Alan Tovey, DirectorThe Basement Information Centre
Simplifying design and construction
![Page 2: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/2.jpg)
Simplifying design and construction
Grades of construction
Construction options
Design and waterproofing issues
Basement Approved Document – 2004
Other Available information
![Page 3: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/3.jpg)
Basement 1 - Benefits and costs (1991, 1999, 2005)
Basement 2 - Design Guide – Soil pressures and masonry (1991)
Basement 3 - Thermal insulation (1993)
Basement 4 – Layout Design Example (1994)
Waterproofing Design Guide (1994)
Waterproofing Site Guide (1994)
Waterproofing existing structures (BSWA, 2005)
Approved Document – (1997, 2004)
Basement Land use (2) (1998)
Others on Website www.basements.org.uk
Available Information - Publications
![Page 4: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/4.jpg)
Basement 1 - Benefits and costs (1991, 1999, 2005)
Basement 2 - Design Guide – Soil pressures and masonry (1991)
Basement 3 - Thermal insulation (1993)
Basement 4 – Layout Design Example (1994)
Waterproofing Design Guide (1994)
Waterproofing Site Guide (1994)
Waterproofing existing structures (BSWA, 2005)
Approved Document – (1997, 2004)
Basement Land use (2) (1998)
Others on Website www.basements.org.uk
Available Information - Publications
![Page 5: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/5.jpg)
Basement 1 - Benefits and costs (1991, 1999, 2005)
Basement 2 - Design Guide – Soil pressures and masonry (1991)
Basement 3 - Thermal insulation (1993)
Basement 4 – Layout Design Example (1994)
Waterproofing Design Guide (1994)
Waterproofing Site Guide (1994)
Waterproofing existing structures (BSWA, 2005)
Approved Document – (1997, 2004)
Basement Land use (2) (1998)
Others on Website www.basements.org.uk
Available Information - Publications
Basements for dwellings
The Building Regulations 1991
National House-Building Council
British Cement Association
2000
![Page 6: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/6.jpg)
Basement 1 - Benefits and costs (1991, 1999, 2005)
Basement 2 - Design Guide – Soil pressures and masonry (1991)
Basement 3 - Thermal insulation (1993)
Basement 4 – Layout Design Example (1994)
Waterproofing Design Guide (1994)
Waterproofing Site Guide (1994)
Waterproofing existing structures (BSWA, 2005)
Approved Document – (1997, 2004)
Basement Land use (2) (1998)
Others on Website www.basements.org.uk
Approved Document additions: -- Plain Masonry and Plain
In-situ Conc. Retaining Walls due for Public Comment Feb 2005
Pending
Available Information - Publications
![Page 7: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/7.jpg)
Grades and typesof construction
Grades and typesof construction
![Page 8: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/8.jpg)
Table 1 (BS 8102) Guide to level of protection to suit basement use
Grade Basement usage Performance level Form of construction
1 Car parking: plant rooms (excluding electrical equipment); workshops
Some seepage and damp patches tolerable
Type B - BS8110
2 Workshops and plant rooms requiring drier environment; retail storage areas
No water penetration but moisture vapour tolerable
Type A
Type B - BS 8007
3 Ventilated residential and working areas including offices, restaurants etc., leisure centres
Dry environment Type A
Type B - BS 8007
Type C
4 Archives and stores requiring controlled environment
Totally dry environment
Type A
Type B - BS 800
Type C ventilated (+ vapour control)
![Page 9: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/9.jpg)
Table 1 (BS 8102) Guide to level of protection to suit basement use
Grade Basement usage Performance level Form of construction
1 Car parking: plant rooms (excluding electrical equipment); workshops
Some seepage and damp patches tolerable
Type B - BS8110
2 Workshops and plant rooms requiring drier environment; retail storage areas
No water penetration but moisture vapour tolerable
Type A
Type B - BS 8007
3 Ventilated residential and working areas including offices, restaurants etc., leisure centres
Dry environment Type A
Type B - BS 8007
Type C
4 Archives and stores requiring controlled environment
Totally dry environment
Type A
Type B - BS 800
Type C ventilated (+ vapour control)
Type B - BS8110Some seepage and damp patches tolerable
Car parking: plant rooms (excluding electrical equipment); workshops
1
![Page 10: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/10.jpg)
Table 1 (BS 8102) Guide to level of protection to suit basement use
Grade Basement usage Performance level Form of construction
1 Car parking: plant rooms (excluding electrical equipment); workshops
Some seepage and damp patches tolerable
Type B - BS8110
2 Workshops and plant rooms requiring drier environment; retail storage areas
No water penetration but moisture vapour tolerable
Type A
Type B - BS 8007
3 Ventilated residential and working areas including offices, restaurants etc., leisure centres
Dry environment Type A
Type B - BS 8007
Type C
4 Archives and stores requiring controlled environment
Totally dry environment
Type A
Type B - BS 800
Type C ventilated (+ vapour control)
Type B - BS8110Some seepage and damp patches tolerable
Car parking: plant rooms (excluding electrical equipment); workshops
1
Type A
Type B - BS 8007
No water penetration but moisture vapour tolerable
Workshops and plant rooms requiring drier environment; retail storage areas
2
Type B - BS8110Some seepage and damp patches tolerable
Car parking: plant rooms (excluding electrical equipment); workshops
1
Type A
Type B - BS 8007
Type C ventilated (+ vapour control)
Totally dry environment
Archives and stores requiring controlled environment
4
Type A
Type B - BS 8007
Type C
Dry environmentVentilated residential and working areas including offices, restaurants etc., leisure centres
3
Form of constructionPerformance levelBasement usageGrade
![Page 11: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/11.jpg)
Table 1 (BS 8102) Guide to level of protection to suit basement use
Grade Basement usage Performance level Form of construction
1 Car parking: plant rooms (excluding electrical equipment); workshops
Some seepage and damp patches tolerable
Type B - BS8110
2 Workshops and plant rooms requiring drier environment; retail storage areas
No water penetration but moisture vapour tolerable
Type A
Type B - BS 8007
3 Ventilated residential and working areas including offices, restaurants etc., leisure centres
Dry environment Type A
Type B - BS 8007
Type C
4 Archives and stores requiring controlled environment
Totally dry environment
Type A
Type B - BS 800
Type C ventilated (+ vapour control)
2 Minimum for garages
3 Minimum for accommodation
Approved Document -
Basements for dwellings
Type B - BS8110Some seepage and damp patches tolerable
Car parking: plant rooms (excluding electrical equipment); workshops
1
Type A
Type B - BS 8007
No water penetration but moisture vapour tolerable
Workshops and plant rooms requiring drier environment; retail storage areas
2
Type B - BS8110Some seepage and damp patches tolerable
Car parking: plant rooms (excluding electrical equipment); workshops
1
Type A
Type B - BS 8007
Type C ventilated (+ vapour control)
Totally dry environment
Archives and stores requiring controlled environment
4
Type A
Type B - BS 8007
Type C
Dry environmentVentilated residential and working areas including offices, restaurants etc., leisure centres
3
Form of constructionPerformance levelBasement usageGrade
![Page 12: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/12.jpg)
WALL TYPE A (Masonry)
WALL TYPE B (Insitu concrete)
WALL TYPE C ( concrete – new build)(masonry – existing)
Total reliance on waterproofing
Structure provides main water resistance
Structure provides some water resistance with internal drainage system
Wall construction types - BS8102
![Page 13: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/13.jpg)
TYPE A STRUCTURES( Tanked protection )
Externalwaterproofing
Internalwaterproofing
Sandwichwaterproofing
![Page 14: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/14.jpg)
External or internalwaterstop as reqd
Crystallization,hydrophilic orinjected waterstop
TYPE B STRUCTURES( Structurally integral protection )
Kickered construction Kickerless construction
?
![Page 15: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/15.jpg)
Drainage sumpwith pumped outlet
Preformed cavity floor and wall drain system
TYPE C STRUCTURES( Drained protection )
![Page 16: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/16.jpg)
Part C – Resistance to moistureAD – Basement for dwellings 2004
Generally water-proofing recommendations same:
as in 1997 version except Type C now with full sump
Basements for dwellings
The Building Regulations 1991
National House-Building Council
British Cement Association
![Page 17: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/17.jpg)
Fig 2A.4 Acceptability of construction types
Type A Type B Type C
BS 8110 BS 8007Plus W-proofing
Plus W-proofing Plus moisture barrier
Water-proofing
See Note 2
Note 1 Note 1
CONSTRUCTION
Notrecommended
Watertable BS 8110 BS 8007
ACCEPTABLE
Plusdrainage
Low
Variable
High
Notes 1. In high water table seek manufacturer’s advise
2. Some constructions may be suitable depending on conditions
Decreasing risk
From : Approved Document – Basements for Dwellings
![Page 18: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/18.jpg)
Fig 2A.4 Acceptability of construction types
Type A Type B Type C
BS 8110 BS 8007Plus W-proofing
Plus W-proofing Plus moisture barrier
Water-proofing
See Note 2
Note 1 Note 1
CONSTRUCTION
Notrecommended
Watertable BS 8110 BS 8007
ACCEPTABLE
Plusdrainage
Low
Variable
High
Notes 1. In high water table seek manufacturer’s advise
2. Some constructions may be suitable depending on conditions
Decreasing risk
From : Approved Document – Basements for Dwellings
Permanentlybelow
![Page 19: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/19.jpg)
Fig 2A.4 Acceptability of construction types
Type A Type B Type C
BS 8110 BS 8007Plus W-proofing
Plus W-proofing Plus moisture barrier
Water-proofing
See Note 2
Note 1 Note 1
CONSTRUCTION
Notrecommended
Watertable BS 8110 BS 8007
ACCEPTABLE
Plusdrainage
Low
Variable
High
Notes 1. In high water table seek manufacturer’s advise
2. Some constructions may be suitable depending on conditions
Decreasing risk
From : Approved Document – Basements for Dwellings
Period ?
![Page 20: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/20.jpg)
Fig 2A.4 Acceptability of construction types
Type A Type B Type C
BS 8110 BS 8007Plus W-proofing
Plus W-proofing Plus moisture barrier
Water-proofing
See Note 2
Note 1 Note 1
CONSTRUCTION
Notrecommended
Watertable BS 8110 BS 8007
ACCEPTABLE
Plusdrainage
Low
Variable
High
Notes 1. In high water table seek manufacturer’s advise
2. Some constructions may be suitable depending on conditions
Decreasing risk
From : Approved Document – Basements for Dwellings
Permanentlyabove
![Page 21: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/21.jpg)
Construction options
Construction options
![Page 22: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/22.jpg)
Restraining tiesReinforcement
In-situ concrete infill
Reinforcement
Wall tiesReinforcement
In-situ concrete infill
Masonry
Reinforcement
Precast concrete
EPS formwork In-situ concrete
Expandedpolystyreneformworksystem
TYPICAL RANGE OF CONSTRUCTION METHODS
![Page 23: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/23.jpg)
Masonry Basement Walls
Types of construction
![Page 24: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/24.jpg)
Key items• Strength of units• Reinforcement - Vert and Horiz• Compaction ??• Waterproofing details
Filled hollow blocks
Plan view
Cross section
Water proofing
Cores not parallel
Running bond may offset cores
![Page 25: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/25.jpg)
Key items• Strength of units.• Reinforcement - Vert and Horiz.• Compaction – easier ( 100mm continuous cavity )
• Waterproofing details
Filled cavity block wall
Plan view
Cross section
Water proofing
Basements for dwellings
The Building Regulations 1991
National House-Building Council
British Cement Association
![Page 26: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/26.jpg)
Expanded Polystyrene Formwork Poured In-Situ Basement Wall
Pre-cast/insitu hybrid wallsPre-cast and PC insulated
Types of construction - contd
![Page 27: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/27.jpg)
Pre-Cast Concrete Wall
![Page 28: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/28.jpg)
Pre-cast/insitu hybrid walls
![Page 29: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/29.jpg)
Expanded Polystyrene Formwork
![Page 30: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/30.jpg)
Expanded Polystyrene Formwork
![Page 31: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/31.jpg)
Poured In-Situ Basement Wall
![Page 32: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/32.jpg)
Design and Water proofing
issues
Design and Water proofing
issues
![Page 33: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/33.jpg)
Design Considerations
StructureWaterproofing
Repair
![Page 34: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/34.jpg)
WATERPROOFING DESIGN PRINCIPLES
Decide on basement usage
Gather site information
Decide on form of construction
Decide on form of waterproofing
![Page 35: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/35.jpg)
Approved Document
Fig 2A.1
Determining appropriate form of basement construction and waterproofing
Basements for dwellings
The Building Regulations 1991
National House-Building Council
British Cement Association
9 Stages
![Page 36: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/36.jpg)
SOLUTION
Selection of Waterproofing
system
Basement Construction
Type A/B/C
Design considerations
Site survey
Proposeddevelopment
Determining appropriate form of basement construction and waterproofing
No
Yes
IsConstruction
buildable? Selection of Waterproofing
system
Basement use
Environmental requirements
Geology
Water table
Topography
Soil drainage
House type and
Foundation design
![Page 37: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/37.jpg)
Geocompositedrainage sheet
Percolatingground water
External or internalwaterproofing as appropriate
Basement structure
Perimeter drain(fin or land drainto discharge waterto down side)
External drainage
Ground level
If external drained used to control conditions >> Make rodable
![Page 38: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/38.jpg)
External or internalwaterproofing as appropriate
Basement structure
Generally waterproofing to basement to be continuous
Adequate details must be provided for junction, etc
Details and construction should be as simple as possible
General principles
![Page 39: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/39.jpg)
External or internalwaterproofing as appropriate?
Basement structure
Continuity seems simple
But essential to consider with structure
![Page 40: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/40.jpg)
Waterproofing DetailsAssumed continuity!!??
![Page 41: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/41.jpg)
Foundation details
External or internalwaterproofing
External or internalwaterproofing
Discontinuitybetween slaband wall
Type A structure - strip foundation
Slab built-in
![Page 42: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/42.jpg)
Foundation detailsType A structure - piled foundation
Internal waterproofing
Difficult toachieve externalwaterproofing
?
![Page 43: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/43.jpg)
Interaction of water proofing with structure
![Page 44: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/44.jpg)
Structural design - Waterproofing
Simple design of section
Ultimately won’t fail but serviceability conditions may affect waterproofing
![Page 45: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/45.jpg)
Cross section
Bending moments in structure
Design structure in three dimensions
![Page 46: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/46.jpg)
Cross section
Bending moments in structure
Plan
Design structure in three dimensions
Corner moments sometimes over looked
![Page 47: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/47.jpg)
Continuity of horizontal reinforcement in masonry walls (Figure 3A.3, AD Basements)
Main vertical reinforcement
Cross section
Horizontal reinforcement = 0.5 As along wall and around corners
Plan view
Similar detail provided for insitu walls (Fig 3B.2)
Basements for dwellings
The Building Regulations 1991
National House-Building Council
British Cement Association
![Page 48: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/48.jpg)
Insitu concrete options
Ties required!
Comment - Need to consider construction abilities/difficulties
Waterproofing details?
Corbel details?
Construction?
Large section but easy to concrete
![Page 49: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/49.jpg)
Drawing is simple in two dimensions But structures are three dimensional !!
Waterproofing membrane shown following thickened profile
Cross section
Design in three dimensions - waterproofing
![Page 50: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/50.jpg)
Drawing is simple in two dimensions But structures are three dimensional !!
Waterproofing membrane shown following thickened profile
Cross section
Design in three dimensions - waterproofing
Membrane likely to require preformed sections to cater for mitre
Plan view at corner
Comment: If not catered for can lead to construction defects
![Page 51: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/51.jpg)
Drawing is simple in two dimensions But structures are three dimensional !!
Waterproofing membrane
Cross section
Design in three dimensions - waterproofing
Comment: Design can help waterproofing
OK here
Simpler square corner no mitre
Plan view at corner
![Page 52: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/52.jpg)
Ensure compatibility between waterproofing and structure
Comment: Structural behaviour can affect selection of waterproofing
.
.
.
.
.
Reinforced wall Un-reinforced wall
Stress and crack width controlled by reinforcement.
Likely to be compatible with most waterproofing membranes.
In an unreinforced wall, crack width is uncontrolled.
May exceed strain capacity of some waterproofing membranes.
![Page 53: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/53.jpg)
Can basement be investigated and repaired?
Structure designed for water-resistance (Type B)
Example 1
May influence re-design and choice of waterproofing. Internal/External?
![Page 54: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/54.jpg)
Can basement be investigated and repaired?
Structure designed for water-resistance (Type B)
Example 1
May influence re-design and choice of waterproofing. Internal/External?
![Page 55: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/55.jpg)
Can basement be investigated and repaired?
Structure designed for water-resistance (Type B)
Example 1
May influence re-design and choice of waterproofing. Internal/External?
![Page 56: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/56.jpg)
Can basement be investigated and repaired?
Structure designed for water-resistance (Type B)
Example 1
Basement under part of area of house
Example 2
Plan
? ?
May influence re-design and choice of waterproofing. Internal/External?
![Page 57: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/57.jpg)
Other Design Issues
Basements for dwellings
The Building Regulations 1991
National House-Building Council
British Cement Association
![Page 58: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/58.jpg)
B asem ent s for dwe lling s
The Bui lding Re gula tion s 19 91
Natio nal H ouse -Build ing C ounc ilBritis h Ce ment Asso ciatio n CoversA, B, C, E, F, H, K, L, N, J
and Vehicle accessAs for AD 1991
+Plus Part M
Amended to deal with
B Regs 2000
The new Approved Document –Basements for dwellings
Basements for dwellings
The Building Regulations 1991
National House-Building Council
British Cement Association
2000
![Page 59: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/59.jpg)
Contents
Site preparation and resistance to moisture
Structure
Fire safety
Conservation of fuel and power
Ventilation
Resistance to the passage of sound
B Regs part
A
B
L
F
E
C
![Page 60: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/60.jpg)
Contents Contd
Stairs, ramps and guards
Glazing - materials and protection
Drainage and waste disposal
Heat producing appliances
Vehicle access
B Regs part
K
N
H
J
![Page 61: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/61.jpg)
Significant guidance on:
Site preparation and resistance to
moisture
Conservation of fuel and power
Structure
![Page 62: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/62.jpg)
‘Site preparation and
resistance to moisture’
Gives Guidance on:
Subsoil drainage
Obtaining water- resistance
![Page 63: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/63.jpg)
‘Structure’
Gives Guidance on:
Masonry retaining walls
In-situ concrete retaining walls
Foundations - plain and reinforced
![Page 64: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/64.jpg)
Foundation type
Soil type (well drained)
Vertical load (kN/m) up to
Moment taken at base of wall (kN/m)
Block comp. strength (N/mm2)
Brick comp. strength (N/mm2)
Area of reinfment As (mm2/m)
Strip Clay
Granular
70 17
12
7
7
20
20
530
340
Table 3A.2 AD - Basements: Minimum masonry strength and reinforcement for 2.7 m propped retaining wall 2.7 m
Table in AD also covers raft foundation and different vertical load
Similar tables for 2.1 m and 1.6 m cantilevered walls2.1 and 1.6 m
Masonry retaining walls
![Page 65: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/65.jpg)
Foundation type
Soil type (well drained)
Vertical load (kN/m) up to
Moment taken at base of wall (kN/m)
Area of reinforcement As (mm2/m)
Strip Clay
Granular
70 17
12
390*
390*
Table 3B.1 Minimum reinforcement for
2.7 m propped in-situ concrete retaining wall
420
290
Wall thickness (mm)
200 300
2.7 m
Table in AD also covers raft foundation and different vertical load
Similar tables for 2.1 m and 1.6 m cantilevered walls
2.1 and 1.6 m
Insitu concrete retaining walls
![Page 66: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/66.jpg)
Width of foundation
( a ) ( b )
Basement
200 mmmin.
Centre line of retaining wall
Cover 40 mm
Retained ground
( a ) + ( b )
= =
Basement
Cover 20 mm
Cover 40 mm
Centre line of retaining wall
1200 mm 1200 mm
Internal wall
Retained ground
C
C
minimum minimum
Reinforcement asparagraph 3C.5.1
Reinforcement asparagraph 3C.5.2
Reinforcement asparagraph 3C.5.3
Reinforcement as paragraph 3B.3.4
Foundation should extend past centreline of retaining wall by a distance equal to 2T, where T is the thickness of the foundation
T (to be not less than 200 mm
Requirement for raft foundation
Foundation requirements for strip foundation
Basements for dwellings
The Building Regulations 1991
National House-Building Council
British Cement Association
![Page 67: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/67.jpg)
‘Conservation of fuel and power’
General requirements
Gives Guidance on:
Tables for wall insulation thickness
Tables for floor insulation thickness
Calculation procedures
Only in AD – Basements for dwellings Not included in AD L1
![Page 68: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/68.jpg)
Simplifying design and construction
Available information, Inc AD Basement s
StructureWaterproofing
RepairAdopt simple details
Design and waterproofing issues
Grades of construction , Construction options
Approved Document – 2004 Simplifies design for walls, and foundations
and aids reliability
![Page 69: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/69.jpg)
And so to the finished project
By simplifying the design
![Page 70: Alan Tovey Basement Construction Slides](https://reader034.fdocuments.net/reader034/viewer/2022052208/552a8e22550346a2428b4694/html5/thumbnails/70.jpg)
Building into the Basement