    EDGE HILL UNIVERSITY

    LEVENS BUILDING

    SINGLE STOREY SECTION

    DEMOLITION STATEMENT

     AJP Ref: 215-267

    BY: The Alan Johnston Partnership LLP4th Floor1 Dale Street

    Liverpool L2 2ET

    Record of Approval 

    Originator Approved Date

    M. B. Hysel M. B. Hysel 11 Dec 2015

  • 8/19/2019 AJP Levens Building Demolition Statement

    2/10

     

    INTRODUCTION 

    The single storey section of the building knows as the Levens Building was the original building

    constructed in 1994. The three storey section was added in 2002.

    The single storey section is to be demolished to allow the construction of a new three storeyteaching block. The works to include the removal of the ground floor slab and foundations.

    CONSTRUCTION 

    The single storey section is of traditional build with loadbearing masonry supporting a timber

    trussed rafter pitched roof. The concrete ground floor slab is 175mm thick and mesh reinforced. It

    would appear to be ground bearing. Although not established it is considered that the building has

    traditional foundations bearing onto a medium clay at approximately 1.5 / 2.0 metres below existing

    ground level.

    The overall stability of the building is provided by the pattern of masonry crosswalls.

    DEMOLITION

    The demolition of this single storey building would not be considered to be particularly unusual.

    There is no evidence of unusual construction procedures or components.

  • 8/19/2019 AJP Levens Building Demolition Statement

    3/10

     

    For and behalf o f The Alan Johnston Partnership LLP

    MARTIN B. HYSEL

    Consultant

  • 8/19/2019 AJP Levens Building Demolition Statement

    4/10

     

     APPENDIX A

    PHOTOGRAPHS

  • 8/19/2019 AJP Levens Building Demolition Statement

    5/10

    1

  • 8/19/2019 AJP Levens Building Demolition Statement

    6/10

  • 8/19/2019 AJP Levens Building Demolition Statement

    7/10

     

     APPENDIX B

    DRAWINGS

    IT ISTHECONTRACTORS RESPONSIBILITYTO REPORT ANY

    INCONSISTENCIESWITH THISDRAWING ANDTO REQUEST

    CLARIFICATIONBEFORE PROCEEDING. DO NOTSCALEFROM THIS

    IT ISTHECONTRACTORS RESPONSIBILITYTO REPORT ANY

    INCONSISTENCIESWITH THISDRAWING ANDTO REQUEST

    CLARIFICATIONBEFORE PROCEEDING. DO NOTSCALEFROM THIS

  • 8/19/2019 AJP Levens Building Demolition Statement

    8/10

    CLARIFICATIONBEFORE PROCEEDING. DO NOT SCALEFROM THIS

    DRAWING. ALL DIMENSIONSTO BECHECKEDONSITEPRIORTO

    CONSTRUCTIONOR MANUFACTURE.

    EDGE HILL UNIVERSITY

    ST HELENS RD

    ORMSKIRK

    L39 4QP

    CLARIFICATIONBEFORE PROCEEDING. DO NOT SCALEFROM THIS

    DRAWING. ALL DIMENSIONSTO BECHECKEDONSITEPRIORTO

    CONSTRUCTIONOR MANUFACTURE.

    EDGE HILL UNIVERSITY

    ST HELENS RD

    ORMSKIRK

    L39 4QP

    FM

    MATEC / LEVENS GROUND FLOOR

    2100

    01/10/2015

  • 8/19/2019 AJP Levens Building Demolition Statement

    9/10

    e-mail [email protected]

    tel. 0161 873 8770fax. 0161 873 8771

    tel. 0141 572 2040fax. 0141 572 2041e-mail [email protected]

    e-mail [email protected]

    tel: 01704 531252fax: 01704 532833isdn: 01704 538544

    Dwg. No.

    Glasgow

    Title

    Scale Contract

    Southport

    Manchester 

    Rev

    This drawing is copyright. It is sent to you in confidence. It must not becopied, used or disclosed to third parties without the express permission of 

    CHECKED

    It is the Contractor's responsibility to report any inconsistencies on thisdrawing, or between drawings, to the Architect and to request clarification

    NJSR. It remains our property and must be returned on request.

    and instruction before proceeding.

    REVISION DRAWN DATE

    REV A  AWJ   24/09/01

    EXTERNAL WINDOWS TO STAIRWELL

     AMENDED

    REV B

    EXTERNAL WINDOWS TO STAIRWELL RELOCATED

     AWJ 11/10/01

    CHANGES TO NOTES

    REV C  AWJ 17/10/01

    REV D

    LINTEL ABOVE FRONT DOOR AMENDED

    17/10/01 AWJ

    RWP RELOCATED

    REV E  AWJ 31/10/01

    REV F

    FRONT DOOR AMENDED TO PLANNING DRAWING

     AWJ 05/11/01

    19/11/01 AWJ

    WINDOWS RELOCATED FOR EXPANSION JOINT

    REV G

    REV H

     ADDITION OF LIFT SHAFT

     AWJ 05/12/01

    15/01/02 AWJ

    PARAPET WALL AMENDED

    REV J

    REV K

    SECONDARY FIRE ESCAPE ADDED

     AWJ 04/02/02

    13/06/02 AWJ

     AS BUILT DRAWING

    REV M

  • 8/19/2019 AJP Levens Building Demolition Statement

    10/10

    e-mail [email protected]

    tel. 0161 873 8770fax. 0161 873 8771

    tel. 0141 572 2040fax. 0141 572 2041e-mail [email protected]

    e-mail [email protected]

    tel: 01704 531252fax: 01704 532833isdn: 01704 538544

    Dwg. No.

    Glasgow

    Title

    Scale Contract

    Southport

    Manchester 

    Rev

    This drawing is copyright. It is sent to you in confidence. It must not becopied, used or disclosed to third parties without the express permission of 

    CHECKED

    It is the Contractor's responsibility to report any inconsistencies on thisdrawing, or between drawings, to the Architect and to request clarification

    NJSR. It remains our property and must be returned on request.

    and instruction before proceeding.

    REVISION DRAWN DATE

    REV A  AWJ 11/10/01

     ADDITIONAL WINDOWS ADDED

    WINDOWS OMITTED

    REV B  AWJ 17/10/01

     AWJREV C

    RWP RELOCATED

    02/11/01

    15/01/02

    PARAPET WALL AMENDED

    REV D  AWJ

     AWJREV E

    SECONDARY FIRE ESCAPE ADDED

    04/02/02

    CHANGES MADE FOLLOWING DISCUSSION OF FIRE STRATEGY

    15/02/02REV F  AWJ

     AWJREV G 13/06/02

     AS BUILT DRAWING