All Electronic Tolling System (AETS) Implementation ProjectAll Electronic Tolling System (AETS)...
Transcript of All Electronic Tolling System (AETS) Implementation ProjectAll Electronic Tolling System (AETS)...
All Electronic Tolling System (AETS) Implementation Project
I-90 (Western Turnpike / Boston Extension) & Harbor Crossings
Stephen M. Collins – MassDOT Director of Statewide Tolling
Presented by:
Donald Bell P.E. - Traffic Technologies, Inc. Phil Miller P.E. - AECOM
Intro
• MassDOT Toll Facilities • Decision to Convert to AET • Procurement Approach • New Roadside (Design Build Procurement) and
BackOffice (Goods and Services Procurement)
• Massachusetts Turnpike Authority – 1952 • Principal Toll Facilities:
– Western Turnpike – Closed/Ticket System • 123 miles – 16 Interchanges
– MHS Extension – Barrier • 12 miles – 3 Toll Barriers
– Boston Harbor Crossings – Barrier • Ted Williams Tunnel • Sumner/Callahan Tunnel • Tobin Memorial Bridge
MassDOT – Tolled Facilities
MassDOT – Tolled Facilities
135 miles end to end
MassDOT – Tolled Facilities • Combined Traffic / Revenue
– 218 million annual transactions • 597K average daily transactions • Averages greater than 700K on weekdays
– $331 million annual revenue – 73% of transactions are paid for via ETC
Reasons to Consider AET
AET Feasibility Study • Evaluated “As-is”, ORT, and AET • Study determined AET:
– Simplifies Roadway Operations – Highest traffic and environmental benefits – Least disruptive to implement – Best long term value – Best customer service for toll-paying customers
All Electronic Tolling System Project Purpose
To eliminate delays associated with tolling; increase the efficiency of maintenance and operations associated with tolling; and improve safety at the point of toll collection.
Tobin Bridge – Ramp TC
Project Area
Boston – See Detail Graphic
Partial Interchange with no Toll PlazaFull Interchange with no Toll Plaza
Full Interchange with Toll Plaza
AET Toll Zone (Both Directions)
Mainline Toll Plaza – One DirectionMainline Toll Plaza – Both DirectionsComplex Interchange with Mainline and Ramp Toll Plazas
MassDOT All Electronic Toll System
Existing Toll Plazas
Future AET System
18 A
llsto
n/ B
right
on
14/ 1
5 - W
esto
n
17 -
New
ton
Cor
ner
16 –
Wes
t New
ton
13 -
Nat
ick
11A
- W
estb
orou
gh
11 -
Mill
bury
10 -
Aub
urn
9 - S
turb
ridge
8 - P
alm
er
7 - L
udlo
w
3 - W
estfi
eld
4 –
Wes
t Spr
ingf
ield
2 - L
ee
1 –
W. S
tock
brid
geN
ew Y
ork
Stat
e Li
ne
12 -
Fram
ingh
am
90
90
954958491
System Interchange
1
1A
90
93
93
93
Tobin Bridge
Sumner / Callahan Tunnels
Williams Tunnel
Prudential Plaza Tunnel
Zakim Bridge
BOSTON
Toll Gantry
Toll Gantry
Toll Gantry
Central Artery Tunnel
N
Mass. Ave.
Exit 22 Clarendon
Arlington
Exit 18 Mass. Ave.
Exit 18/ 20 Brighton
Cambridge
90
Connecting Roads
Toll Gantry
Project Area - Boston
Infrastructure • One Design/Build Contract for New System:
– New Toll Zones and data/power, – New AET Roadside System, – Traffic Control before and at Go Live.
• Follow-up Projects: – Future Demolition of Legacy Plazas – Interchange Reconstruction
MassDOT AET Program • Two methods of payment:
Implementation Timeline Project Phases: Tobin Demonstration – Summer 2014 (GO LIVE TODAY !)
•AETS – “Best Value” Design-Build Procurement* – AETS Construction & Implementation 2014-2016 – 10 year Operations and Maintenance
•Back Office/Customer Service Center – Generally concurrent with AETS Implementation – 10 year Operations – “Best Value” Procurement
•Demolition of legacy plazas – Under Design – Procured in 2016 – Demolition to follow AETS “Go-Live” in 2016
• Interchange Improvements – 2017+
Codependent Implementation
• Concurrent NTP • Concurrent Integration Testing • Concurrent Production Readiness Testing • Concurrent Go-Live • Co-dependent Incentives for early Go-Live • Co-dependent Disincentives for late Go-Live
Operational Performance
• 10 Year Operational Contracts • Both CSC and Roadside/Host Systems are
Performance Standard Driven • Automatic Monthly Invoice Adjustments
AETS Roadside and Host • Roadside & Host System o Toll Zones o Trip Building o Toll Calculation o ALPR/Fingerprinting o Image Review System o Traffic and Revenue System of Record
CSC • Performs Image Review on Host provided
System • Performs Transaction Correction on Host
provided System • All Typical Back Office Functions • E-ZPass Account Management • PAY BY PLATE MA Accounts Management • PAY BY PLATE MA Invoicing
MassDOT’s Tolling Future
All Electronic Tolling System (AETS) Implementation Project
THANK YOU
Presented by:
Phil Miller, P.E. - AECOM Donald Bell, P.E. – Traffic Technologies, Inc.