INFANT FEEDING DR. MOHAMMAD F. IBRAHEEM DEPARTMENT OF PEDIATRICS (2)
ALI FAKHIR IBRAHEEM - C.V
-
Upload
ali-fakhir -
Category
Documents
-
view
40 -
download
0
Transcript of ALI FAKHIR IBRAHEEM - C.V
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 1 of 34
ALI FAKHIR IBRAHEEM
PROJECT ENGINEER
A registered member of Iraqi engineers union with registration number (102571) in 20/10/2002 and civil engineer with 13 years of experience ,capable of working independently and
committed to provide high quality services to every project with focus on progress .
PERSONAL INFORMATIONS:
Full Name : Ali Fakhir Ibraheem
Nationality : Iraqi
Date of birth : 24/01/1980
Marital Status : Married
Driving license : Having both Emirati & Omani driving license
Languages : Arabic, English, Turkish and Urdu.
Contact No : 009647510665268
Address : Iraq/ Baghdad
E-mail : [email protected]
EDUCATION:
B.Sc.in Civil engineering department from college of engineering / Al Mustansiriya university in
academic year 2001/2002.
COMPUTER SKILL:
Engineering programs (Primavera P6), Auto-Cad 2D, 3D, Land Development Micro Station,
Microsoft (Word, Excel & Power Point)
SKILLS AND RESPONSIBILITIES:
Organization and supervision the functions of the projects.
Execution and provide leadership key responsibilities.
Coordination with concerned departments according to project requirements
Shop drawing reviewing and providing feedback to engineering departments as and when
required.
Managing the projects schedules and arrangements the resources.
Ensuring the specification, standards as per requirements.
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 2 of 34
WORK EXPERIENCE: Total 13 Years
1- SULTANATE OF OMAN / NIZWA
Period : 15.03.2016 TO 20.10.2016
Company : Tatget Oman LLC
Designation : Project Engineer
Project : Hisn A’Shumoukh Extension –Phase 17 (DPN /15/14)
Construction of RGO Complex at Hisn Al Shumookh / Nizwa
Client : Royal Court Affairs / Royal Estates / The Palace- Muscat .
Value : 19,582,602 Omani Riyal.
The Works including :
1- Barracks buildings construction (seven numbers) for the Royal guards officers including all
utilities ( Strom water pipes lines, sewerage pipes lines , potable water pipes lines , fire fighting
pipes lines and irrigation pipes lines.
2- All Externals works around the Barracks including the interior roads works ( length = 8.4 Km )
Responsibilities:
1-Manage and coordinate multidiscipline engineering activities to ensure project is executed in a safe,
efficient, cost effective and timely manner. Mainly Infrastructure and buildings experience (worked,
water and buildings).
2-Act as primary technical coordination interface with client to ensure that the client’s expectations
are satisfied.
3- Ensure the project conforms to the client’s approved Basis of Design and all applicable regulatory
and code requirements of specific accountabilities
4- Maintains HSE focus within the team to ensure OHSE requirements included in design and
procurement.
5- Proactively resolves performance, scope and schedule issues with the Client as they arise.
6- Identifies , documents, communicates and meets the client’s requirements
7- Time Management
8- Contributes to the development of overall project schedule.
9- Supervises work in accordance with the approved schedule.
10- Contributes to compliance with Worley Parsons policies and procedures.
11- Focuses team on achievement of milestones and other key project objectives.
14- Listens to the team, discusses the issues, resolves problems and directs activities to remove
roadblocks and achieve objectives.
15- Sets clear objectives to the design team, including achieving productivity and budget targets.
16- Ensures design team aware of, and complies with, applicable regulations and codes.
17- Manages inter-discipline interfaces effectively.
18- Procurement/Subcontracts Management
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 3 of 34
2. SULTANATE OF OMAN / SUR
Period : 13.10.2014 TO 25.01.2016
Company : Target Oman LLC
Designation : Project Engineer
Project : Construction of Water Distribution Network in Sur City and Adjoining areas
Client : Public Authority for Electricity and Water.
Consultant : Malcolm Pirnie Engineering Consultancy.
Value : 17,106,872 Omani Riyal.
Works Scope including :
Excavation, Laying, Hydro testing and Backfilling works of HDPE networks in Sur in South
eastern governorate/ Sultanate of Oman /the works including 171,247. KM length
( diameters 125 mm, 180mm, 250mm and 315 mm) Including wadi casting and gabion
protection works.
Excavation, Laying , Hydro testing and Backfilling works of ductile iron Pipe total length =35
Km ( Diameter 150 mm, 300, 350mm, 400, 500 mm) including, thrust blocks, anchor blocks,
wadi casting and Gabion protection works.
Construction of Four Numbers water elevated tanks ( Capacity 1500 m3 ) with Yard piping
works.
Construction of one water elevated tank (Capacity 1000 m3) with Yard piping works.
Construction of one water elevated tanks (Capacity 500 m3) with Yard piping works.
Construction of Ground Reservoir (Capacity 15000 m3) with Yard piping works.
Construction of Ground Reservoir (Capacity 5000 m3) with Yard piping works.
Construction of Pressure reducer valve chambers (N0 .16) with fitting installation and all
accessories.
Construction of District flow meter chambers (No 7) with fitting installation and all
accessories
Thrust boring works ( 20 Numbers) using steel sleeves DIA 700 mm by Jacking method
Construction of Gate valve chambers for Ductile Iron line No 5o with fitting installation and
all accessories.
Construction of Chlorine chambers (No. 4) with all accessories.
Construction of washout chambers for DI line and HDPE line No 63 with fitting installation
and all accessories.
Construction of Non return Valve (No 2) chambers with fitting installation and all
accessories.
Construction of Flow control valve chambers (No.2) with fitting installation and all
accessories.
Flushing and disinfection works for The Elevated tanks, Ground reservoirs and pipes
networks, with shutdown works and tapping with existing networks.
Responsibilities:
1-Planning & managing the construction project from conception to completion.
2-Ensuring the project is completed on time, within budget & with the required quality
.
3-Preparing all correspondence with various parties including valuations & claims.
4-Liaising with clients & consultants and attending regular meetings.
5-Monitor and supervise Project progress to ensure specification, cost and schedule remain within
defined limits.
6-Prepare, Supervise & Manage the preparation of project Scopes of work, Drawings, cost estimates,
schedules, , change control and procurement & construction contractor technical evaluation.
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 4 of 34
2- IRAQ / ERBIL/ KURDISTAN REGIONAL
Period : 07.09.2010 TO 01.09. 2014
Company : Yuksel Insaat.A.S. Erbil / Iraq
Designation : Structural and drainage Senior Engineer
Project : KORA-SHAQLAWA-QANDEEL High way project /Erbil / Iraq
Client : Ministry of Reconstruction and housing / General directorate of Roads and
Bridges (GDRB) In Kurdistan regional government /Iraq
Consultant : Al Muhandis Engineering Consultancy
Contractor : Yuksel Insaat. A.S
Value : 178,628,200 USA Dollar
Works Scope Including:
Drainage pipes PVC Laying (Total length =90 Km, Concrete pipes =30 Km and GRP pipes
Laying (total length = 20.5 Km laying with installation of manholes.
Earth works ( Cutting and Filling works ) for Road works
Box and drainage culverts construction.
Construction Five Numbers Overpass Bridges and interchanges.
Underpasses constructions.
Concrete ditches and open cannels construction 120km all types.
Tunnel length 900 m each tube works , lining works. Drainage systems.
Pavement works including Road base layers ,Wet mix layer, Bitumen base course, Binder
course layer ,Wearing course layer, road guard rails installation and road marking works
Responsibilities:
1-Checking plans, drawings and quantities for accuracy of calculations.
2-Ensuring that all materials used and work performed are as per specifications.
3-Overseeing the selection and requisition of materials and plant.
4-Managing, monitoring and interpreting the contract design documents supplied by the
client/architect.
5-liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the
general workforce involved in the project.
6-liaising with the local authority (where appropriate to the project) to ensure compliance with local
construction regulations and by-laws.
7-liaising with clients and their representatives (architects, engineers and surveyors), including
attending regular meetings to keep them informed of progress.
8-day-to-day management of the site, including supervising and monitoring the site labour force and
the work of any subcontractors.
9-planning the work and efficiently organizing the plant and site facilities in order to meet agreed
deadlines.
10-overseeing quality control, health and safety matters on site.
11-preparing reports as required.
12-resolving any unexpected technical difficulties and other problems that may arise.
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 5 of 34
3. UNITED ARAB EMIRATES
Period : 27.10. 2009 TO 01.09. 2010
Company : Al Uboor Contracting Company / Dubai/ UAE
Designation : Project Engineer
Project : Canal city development, Dubai /UAE
Client : Meraas development / Dubai
Consultant : Al Turath engineering consultancy.
Contractor : Al Uboor Contracting Company / Dubai/ UAE
Value : 40,000,000 UAE DHS
Works Scope Including
Relocation of existing water line dia 600mm ( length 7.3 Km) with washout, flow meter and air
valves chambers construction.
Responsibilities:
1-Estimate the quantities, Follow up with supplier and cost control of the project..
2-Supervising the activities of site engineers.
3-Provide the technical advices regarding the design, Construction program, modification managerial
personal.
4-Attend the meetings and discuss projects activities with the client.
5-Follow up all sites requirements, drawings and materials.
4. UNITED ARAB EMIRATES
Period : 01.09. 2007 TO 01.09. 2009
Main Contractor: Yuksel Dubai construction company
Designation : Project Engineer
Project : Al Nahada –Beirut Junction /Dubai / UAE
Client : Roads and Transport Authority / Dubai /UAE.
Consultant : Parson –Deleuw ,Cather Overseas / Dubai/UAE.
Value : 227,832,920 UAE DHS
Works Scope Including:
1- Implemented in connection to Phase II of the Dubai International Airport improvement, this
project includes the construction of a 630 m tunnel (on the Al Nahda highway) and a 2x3 lane 353
m. bridge (on the Beirut highway), as well as improvement and construction of two at-grade
interchanges. Road signs, landscaping, street lighting, irrigation system, drainage systems, and
tunnel safety works were also carried out within the scope of works..
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 6 of 34
2- GRP Sewerage Pressure Line – Laying of GRP 1200mm Pressure lines with all testing with
construction of chambers as shown:
NDRC works(7 nos.) of length 391m
Pressure line 3½ km
Construction of 5 nos. thrust blocks, chambers work including washout chamber 4 nos., air
valve chambers 4 nos., access chambers 1 no. and connection chambers 2 nos.
700mm DIA- AC Irrigation pipe line of 1½ km relocation with construction of air valves and
washout chambers.
600mm DIA- AC Water Line – Dubai Electricity and Water Authority (DEWA) including:
600mm DIA - AC Pipeline laying of 2.28km with NDRC works 9 nos.
Butterfly valves chambers works and AC pipe fittings including flexible joints.
Steel sleeves works, Supports, protection ancillaries and all related works.
Precast concrete elements works .
Responsibilities:
1-Planning & managing the construction project from conception to completion .
2-Ensuring the project is completed on time, within budget & with the required quality .
3-Preparing all correspondence with various parties including valuations & claims .
4-Liaising with clients & consultants and attending regular meetings .
5-Monitor and supervise Project progress to ensure specification, cost and schedule remain within
defined limits.
6-Prepare, Supervise & Manage the preparation of project Scopes of work, Drawings, cost estimates,
schedules, performance evaluation of bid analysis, change control and procurement & construction
contractor technical evaluation .
7-Administer all policies and procedures for Procurement & Construction contractor Qualifications.
5. UNITED ARAB EMIRATES
Period : 01.01.2007 TO 01.08.2007 .
Company : Bin Hadher Contracting Company / Sharjah/UAE
Designation : Site Engineer
Project : : G + 8 Floors Residential and commercial Building
Client : Armada Properties
Consultant : Oriental innovation Consultancy Sharjah
Contractor Bin Hadher Contracting Company / Sharjah/UAE
Value : 18,267,986 UAE DHS
Responsibilities:
1- Managing the civil sites activities and coordinating with Consultants and Clients
2- Preparing the Sites daily reports and follow up the program of works
3- Coordinating with project Engineer regarding the requirements of the site work
4- Preparing the request for inspection and submit to the Consultant for approval.
5- Attending the daily, weekly and monthly meeting and reporting the Project Engineer regarding
the daily activities of works in site.
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 7 of 34
6- IRAQ- BAGHDAD
Period : 01.02. 2005 TO 01.12. 2006
Company : Petro Land Construction Co., Baghdad
Designation : Site Engineer
Project : Sewerage Pumps Station Construction
Client : Baghdad Municipality
Consultant : Municipality Engineering Consultancy
Contractor : Petro Land Construction Co.
Value : 119,225,256 $
Works Scope Including:
Sewerage pumps station construction with GRP pipe laying 17km and sewerage pumps stations in
Baghdad.
Responsibilities:
1-checking plans, drawings and quantities for accuracy of calculations;
2-ensuring that all materials used and work performed are as per specifications;
3-overseeing the selection and requisition of materials and plant;
4-managing, monitoring and interpreting the contract design documents supplied by the
client/architect;
5-liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the
general staff.
7- IRAQ- BAGHDAD (MINISTRY OF RECONSTRUCTION AND HOUSING).
Period : 23.08. 2003 TO 01.01. 2005
Designation : Site Engineer
Company : Al Mutasim General Contracting
Client : Ministry of water resources / Baghdad/ IRAQ
Title : Site Engineer
Value : 30,654,327 $
Works Scope Including:
Reconstruction of Ministry of Water Resources Buildings (B+G+11) in Baghdad.
Construction Steel Structure Building (G+8) in Baghdad.
Construction of Complexes buildings (G+2) in Baghdad.
Responsibilities:
1-checking plans, drawings and quantities for accuracy of calculations;
2-ensuring that all materials used and work performed are as per specifications;
3-overseeing the selection and requisition of materials and plant;
4-managing, monitoring and interpreting the contract design documents supplied by the
client/architect;
5-liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the
general staff.
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 8 of 34
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 9 of 34
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 10 of 34
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 11 of 34
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 12 of 34
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 13 of 34
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 14 of 34
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 15 of 34
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 16 of 34
Project :Extension of Phase -17 Hisn Al Shmookh / Sultanate of Oman / Buildings works.
Client : Royal Affairs court / Oman
Company : Target Oman LLC
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 17 of 34
Extension of Hisn Al Shmookh Phase-17 / Sultanate of Oman / Roads works and External
works
2)) Sultanate of Oman /Sur/Target Oman LLC /
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 18 of 34
Project : Construction of water distribution network in Sur City
Client : Public authority for electricity and water
Construction of Ground reservoir with Capacity 15000 m3 and eleveated tank with capacity
1500 m3
Sultanate of Oman /Sur/Target Oman LLC /
Project : Construction of water distribution network in Sur City
Client : Public authority for electricity and water /Pipes laying works for DI line at Sur City
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 19 of 34
Laying of DI line Dia 800 mm Water line
Construction of Ground reservoir with Capacity 5000 m3
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 20 of 34
Construction of elevated tank with Capacity 1500 m3
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 21 of 34
Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 22 of 34
Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 23 of 34
Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 24 of 34
Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
Construction of Tunnel length 900 m for each Tube
Road works and ditches
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 25 of 34
Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
Asphalt plant
Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
Crushers
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 26 of 34
Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
Crushers
Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
Construction of High way
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 27 of 34
Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
Construction of Tunnel each tube = 900 m Length
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 28 of 34
Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
Construction of Box culverts
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 29 of 34
Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
Construction of Drainage Culvert
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 30 of 34
Project : Al Nahda – Beirut –Junction / Dubai/ UAE
Client : Roads and transport Authority / Dubai/ UAE
Company : Yuksel Insaat .A.S / Dubai/ UAE
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 31 of 34
Baghdad Municipality / Petroland Company Sewerage pumps station / Baghdad
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 32 of 34
Project : Construction of Sewerage pumps station and net works in Baghdad
Client : Baghdad Municipality
GRP pipes laying
Project : Construction of Accommodation complex for Baghdad university staff
Client : Ministry of higher education and scientific research
Company : Al Mustasim Company / Ministry of reconstruction and housing / Iraq / Baghdad
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 33 of 34
Project : Construction of Accommodation complex for Baghdad university staff
Client : Ministry of higher education and scientific research
Company : Al Mustasim Company / Ministry of reconstruction and housing / Iraq / Baghdad
CURRICULUM VITAE
ALI FAKHIR IBRAHEEM
Page 34 of 34
Project : Reconstruction of Ministry of water resources in Baghdad
Client : Ministry of Water resources
Company : Al Mutasim company / Ministry of reconstruction and housing .