![Page 1: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/1.jpg)
Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat
and Power (RNG/CHP) for Oil Sands
Summary presentation of report commissioned by NRCan (Proposal 500018271)
Sept. 2016
Scott Stanners
Craig Louie
Chris Norman
9 November 2016 1Commercial Confidential Sysene Consulting Inc.
![Page 2: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/2.jpg)
Agenda
9 November 2016 2
SysEne Company Background
Alberta Context
NRCan Project
Objective 1 – Woody Biomass to RNG
Objective 2 – Woody Biomass for CHP in the Oil Sands
Alternatives
Conclusions
(Link to Full Report )
![Page 3: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/3.jpg)
Company Background
9 November 2016 3
Engineering and Management Consulting for Energy, Transportation, Resource, and High Tech
Systems Approach to Technology, Process, and People
Flyn McCarthy
Chris Norman
Scott Stanners
CraigLouie
Ophir Kendler
Michael Eiche
![Page 4: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/4.jpg)
Projects in the Bioenergy Sector
9 November 2016 4
FortisBC Glenmore Landfill to RNG Community Fuels Biodiesel Plant (Calif.)
Microsoft Data Center Wyoming Landfill to Fuel Cell
Chip, Pellet and Dust Handling System Upgrades
![Page 5: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/5.jpg)
Alberta Context
9 November 2016 5
Coal phase out
Strategic interest
Social license
![Page 6: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/6.jpg)
Oil Sands SAGD requirements
Suncor Fort McKay
9 November 2016 6
• 12 MW electricity• 345 MW steam
![Page 7: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/7.jpg)
Conventional CHP pathway at SAGD site
•Fort MacKay •172 MWe Natural Gas
Gas Turbine with Steam Bottoming Cycle•77% of steam in 2013•Excess electricity sold to
grid•Operating since 2004
9 November 2016 7
![Page 8: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/8.jpg)
NRCan Study - Evaluation of 2 Pathways
9 November 2016 8
Woody biomass
Renewable Natural Gas
Combined Heat and Power
Gasification
![Page 9: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/9.jpg)
RNG Cost with Current Technology
9 November 2016 9$ CAD
Natural Gas Wholesale Alberta ~ $2/GJ
![Page 10: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/10.jpg)
Woody biomass characteristics vary and are difficult to convert
9 November 2016 10
![Page 11: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/11.jpg)
Worldwide woody biomass RNG plants
9 November 2016 11
• FICFB = Fast Internally Circulating Fluidized Bed• MILENA = ECN brand name for their indirect gasifier technology• WoodRoll = Cortus Energy brand name for their biomass-to-syngas technology
![Page 12: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/12.jpg)
Fuel feeding system
9 November 2016 12
![Page 13: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/13.jpg)
Current technology is complex with many reactors
9 November 2016 13
![Page 14: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/14.jpg)
Technology maturity is still low
9 November 2016 14
Well-funded, large scale (20 MW) demo projects have often experienced many problems and low availability.
![Page 15: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/15.jpg)
There are many technology challenges
9 November 2016 15
The “Achilles Heel” of biomass gasification
![Page 16: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/16.jpg)
GoBiGas cost breakdown ($USD)
9 November 2016 16
![Page 17: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/17.jpg)
Pilot and prefeasibility example
9 November 2016 17
![Page 18: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/18.jpg)
Bio-RNG Pipeline interconnect costs
9 November 2016 18
![Page 19: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/19.jpg)
Preferred options for Alberta conditions
9 November 2016 19
Valmet• Full scale 10-200
MW• Capable company• Successful projects
Cortus Energy• Promising technology• Modular plant design• Reasonable momentum
ECN• Promising technology• High efficiency• Reasonable momentum
New Technology companies
Established large suppliers
![Page 20: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/20.jpg)
Mapping Alberta Biomass to Oil Sands
9 November 2016 20
![Page 21: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/21.jpg)
Supply challenges
9 November 2016 21Idaho National Laboratory 2015
![Page 22: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/22.jpg)
Wood chip costs
Unsubsidized
Operation Cost per green ton, $USD
Harvesting $81
Chipping $18
Transportation $15
Total $114
9 November 2016 22
Subsidized
Operation Cost per green ton, $USD
Harvesting $0
Chipping $18
Transportation $15
Total $33
$114/ton = $20/GJ RNG for fuel
![Page 23: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/23.jpg)
Example: depot strategy
9 November 2016 23
![Page 24: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/24.jpg)
Current supply chain
9 November 2016 24
• High risk• High costs• Uncertain future• Difficult to make high capital
plant investment decisions
![Page 25: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/25.jpg)
A preferred future
9 November 2016 25
![Page 26: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/26.jpg)
Nexterra business case in UK
9 November 2016 26
• 10 MWe• $100 million• “Free” wood
• Renewable Obligation Certificates
• 25 cents/kWh
![Page 27: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/27.jpg)
Biomass co-firing: partial gasifier (140 MW), partial coal (560 MW)
9 November 2016 27
![Page 28: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/28.jpg)
Case study: Lachenaie Landfill, Montreal
9 November 2016 28
Progressive Wastes
104 MW RNG Landfill to pipeline injection
Commissioned 2015
Project cost $44 million
$6/GJ RNG production cost
![Page 29: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/29.jpg)
Alternate pathway biomass combustion to heat
9 November 2016 29
Valmet CYMIC Boiler
![Page 30: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/30.jpg)
Conclusions
1. Biomass combustion to heat (steam)
2. Biomass co-firing (but coal)
3. Waste-to-RNG
4. Supply chain modernization
5. Government strategy/policy adjustments
9 November 2016 30
![Page 31: Alberta Woody Biomass Syngas to Renewable Natural Gas ... · Alberta Woody Biomass Syngas to Renewable Natural Gas/Combined Heat and Power (RNG/CHP) for Oil Sands Summary presentation](https://reader034.fdocuments.net/reader034/viewer/2022051509/5aec5f907f8b9ae5318edc3b/html5/thumbnails/31.jpg)
Contact Us
Chris Norman [email protected]
Craig Louie [email protected]
Scott Stanners: [email protected]
9 November 2016 31