Page 1: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

AIRPORT TERMINAL BUILDINGFRP-REINFORCED GLULAM

ROOF STRUCTURE

Silesian University of Technology

Faculty of Civil Engineering

Department of Structural Engineering

ENGINEERING DIPLOMA

author:Agnieszka KNOPPIK

supervisor:PhD SE Marcin GÓRSKI

Page 2: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Aim of project

The aim of project was to design a roof

structure of passenger terminal building for

Katowice International Airport made of FRP-

reinforced glue-laminated timber frame

system taking into consideration operation of

the building under standard operation

conditions.

Page 3: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Range of project1. Architectural concept of terminal building

2. Design models of roof structure beam model (simplified) surface model (detailed)

3. Composition of loads and combinations of loads under standard operation conditions

4. Stength & stability analysis of roof structure analytic method finate element method

5. Spatial stiffening of roof structure

6. Constructional drawings of main structure and structural elements

Page 4: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Requirements

1. Legal requirements

• aviation law

• building law

2. Technical requirements

• complex development of apron and terminal

3. Architectural requirements

• functional program

1. Project basis

Page 5: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Passenger terminals

1. Terminal 3 at Beijing Capital International Airport, China

• 986,000 m2 of total floor area

• structure – standard steel modules

2. Review of existing structures

2. Teminal at Chek Lap Kok Airport, Hong Kong• 515,000m2 of total floor area

• structure – RC frames, steel vaulted frames, waffle floor

3. New Teminal 2 a Mexico City International Airport, Mexico

• 350,000 m2 of total floor area

• RC with masonry filling

Page 6: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Glulam hall structures

arches

trusssolid

domes

ribbed

net

frames

column - beam

curved

2. Review of existing structures

Page 7: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Architectureground floor first floor

3. Structural solutions

My architectural concept

Page 8: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Structure B x L = 42.9 x 174.9 m; H ≈ 20 m

Load-bearing structure FRP-reinforced glulam

cable-stayed frames

every 6 / 9 m.

3. Structural solutions

Page 9: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Static model – beam modelarch elements replaced with sequence 0f straight segments

flexible supports replacing cables

4. Loads

Rough assesment of internal forces distribution.

Page 10: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Dead load

self load of roof covering

self load of structure

installations

roof bracing

case A - max. dead load

4. Loads

case B - min. dead load

Page 11: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Wind load PN-77-B-02011

qk = 550 Pa (account for thrust)

Ce = 1.2 (height-dependent)

β = 1.8 (initial assumption)

4. Loads

Page 12: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Wind load

case C

wind from the left

Case E

wind from the front

case D

wind from the right

4. Loads

Page 13: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Snow load EN 1991-1-3

sk = 0.9 kN/m (zone II)

Ce = 0.8 (windswept topography)

Ct = 0.77 (glass roof covering)

4. Loads

Page 14: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Snow loadcase F

balanced situation

case G

unbalanced situation 1

case H

unbalanced situation 2

4. Loads

Page 15: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Temperature EN 1991-1-5 difference between FRP and

glulam: thermal expansion coefficients

heat transfer

changing cross-sections : different uniform temperature

moisture

Temperature difference

case I - summer ΔT = 200C

case J - winter ΔT = -200C

4. Loads

Page 16: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Combinations of loads EN 1990Fundamental combination

(ULS)

Characteristic combination (SLS)

5. Combinations of loads

always A / B + optionally C / D / E + F / G / H + I / J

dead load wind load snow load temperature

Page 17: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Envelopes of internal forces

Bending moments

Shear forces

Normal forces

5. Combinations of loads

Page 18: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

FRP –reinforced glulamMoment curvature model – similar to reinforced concrete linear-elastic-ideal-plastic relationship within

cross-section linear-elastic behaviour of FRP Bernoulli hypothesis applied shear strength of bond between FRP and timber

greater than shear strength of timber along fibres ideally stiff bond, so εw = εf

substitute section method for stiffness evaluation influence of glue on stiffness neglected, Eglue =

Etimber

6. FRP-reinforced glulam

Page 19: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Mechanism of action. Modes of failure

7. ULS analytic

Page 20: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Ultimate Limit States

7. ULS analytic

bending with axial tension

bending with axial compression (horizontal elements) bending with axial compression (vertical elements) strength condition at bent segments

shear

effective height: h = h0 or h = h0 – hp

modification factor: kM = kM(hn, hf, hc, E0, Ef)

Page 21: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

ULS control

Control sections: bending + compressionControl sections: shear

7. ULS analytic

Page 22: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Static model – surface model

8. ULS FEM

Page 23: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Static model – surface model

8. ULS FEM

Page 24: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Dynamic wind action. Modal analysis

8. ULS FEM

n = 0.45 β = 1.51n = 1.28 β = 1.41n = 1.34 β = 1.41n = 1.90 β = 1.41n = 2.94 β = 1.42n = 4.07 β = 1.41

assumption

β = 1.8

satisfactory!

Page 25: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Ultimate stress

8. ULS FEM

Model 1: High concetration of stresses at the internal supportModel 2. Increased stiffness of cables. Little change in stress distribution

Model 3. No cables. Little change in stress distribution

Model 4. Second column introduced. Satisfactory stress distribution

Page 26: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Ultimate stress

8. ULS FEM

Model 5. Scheme

Reinforcement applied:• support area - 3 FRP strips along top fibres• sag area – 1 FRP strip along bottom fibres

3 strips σt > 90% ft,0,g,d

2 strips σt > 80% ft,0,g,d

1 strip σt > 70% ft,0,g,d

Page 27: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Serviceability Limit States

instanteneous deflection final deflection

stiffness increase kEI ∙ EI

kEI = kEI(hf, hp)

negligible effects of FRP creep

ufin = uinst (1 + kdef)

ufin ≤ ufin,net

9. SLS

Page 28: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Serviceability Limit States

9. SLS

Deformation of girder under characteristic combination of loads

Horizontal displacements

Vertical displacements

Page 29: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Serviceability Limit States

9. SLS

Control sections

section I-I

uins = 4.1cm kEI = 1.0 ufin = 6.2cm > unet = 5.0cm

section II-II

uins = 12.0cm kEI = 1.1 ufin = 16.0cm > unet = 10.0cm

Page 30: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

+ reinforcement in sag area (3 FRP strips h = 1.8mm, Ef = 300GPa)

Serviceability Limit States

9. SLS

Horizontal displacements

Vertical displacements

Page 31: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Serviceability Limit States

9. SLS

Control sections

section I-I uins = 3.1cm kEI = 1.0 ufin = 4.6cm < unet = 5.0cm

section II-II uins = 8.4cm kEI = 1.25 ufin = 9.9cm < unet = 10.0cm

most unfavourable case A+H

1 strip kEI = 1.10 u1s

= 6.2cm2 strips kEI = 1.19 u2s = 6.7cm3 strips kEI = 1.26 u3s = 7.1cm

Page 32: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Wind trusses• transverse wind truss every 30m• longitudinal wind truss along outer edge of roof• wall truss

10. Spatial stiffening

Page 33: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Wind trussesWind truss designed for uniformly distributed load q (wind load and load from stiffened frames)

10. Spatial stiffening

Wall truss being a component of roof truss designed for internal forces under q load

Wall truss between external columns designed for reaction from girder on columns

Page 34: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Vertical bracing

10. Spatial stiffening

Designed for concentrated load Q

Q = q ∙ a

Page 35: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Bolted joints (steel-to-timber joint)

10. Spatial stiffening

Thickness of steel plate

Required number of screws in joint per element

Number of connectors influences minimum width of connected element!

t = t(d, fuk)

R = R(fh,1,d, t1, d, Myd)

Page 36: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Supports

10. Spatial stiffening

Support of girder on RC deck – pivot supportSupport of girder on RC deck – column support

• clamp strength to reaction from girder

• min. required area of support

• min. required dimensions of steel bearing

• min. required dimensions of pivot roller

Page 37: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Glued joints

10. Spatial stiffening

shear stress

tensile stress across fibres

Page 38: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Articles

Books

9 Polish works 21 foreign works

1.Ajdukiewicz A., Mames J.: Konstrukcje z betonu sprężonego. Polski Cement Sp. z o.o., Kraków (2004)

2.Flaga A.: Inżynieria wiatrowa. Podstawy i zastosowania. Wydawnictwo “Arkady”, Warszawa (2008)

3.Jasieńko J.: Połączenia klejowe i inżynierskie w naprawie, konserwacji i wzmacnianiu zabytkowych kontrukcji drewnianych. Dolnośląskie Wydawnictwo Edukacyjne, Wrocław (2003)

4.Łubiński M., Filipowicz A., Żółtowski W.: Konstrukcje metalowe. Część I: Podstawy projektowania, wydanie 2zm. Wydawnictwo ``Arkady'', Warszawa (2000)

5.Masłowski E., Spiżewska D.: Wzmacnianie konstrukcji budowlanych. Wydawnictwo ``Arkady'', Warszawa (2000)

6.Michniewicz Z.: Konstrukcje drewniane. Wydawnictwo “Arkady”, Warszawa (1958)

7.Mielczarek Z.: Nowoczesne konstrukcje w budownictwie ogólnym. Wydawnictwo “Arkady”, Warszawa (2001)

8.Neufert E., Neufert P.: Architect’s data. 3rd edition9.Nożyński W.: Przykłady obliczeń konstrukcji budowlanych z drewna.

Wydanie 2 zm., Wydawnictwa Szkolne i Pedagogiczne S.A., Warszawa (1994)

10.Świątecki A., Nita P., Świątecki P.: Lotniska. Wydawnictwo Instytutu Wojsk Lotniczych, Warszawa (1999)

Bibliography

Page 39: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Standards

1. PN-77-B-02011 – Obciążenia w obliczeniach statycznych. Obciążenie wiatrem.

2. PN-81/B-03020. Grunty budowlane. Posadowienie bezpośrednie budowli – Obliczenia statyczne i projektowanie.

3. PN-82/B-02402. Ogrzewnictwo – Temperatury ogrzewanych pomieszczeń w budynkach.

4. PN-90-B-03200. Konstrukcje stalowe. Obliczenia statyczne i projektowanie.

5. PN-B-03150:2000. Konstrukcje drewniane – obliczenia statyczne i projektowanie.

6. PN-B-03264:2002. Konstrukcje betonowe, żelbetowe i sprężone – obliczenia statyczne i projektowanie.

7. prEN 1990 – Eurocode 0: Basis of structural design.

8. prEN 1991-1-1 – Eurocode 1: Actions on structures - Part 1-1: General actions -Densities, self-weight, imposed loads for buildings.

9. prEN 1991-1-3 – Eurocode 1: Actions on structures - Part 1-3: General actions – Snow loads.

10. prEN 1991-1-5 – Eurocode 1: Actions on structures - Part 1-5: General actions – Thermal actions.

Bibliography

Page 40: AIRPORT   TERMINAL  BUILDING FRP-REINFORCED   GLULAM ROOF   STRUCTURE

Legal papers

1. Convention on International Civil Aviation. 9th edition (2006)

2. Konwencja o miedzynaroodowym lotnictwie cywilnym (2002)

3. Prawo budowlane. Ustawa z dnia 7 lipca 1994 r.

4. Prawo lotnicze. Ustawa z dnia 3 lipca 2002 r.

5. Rozporzadzenie Ministra Infrastruktury z dnia 31 sierpnia 1998 r. w sprawie przepisów techniczno-budowlanych dla lotnisk cywilnych.

6. Rozporzadzenie Ministra Infrastruktury z dnia 12 kwietnia 2002 r. w sprawie warunków technicznych, jakim powinny odpowiadac budynki i ich usytuowanie.

7. Rozporzadzenie Ministra Infrastruktury z dnia 25 czerwca 2003 r. w sprawie warunków, jakie powinny spełniac obiekty budowlane oraz naturalne w otoczeniu lotniska.

8. Rozporzadzenie Ministra Infrastruktury z dnia 30 kwietnia 2004 r. w sprawie klasyfikacji lotnisk i rejestru lotnisk cywilnych.

Bibliography

Web pages