Page 1 of 26 Ali Fakhir Ibrahim Civil Project Engineer E-mail : [email protected] Contact : +9647510665268 LinkedIn : https://www.linkedin.com/in/ali-fakhir-841412134 Nationality: Iraqi Profile Overview Experience in construction field , including the projects management experience in the Gulf countries. Proven ability to take post-contract projects from planning stage through EPC execution stages till successful delivery. Highly skilled in administering and controlling project life cycle deliveries to close projects with technical and commercial success. Excellent in establishing vibrant team work culture, while managing stakeholders’ relationships and Regulatory clearances. PROFESSIONAL SYNOPSIS Experienced in executing projects with total administrative control, and costs running up to multi-billion USD Expertise in Buildings, infrastructures and roads construction with smooth coordination with MEP deliverables Efficient in coordinating design & engineering deliverables, and generation and approval process of project submittals. Competent to review all technical submittals to ensure compliance with approved design and specifications Conversant with engineering & construction codes & standards, contractual conditions, construction methodologies Deft at engaging and managing team and project stakeholders in bringing out key project deliverables in time Proactive in identifying and assessing risks, mitigating risks, and resolving issues & conflicts to minimize impacts on project schedule and milestones Result-focused leader and team player with strong liaison, communication and problem solving skills, ability to raise performance levels, and deal with local authorities & Govt. departments for statutory sanctions and clearances Core competencies include….. Execution Planning Work Programming Site Logistics Set Up Resources Management EPC Coordination Contraction Management Contracts & Claims Relationship Management Budgeting & Cost Control QHSE Administration Quantity Survey & Billing Handover Protocol EXPERIENCE SUMMARY 1-1- TARGET OMAN LLC PROJECT ENGINEER SULTANATE OF OMAN 13 OCT 2014 --- - 20 OCT 2016 Project : HisnA’Shumoukh Extension Phase 17 (DPN /15/14 Construction of RGO Complex at Hisn Al Shumookh - nizwa Client : Royal Court Affairs / Royal Estates / The Palace- Muscat . Value : 19,582,602 Omani Riyal. The Works including : 1-Barracks buildings construction (seven numbers)for the Royal guards officers including all utilities( Strom water pipes lines, sewerage pipes lines , potable water pipes lines , fire fighting pipes lines and irrigation pipes lines 2-All Externals works around the Barracks including the interior roads works length = 8.4km

Transcript of Ali Fakir C.V

Page 1 of 26

Ali Fakhir Ibrahim

Civil Project Engineer

E-mail : [email protected] Contact : +9647510665268 LinkedIn : https://www.linkedin.com/in/ali-fakhir-841412134

Nationality: Iraqi

Profile Overview

Experience in construction field , including the projects management experience in the Gulf countries. Proven ability to take post-contract projects from planning stage through EPC execution stages till successful delivery. Highly skilled in administering and controlling project life cycle deliveries to close projects with technical and commercial success. Excellent in establishing vibrant team work culture, while managing stakeholders’ relationships and Regulatory clearances.

PROFESSIONAL SYNOPSIS

Experienced in executing projects with total administrative control, and costs running up to multi-billion USD

Expertise in Buildings, infrastructures and roads construction with smooth coordination with MEP deliverables

Efficient in coordinating design & engineering deliverables, and generation and approval process of project submittals.

Competent to review all technical submittals to ensure compliance with approved design and specifications

Conversant with engineering & construction codes & standards, contractual conditions, construction methodologies

Deft at engaging and managing team and project stakeholders in bringing out key project deliverables in time

Proactive in identifying and assessing risks, mitigating risks, and resolving issues & conflicts to minimize impacts on project schedule and milestones

Result-focused leader and team player with strong liaison, communication and problem solving skills, ability to raise performance levels, and deal with local authorities & Govt. departments for statutory sanctions and clearances

Core competencies include…..

Execution Planning Work Programming Site Logistics Set Up Resources Management

EPC Coordination Contraction Management Contracts & Claims Relationship Management

Budgeting & Cost Control QHSE Administration Quantity Survey & Billing Handover Protocol

EXPERIENCE SUMMARY

1-1- TARGET OMAN LLC

PROJECT ENGINEER SULTANATE OF OMAN 13 OCT 2014 --- - 20 OCT 2016

Project : HisnA’Shumoukh Extension –Phase 17 (DPN /15/14 Construction of RGO Complex at Hisn Al Shumookh - nizwa

Client : Royal Court Affairs / Royal Estates / The Palace- Muscat .

Value : 19,582,602 Omani Riyal.

The Works including :

1-Barracks buildings construction (seven numbers)for the Royal guards officers including all utilities( Strom water pipes

lines, sewerage pipes lines , potable water pipes lines , fire fighting pipes lines and irrigation pipes lines

2-All Externals works around the Barracks including the interior roads works length = 8.4km

Page 2 of 26

Responsibilities:

1-Manage and coordinate multidiscipline engineering activities to ensure project is executed in a safe, efficient, cost effective and timely

manner. Mainly Infrastructure and buildings experience (worked, water and buildings).

2-Act as primary technical coordination interface with client to ensure that the client’s expectations are satisfied.

3- Ensure the project conforms to the client’s approved Basis of Design and all applicable regulatory and code requirements ofspecific

accountabilities

4- Maintains HSE focus within the team to ensure OHSE requirements included in design and procurement.

5- Proactively resolves performance, scope and schedule issues with the Client as they arise.

6- Identifies , documents, communicates and meets the client’s requirements

7- Time Management

8- Contributes to the development of overall project schedule.

9- Supervises work in accordance with the approved schedule.

10- Focuses team on achievement of milestones and other key project objectives.

11- Listens to the team, discusses the issues, resolves problems and directs activities to remove roadblocks and achieve objectives.

12- Sets clear objectives to the design team, including achieving productivity and budget targets.

13- Ensures design team aware of, and complies with, applicable regulations and codes.

14- Manages inter-discipline interfaces effectively.

15- Procurement/Subcontracts Management

1-2. SULTANATE OF OMAN / SUR

Project : Construction of Water Distribution Network in Sur City and Adjoining areas

Client : Public Authority for Electricity and Water.

Consultant : Malcolm Pirnie Engineering Consultancy.

Value : 17,106,872 Omani Riyal.

Works Scope including :

Excavation, Laying, Hydro testing and Backfilling works of HDPE networks in Sur in South eastern governorate/ Sultanate

of Oman/the works including 171,247. KM length

( diameters 125 mm, 180mm, 250mm and 315 mm) Including wadi casting and gabion protection works.

Excavation, Laying , Hydro testing and Backfilling works of ductile iron Pipe total length =35 Km ( Diameter 150 mm, 300,

350mm, 400, 500 mm) including, thrust blocks, anchor blocks, Wadi casting and Gabion protection works.

Construction of Four Numbers water elevated tanks ( Capacity 1500 m3 ) with Yard piping works.

Construction of one water elevated tank (Capacity 1000 m3) with Yard piping works.

Construction of one water elevated tanks (Capacity 500 m3) with Yard piping works.

Construction of Ground Reservoir (Capacity 15000 m3) with Yard piping works.

Construction of Ground Reservoir (Capacity 5000 m3) with Yard piping works.

Construction of Pressure reducer valve chambers (N0 .16) with fitting installation and all accessories.

Construction of District flow meter chambers(No 7) with fitting installation and all accessories

Thrust boring works ( 20 Numbers) using steel sleeves DIA 700 mm by Jacking method

Construction of Gate valve chambers for Ductile Iron line No 5o with fitting installation and all accessories.

Construction of Chlorine chambers (No. 4) with all accessories.

Construction of washout chambers for DI line and HDPE line No 63 with fitting installation and all accessories.

Construction of Non return Valve (No 2) chambers with fitting installation and all accessories.

Construction of Flow control valve chambers (No.2) with fitting installation and all accessories.

Flushing and disinfection works for The Elevated tanks, Ground reservoirs and pipes networks, with shutdown works and

tapping with existing networks.

Responsibilities:

1-Planning & managing the construction project from conception to completion.

2-Ensuring the project is completed on time, within budget & with the required quality

3-Preparing all correspondence with various parties including valuations & claims.

4-Liaising with clients ,consultants and attending regular meetings.

5-Monitor and supervise Project progress to ensure specification, cost and schedule remain within defined limits.

6-Prepare, Supervise & Manage the preparation of project Scopes of work, Drawings, cost estimates, schedules, , change control and

procurement &construction contractor technical evaluation.

Page 3 of 26

2- YUKSEL INSAAT.A.S

SENIOR STRUCTURAL AND UTILITIES ENGINEER IRAQ / ERBIL/ KURDISTAN REGIONAL 7 SEP 2010----1 SEP 2014

Project : KORA-SHAQLAWA-QANDEEL High way project /Erbil / Iraq

Client : Ministry of Reconstruction and housing / General directorate of Roads and Bridges (GDRB) In Kurdistan

Consultant : Al Muhandis Engineering Consultancy

Contractor : Yuksel Insaat. A.S

Value : 178,628,200 USA Dollar

Works Scope Including:

Drainage pipes PVC Laying (Total length =90 Km, Concrete pipes =30 Km and GRP pipes laying (total length = 20.5 Km

laying with installation of manholes.

Earth works ( Cutting and Filling works ) for Road works

Box and drainage culverts construction.

Construction Five Numbers Overpass Bridges and interchanges.

Underpasses constructions.

Concrete ditches and open cannels construction 120km all types.

Tunnel length 900 m each tube works, lining works and drainage systems.

Pavement works including Road base layers ,Wet mix layer, Bitumen base course, Binder course layer ,Wearing course layer,

road guard rails installation and road marking works

Responsibilities:

1-Checking plans, drawings and quantities for accuracy of calculations.

2-Ensuring that all materials used and work performed are as per specifications.

3-Overseeing the selection and requisition of materials and plant.

4-Managing, monitoring and interpreting the contract design documents supplied by the client/architect.

5-liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.

6-liaising with the local authority (where appropriate to the project) to ensure compliance with local construction regulations and by-laws.

7-liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them

informed of progress.

8-day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.

9-planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.

10-overseeing quality control, health and safety matters on site.

11-preparing reports as required.

12-resolving any unexpected technical difficulties and other problems that may arise.

3-Al UBOOR CONTRACTING COMPANY / UNITED ABAB EMIRATES

PROJECT ENGINEER UNITED ABAB EMIRATES/ DUBAI 27 Sep 2009-----01 Sep 2010 Project : Canal city development, Dubai /UAE

Client : MERAAS development / Dubai

Consultant : Al Turath engineering consultancy.

Value : 40,000,000 AED

Works Scope Including

Relocation of existing water line dia 600mm ( length 7.3 Km) with washout, flow meter and air valves chambers construction.

Page 4 of 26

Responsibilities:

1-Estimate the quantities, Follow up with supplier and cost control of the project..

2-Supervising the activities of site engineers.

3-Provide the technical advices regarding the design, Construction program, modification managerial personal

4-Attend the meetings and discuss projects activities with the client.

4-YUKSEL DUBAI CONSTRUCTION LLC . /DUBAI /UNITED ARAB EMIRATES.

PROJECT ENGINEER

UNITED ARAB EMIRATES

1 Sep 2007-----1 Sep 2009

Project : Al Nahada –Beirut Junction /Dubai /UAE

Client : Roads and Transport Authority / Dubai /UAE.

Consultant : Parson –Deleuw ,Cather Overseas/ Dubai/UAE.

Value : 227,832,920 AED

Works Scope Including:

1-Implemented in connection to Phase II of the Dubai International Airport improvement, this project includes the construction of

a 630 m tunnel (on the Al Nahda highway) and a 2x3 lane 353 m. bridge (on the Beirut highway), as well as improvement and

construction of two at-grade interchanges. Road signs, landscaping, street lighting, irrigation system, drainage systems, and tunnel

safety works were also carried out within the scope of works..

2- GRP Sewerage Pressure Line – Laying of GRP 1200mm Pressure lineswith all testingwith construction of chambers as shown:

NDRC works(7 nos.) of length 391m

Pressure line 3½ km

Construction of 5 nos. thrust blocks, chambers work including washout chamber 4 nos., air valve chambers 4 nos., access

chambers 1 no. and connection chambers 2 nos.

700mm DIA- AC Irrigation pipe line of 1½ km relocation with construction of air valves and washout chambers.

600mm DIA- AC Water Line – Dubai Electricity and Water Authority (DEWA) including:

600mm DIA - AC Pipeline laying of 2.28km with NDRC works 9 nos.

Butterfly valves chambers works and AC pipe fittings including flexible joints.

Steel sleeves works, Supports, protection ancillaries and all related works.

Precast concrete elements works .

Responsibilities:

1-Planning & managing the construction project from conception to completion .

2-Ensuring the project is completed on time, within budget & with the required quality .

3-Preparing all correspondence with various parties including valuations &claims .

4-Liaising with clients & consultants and attending regular meetings .

5-Monitor and supervise Project progress to ensure specification, cost and schedule remain within defined limits.

6-Prepare, Supervise & Manage the preparation of project Scopes of work, Drawings, cost estimates, schedules, performance

evaluation of bid analysis, change control and procurement & construction contractor technical evaluation .

7-Administer all policies and procedures for Procurement & Construction contractor Qualifications.

Page 5 of 26

5-BIN HADHER GROUP / SHARJAH /UNITED ARAB EMIRATES.

CIVIL SITE ENGINEER

UNITED ARAB EMIRATE

1 JAN 2007----1 AUG 2007 Project : G + 10 Floors / Residential and commercial Building in Sharjah / UAE

Client : Armada Properties

Consultant : Oriental innovation Consultancy /Sharjah

Value : 11,200,000 AED

Responsibilities:

1-Managing the civil sites activities and coordinating with Consultants and Clients

2-Preparing the Sites daily reports and follow up the program of works

3-Coordinating with project Engineer regarding the requirements of the site work

4-Preparing the request for inspection and submit to the Consultant for approval.

5-Attending the daily, weekly and monthly meeting and reporting the Project Engineer regarding the daily activities of works

in site.

6-PETRO LAND CONSTRUCTION COMPANY CIVIL SITE ENGINEER IRAQ /BAGHDAD FEB2005----DEC 2006

Project : Sewerage Pumps Station Construction

Client : Baghdad Municipality

Consultant : Municipality Engineering Consultancy

Contractor : Petro Land Construction Co.

Value : 119,225,256 USD

Works Scope Including:

Sewerage pumps station construction with GRP pipe laying 17km and sewerage pumps stations in Baghdad.

Responsibilities:

1-checking plans, drawings and quantities for accuracy of calculations;

2-ensuring that all materials used and work performed are as per specifications;

3-overseeing the selection and requisition of materials and plant;

4-managing, monitoring and interpreting the contract design documents supplied by the client/architect;

5-liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general staff.

MINISTRY OF RECONSTRUCTION AND HOUSING /AL MUTASIM CONTRACTING COMPANY

CIVIL SITE ENGINEER

IRAQ/BAGHDAD

23 AUG 2003----JAN 2005

Project: Rehabilitation of Ministry of water resources building ( Basement+G+11) in Baghdad Project 2: Construction of Residential complexes for Baghdad University Staff Total Value of Project : 30,654,327 USD

Page 6 of 26

Education

Bachelor degree in Civil Engineering, Al Mustansiriya University /college of Engineering/ graduated year oct 2002

Primavera Project Planner from Interman Institute in Sharjah/ United Arab Emirates/in 2008 Computer Skills

Programs: MS Office, Primavera Project Planner, AutoCAD 2D & 3D

Others: Internet Applications Languages Arabic / Native language

English /Fluent in conversation, reading and writing

Turkish / Intermediate in Conversation , reading and writing

Urdu / Intermediate in Conversation and reading

PERSONAL PARTICULARS

Date of Birth: 24 January /1980

Nationality: Iraqi

Marital Status: Single

Driving License: Light vehicle (Valid up to 2024) Issued From Sultanate of Oman

MEMBERSHIP

Aregistered member of Iraqi engineers union with registration number (102571) in 20/10/2002 and civil engineer with 13 years of

experience ,capable of working independently and committed to provide high quality services to every project with focus on progress .

REFERENCES

Name Designation Company Contact Number

1- Mohammed Fateh Telli Project Manager YUKSEL INSAAT A.S 00905422571937

E-mail : [email protected]

2- Mohammed Abbas Project Manager Al RAJEHI CONSTRUCTION 00966555071785

E-mail : [email protected]

3- Abu Al Dhahab Hussain Bakhait Project Manager OMIS CONSTRUCTION/DUBAI 00971507760016

E-mail : [email protected]

Page 7 of 26

High rise at Sharjah

Page 8 of 26

Page 9 of 26

Page 10 of 26

Page 11 of 26

Page 12 of 26

Page 13 of 26

Page 14 of 26

PREVIOUS PROJECTS PHOTOGRAPHS

1-Extension of Hisn Al Shmookh Phase-17 / Sultanate of Oman / Buildings works

2-Extension of Hisn Al Shmookh Phase-17 / Sultanate of Oman / Internal Roads works

Page 15 of 26

3-Extension of Hisn Al Shmookh Phase-17 / Sultanate of Oman / Internal Roads works

4- Sultanate of Oman /Sur/Target Oman LLC /

Project : Construction of water distribution network in Sur City

Client : Public authority for electricity and water

Page 16 of 26

5-Sultanate of Oman /Sur/Target Oman LLC /

Project : Construction of water distribution network in Sur City

Client : Public authority for electricity and water /Pipes laying works for DI line at Sur City

6-Sultanate of Oman /Sur/Target Oman LLC /

Project : Construction of water distribution network in Sur City

Client : Public authority for electricity and water /Pipes laying works for DI line at Sur City

Page 17 of 26

7-Construction of Ground reservoir with Capacity 5000 m3

8-Construction of elevated tank with Capacity 1000 m3 in Sur /Oman

Page 18 of 26

9-Construction of elevated tank with Capacity 1500 m3 in Sur /Oman

10-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat

Page 19 of 26

11-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat/ Bridge construction

12-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat/ Road pavements

13-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat

Construction of Tunnel length 900 m for each Tube

Page 20 of 26

14-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat/ Roads works and Ditches

15-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat

Asphalt plant

Page 21 of 26

16-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat

Crushers

17-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat

Construction of Box culverts

Page 22 of 26

18-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat

Construction of Box culverts

19-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat

Construction of Drainage Culvert

Page 23 of 26

20-Project : Al Nahda – Beirut –Junction / Dubai/ UAE

Client : Roads and transport Authority / Dubai/ UAE

Company :YukselInsaat .A.S / Dubai/ UAE

Page 24 of 26

21-Project : Construction of Sewerage pumps station and net works in Baghdad

Client : Baghdad Municipality

GRP pipes laying

22-Project : Construction of Sewerage pumps station and net works in Baghdad

Client : Baghdad Municipality

GRP pipes laying

Page 25 of 26

23-Project : Construction of Sewerage pumps station and net works in Baghdad

Client : Baghdad Municipality

GRP pipes laying

24-Project : Reconstruction of Ministry of water resources in Baghdad

Client : Ministry of Water resources

Company : Al Mutasim company / Ministry of reconstruction and housing .

Page 26 of 26

25-Project : Reconstruction of Ministry of water resources in Baghdad

Client : Ministry of Water resources

Company : Al Mutasim company / Ministry of reconstruction and housing .

26-Project : Reconstruction of Ministry of water resources in Baghdad

Client : Ministry of Water resources

Company : Al Mutasim company / Ministry of reconstruction and housing .