Akin tooooo
Click here to load reader
-
Upload
rox-liberato -
Category
Technology
-
view
207 -
download
0
Transcript of Akin tooooo
Powerpoint TemplatesPage 1
Powerpoint Templates
Powerpoint TemplatesPage 2
EXPERIMENTATION
The testing of an idea and plays an essential role in the design process.
Powerpoint TemplatesPage 3
Engineering projects can be viewed associal experiments because the mainconcern is the people, society and theenvironment.
* Engineering projects are experimentsthat involve technology development andhumans.
Powerpoint TemplatesPage 4
• Primary obligation is to protect thesafety of human subjects and respecttheir right of consent.
• A constant awareness of theexperimental nature of anyproject, imaginative forecasting of itspossible side effects, and areasonable effort to monitor them.
Powerpoint TemplatesPage 5
Engineering product design steps:
• Concepts
• Preliminary designs, tests
• More detailed designs
• More tests
• Production
• More tests
Powerpoint TemplatesPage 6
• The public purchases/uses the product
• More test
• Role of profits/competition with other companies
• More test
• Innovation
• Test
Powerpoint TemplatesPage 7
Engineers learn from the past from their own earlier designs and operating results, as well as from those of other engineers.
Moreover, from the lessons learned in college or during the first experimentation
Powerpoint TemplatesPage 8
• Projects carried out in partial ignorance
• The final outcomes of engineering projects, like those of experiments, are generally uncertain.
• Effective Engineering relies upon knowledge gained about products both before and after they leave the factory.
Powerpoint TemplatesPage 9
• Experimental Control – Clients and consumers exercise most of the control because it is they who choose the products.
• Informed Consent – moral and legal rights before participating in an experiment is not really important
• 2 main elements : knowledge and voluntariness
• Knowledge Gained – scientific experiments are conducted to gain new knowledge while “engineering projects are experiments that are not necessarily designed to produce very much knowledge”
Powerpoint TemplatesPage 10
Conscientiousness:
Respect right of consent of
public, honest and know what is right
and wrong
Comprehensive perspective:
Awareness of experimental nature of
projects, forecasting and monitoring
Powerpoint TemplatesPage 11
Moral autonomy:
Personally engaged, thoughtful,
involvement in project
Accountability:
Accept responsibility for results of
a project
Powerpoint TemplatesPage 12
• Produce standards of professional conduct
• Assurance to comply with standards
• Provide support and defense for people who wish to act ethically
Powerpoint TemplatesPage 13
• Uniformity of physical properties and functions
• Safety and reliability
• Quality of Product
• Quality of Personnel and services
•Use of accepted procedures
• Separability
• Quality Procedures approved by ISO
Powerpoint TemplatesPage 14