Algeria Metro

Click here to load reader

download Algeria Metro

of 46

  • date post

    19-Jun-2015
  • Category

    Engineering

  • view

    792
  • download

    3

Embed Size (px)

description

Aomar hadbi entreprise metro d'alger (algeria)

Transcript of Algeria Metro

  • 1. DEVELOPING OF URBAN TRANSPORTS IN ALGERIA IN RECENTS YEARSRPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIREMINISTRE DES TRANSPORTSENTREPRISE MTRO DALGERMETROSTRAMWAYSCar cablesCar cables

2. introductionRPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIREMINISTRE DES TRANSPORTSENTREPRISE MTRO DALGERThe Transport Sector in Algeria is in perpetual development, in particular to address the need for public transport, and address the problems of road congestion due to changes in the fleet, the Department of Transportation has completed the extension and modernization of urban transport across the country. Thus, the Algerian state spent over than 10 billions euros for development of guided transport in Algeria over the past 10 years.- total length of metro lines planned : 70 km over 2 cities- total length of tram lines planned : 184 km over 9 cities- total lines of cables cars planned :21 projects over 10 cities 3. ALGIERS SUBWAY COMPANYRPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIREMINISTRE DES TRANSPORTSENTREPRISE MTRO DALGERThe Operating Company and realization of urban railway called "Algiers Metro," EPA / SPA, was founded in 1984, in his capacity as delegated project of the Ministry of Transport. It ensures the implementation of various urban transport projects such as the Metro, Tram and the cable cars across the country.In order to ensure better management of tasks assigned to it, the Company has established a structure for monitoring and management of the achievements of all its projects in partnership with its subsidiary, the Office of studies urban Transport BETUR in the development of design and engineering for urban transport. 4. METROS PROJECTSRPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIREMINISTRE DES TRANSPORTSENTREPRISE MTRO DALGER 5. RPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIREMINISTRE DES TRANSPORTSENTREPRISE MTRO DALGERNETWORK SUBWAY AN TRAM PROGRAMMED IN ALGIERSLINE Nn1 on OPERATION SINCE 2011 1 ALGIERS SUBWAY PATH: Emir Abdelkader - Hai El Badr LENGTH: 9 Km [10 stations] Operating hours: 5:00 am ~ 11:00 p.m. pm (headway 3minuites)? Extensions under construction Extension A: 1.69 Km Emir Abdelkader ~ Martys Square Extension B: 3,99Km Hai El Badr ~ El Harrach Centre Extension C: 3,70Km Hai El Badr ~ Ain Naadja 2 LOT 1: 9.4 Km El Harrach Centre ~ Bab Ezzouar ~ International Airport Algiers LOT 2: 6.00 Km Ain Naadja ~ Baraki Lines on study LOT 3: 8.00 Km Des Martyrs ~ Bab El Oued? ~ Chevalley LOT 3 Extensions: 14.00 Km Chevalley Delly Brahim ~ ~? Ouled Fayet Cheraga ~ ~ ~ El Achou Draria 6. Ligne 1Extension HEB -El HarrachExtension TGP - Placedes martyrsExtension HEBAin NadjaEXTENSION AIN NADJAA -BARAKIEXTENSION EL HARRACH - BAB EZZOUAR AEROPORT HOUARI BOUMEDIENEEXTENSION PLACE DES MARTYRS BAB EL OUED - CHEVALLEY2011: 9km,10 stations2015:13 km,13stations2017:18 km ,18 stations2020:40 km,37 stations2025:54km,55 stattions.ALGIERS SUBWAY NETWORK 7. ALGIERS METRO 8. The Algiers Metro extends in its first phase from south east part to the center of algiers(hai El Badr ) to the main post office on a length of 9.5 km and serving a total of ten (10) stations: HEB -CMS-CAM-UFA-JES-HAM-AID KBK-May-TGP-all the stations are under ground execpt the terminus station(hai el badr) wich is at grade levelIt basically has 14 air conditionned trains of 6 wagons from wich 11 trains rally, daily from 5 am to 11pm ,10 stations seven days at a rhythm of a train every 3 minutes at peak hours and a train every 5 minutes at normal hours, 02 trains kept for maintenance and 01 as a reserve train.In 26 months of operation, the line 1 Algiers Metro attendance reached 50 millions passengers. 9. CHARACTERISTICS OF THE TUNNEL Double track tunnel - Tunnel Depth: 12 to 15 meters - Opening diameters of 8.80 to 9.40 meters - Distance between rail: 1435mm - The railway conventional, with a third rail to supply the rolling stock.9 10. equipment of the full system in the tunnel: Railway signaling Radio stations, The emergency phones with emergency switches, The electric power networks, Facilities ventilation equipment, Dry column.10CHARACTERISTICS OF THE SYSTEM 11. station depth: 13-23 m - Length of the station: 115 m - Width of the station: 23 m - Width of the quay: 4 m - - All stations are equipped with escalators with the exception of the station Hai El Badr (at grade station)-11CHARACTERISTICS OF THE STATIONS 12. Length of the train: 108.5 Width M car: 2.80 M Capacity trains: 1,200 Transport Capacity: 21,000 Voyageur / Time / Direction Number of trains for line 1: 14 trains Number of cars per train: 06 air-conditioned coaches Frequency: 200 Seconds Maximum speed: 70 km / h Commercial speed: 30 Km / h Manufacturer: Spanish Society CAFROLLING STOCK CARACTERISTICS12 13. Composed of two items:PCC : Centralized Control Station, from which there is centralization of all information pertaining to the smooth functioning of the Metro.The CCO provides control, monitoring and traffic management of all trains on the line,HVB: High Voltage, provides power to the entire line into electrical energyCENTRAL COMMAND OPERATION BUILDING13 14. The maintenance workshop Bachdjarrah erected on an area of 18 hectares, consists of infrastructure to ensure all activities related to the maintenance of rolling stock building-a major revision to the trains -a building for small daily review. -The Parking garages for trains. -a building for the ongoing maintenance of the trains. -The Station situated at the building is designed to control trains during technical tests at the test track and also control the movement of trains at all the complex maintenanceWORK SHOP MAINTENANCE14 15. Ligne 1Extension HEB -El HarrachExtension TGP - Placedes martyrsExtension HEBAin NadjaEXTENSION AIN NADJAA -BARAKIEXTENSION EL HARRACH - BAB EZZOUAR AEROPORT HOUARI BOUMEDIENEEXTENSION PLACE DES MARTYRS BAB EL OUED - CHEVALLEYThe Metro network for the city of Algiers total-to 2017, 18 km of lines and 19 stations.- 2020, 40 km of lines and 39 stationsALGIERS SUBWAY NET WORK 2020 16. EXTENSION B HAI EL BADR EL HARRACH4,0 km, 4 stationsOn operation : May 2015 17. EXTENSION C HAI EL BADR- AIN NAADJA3,6km,3 stationsOn operation: January 2017 18. EXTENSION A TAFOURAH-MARTYRS SQUARE1,6km,2 stationsOn operation: January 2017 19. EXTENSION B1 EL HARRACH -AEROPORT9,5 KM, 10 stationsOn operation: January 2020 20. RPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIRE MINISTRE DES TRANSPORTS ENTREPRISE MTRO DALGEREXTENSION EL HARRACH BAB EZZOUAR - Aroport HOUARI.BOUMEDIENE09.5 KM de linaire;10 stations09 puits de ventilationSTATION HACEN BADISTATION RABIA TAHERSTATION SMAIL YAFCEHSTATION CENTRE D AFFAIRESTATION AEROPORTSTATION UNIVERSITE HOUARI BOUMEDIENNESTATION POLE UNIVERSITAIRESTATION BAULIEUSTATION OUED SMAR 21. RPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIRE MINISTRE DES TRANSPORTS ENTREPRISE MTRO DALGEREXTENSION EL HARRACH BAB EZZOUAR - Aroport HOUARI.BOUMEDIENEVUE SUR LA SALLE DES BILLETS 22. EXTENSION C1 AIN NAADJA -BARAKI6KM,107stationsOn operation: January 2020 23. BARAKIRPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIREMINISTRE DES TRANSPORTSENTREPRISE MTRO DALGEREXTENSION AIN NAADJA - BARAKISTATION MOHAMED BOUDIAFSTATION AIN NAADJA GARESTATION FUTUR PARC URBAINSTATION MOHAMED BELARBISTATION LE JARDINSTATION CIT 2004 06 KM de linaire;05 stations souterraines et 01 station en viaduc05 puits de ventilationViaduc 24. ORAN METROPROJECT 25. RPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIRE MINISTRE DES TRANSPORTS ENTREPRISE MTRO DALGERMtro dOranPhase 1Phase 3Phase 2Phase 412,8 km4,6 km1,7 km8 kmTOTAL PHASES 1, 2 ET 3: 19,66 km / 20 stations 26. Network of metro and tram in ORAN 27. TRAMWAYS IN OPERATIONRPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIREMINISTRE DES TRANSPORTSENTREPRISE MTRO DALGER 28. ALGIERS 23 Km, 38 stations, 41 trainsORAN18,7 km , 28 stations, 30 trainsCONSTANTINE 9 km, 10 stations, 27 trains 29. TRAMWAYS UNDER CONSTRUCTION17,8 km, 26 stations, 30 trainsSidi Bel Abbes TramOuargla Tram12,6 km, 23 stations, 23 trains14,2 km, 24 stations, 25 trainsMostaganem Tram22,2 km, 37 stations, 39 trainsStif Tram 30. Annaba Tram21,8 km, 34 stations, 56 trains13 km, 13 stations, 24 trainConstantine TramTRAMWAYS UNDER CONSTRUCTION 31. NEWS PROJECTS IN TENDER PROCESS15 km, 24 stations, 36 trainsBatna TramOran Tram Ext. A,B,C21,1 km, 29 stations, 17 trains8,6 km, 12 stations, 11 trainsOran Tram Extention D4,3 km, 6 stations, 7 trainsAlger Ext. Ruisseau - BMR 32. TRAMWAYS PROJECTS FEASABILITY STUDYRPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIREMINISTRE DES TRANSPORTSENTREPRISE MTRO DALGER 33. Tramway de Bchar- Longueur : 13 Km, Nombre de stations : 23Tramway de Bejaa- Longueur : 9,7 Km, Nombre de stations : 19Tramway de BlidaTramway de TlemcenTramway de Alger OuestTramway de Biskra- Longueur: 21,5 Km, Nombre de stations: 33- Longueur :11 Km, Nombre de stations : 18- Feasabilty study in progress- Feasability study in progressTramway de TEBESSAfeasabilty study in progressTramway de DJELFA 34. RPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIRE MINISTRE DES TRANSPORTS ENTREPRISE MTRO DALGERCABLE CARS PROJECTS 35. RPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIREMINISTRE DES TRANSPORTSENTREPRISE MTRO DALGERCABLES CARS ON OPERATION 36. RPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIRE MINISTRE DES TRANSPORTS ENTREPRISE MTRO DALGERCONSTANTINE On operation since June 2008TLEMCENOn operation since Fbruary 2009SKIKDAOn operation since july 2009ALGIERS oued koriche bouzareah on operation since september 2014 37. RPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIRE MINISTRE DES TRANSPORTS ENTREPRISE MTRO DALGERTlphrique El Madania renoved in 2008Tlphrique Notre Dame dAfriquerenoved in 2009Tlphrique MmorialRenoved in 2009Tlphrique Palais de la Culture Renoved in 2010 38. RPUBLIQUE ALGRIENNE DMOCRATIQUE ET POPULAIRE MINISTRE DES TRANSPORTS ENTREPRISE MTRO DALGERTlcabine de BLIDA Rnov en Juin 2009Tlcabine