Project Overview State of California Public Utilities Commission MAY 2015 FACT SHEET Public Scoping Comments and Next Steps The CPUC invites the public to present comments about the Alberhill and Valley–Ivyglen Projects and the scope of the EIR. Comments may be mailed, emailed, or faxed. All public scoping comments must be received or postmarked by June 5, 2015. Once the public scoping period ends, the CPUC will prepare a Draft EIR, which will be circulated for public review and comment. For more information… Email: [email protected] Website: http://tinyurl.com/Alberhill Mail: Alberhill System Project c/o Ecology and Environment, Inc., 505 Sansome Street, Suite 300 San Francisco, CA 94111 Fax: (415) 398-5326 Voicemail: (877) 313-5385 Alberhill System Project Southern California Edison (SCE) is proposing to construct a new 500/115-kV Substation (Alberhill Substation) within the Valley South 115-kV System service area (Figure 1) to meet projected electrical demand that would exceed the current operating limit of the Valley South 115-kV System. The California Public Utilities Commission (CPUC), as Lead Agency under the California Environmental Quality Act (CEQA), will prepare an Environmental Impact Report (EIR) for the Alberhill Project. The CPUC is also the Lead Agency for another SCE-proposed project: the Valley–Ivyglen Subtransmission Line Project (Valley–Ivyglen Project). The Alberhill Project would be constructed within approximately 6.5 miles of the same right-of-way as the Valley–Ivyglen Project and would be located on some of the structures constructed for the Valley–Ivyglen Project. Due to geographic proximity, overlapping impacts, and similar timelines, the CPUC determined that it would be in the public’s best interest to disclose the environmental impacts of the Valley–Ivyglen and Alberhill Projects in a single EIR. The EIR will provide separate analyses for each project. This EIR will describe the nature and extent of the impacts resulting from the Valley–Ivyglen and Alberhill Projects. There will be opportunities during the EIR process for the public to learn about and comment on the proposed projects and their environmental impacts. Project Components The proposed Alberhill Project includes construction of the following components (Figure 2): A new 500/115-kV substation (Alberhill Substation); Two, approximately 1.-5-mile-long, 500-kV transmission lines to connect the Alberhill Substation to the existing Serrano-Valley 500-kV transmission line; One new and four modified subtransmission lines, totaling approximately 20.5 miles, to transfer five substations served by the Valley South 115-kV System to the Alberhill Substation; Telecommunications lines on the new and replaced transmis- sion and subtransmission lines and in new and existing underground conduit; and A 120-foot microwave antenna tower at the proposed Alber- hill Substation site, microwave telecommunications antennas at the existing Santiago Peak communications site and Serrano Substation, and other telecommunications equipment installations at existing and proposed substations. Potential Environmental Impacts Identified In its initial review of the Alberhill Project, the CPUC has identified the following potential adverse environmental impacts: Aesthetics – Operation of a new substation, transmission lines, and subtransmission lines could result in impacts on scenic roads and visual quality. Air Quality – Construction activities could result in fugitive dust emissions that exceed local air district thresholds. Biological Resources – Construction activities could result in impacts on special status species and sensitive habitats. Hazardous Materials – Construction activities could result in temporary effects from the use of hazardous materials. Opera- tion of a substation could result in impacts during an accidental release of hazardous materials. Hydrology and Water Quality – Construction activities could result in impacts on drainage patterns and water quality.

Transcript of Alberhill Fact Sheet FINAL - California Public Utilities ... Fact... · FACT SHEET Public Scoping...

Page 1: Alberhill Fact Sheet FINAL - California Public Utilities ... Fact... · FACT SHEET Public Scoping Comments and Next Steps The CPUC invites the public to present comments about the

Project Overview

State of CaliforniaPublic Utilities Commission MAY 2015

FACT SHEET

Public Scoping Comments and Next Steps

The CPUC invites the public to present comments about the Alberhill and Valley–Ivyglen Projects and the scope of the EIR. Comments may be mailed, emailed, or faxed. All public scoping comments must be received or postmarked by June 5, 2015. Once the public scoping period ends, the CPUC will prepare a Draft EIR, which will be circulated for public review and comment.

For more information… Email: [email protected] Website: http://tinyurl.com/AlberhillMail: Alberhill System Projectc/o Ecology and Environment, Inc., 505 Sansome Street, Suite 300San Francisco, CA 94111Fax: (415) 398-5326 Voicemail: (877) 313-5385

Alberhill System Project

Southern California Edison (SCE) is proposing to construct a new 500/115-kV Substation (Alberhill Substation) within the Valley South 115-kV System service area (Figure 1) to meet projected electrical demand that would exceed the current operating limit of the Valley South 115-kV System.

The California Public Utilities Commission (CPUC), as Lead Agency under the California Environmental Quality Act (CEQA), will prepare an Environmental Impact Report (EIR) for the Alberhill Project. The CPUC is also the Lead Agency for another SCE-proposed project: the Valley–Ivyglen Subtransmission Line Project (Valley–Ivyglen Project). The Alberhill Project would be constructed within approximately 6.5 miles of the same right-of-way as the Valley–Ivyglen Project and would be located on some of the structures constructed for the Valley–Ivyglen Project. Due to geographic proximity, overlapping impacts, and similar timelines, the CPUC determined that it would be in the public’s best interest to disclose the environmental impacts of the Valley–Ivyglen and Alberhill Projects in a single EIR. The EIR will provide separate analyses for each project. This EIR will describe the nature and extent of the impacts resulting from the Valley–Ivyglen and Alberhill Projects. There will be opportunities during the EIR process for the public to learn about and comment on the proposed projects and their environmental impacts.

Project Components

The proposed Alberhill Project includes construction of the following components (Figure 2):

A new 500/115-kV substation (Alberhill Substation);Two, approximately 1.-5-mile-long, 500-kV transmission lines to connect the Alberhill Substation to the existing Serrano-Valley 500-kV transmission line;One new and four modified subtransmission lines, totaling approximately 20.5 miles, to transfer five substations served by the Valley South 115-kV System to the Alberhill Substation;Telecommunications lines on the new and replaced transmis-sion and subtransmission lines and in new and existing underground conduit; andA 120-foot microwave antenna tower at the proposed Alber-hill Substation site, microwave telecommunications antennas at the existing Santiago Peak communications site and Serrano Substation, and other telecommunications equipment installations at existing and proposed substations.

Potential Environmental Impacts Identified

In its initial review of the Alberhill Project, the CPUC has identified the following potential adverse environmental impacts:

Aesthetics – Operation of a new substation, transmission lines, and subtransmission lines could result in impacts on scenic roads and visual quality.Air Quality – Construction activities could result in fugitive dust emissions that exceed local air district thresholds. Biological Resources – Construction activities could result in impacts on special status species and sensitive habitats.Hazardous Materials – Construction activities could result in temporary effects from the use of hazardous materials. Opera-tion of a substation could result in impacts during an accidental release of hazardous materials.Hydrology and Water Quality – Construction activities could result in impacts on drainage patterns and water quality.

••

Page 2: Alberhill Fact Sheet FINAL - California Public Utilities ... Fact... · FACT SHEET Public Scoping Comments and Next Steps The CPUC invites the public to present comments about the

Valley South 115-kV System and Electrical Needs AreaAlberhill System Project

Figure 1

WALNUT

BARRE

SERRANO

MIRALOMA

IVYGLEN ALBERHILL(proposed)

ELSINORE

SKYLARK

TENAJA

NEWCOMB

VALLEY

LakeElsinore

L O S A N GE L E S C OUNTY

SAN BERNARDINO COUNTY

R IVERS IDE COUNTY

6260

91

39

74

74

74

79

79

3

1

1

111

243

15

15

151010

10

5

5

5

10

215

215

210

O RANGE C OUNTY

SAN D IEGO COUNTY

P a c i fi c O c e a n 500/115-kV substation115/12-kV substation

0 5 10 15

M I L E S

20 25

N

FOGARTY

Note: Only the substations within the western side of the existingValley South 115-kV System would be part of the proposedAlberhill 115-kV System. Only the Tenaja Substation withinthe eastern side of the Valley South 115-kV System is shown.

Glendora

West Covina

Ontario

San Bernardino

HemetPerris

PalmSprings

Corona

Anaheim

Orange

Temecula

Riverside

MissionViejo

HuntingtonBeach

Cities (City of Lake Elsinore city limits shown in white)

Alberhill 115-kV System (proposed)

Valley North 115-kV System

City ofLake Elsinore

Valley South115-kV System and Electrical Needs Area

Riverside County

Orange County

CITY OFLAKE

ELSINORE

U N I N C O R P O R A T E D

R I V E R S I D E C O U N T Y

CITY OFCANYON

LAKE

CITY OFPERRIS

CITY OF MENIFEE

CITY OF WILDOMAR

Lake

Lee Lake

Lake Mathews –Estelle Mountain Reserve

Elsinore

IVYGLEN

ELSINORE

SKYLARK

NEWCOMB

0 1

M I L E S

2

Alberhill System ProjectFigure 2

Proposed Alberhill Substation site

Substation location

CA

Modi�ed, replaced, or new 115-kV subtransmission line

Proposed 500-kV transmission line

Existing 500-kV Serrano-Valley transmission line

City boundaries

GRAND AVE

15

15

15

74

74

74

MU

RR

IETA

RD

GO

ETZ

RD

N E WP ORT RD

BUN DY

LEMO N S T

SCOTTRD

E T HANAC RD

C ANYON RD

CORYDO

N ST

MISSIO

N TRA

ILLA

KE S

T

300-ft. segment(not to scale)

TEMESCALCANYON RD

LAKESHORE DR

LAKESHORE DR

BAKER STN

ORT

HM

AIN

(500-kV transmission linealignments revised April 2011to avoid the Reserve)

FOGARTY