Aligning an Organization’s Project Delivery with Global Project Management StandardsNorthwest Transportation ConferenceMarch 9th – 11th, 2020CH2M-HILL Alumni Center, Oregon State University, Corvallis, Oregon
Jeff Busch PMP
PROJECT MANAGEMENTA CORE MESSAGE…
“To help organizations maximize their performance and achieve strategic goals.”
When tailored to “fit” to an organization’s culture, project management brings improved value by: Execution of strategy – through repeatable, reliable performance and
standardization
Integration within the organization – through elimination of “silos” and better communication and collaboration
The learning that a developing PM organization undergoes as it explores new products, processes and markets
Jeff Busch PMP
~ Project Management Institute, PMBOK® Guide, – Fifth Edition, PMI
PMI Hierarchy of Terms
City Public Works Wastewater Department
West City WWTP Extension (10-year Program)
Phase III Clarifier Project
NW Trunk Line Extension
Wastewater Operations
Maintenance Project
Jeff Busch PMP Adapted from Construction Extension to the PMBOK® Guide, PMI, Newtown Square, Pennsylvania, 2013
PORTFOLIO Level
PROGRAM Level
PROJECT Level
Strategy
BenefitsControl
ProductsServicesResults
PMI (Processes)Product Development Quality
Think
Study
Research
Implement
Ongoing Operations
Plan
MaintainPhase Out Control
Improve
Initiate
Plan
ExecuteControl Closeout
ConceptDefinition
Proof of Concept
Define
Measure
Analyze
SDLC
Maintenance
Needs Analysis
Systems Analysis/Requirements Gathering
Project Planning
Contract
DefineDevelopLaunch
DesignBuild/TestInstallStartup
Planning & Design
Concept(Pre-feasibility
Construction
Detailed DesignConstruct.Closeout
Warranty Period
Feasibility
Life Cycle Mapping
Jeff Busch PMP
ODOT Racetrack
JACOBS Project Delivery Workflow INITIATION PLANNING EXECUTION CLOSEOUT
Core Processes Support Processes
Jeff Busch PMP
Jeff Busch PMP
Jeff Busch PMP
Effects of Poor Project Performance
Companieswith poor PM practices:
Higher direct costs
Late deliveries
Missed Market opportunities
Dissatisfied customers
Public Agencies with poor PM practices:
Negative press
Late and over budget projects
Not having enough staff for large programs
Or, having too much staff
Not meeting fiscal budget goals
Under/Over obligating
Jeff Busch PMP
Jeff Busch PMP
http://www.pmsolutions.com/news/view/project-management-maturity-research
Companies with more mature PM practices have better performances
73% of the projects at organizations with the high project management maturity meet their original business goals and intents.
Jeff Busch PMP
Jeff Busch PMP
What is Organizational Project Management?
According to the Project Management Institute (PMI):
“OPM is the systematic management of projects, programs, and portfolios in alignment with the organization’s strategic business goals.”
Jeff Busch PMP
Vision
Mission
Organizational Strategy and Objectives
Portfolios, Programs, and ProjectsOrganizational Project Management
Strategy
Cost advantage
Time advantage
Product performance
Public focus
Funding focus
Tangible Benefits Lower non-conformance costs (NCC’s) –
often the key drivers Project margin improvement/recovery Increased market share capture Improved cash flow Improved customer satisfaction Improved time-to-market execution Improved safety, health, or
environmental performance Improved service delivery Improved operational capability or
availability
Intangible Benefits Improved workplace environment More effective leadership Enhanced Career opportunities Improved use of resources which
affect: Morale Retention Attractiveness of the organization Brand recognition and Good Will Increased customer trust
Jeff Busch PMP
Organization Maturity Levels
Jeff Busch PMP
Non-conformance costs (NCC’s) and their relationship with OPM maturity. Maturity scales are shown for both the CMMI-based levels and for OPM3® (SMCI stages). The “Target” is the planned project goal in terms of costs schedule, and scope. The curve represents the actual statistical performance of the organization in accomplishing these objectives. (Sopko, Strausser, 2010).
As PM maturity increases projects become more predictable, profitable.
Organizations with immature PM practices are unpredictable.
Jeff Busch PMP
Jeff Busch PMP
•PMP Certification•PMs take on different types of projects•Smaller organization
City Of Bend
•Larger organization•PM Training – PMP Lite 101•PMP Certification•Strategic PMOs
•Best practices•Tools•Techniques
Bonneville Power Administration
•PM Training internally using PMBOK as foundation•PM Maturity Assessment•Working on increasing PM Maturity
City Of Tacoma
Case Studies