All Hands Meeting

DORII Deployment of Remote

Instrumentation Infrastructure

Norbert [email protected]

PSNC

October 20, 2009, Garching

Page 2: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

The past What was done

Today (AHM) Focus on the topics at the AHM

Increase stability of the middleware components Schedule of upcoming patches

Further dissemination activities Industry related events

Deployment of applications Deployment in MOON (?)

The future Upcoming events Deliverables Next AHM

Introduction

Page 3: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

DORII review

• July 3rd, 2009, Brussels– with a rehearsal a day before

• Programme

Page 4: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

DORII review

“The Project demonstrated strong and effective leadership. All project milestones have been met accordingly. All deliverables have been completed and most of them were on time”.

• Recommendation 1: DeliverablesProvide more concise and focused descriptions of applications, requirements,and results. In the deliverables, the information should not be repeated too often and in all details. The same is also true for the description of the software applications. However, presentations given at the review meeting were convincing.

Page 5: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

DORII review

• Recommendation 2: RequirementsIn the next iteration of requirements: make it more clear which requirements are identified and which of them have already been achieved.

• Recommendation 3: FTE spending (Management)Try to keep FTE spending according to project plans.

• Recommendation 4: Outreach/ExploitationReach out for newer user communities and industry: exploit results as much as possible. Improve the impact of the project. Especially, a strategy must be developed immediately how to maintain and exploit the benefits of DORII after the end of the project. Apart from the currently three scientific areas (see executive summary), other potential users should be involved by this strategy.

• Recommendation 5: Scientific User CommunityFor next review: the scientific user community should report on its experience

Page 6: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

Deliverables

• DSA2.3a Deployment and test of selected applications on the infrastructure - Update

• DNA4.2 Architectural Description of DORII Middleware

• DSA1.3 Final design of the distributed infrastructure over the GEANT network

• DJRA1.4 Next release of JRA components

• DNA1.8 Activity report

• DNA2.6 Report on Dissemination

• DNA4.3 Inventory of Standardization Efforts and Contributions

What was done July-October 2009

Page 7: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

SG meetings Teleconferences every 10 days

Activity meetings/teleconferences NA2, NA3, SA2, JRA1

RISGE RG meeting at OGF27, Canada, Oct. 12-15 Dissemination Events

– ISC2009 conference and exhibition in Hamburg, June 24-26, 2009 (DORII booth)– BalticGrid Summer School, Moletai Observatory (Lithuania), June 29 – July 3,

2009 (DORI presentation)– and local presentations, e.g. at in Genova (Italy, June 8-10), conference of the

National Contact Point in Warsaw (June 2009)– GridKa School, September 2009, Karlsruhe (Germany), with DORII presentation

and tutorial– DORII Summer School, Sept. 2009, St. Stefan (Austria)

What was done July-October 2009

Page 8: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

Forthcoming Events

• Supercomputing 2009 – DORII booth– Portland, U.S., November 2009

• Next AHM – Not decided yet

• OGF28, March 2010• INGRID 2010, May 2010

– Poznań, Poland

• DORII School, May 2010– In conjunction with INGRID conference

Page 9: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

Project phases

Month 3 (April’08) : Requirements analysis Corresponds to milestone MNA3.1

Month 10 (November’08) : First release of infrastructure for applications and instrumentation

This corresponds to specific milestones: MSA2.1, MSA1.1

Month 13 (February 2009): Deployment of the first applications on the infrastructure

Month 18 (JULY 2009): Second version of infrastructure ready, including networking and instrumentation

Month 20: Second deployment of the applications on the infrastructure

Schedule of the deployment What are the current stateNA3 Deliverable

Month 28: Third version of applications, update of the second version, stable, scalable and ready for use by external communities

Page 10: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

Major measurable parameters

Setup up of the OGF research group

Summer Schools: 2 (one per year) Two summer schools organised for scientific communities, presenting the way of how

we can use the eInfrastructure and giving a show of best practices. DORII Summer School 2009 – done DORII School 2010 - TBD

Papers at international conference proceedings, magazines and journals: at least 5 (two per year, one before the end of the project) at least 1 in an international journal.

A professional video presentation about the daily use of the eInfrastructure by scientific groups: Month 24

Deploying the results also to a wider community outside the project We will show and justify that the provided software framework can be

deployed with a reasonably low effort under the MOON consortium (that is ouside the DORII project).

The OGS partner plans to deploy and disseminate the results of the environmental monitoring to other communities.

Prototypes ready for deployment: 3 during the project lifetime, according to the defined milestones: MNA3.2, MNA3.3, MNA3.4.

Page 11: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

Meeting Agenda

Tuesday14.00 - 14.30 Welcome, general status and overview 14.30 - 16.00 Network Infrastructure and QoS - SA1 - WP presentation, discussion16.00 - 16.30 Standardization - presentation (NA4)16.30 - 16.45 Coffee Break16.45 - 17.15 Dissemination presentation (NA2)17.15 Dissemination discussion/next steps / planning for the events (NA2)

Wednesday9.00 - 9.30 Deployment and management of production infrastructure SA2 - WP presentation9.30 - 10.30 Infrastructure discussion , open points (SA2)10.30 - 10.45 coffee break10.45 - 11.45 JRA - general WP presentation, detailed presentation of subtasks11.45 - 12.45 Lunch time12.45 - 14.30 JRA - plans, discussions14.30 - 15.30 Integration team meeting15.30 - 18.00 Integration work

Page 12: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

Meeting Agenda (cont.)

Thursday9.00 - 9.30 Applications NA3 general presentation9.30 - 10.00 Applications general discussion10.00 - 10.15 Coffee break10.15 - 13.30 NA3 applications each pilot application 1. to present online demo on current results 2. open points 3. future plans

13.30 - 14.30 lunch time14.30 - 17:00 NA3 applications presentation17.00 - 17.30 Summary and next steps

Friday 9:00 10:30 SG meeting 10:30 13:00 DORII+ discussion

Page 13: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

Announcements

• No Collaboration Board meeting

• Please propose a place and date for next AHM – February or March ?

Page 14: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.

Upcoming Deliverables

November 1st• DSA1.4Development of prototypes for measuring performance of remote instrumentation infrastructures

December 1st• DNA1.9 Activity report• DNA3.3 Pilot and non-pilot applications – deployment report and evaluation• DNA4.4 Roadmap: Towards a Unified European Remote Instrumentation Grid

Page 15: All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer meyer@man.poznan.pl PSNC October 20, 2009, Garching.