Aker BP Contractor Safety Day 2018 Barrier Control Scandic Hotel Forus 24th May 2018

Transcript of Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER...

Page 1: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Aker BP Contractor Safety

Day 2018Barrier Control

Scandic Hotel Forus 24th May 2018

Page 2: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Contractor Safety Day 2018Barrier Control

Jon Wredmark HSE Manager Risk & Barrier Mgt. Aker BP

24th May 2018

Page 3: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

3

CONTRACTOR SAFETY DAY 2018 – BARRIER CONTROL

My story…

Page 4: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

4

CONTRACTOR SAFETY DAY 2018 – BARRIER CONTROL

Our story…

Page 5: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

5

CONTRACTOR SAFETY DAY 2018 – BARRIER CONTROL

Also Our story…

Page 6: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

6https://www.epmag.com/what-could-2018-hold-oil-gas-exploration-

1675506?utm_source=Internal&utm_medium=Reccomended%20Content&utm_campaign=reccoengine&utm_content=what-could-2018-hold-oil-gas-

exploration-1675506

CONTRACTOR SAFETY DAY 2018 – BARRIER CONTROL

What history will

you make?

Page 7: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

7

Governance in pictures

CONTRACTOR SAFETY DAY 2018 – BARRIER CONTROL

Risk and Barrier Management

Our governance – Barrier control in everything we do

Risk management

Barrier management

Business management

Operational

barriers

Organizatio

nal barriers

Technical

barriers

PERFORMANCE HSE QUALITY

INTEGRATED

PRIORITISED

TRANSPARENT

DYNAMIC

...“Tasks related to HSE

and reducing risk of major

accidents shall be

prioritized at all levels”…

Page 8: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

8

CONTRACTOR SAFETY DAY 2018 – BARRIER CONTROL

Time & Context – our challenge

PERFORMANCE HSE QUALITY

Human developmnet picture?

Page 9: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

9

CONTRACTOR SAFETY DAY 2018 – BARRIER CONTROL

Leadership – our expectation of you

PERFORMANCE HSE QUALITY

Visible leadership

Care for our people

Safe performance

Control our barriers

Page 10: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity
Page 11: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Aker BP Contractor Safety Day

May 24th 2018Rolf Nystein – VP Supply Chain

Aker BP

Page 12: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

12

Aker BP aims to build the benchmark offshore E&P company

... by building the benchmark E&P company

together with our suppliers

Use the downturn to create

a company for the future...

Deliver on existing projects

Realize value of resource inventory

Integrate acquisitions

Execute

Deliver on improvement agenda

Strengthen improvement capabilities

Develop new improvement initiatives

Improve

Be opportunistic and exploit market

opportunities

Selective growth that is value accretive

Secure new exploration acreage

Grow

Reorganize the value chain by strategic

partnerships and alliances

Digitize the E&P value chain

Value chain based on shared LEAN

understanding, toolbox and culture

Flexible business model ready for

growth and volatility

CONTRACTOR SAFETY DAY 2018

Page 13: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

13*PTIL Framework regulation Section 18 : REGULATIONS RELATING TO HEALTH, SAFETY AND THE ENVIRONMENT IN THE PETROLEUM

ACTIVITIES AND AT CERTAIN ONSHORE FACILITIES: Qualification and follow-up of other participants

THE FRAMEWORK REGULATIONS -

Section 18*

• ….the responsible party shall

ensure that the contractors

and suppliers are qualified…

• …ensure that the participants

comply with the requirements

while performing

Aker BP expect our suppliers to follow Norwegian regulations

We must use our

«One Team» value

to drive increased trust and

transparency to improve

Barrier control

CONTRACTOR SAFETY DAY 2018

Page 14: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

The «Manage Supplier» process

Page 15: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

15

Governance through our Business Management System (BMS)

Supply Chain

Sourcing

Supplier Management

HSE

Risk Management

HSE in Contracts

Quality

Audits and Assurance

Self-Verifcation and Oversight

CONTRACTOR SAFETY DAY 2018

Engineering

Technical authority

procedure

Page 16: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

16

CONTRACTOR SAFETY DAY 2018

Supplier management process

We expect that our suppliers

demonstrate:

• That you have a robust HSE culture

• That you identify potential risks and

hazards

• That you identify Barriers - and design

your Self Verifications accordingly

• That HSE KPI’s are followed up

Performance

Review Meetings

Alliance Steering

Committees

Assessment and

Qualification

Delivering the

work

Page 17: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

17

Targeted audits

3rd Party assessments

Oversight on-site

Performance reviews

Self-verifications on-site

Safety conversations

Leadership in field

3 lines of defence

Audit

Assurance / Oversight

Self-Verification

CONTRACTOR SAFETY DAY 2018

Page 18: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

18

Supplier Segmentation

Transactional

Strategic/

HCA

Core

CONTRACTOR SAFETY DAY 2018

37

Suppliers

~50 Suppliers

Page 19: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Determination of High Consequence Activity suppliers

− HCA is defined as an activity able to directly lead to the immediate realization of a Level A or B risk as shown on the Aker BP threat matrix defined in Aker BP document Aker BP Threat Matrix

19

CONTRACTOR SAFETY DAY 2018

Examples:

• Helicopter accidents

• Vessel Collitions

• Loss of primary containment

• Loss of well control

• …

Page 20: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

20

Communication on Different Organization Levels

Technical support

Technician

Site Interface (‘on the job’)

Supervisory

Operational(weekly/monthly)

G/L1VP

TVP BUL

Day-2-day

Operational

Business Perf.

Strategy

PRMWells

Direct. / PSCM

Director

SL Meeting

PRM

Daily

meetings

CEO/Corporate mgmt

Senior leaders

Operational

level

➢S

tra

teg

ic S

up

pli

ers

➢C

ore

Su

pp

lie

rs

➢T

ran

sa

cti

on

al

Su

pp

lie

rs

CONTRACTOR SAFETY DAY 2018

Page 21: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

21

Training & Roll outCONTRACTOR SAFETY DAY 2018

50managers trained

Continuous training

- require

commitment

Page 22: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

22

Follow Norwegian Regulations

Demonstrate Personal

Leadership

Checking Barriers regularly

Learn and improve continuously

What should Aker BP and our suppliers expect from each otherCONTRACTOR SAFETY DAY 2018

Page 23: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity
Page 24: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Self verification and

Oversight

Knut Olav Dahle

Page 25: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

25

Governance through our Business Management System (BMS)

Supply Chain

Sourcing

Supplier

Management

HSE

Risk Management

HSE in Contracts

Quality

Audits and Assurance

Self-Verification and

Oversight

Engineering

Technical authority

procedure

Page 26: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Supplier

Aker BP

Supplier

Aker BP

Onshore Offshore

One

Team

Page 27: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

27

HOW WE WORK IN D&W

02 Our performance & continuous improvement principles

PLANACT

DOSTUDY

One

team

Productivity

QualityHSE

02Performance

& Continuous

Improvement

Page 28: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

BARRIER CONTROL / SELF

VERIFICATION

PREVENT MITIGATE

Page 29: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

BREAK

Page 30: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Aker BP Contractor Safety

Day

May 24th 2018

Tor Egil Håland – Alliance Manager

Rasmus D. Fjørtoft – Alliance HSSE&Q

Lead

Page 31: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

31

AKER BP CONTRACTOR SAFETY DAY 2018

Asset Integrity Alliance

• 38 000 employees in more than 14

countries. 500 employees in Norway

• Expertise within ISO trades, Rope

Access, Inspection and V&M

projects

• 1600 employees in more than 5

countries. 180 employees in Norway

• Expertise within Integrity management,

Inspection & NDT, Material and

Corrosion, Structure analyses and

monitoring techniques.

• 28 000 employees in more than 40

countries. 800 employees in Norway.

• A multidisciplinary enterprise that

offers services within ISO trades,

PFP, interior outfitting, HVAC and

rope access

Renowned as the leading operating

Organization on the Norwegian

Continental Shelf

• No HSE or Quality incidents

• No LOPC or Structural collapse • Increase effectiveness / productivity with 25%

• Reduce Engineering hours with 25%

• Reduce offshore cost with 50%

Page 32: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

32

AKER BP CONTRACTOR SAFETY DAY 2018

Asset Integrity Alliance

Alliance Roadmap 2018 -

2021

Page 33: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

33ISO :Insulation, Scaffolding, Painting

AKER BP CONTRACTOR SAFETY DAY 2018

Do we have any challenges within ISO and Inspection to maintain barrier control to day?

Asset Integrity Alliance

Page 34: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

34

AKER BP CONTRACTOR SAFETY DAY 2018

Falling scaffolding equipment on Ula

[13.1.2017]

Asset Integrity Alliance

HC seep from Valhall WP test separator

[24.12.2017]

We fail to maintain our barriers!

316SS

Carbon steel

Page 35: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

35

AKER BP CONTRACTOR SAFETY DAY 2018

How shall we reach our goal to zero LOPC and HSE incident?

Asset Integrity Alliance

• No HSE or Quality incidents

• No LOPC or Structural collapse • Increase productivity with 25%

• Reduce Engineering hours with 25%

• Reduce offshore cost with 50%

Page 36: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

36

AKER BP CONTRACTOR SAFETY DAY 2018

Increased barrier control trough strengthened collaboration

Asset Integrity Alliance

Finding the best solutions

To strengthening the

competitive position for

both Aker BP and

its alliance partners,

creating Innovative

solutions for HSE

challenges

Page 37: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

37

AKER BP CONTRACTOR SAFETY DAY 2018

Increased barrier control trough integrated, empowered team

Asset Integrity Alliance

Integrated empowered team

The benefits each alliance

partner receives are greater

than those gained by working

individually

Page 38: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

38

AKER BP CONTRACTOR SAFETY DAY 2018

Increased barrier control trough mutual transparency

Asset Integrity Alliance

Increased transparency

Mutual transparency within the

alliance; early involvement and

shared perspective on risk/

opportunities and clarity on

barriers.

Alliance glasses

Page 39: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

39

AKER BP CONTRACTOR DAY

Increased barrier control trough trust based relations

Asset Integrity Alliance

Trust based relations

To enable sharing and

collaboration and Joint

HSE leadership

Page 40: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

40

AKER BP CONTRACTOR SAFETY DAY 2018

Barrier Control – Self Verification Plan and Oversight Plan

Asset Integrity Alliance

Page 41: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

41

AKER BP CONTRACTOR SAFETY DAY 2018

Asset Integrity Alliance

2018 will be a year for learning.

But.. we will all be in the same…

Page 42: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

42

AKER BP CONTRACTOR SAFETY DAY 2018

Asset Integrity Alliance

..boat

Page 43: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity
Page 44: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Safety Culture & Barriers PRO

Valhall Flank West Project

Reference Case

Aker BP - Contractor Safety Day 2018

Michael Bible – 24.05.2018

Page 45: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

45

AKER BP – CONTRACTOR SAFETY DAY 2018

BU PRO - Vision & Goals

VIS

ION

GO

AL

S

Aker BP Projects to be recognized as a reference

for project excellence

• 65 hours/ton engineering hours

• 35$/BBL break even costs

• 25% reduction in execution time

While maintaining HSE excellence!

Page 46: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

46

AKER BP - CONTRACTOR SAFETY DAY 2018

VFW PROJECT – DEVELOPMENT CONCEPT

Valhall Flank West project

• PL 006 Valhall license

• Located 4 kms west of VCC

Plan for Development &

Operation (PDO)

• Submitted - 15Dec17

• Approved - 23Mar18

Execute Stage start 15Dec17

• In “execute” 6-months

• 1st Oil ≈ 20 Oct 2019

Page 47: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

47

Multiple Alliance Delivery

Valhall Flank West

Project

Total Scope

AKER BP – CONTRACTOR SAFETY DAY 2018

Robust safety culture…

Effective barrier management!

Page 48: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

48

AKER BP - CONTRACTOR SAFETY DAY 2018

VFW PROJECT – SAFETY CULTURE CHALLENGES & EXPERIENCES

Establish HSE mindset / attitude - aligned to Aker BP HSE policy / expectations

Implement risk-based programs - prevent common HSE incidents / accidents

Establish an environment of trust - each person feels engaged / empowered

Commit to high expectations for HSE performance - ZERO incidents & accidents

Implement “One-team” HSE culture - “one for all, all for one” principle

Page 49: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

49

AKER BP - CONTRACTOR SAFETY DAY 2018

VFW PROJECT – SAFETY CULTURE

Safety culture driven by active leadership

Established clear HSE philosophy / principles

Commitment to implement HSE philosophy /

principles

Project leaders accept responsibility

(accountability) for HSE performance

Implement “One-Team” project HSE culture - “one for all, all for one” principle

VFW HSE SUMMIT – 10 Jan 2017

Leaders aligning the HSE culture!

Page 50: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

50

AKER BP – CONTRACTOR SAFETY DAY 2018

VFW PROJECT – SAFETY CULTURE

VFW PRIORITIES

Commit to high expectations for HSE performance - ZERO incidents & accidents

Established HSE as #1 project priority

Set high performance target - ZERO

Communicated consistent HSE message

➢ Don’t send the wrong message!

Ex 1: “tight/tough schedule”

Ex 2: “schedule driven project”

HSE

Quality

Schedule

Cost

Page 51: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

51

AKER BP - CONTRACTOR SAFETY DAY 2018

VFW PROJECT – SAFETY CULTURE

Robust HSE programs

Aligned to Aker BP policy / expectations

Activities tailored by each Alliance

Establish HSE mindset / attitude - aligned to Aker BP HSE policy / expectations

Team & Management Commitments

Activity Calendar Personal CommitmentsContinuous Risk Process Start-up Tasks

Page 52: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

52

AKER BP - CONTRACTOR SAFETY DAY 2018

VFW PROJECT – SAFETY CULTURE

Implement risk-based programs - prevent common HSE incidents / accidents

Identified & control high-risk activities

➢ Construction, Offshore SIMOPS

Synergi data to support HSE program

➢ Feed HSE programs through development

Manager’s 14-Day ProgramSafety Initiative HSSE Workshops

Page 53: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

53

AKER BP - CONTRACTOR SAFETY DAY 2018

VFW PROJECT – SAFETY CULTURE

Empower the team

Each member - obligation to “STOP” unsafe

work

Constant involvement at individual level

Need “buy-in” from each team member to be

successful!

Actions need to match the words…

Establish an environment of trust - each person feels engaged / empowered

Page 54: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

54

AKER BP - CONTRACTOR SAFETY DAY 2018

VFW PROJECT – BARRIER MANAGEMENT

Inherently Safer Design (ISD) philosophy

➢ Simplify design

➢ Minimize complexity & functionality

Follow the barrier management process

➢ Clear barrier management strategy

Close communication & cooperation

➢ Asset, Operations, D&W, TAs

Design, develop & deliver projects safe to operate

INTEGRATED WORK PROCESS WORKSHOP

Page 55: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

55

AKER BP - CONTRACTOR SAFETY DAY 2018

VFW PROJECT – BARRIER MANAGEMENT

Prevent barrier gaps, misalignments,

osv.

Established project integrated work

processes

Improved “one team” mindset

Inclusive of Asset, other BUs, Ops,

Technical Authorities, osv.

Reduced uncertainty across projects

Project Coordination & Interface Management

INTEGRATED WORK PROCESS WORKSHOP

Page 56: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

56

AKER BP - CONTRACTOR SAFETY DAY 2018

VFW PROJECT – BARRIER MANAGEMENT

High-risk: 2019 Offshore Campaign

Early integrated offshore planning

Offshore safety milestones

SIMOPS Matrices (by offshore phase)

Use of “Simulations” to visualize high-

risk activities (using iPort)

Identify risks – “out of harm’s way”

Offshore Safety & Quality Barriers

iPort - NUI / Maersk Simulation

Page 57: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

57

AKER BP - CONTRACTOR SAFETY DAY 2018

SUMMARY

Be proactive…

Be engaged…

Be clear…

Be accountable…

Be SAFER…

Page 58: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity
Page 59: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Maersk Interceptor Accident

59

AkerBP Contractor Safety Day, 24 May, Thomas Falk, Asset Manager

Page 60: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Tambar Fatality - Animation

Page 61: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

page 61

Barrier Element Weaknesses

Raw Water Pump System Design

Safe Job Analysis Process

Lifting Equipment Design

Control of Work Process

Toolbox Talk

Organisational Barrier Elements

Operational Barrier Elements

Technical Barrier Elements

Lifting Competency

Hazard Identification and risk awareness

Page 62: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Control of Work- Simple to be safe

page 62

Safe Working with Loads Out of Harm’s Way

Maersk Drilling Reflections

Page 63: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Learning Process

Maersk Drilling Investigation Report

19 Recommendations

page 63

Order Response Group Close Out Presentation

29 Actions

PSA Investigation Report

7 Non-conformities

Maersk Interceptor Learning Verification Group

Page 64: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

page 64

Sharing Learnings – We need your help

Maersk Drilling presenting at Industry Forums

Maersk Drilling presenting to industry partners

You sharing and discussing within your organisations

(Sharing of Animation)

Page 65: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

LUNCH

RESTART 13:05

Page 66: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity
Page 67: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Water Injection TestIvar Aasen

Atle Nottveit, SLB/Inge Sundet Aker BP

Page 68: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

68

Reservoir depletion a challenge at Ivar Aasen

➢Pressure support from water injectors

required to maintain production

➢Request from Asset and ResDev to

perform a water injection test

Injection test perceived as important and

time critical by D&W

Frame agreement with Schlumberger for

all drilling and wells services at Ivar Aasen

Background

Page 69: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

69

Sequence of events

Order

sent

Injection test

delayed twice.

Agree to get

3rd party

equipment.

Equipment

load out.

Operations

start.

Job

temporarily

stopped.

Waiting for

original pumps.

SLB pumps

mobilized.

Successful

injection test.

May June July

Page 70: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

70

Leak in crossover flange• HiPo for injury if the high-pressure flange had popped off and

hit personnel within the limited high pressure area

Diesel leak• 800 ltr spilled out of the reservoir tank and into the engine

enclosure, secondary containment; 40-80 ltr ended up on deck, but

no spill to drain or sea

Job stopped due to diesel leak.

3rd party pumps demobilized

HSE Potential

Consequences

Quality

Page 71: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

71

Poor change management and weak risk management

• Job schedule changed several times:- Initially planned equipment was assigned to other operations and was not available

• Once job was called off, insufficient time was given to- Sub-contractor to prepare rented equipment

- SLB and Aker BP DW to update HAZID and implement mitigation action

• Misconceived sense of urgency in communication from Asset/ResDev

Why did it happen

Page 72: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

72

Be precise and document MOC’s (including risk assessments)

Ensure verification/audit of sub-suppliers

Ensure clear expectations to sub-suppliers

Ensure «acceptance to say NO» culture

Key learnings

Page 73: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity
Page 74: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Management Perspective

Tommy Sigmundstad . SVP Drilling&Wells Aker BP

Page 75: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

75

AKER BP – CONTRACTOR HSE DAY 2018

HSE Leadership Reflections

Page 76: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

76

AKER BP – CONTRACTOR HSE DAY 2018

Performance First

• HSE,Quality and Productivity is all

connected

• Right behavior and leadership

• Risk identification and Awareness

• Operating Discipline

Page 77: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity
Page 78: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Mentimeter poll

Break - Coffee/Tea

Speed Dating

Page 79: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

Speed dating

«This is my key learning from today,

which I would like to share with you»

Page 80: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity
Page 81: Aker BP Contractor Safety Day 2018 · AKER BP - CONTRACTOR SAFETY DAY 2018. VFW PROJECT – BARRIER MANAGEMENT Inherently Safer Design (ISD) philosophy Simplify design Minimize complexity

www.menti.com