplannedindicatortargetwasrevealedtobyalreadyachievedthroughthebaselineinformation.Anewindicatortargetwasnotestablishedafterthis,whichwasmissedopportunitytocollectanothertypeofusefuldata.5.8VerifiedreportedresultsThereisclearevidenceofallactivitiesplannedfortheproject,beingundertaken.TheonlyexceptionbeingActivity4.5–aliteracypilotprogramforadults,whichdidnotgoaheadbecauseofthelackofgovernmentsupportforit.KHEN’sreportingofresultswasattimessomewhatconfusedandthenmisleading,primarilyduetoamisunderstandingorinconsistencybetweenthedatacollectedandthedatarequestedintheirlogframe.Forexample,theindicatorforOutput1.1was:

    -11communityschools&14statecanbecountedandassessedasmeeting80%ofCFSstandardsby2017KHENReportedthisas72%achieved–onfurtherinvestigationtheevaluationfoundthiswastheaveragescoreachievedforall25schools,whichisinteresting,butnotwhattheindicatoraskedfor;itaskedtomeasurehowmanyschoolsreached80%ormoreoftheCFStargets.Thiswasinfactonly8schools,or32%oftheschools.Thesewerenotdeliberateattemptstomisleadordistortdatabutrathersomemisunderstandingonhowtoprocessthedatatheycollected,andsomeerrorsinsettingupofdatatools.Thesearesmall,veryfixableissuesbutworthnotinginthisreportsothatKHENcancontinuetoimproveitsorganisationalcapacity.5.9HumanimpactThemostobvioushumandimensionandbenefitinthisprojectischildreninschool.Forthemostpart,childrenintheschoolsvisitedseemedhappyandengagedintheclassroom,attentiveandresponsivetoexercisesandteacherrequests,eveninspitetheoften-one-wayroteteachingstylebeingused.Childrenwerenotoverlydistractedbytheconsultancyteamarrivingatschools,andquicklyswitchedtheirattentionbacktotheclass,whichwasbothsurprisingandpleasing.Similarly,whilsttheconsultancyteamswereundertakingin-classroomobservations,thechildrenwerenotnoticeablydistractedbytheforeignpresenceandwereabletomaintainfocusinclass.Childrendemonstratedgooddisciplineinclass,andduringbreakperiods,and100%ofinterviewedchildrenrespondedpositivelytoquestionsaboutlikingschool.Thesefindingswereverypleasing,and,puttingasideallotherissuesaboutteachingandschoolquality,theyareevidencethattheproject’sfocusonincreasingaccesstoaschool,isreallyvaluableforanindividualchild.Thisisimportanttohighlightintheevaluation,thatsimplyput,childrenwerehappytobetheschoolsbeingsupportedbyKHEN.Theotherinterestinghumanelementexperiencedintheresearchwasthatof‘ContractTeachers’.Asmentionedearlier,theirexperienceintheprojectisoneofthemorefragileparts.However,someofthenewcontractteachersinterviewedwerethemostimpressiveteachers(pleaseseemini-casestudyonpage20formoreinfo).Thecontractteachermodelcanbereallyimpactfulatahumanlevel,ifitfindsthosepeoplewithapassionforteaching,ornaturalinstinctforit,andiftheyaresupportedproperlycanbeatremendouswin-win–forboththekidsinclasseswhogetamotivatedteacher,andtheteacherswhoarelookingforwaystousetheirpotentialandenergy.5.10AlignmentwiththeCFSframework20Ingeneral,theprojectmodelisattemptingtoaddressallsix-majordimensionoftheRoGCandsub-pointsineachdimension,buthasinvestedmoreincertainareasthanothers,andhadgreatersuccessincertainareathanothers.Thestrongerareasappliedintheprojectasnotedbytheevaluationare:

    20Dimension1(access);Dimension2(effectivelearning);Dimension3(heathysafetyprotection);Dimension4(gender);Dimension5(communityparticipation);Dimension6(schoolmanagement)

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 28

    StrongerareasofcompliancewithCFS Weakerareas/areasformorefocus

    Dimension1 Schoolmapping,datacollectionandenrollment

    Dimension2 Child-centrededucation,supportforslowlearners,andschoollibraries

    Dimension2 Attractiveclassroomenvironments,andlifeskillsclasses(thecommitmenttolifeskillsisgood,contentneedsimproving

    Dimension3 Schoolenvironmentsandbasicchildsafetyinschool

    Dimension3 Childprotection,WASHinschools Dimension5 Communitysocialisingwithschool,studentcouncils,communityoutreachbyschools

    Dimension4 Gendermainstreaming(viaenrollmentandgoodBoy/girlratios)

    Dimension6 Linksbetweenschools,schooldevelopmentplans,schoolassessment,directortraining–alltheseareasareveryimportantandneedsstrengthening,despiteinvestmentinmostofthem

    Dimension5 Exhibitingchildren’swork(goodexamplesinsomeschoolsbutnotconsistent),communitysupport

    6.RecommandationsAfulldetailedlistofdetailedrecommendationsistabledbelow,andcategorisedintokeyareasforeaseofreview.However,somefundamental,broadrecommendationneedtoberaisedinitiallyandshouldbetakenintoaccountwithanyfutureeducationprojectsbeingconsidered.

    8. Foreducationprojects,focusonlearningoutcomesforkids–thisisfirstthinganyeducationproject

    shouldaimtodo.TheevaluationacknowledgesthatKHENmightnothavebeenreadyforthisinthepast,butgoingforwardsthisshouldbethecentrepieceofalleducationwork.

    9. ifKHENwantstogrowasaneducation-focusedNGO,itshouldgainmoretechnicalexpertiseandanyfutureeducationactivitiesshouldbetechnicallystronger,specificallyinactivitiessuchG1-3readingtools,readingkitsandtraining,teachermentoringandin-servicesupport.Looktoleverageexistingopportunitiesandrelationships,suchasSeeBeyondBorderssuccessfulmentoringapproachinBattambang,orKHEN’slinkswithforeignuniversities,totryandgetprofessionalteachersorsocialworkertocomeandsupportKHEN.

    10. Forfutureeducationproject,increaseandtargetinvestmentinpre-primaryandGrades1-3.ThisisbecauseitalignswithMoEYSreformagenda,wheresignificantsuccesshasbeenachievedrecently,butmostimportantly,thesearethecrucialyearsforchild’seducationalprospects;asolidfoundationhereleadtopositivelong-termlearningresults.

    11. Revisethetrainingmodelfromcascade,infrequenttraining,toregularsupportandmentoring,progressiveandintervaled,andifpossible,in-service.ThiswillbeabigshiftforanorganizationsuchasKHEN,sopossiblyitsonlypilotedinthenearfuture-sayinasmallnumberofschoolswithinabiggergroup–thismightbethemostpracticalwayconsideringKHEN’sstaffsizeandtheircurrentlevelofeducationalexpertiserightnow.

    12. Looktoappropriatelybudgetandresourcethesoftwaresideofprojects.13. Improvetheprospectofprojectactivitiesandoutputsflourishingafterproject’sendbyfocusing

    morestronglyonmanagementandmaintenanceofresults,andengagingthesupportofstakeholders–atthecommunitylevelandinofficialpositions.

    14. Investinqualitysolutions/activities,evenifmeansfewertargetschools/beneficiaries,andatahighercostforeachbeneficiary-QualityoverQuantity!

    15. Beattentiveasanorganisationtothegapbetweenstrong,durableresultsandweak,fragileresultsandtrytonarrowthatgap.

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 29

    CategorisedandspecificrecommendationsLogframe&Design

    1.Morepracticallogframethatflows‘logically’-objective,output,activity–withoutputsthatcombinetoachieveanobjective,andimprovedindicatorsthatmeasurethemostimportantpartofaproject,inthecaseofaneducationproject-learningoutcomes.ExternalsupportpossiblyneededtohelpKHENskillupinthisregard2.Linkactivitiestooutputsinthelogframe-thetemplateusedforthelogframegroupedallobjectivestogether,outputstogether,andactivitiestogether,ratherthanallowingaflowfromobjective,tooutput,toactivity;It’seasytogetlostwiththistypeoftemplateanitsrecommendedtouseanalternativethatgroupsactivitiesandoutputsinordertoenhanceprojectdesignandmanagement

    3.RemoveM&Efromlogframetosimplify–justincludeasseparatebudgetline–noneedto‘monitor’andreportonM&E4.Dataanalysisneedstofocusonthekeytargetgroupssuchasschoolsandchildrenandorganisedatatobeabletoreviewtheresultsofthosegroups–sothatgroupswhoneedextrasupportcanbeidentified.Forexample,it’snotusefultoaveragetheresultsofallschools,withoutlookingateachindividualtoassessanypoorperformers.

    5.Adaptation–don’tbeafraidtoalteralogframeifneeded–forexample,objective2–thegraduationdataasabaselinealreadyexceededthetargetindicator.Inthiscase,itwouldhavebeenbettertoalterthatindicatorandlookforsomeotherissuemeasure

    Budgeting 6.Exploreunit-basedbudgeting-impressionsarethatsomeitemsover-budgetedandsomeunder-e.g.exposurevisit5.5kversusschoolrenovation11k

    7.UtiliseasingleM&Ebudgetratherthanaddingtoeachobjective–thisisclearerandmoreefficient

    8.Clearlybudgetforperdiemsandhaveaclearpolicyonthistoavoidissueswithgovernmentandtoavoidoverspendonthis,attheexpenseofothermoreimportantactivities.

    9.Reviewproportionalspendinginanoverallbudgetlevelandmaximizetheproportionspentonprogramactivities.

    ChildProtection&safeguarding

    10.CPactivitiesaregoodandquitesophisticated,butperhapsoverlyso,forschoolsattheircurrentstageofdevelopment–itmaybebettertofocusonimprovedunderstandingofsafetyandbasicreferralinschools,ratherthancomplexlegaltraining.

    11.Focusonchildsafetyinschools–childprotectionisimportantbutbasicconceptsofsafetyinschoolsarelackingandchildsafetyisthefirststeptobeachieved.

    Kalyan/SreytacouldprovideinputintoKHEN’sapproachesandongoingtechnicalsupport.

    12.Reviewteacheranddirectortrainingandknowledge–contractteachershavenotbeentrainedonchildprotectionandthereisbigvariationinresponsesonhowtoaddresspotentialcaseofCP–refreshertrainingandfurtherfollowupsupportlooksneeded

    Training 13.Linkexposurevisitstofollowuptasksorin-schoolapplications–iftherearenoobligationsafterwardspeopleeasilyforget.Thiscouldbepossiblylinkedtoincentives,forexamplesomesmallrewardorbonusforachievingimprovinglessonplanpreparationfor3monthsinarow.

    14.ConsiderusingDounTretSchoolasthesiteforanexposurevisitforotherschools

  • ProjectEvaluation–ICREECIIinSamloutDistrict,BattambangProvince–February2018–AiKCConsulting 30

    15.Morefocusonsupportforteacherdevelopmentandlearning-in-servicesupport,individualised,mentoring.

    LookatSBBforadvice/inputbasedontheirsuccessfulmentoringprogram.

    16.ItwouldbebeneficialtoprovideCFStrainingagain/refresher,butwithadifferenttrainingapproachandtrainer.Thetheoryneedstobelinkedtouseinclassroom-clearteachersdon’tfullyunderstandtheconceptsthereinandhowtoapplythem

    17.Uselocaltechnicalknowledgeand/orexternalknowledgetoincreaseinternaltechnicalcapabilities–KhencouldleverageitslinkswithAustralianuniversitiestogainmoretechnicalstrength–forexample,anexperiencedteacher/professortohelpwithteachertraining,orasocialworkertocomeandhelpwithstrengtheningCPservices(notadvisabletogeteducationstudentsastheywon’thavetheexperiencetodealwiththesituationsinruralCambodia).

    Educationapproaches

    18.Moreinvestmentandprojectfocusonpre-primaryschoolreadinessandG1-3–thiscouldbecomeatechnicalcoreorfocusforKHEN(withmoretrainingandsupportfromathirdparty)

    19.KHENtolearnaboutuseG1-3readingbenchmarksandlibrarymanagementapproach,andpossiblypilotthisinanextproject-KHENtotryinsmallnumberofschoolsasapilot(tolearnandsuccessattechnique)andtoalsobeabletocomparedifferencesinschools

    20.LooktoinfluenceThursdaylifeskillscourses-introducing‘problemsolvingactivitiesintolifeskillsclassesorintokids’clubs-introducefunactivities–getdirectorsinvolvedtostrengthenadult/studentrelations

    21.Looktoencourageandharnessenthusiasmfromcontractteachersthehatanddevelopthem–KAPE/ChildFundE2Lapproachcouldbereviewedasthathasdemonstratedgoodresultssofar.

    22.Revisetheapproachtothechildren’sclubsand:- enhanceitschild-centeredness;- altertheaimoftheclubstobesafe,comfortable,informativeandalsofunspaces

    forchildren;- improvethestruc