Algeria Part of RWE Dea’s Growth · Field Development Reggane Nord, Algeria . RWE Dea 11.09.2014...
Transcript of Algeria Part of RWE Dea’s Growth · Field Development Reggane Nord, Algeria . RWE Dea 11.09.2014...
Algeria – Part of RWE Dea’s Growth
Path
Christoph Schlichter RWE Dea AG Hamburg, 15 September 2014
RWE Dea 11.09.2014 PAGE 2
Germany
* OE = Oil Equivalents
Azerbaijan
RWE Dea: Where we come from,
and where we stand today
Ukraine
RWE Dea Facts & Figures 2013
115 years
17 countries
160 licences
230 mn m³ OE* resources
5 mn m³ OE* production
€ 2 bn sales
€ 524 mn profit
€ 634 mn investments
1,443 employees from 50 nations
Canary
Islands
Libya
Mauritania
Poland
Norway
United Kingdom
Trinidad & Tobago
Ireland
Algeria
Denmark
Suriname
Egypt
Turkmenistan
Guyana
RWE Dea 11.09.2014 PAGE 3
We want to secure our future growth in North
Africa by continued investments
North Africa Region with high potential
RWE Dea holds a very good position in terms
of reserves in Egypt, Algeria and Libya
Objective
> Maintain a high level of production
> Carry out field development projects
> “Frontier exploration”
Current focus
2014:
Further development
of the Disouq gas
fields in Egypt
Field Development
Reggane Nord,
Algeria
RWE Dea 11.09.2014 PAGE 4
1 – 10 years 3 – 6 years 2 – 6 years 2 to > 40 years
6 – 22 years
RWE Dea covers the entire value chain in the
upstream business
Concession acquisition
Exploration wells
Rehabilitation Concept selection
Reservoir description
Construction and installation
Production Data acquisition and evaluation
1 2 3 4 5 6 7 8
Suriname, Trinidad & Tobago
Titan, Skarfjell, Zidane (Norway), NC 193 / 195 (Libya)
Reggane (Algeria), Knarr (Norway)
Breagh, Clipper South, Devenick (UK), Disouq (Egypt)
Examples of projects under way
Reggane: 2003 2009 2012 2013 2017
RWE Dea 11.09.2014 PAGE 5
Algerian Reggane Nord Project
entering execution phase
Well aligned Partnership moving forward
significant gas project
> Partner: Sonatrach (40.0%), Repsol
(29.25%), RWE Dea (19.5%), Edison
(11.25%)
> 2011-Nov: RDD approval by ALNAFT
> 2012-Sep: Registration of Groupement
Reggane
> 2014-May: Entering Execute Phase
> 2017-Summer: First gas
RWE Dea 11.09.2014 PAGE 6
Central Processing Facility (CPF) - Plot plan
EQUIPMENT LIST
1 SLUGCATCHERS & RECEPTION 16 PRODUCED WATER STORAGE
2 BOOSTER COMPRESSION 17 HEATING MEDIUM SYSTEM
3 ACID GAS REMOVAL UNIT (AGRU) 18 FUEL GAS SYSTEM
4 GAS DEHYDRATION 19 POWER GENERATION
5 HYDROCARBON DEW-POINTING 20 CHEMICAL INJECTION
6 EXPORT GAS COMPRESSION 21 DIESEL STORAGE SYSTEM
7 EXPORT GAS 22 CLOSED DRAINS SYSTEM
8 CONDENSATE STABILISATION 23 OPEN DRAINS SYSTEM
9 CONDENSATE STORAGE 24 COMPRESSED AIR
10 OFF-SPEC CONDENSATE STORAGE 25 PLANT WATER
11 HP/LP/ATMOS FLARE 26 DEMINERALISED WATER
12 HP/LP/ATMOS FLARE 27 SERVICE WATER
13 LIQUID FLARE 28 FIRE WATER
14 ACID GAS VENT 29 NITROGEN WATER
15 PRODUCED WATER TREATMENT
RWE Dea 11.09.2014 PAGE 7
<Datum>
Wells and Gathering Infrastructure
Production Profile
KCA-Deutag
rig
RWE Dea 11.09.2014 PAGE 8
<Datum>
Overview of Infrastructure
RWE Dea 11.09.2014 PAGE 9
The stated objective is to grow internationally
Europe
Focus on
> United Kingdom
> Norway
> Germany
Increasing
reserves
Focus on
> Egypt, Libya
> Algeria
MENA Region
Caspian / Black Sea region
Focus on
> Azerbaijan, Ukraine
> Turkmenistan, Kazakhstan
Latin America / in T&T region
Focus on
> Trinidad & Tobago,
Southern Caribbean
> Equatorial Region of South America
Sub-Sahara Africa Australasia
Thank you
for your
attention