Alenia speech
-
Upload
aerospacecampania -
Category
Documents
-
view
374 -
download
8
Transcript of Alenia speech
Virtual Test and Engineering Simulation in A&DVirtual Test and Engineering Simulation in A&D
October 23October 23 rdrd --2424thth
Virtualization and Simulation As Key Assets for the New Business Challenge
NazarioNazario CaucegliaCauceglia
Chief Technical Officer
Company Confidential 2Rome, October 23rd-24th
Summary
�� Virtualization Skills & HighlightsVirtualization Skills & Highlights
��Virtualization Roadmap & AchievementsVirtualization Roadmap & Achievements
�� Alenia Aeronautica VisionAlenia Aeronautica Vision
��Way Ahead and ConclusionWay Ahead and Conclusion
�� Alenia Aeronautica ContextAlenia Aeronautica Context
Company Confidential 3Rome, October 23rd-24th
Aircraft Helicopter Space Electronic for Defence
Defence System Transportation & Energy
Alenia Aeronautica Agusta WestlandAlcatel Alenia
SpaceSelex Sensors &
Airborne SystemsMBDA Ansaldo Breda
Telespazio Galileo Avionica Oto Melara Ansaldo Energia
Selex Sensors & Airborne Systems
LtdWASS Ansaldo STS
SelexCommunication
Fata
Selex Sistemi Integrati
Orizzonte
Elettronica
Selex Service Management
Elsag Datamat
Alenia AermacchiAlenia Aeronavali
ATR
Alenia in Finmeccanica
Company Confidential 4Rome, October 23rd-24th
Combat a/cCombat a/c Military AirliftersMilitary Airlifters
Overhaul and ModificationOverhaul and Modification
Mission SystemsMission Systems
Aerostructures /Commercial Aircraft
Aerostructures /Commercial Aircraft
TrainersTrainers
UAV/UCAV
RegionalsRegionals
Alenia Aeronautica investigates and reinforces his technological base (from composite materials to Autonomous Flight Technologies) enabli ng his presence in several segments with competitive product and sustaining a growing strate gy.
Programs
Company Confidential 5Rome, October 23rd-24th
ATR42/72
Partner: EADS-FWorkshare: 50 %
Dassault Falcon900/2000
Fuselage Section ThrustReverserEngine Nacelle
Airbus A321/ A330/ A340/300-310Tail ConeWing Components
Boeing B767/ 777/ 717/ 757Control Surfaces, Fin, Fuselage Panels/Barrels Wing Tips Radome
Supplier Risk sharing Supplier
Partner
AirbusA380Fuselage section 15
Boeing B787Stabilizer Central and Rear sections fuselage 26% 787 structure
Prime
ATR CARGOCivil & Military certification
Superjet 100
Partner: Sukhoi
Civil Programs
Company Confidential 6Rome, October 23rd-24th
Risk sharing Supplier
Partner Prime
AM-XPrimary Responsibility for Complete Weapon System
C-27JCivil & Military certification
ATR SMCivil & Military certification
Sky-XUAVFirst flight May 2005
NeuronUCAV22% Workshare
TornadoInterdiction & StrikeWorkshare: 15 %
TyphoonAir Superiority &Ground AttackWorkshare: 21 %
JSFFinal Assy in Italy (AMI and other Nations)Logistic Support Center (South Europe)Wing Structure DesignWing production & assembly
Sky-YMALE UAVFirst flight June 2007
Military Programs
Company Confidential 7Rome, October 23rd-24th
Il nuovo Business Model A&D
60 60 –– 70%70% Revenue (Prime e Co-Prime)( C-27J, ATR M3, ATR 42/72, EFA, … )
30 30 –– 40%40% Revenue( A380, 787, … )
Alenia Aeronautica
Alenia Alenia is willing to enforce the PrimePrime / CoCo--PrimePrime role in cooperation with key Risk Sharing partners
Component, Part and Tooling SupplierDesign Services
System Specialist,Sub-Assembly Supplier
CUSTOMER
Risk Sharing Partners &
Major System Supplier
Prime
Partner<<Co-development>>
Risk Sharing Business Model
Contracting Based Business Model
Supplier
Revenues Distribution in the Value Chain Assets
Company Confidential 8Rome, October 23rd-24th
Current discontinuity emphasizes that the Current discontinuity emphasizes that the knowledgeknowledge is the main enabler factor of is the main enabler factor of modern competitive system modern competitive system
ResourcesWork
Capitals
Technologies
Knowledge
Networked
Knowledge
years
Value
10
15
20
25
1960 1980 2000 2020
LEADERSLEADERS
RAMPANTRAMPANT
FOLLOWERSFOLLOWERS
Competitiveness Roadmap
Company Confidential 9Rome, October 23rd-24th
IP Central to Economic Growth & CompetitionIP Central to Economic Growth & Competition
0
2
4
6
8
10
12
14
1954 1964 1974 1984 1994 2004
US investment in intangible assets (>$1T/year)equivalent to investment in tangibles
~80% of the value of modern companies
comes from intangible assets
~80% of the value of modern companies
comes from intangible assets
Tangibles
Intangibles
Sources: US Federal Reserve – Nakamura, Ned Davis Research
“The competition of the future world is a competition for Intellectual Property Rights”
Chinese PremierWen Jiabao
Japan intends to “bring about a nation founded on intellectual property”
Japanese Prime MinisterJunichiro Koizumi
“Intellectual property is the backbone of America's economy”
U.S. Commerce Secretary Carlos Gutierrez
% GG
ross
DDom
estic
PPro
duct
The Knowledge Wave
Company Confidential 10Rome, October 23rd-24th
Alenia AeronauticaAlenia Aeronautica is subjected to many external and internal factors that push both toward new competitive positions and toward a reorganization of the company value chain
• Networked Knowledge in a Cooperative Environment (Extended Enterprise)- Project Team de-located
- “Real-Time” Collaboration
• Growing Competition
• Intellectual Property Rights management
Exogenous factorsExogenous factors
• Multiplicity of Roles & Programs
• Efficiency increasing
• Optimization of the supplier base
• Know-how Capitalization
• Next 5 years plan: doubled revenues
Endogenous FactorsEndogenous Factors
The challenges that Alenia is coping with:
Executive Summary
Company Confidential 11Rome, October 23rd-24th
The Specialized EnterpriseSpecialized Enterprise supports the business imperatives through:
DifferentiationDifferentiationFocusing time management , talents and investments on specific critical components related to the main peculiar st rategies
ReactivityReactivityAn evoluted business model to cope with changes in m arket requirements through a networked organization made by internal and external specialists cooperating
EfficencyEfficency
Merging similar activities/business belonging to different units to reach scale effects, knowledge sharing and incre ase effect ofbest-in-class partners
Traditional Enterprise Specialized EnterpriseSpecialized Enterprise
The New Business Model
Company Confidential 12Rome, October 23rd-24th
CatalystsCatalysts
Information and Communication Technology
StandardsStandards
Main CapabilitiesMain Capabilities
DifferentiationDifferentiation
ReactivityReactivity
SecuritySecurity
Standard ProcessesStandard Processes
Shared KnowledgeShared Knowledge
Enterprise Transformation Roadmap
Company Confidential 13Rome, October 23rd-24th
Commissions Decision
Change Dossier
Investigations ApplicabilityProgram Steering
Customercontract
MonitoringProgramMaster Table
Option Catalog Customer Delivery
Mapping Standard to Serial Numbers
Certification
Conformity
��Deviations
As ContractedAs Contracted
PProgram MManagement
��Commissions Decision
Change Dossier
Investigations ApplicabilityProgram Steering
Customercontract
MonitoringProgramMaster Table
Option Catalog Customer Delivery
Mapping Standard to Serial Numbers
Certification
Conformity
����Deviations
As ContractedAs Contracted
PProgram MManagement
����
Change control & Traceability
CChange OOrchestration
Change control & Traceability
CChange OOrchestration
As Designed As Planned As Built(As Delivered)
As MaintainedResourcesRequirementManagement
PProduct, PProcess & RResources MManagement
As Designed As Planned As Built(As Delivered)
As MaintainedResourcesRequirementManagement
PProduct, PProcess & RResources MManagement
Creation Tools
Catia v4 Catia v5 Word Excel HMS CAPP CASE Et….
Creation Tools
Catia v4 Catia v5 Word Excel HMS CAPP CASE Et….
C A EManagement
PProduct / SSimulation and PPrototyping ( virtual & physical )
C A DManagement
C A TManagement
C A MManagement
C A P PManagement
C A EManagement
PProduct / SSimulation and PPrototyping ( virtual & physical )
C A DManagement
C A TManagement
C A MManagement
C A P PManagement
Technology Infrastructure, System IntegrationTechnology Infrastructure, System Integration
WWorkflowMManagement
DDocument / CContentMManagement
CCollaboration
SSecurity / CCommunication
MManagement
NetworkNetwork
KnowledgeKnowledgeMManagement
WWorkflowMManagement
DDocument / CContentMManagement
CCollaboration
SSecurity / CCommunication
MManagement
NetworkNetworkNetworkNetwork
KnowledgeKnowledgeMManagement
Alenet Model
Company Confidential 14Rome, October 23rd-24th
Collaboration ManagementCollaboration ManagementCommunity ManagementCommunity Management
• Document / Content Management• Knowledge Management• Collaboration Service• Process Management
EEnterprise nterprise RResources esources PPlanninglanning
HR Finance Logistic Procurement
CCustomerustomer
RRelationshipelationship
MManagementanagement
SSupplyupply
CChainhain
MManagementanagement
P L MP L MCoreCore
SShop hop FFloor loor CControlontrol
++
FMS Plant Automation …….
• Security• Social Network Analysis• Key Performance Indicator
NETWORKNETWORK
Enterprise ModelEnterprise Model
New Enterprise Model
Company Confidential 15Rome, October 23rd-24th
ModelModelModelModel----based Aircraft Development in Extended Enterprisebased Aircraft Development in Extended Enterprisebased Aircraft Development in Extended Enterprisebased Aircraft Development in Extended Enterprise
�Concept phase is the bet and trade-off shall wrap-up requirements, functional views, architectures and verification methods
�Multi-disciplinary approach is mandatory for system perspective as “whole”
�Full lifecycle coverage shall anticipate all the implications in design, manufacturing, operation and maintenance
�Systems are spread in a deep supply chain, so global collaborative environment, federative process governance and information integration are key enablers
Concurrent Engineering Enables Risk and Cost Reduct ionConcurrent Engineering Enables Risk and Cost Reduct ion
Model Based Aircraft Development
Company Confidential 16Rome, October 23rd-24th
Inte
grat
ion
& T
estin
g
Inte
grat
ion
& T
estin
g
V-Model Based Product Development
Decomposition & Design
Decomposition & Design
Operational ScenarioOperational Scenario
Performance SimulationPerformance Simulation
Needs &Requirements
Concept& Definition
Development ProductionOperation& Support
Assessment
SYSTEMSYSTEM
SUBSUB-- SYSTEMSYSTEM
EQUIPMENTEQUIPMENT
Concept EvaluationConcept Evaluation
Flight TestFlight Test
Laboratory TestLaboratory Test
Synthetic EnvironmentSynthetic Environment
The virtualization covers the full lifecycle develo pment and the validation process
Company Confidential 17Rome, October 23rd-24th
ConceptConcept ValidationValidation ProductProduct
Design Powered By Virtualization
Virtualization drives the product development from the concept to the real integration
Company Confidential 18Rome, October 23rd-24th
Virtual Testing and Validation
�Reduce the physical tests to minimize development r isks and costs
�Exploit virtual platform when the physical test is not practical
Company Confidential 19Rome, October 23rd-24th
13S21283144-206
IMP
Node
IMP
13S21283144-206
Node
IMP
13S21283310-000
Downstream BC:
13S21283140-012 / 3140-004 / 3106-002
Node
IMP
Node
IMP
Restrictor -204 ref. 13S21283140 diam=51.4
11S21283120-212 diam=19[mm]
13S21283144-206
11S21283058-004 (part)
Node
IMP
Node
IMP
Downstream BC:
Ptot and y(ng) specified
Equivalent model
Experimental data
Node
IMP
13S21283310-00011S21283056-002
Node
IMP
11S21283057-002Node
IMP
Node
IMP
11S21283056-002 Experimental data Downstream BC:Downstream BC: 11S21283055-004Node
IMP
Node
IMP
Node
IMP
11S21283055-004Node
IMP
11S21283055-004
11S21283056-002
Node
IMP
Equivalent model +restrictors (3x25)
Downstream BC:
Node
IMP
Orifice
11S21283055-004
Node
IMP
Downstream BC:
11S21283086-204 diam=45[mm]
Node
IMP
Experimental data
Node
IMP
Node
IMP
11S21283054-002Node
IMP
11S21283086-216 diam=16[mm]
11S21283055-00411S21283062-00211S21283063-00211S21283071-002Experimental dataNode
IMP
Node
IMP
Node
IMP
Node
IMP
Downstream BC:
Experimental data
Pressure Point 1011
Pressure Point 1012
Pressure Point 1010
AHRS
Pressure Point 1006
Rack 90 VU +Panneau Plafond
Rack 120 VU
Pressure Point 1008
PyloneElectrique
Rack 80 VU+bloc sondes
Pressure Point 1007
-62.9 [g/s]
-155.9 [g/s]
-148.8 [g/s]
-103.2 [g/s]-72.2 [g/s]
-65.4 [g/s]
Cockpit+ E/R radar +glace sondes
-9.2 [g/s]
-7.2 [g/s]
-6.7 [g/s]
-31.0 [g/s]
-45.6 [g/s]
Restrictor diam=54[mm] / Smoke Valve
Flow @ fan = -228.0 [g/s]
CFD architectural characterization
System/sub-system Analysis (Easy5)
System Engineering and Architecting
Virtualization drives the model-based system engine ering from requirements to architecture definition, enhancing the conceptual d esign as critical phase in lifecycle
Company Confidential 20Rome, October 23rd-24th
CADCAD--CAE IntegrationCAE Integration
22
MultiMulti --disciplinary disciplinary OptimizationOptimization
33
Enterprise Integrate Enterprise Integrate Simulation Simulation
EnvironmentEnvironment
44
Vertical CAD-CAE Extended Enterprise Lifecycle VirtualizationExtended Enterprise Lifecycle Virtualization
Discipline Coverage
Life
cycl
e E
xten
sion
Vertical CADVertical CAD --CAECAE
11
Virtualization Skills Development Roadmap
Company Confidential 21Rome, October 23rd-24th
1 2 3 4 5 6 7 8 9 10 11 121 2 3 4 5 6 7 8 9 10 11 121 2 3 4 5 6 7 8 9 10 11 121 2 3 4 5 6 7 8 9 10 11 1210 11 12
20072007 20082008 20092009 20102010
1 2 3 4 5 6 7 8 9 10 11 121 2 3 4 5 6 7 8 9 10 11 121 2 3 4 5 6 7 8 9 10 11 121 2 3 4 5 6 7 8 9 10 11 1210 11 12
20072007 20082008 20092009 20102010
Phase1
Prototype Prototype
DeliveryDelivery
Alenet Virtual Prototyping and Simulation Planning
Extension & DesignExtension & Design
ImplementationImplementation
RefinementRefinement
Phase2 Phase3
Alenet Virtual & Physical Prototyping:
�MSC Prime Integrator
�Exemplar|Engineous Second Partner
ContractContract
Integrated Integrated
SolutionSolution
StandardizationStandardization
Company Confidential 22Rome, October 23rd-24th
Alenet Multi-disciplinary Integration
Multi-disciplinary Environment for Product Developm ent
Company Confidential 23Rome, October 23rd-24th
4 x
Montecito
~2.2 TFlops
2 x OpteronDualCore
~2.8 TFlops
Tape
Library
OSS MDS
Lustre
PFS
Storage 20 TB
Quadrics QsNetII Quadrics for the structure integration
Bull Storage System and Parallel File System (Lustre)
Bull 6 nodes 8x Intel Montecito
HP 200 nodes 2x Opteron DualCore
Storagetek Backup Library
Bull 36 nodes 4x Intel Montecito
8 x
Montecito
HPC Capabilities
•Operative System: Linux
• Compiler: GNU, Intel C/C++/Fortran, Portland PGCC / PGF90 / PGHPF
• Library: Intel MKL, IMSL, Lapack (Scalapack) FFTW
• Parallel Language : MPI-CH, MPI-Quadrics, HP-MPI, OpenMP
• Debugger: Gdb, Xdb, Totalview, DDT
• Performance Tools: PAPI, vprof, Vampir
• Parallel File System: Lustre (CFS)
High Performance Computing CenterHigh Performance Computing Center
Company Confidential 24Rome, October 23rd-24th
The High Performance Computing Center
Company Confidential 25Rome, October 23rd-24th
Wrap-up
ConclusionsConclusions
�In order to face successfully the incoming change of the worldwide business model, Alenia is engaged in a challenging evolution of technology and process
�This innovation is a mandatory requirement to sustain the marketcompetitiveness for a global player role pursued by Alenia
�Alenet Project has been conceived in this perspective through two main streams of:
• New Integrated PLM
• Virtual Prototyping and Testing
�Virtualization and HPC are key assets in Alenia Aeronautica strategies
�The relevant capabilities are pursued and developed through internal initiatives (es. Alenet Project) and research programs (es. CRESCENDO)
�The framework based on strategic alliance system can support the business development as “virtualization and HPC” service provider through Alenia Aeronautica controlled company (Alenia Improvement)
Virtual Test and Engineering Simulation in A&DVirtual Test and Engineering Simulation in A&D
October 23October 23 rdrd --2424thth