Al Hefner (NIST Lead) Frances Cleveland (Technical Champion). PAP 7 Overview Status of IEC 61850-7-420 and IEEE 1547.8 Identify new issues for PAP 7 Update the Scoping Document Develop a White Paper based on Scoping Document. PAP 7: Task Interactions. - PowerPoint PPT Presentation

Transcript of Al Hefner (NIST Lead) Frances Cleveland (Technical Champion)

Page 1: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)

Al Hefner (NIST Lead)

Frances Cleveland (Technical Champion)

Page 2: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)

•PAP 7 Overview•Status of IEC 61850-7-420 and IEEE 1547.8 •Identify new issues for PAP 7•Update the Scoping Document •Develop a White Paper based on Scoping Document

Page 3: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)

PAP 7: Task Interactions

3

Task 2: IEEE 1547.4 for island applications and IEEE 1547.6 for secondary networks

PAPs

MIC

Task 4: Develop and Harmonize Object Models

IEC 61850-7-420: Expanded to include Multifunctional ES-DER operational interface;

Harmonized with CIM & MultiSpeak;Mapped to MMS, DNP3, web services, & SEP v2

Page 4: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)

PAP 7 Scope - Energy Storage and Distributed Energy Resources

•Develop Scoping Study on Energy Storage and Distributed Energy Resources

•Complete IEEE 1547.4 and .6•Initiate IEEE 1547.8 on electrical connectivity of ES-DER

allowing low-voltage ride-through, microgrids, and other ES-DER management

•Develop Use Cases for ES-DER•Develop information exchange requirements to submit to

IEC TC57 WG17•Monitor IEEE 1547.8 and IEC TC57 WG17

Page 5: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)

DER (Generation and Storage) Cost Justification

• DERs will provide:• Energy (real power) from generators and from storage units• Reactive power support (volt/var support) to both

distribution and transmission efficiency and stability• Combined generation and storage can provide rapid

response to mitigate intermittent renewable resources like wind and solar

• Low voltage ride-through, emergency reserves, harmonic-damping

• Rapid response to frequency deviations

Page 6: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)

Different DER Interactions: Direct Control, Interactive Requests, Broadcast/Multicast

DER Integrated System

DER Generator

DER Storage

Controller

Controller

DER Energy Management System

at Utility Site or Customer Site

Utility/ESP DER Management System

Distributed Energy Resources (DER) Site

One-way Broadcast/Multicast

Loosely-coupled Two-way Interactive

Requests

Tightly-coupled Direct Control

Tightly-coupled Direct Control

DER Management: Interactions between Components

Loosely-coupled Two-way Interactive

Requests

Loosely-coupled Two-way Interactive

Requests

Page 7: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)

DER Key Use Cases Must Cope with Many Different Configurations• DER will be managed:

• By customers for their own exclusive use• Through direct control by utilities or aggregators• Through market-driven bids, with direct control by utilities• Through market-driven, tariff-based demand response

• Direct, tightly-coupled control• Between inverter controller and ES-DER device• Between Customer EMS and multiple ES-DER devices in a building,

subdivision, or campus• Interactive two-way monitoring and control

• Between ISO/RTO and ES-DER system whose bid has been accepted• Between Customer EMS and multiple ES-DER systems with their own

(sophisticated) controllers• Broadcast/multicast one-way “pricing” or “request” signals

• Between utility and Customer EMS• Between aggregator and ES-DER systems

Page 8: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)

PV/Storage Inverter-based System Phase 1 Functions and Interactions

Phase 1 Functions• Connect/Disconnect from grid• Limit maximum generation• Set power factor • Var settings, based on voltage• Var settings, based on watts• Storage charge / discharge rate (fast

PEV chargers??)• “Pricing” signal • Event / history logging• State / status reporting• Time synchronization

Interaction• Direct command• Immediate request• Change settings• Schedule of settings based on

time• Schedule of settings based on

temperaturePhase 2 Functions• Low voltage ride-through!!• Counteracting frequency

deviation • Other

Page 9: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)

One PV/Storage Inverter Mode

Page 10: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)

IEC 61850-7-420 for DER• IEC 61850 – Interface Standard of Object Models for Utility Industry

• Very modular• Establishes “well-known” standardized names, data formats, and services• Initially focused on substation automation, but now being expanded

• IEC 61850-7-420 for DER• Addresses only the “Nouns”• IEC 61850 object modeling constructs of LNs, etc:

• Covers:• General DER management• Photovoltaic systems• Fuel cells• Diesel generation• Combined heat and power• Wind power is handled separately (IEC 61400-25)

• Currently status is Final Draft International Standard (FDIS)• Due to become International Standard (IS) by mid-2008

Logical Nodes

Common Data Class

Common Components

Standard Data Types

Logical Nodes (LN)

Common Data Classes (CDC)

Common Attributes

Logical Devices (LD)

Data Objects (DO)

Page 11: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)

Current Status

•IEEE 1547.8 has its writing groups developing the first draft of the document

•IEC 61850-90-7 is being developed as a Technical Report that contains all of the proposed ES-DER additions to IEC 61850-7-420

• TR IEC 61850-90-7 will be an informative document that can (hopefully) be approved by the IEC within 6 months

• With this TR, vendors can start to implement IEC 61850-7-420 even though they recognize that some minor changes might be made

• In parallel, these (and other) data objects will be added to IEC 61850-7-420 Ed 2 for normative standardization within 2 years

•Develop a White Paper based on Scoping Document

Page 12: Al Hefner   (NIST Lead) Frances Cleveland  (Technical Champion)