AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of...

55
AIRPORT SHUTTLE SERVICE

Transcript of AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of...

Page 1: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE SERVICE

Page 2: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Survey Objectives

• Demand assessment• Finalization of routes• Finalization of station locations• Fare Structure

Page 3: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Survey Data

Desire to Shift – Mode and distance wiseOnline Travel Survey Forms – 107 respondents (~800 data points)

Current Passenger DemandAirport Taxi data at domestic departure (from booth 1 for 9 days) – 12400 data entries for 173.9 hours or 7.25 days

Current Modal SplitJuly 2006 traffic survey at Mehram Nagar Junction (domestic airport). Data across 2 week days for a total of 8 hours.

Page 4: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Analysis Methodology

Page 5: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Shuttle Journey Cost(Base fare Rs. 100, then 5 Rs. Per Km)

Page 6: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Shuttle Journey Time(13.91 & 15.01 km/hr. for shuttle, 18 km/hr. for taxis)

Page 7: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Online – Traveler Survey Form

• Personal info – name, age, residence, dist to airport

• Frequency of travel• Kind of trips• Current mode of travel (from and to airport)• Desire to shift (both from and to the airport) –

mode and distance wise breakup

Page 8: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AGE PROFILE & TRAVEL DISTANCE

Page 9: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

TRIP CLASSIFICATION & TRAVEL FREQUENCY

Page 10: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

CURRENT MODE OF TRAVEL – May 2009

Page 11: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

•Most chauffeur car owners are not willing to use airport link for upto 15km •For longer distances they are more likely to use •Next important choice is B/Y taxi

Page 12: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

•Most friend/family driven car owners are not willing to use airport link for up to 15km •For longer distances they are more likely to use •Next important choice is A/C Cab taxi

Page 13: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

•Most A/C cab users would retain their travel mode while travel from airport•While travel to airport most are willing to shift for longer journeys•Next important choice is B/Y taxi

Page 14: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

•Most B/Y cab users will use the shuttle for travelling from airport – preferred for longer distances•For travel to airport, the shuttle becomes attractive for more than 20km journey length•Next important choice is auto rickshaw

Page 15: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

•Most A/C cab users will shift to shuttle for 15-30km journey from airport•Travelling to airport the shuttle becomes desirable for 15km or more journey length•Next important mode choice is B/Y taxi

Page 16: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

•Most auto rickshaw users will opt for shuttle for more than 20km journey from the airport•Most auto rickshaw users going to the airport will prefer shuttle for more than 15km journeys•Next important choice is B/Y taxi

Page 17: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Willingness to shift ? CHAUFFER DRIVEN PRIVATE CAR

Page 18: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Willingness to shift ? FAMILY/FRIEND PRIVATE CAR

Page 19: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Willingness to shift ? PRE BOOKED A/C CAB

Page 20: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Willingness to shift ? NON A/C / B&Y CAB

Page 21: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Willingness to shift ? A/C RADIO CAB

Page 22: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Willingness to shift ? AUTO RICKSHAW

Page 23: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

CURRENT MODE OF TRAVEL – May 2009

Page 24: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

CURRENT MODE OF TRAVEL (domestic terminal) – July 2006, June 2009

Page 25: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

CURRENT MODE OF TRAVEL (international terminal) – July 2006*

*Available data common for types of cars and all pvt./A/C taxi, split into chauffeur and friend family driven as well pvt. and radio cabs, using percentage breakup from June 2009 data

Page 26: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

TAXI DATA SURVEY

Domestic TerminalTotal Number of Entries 12400Sample 50%Total Number of entries used 10132Date of entries 30th April 2009 – 8th May 2009Total no. of hrs 173.9 hrs Total number of effective days 7.25Average taxis per day 3420

International TerminalTotal Number of Entries 10509Sample 100%Total Number of entries used 8801Date of entries 16th April 2009 – 25th April 2009Total no. of hrs 192hrs Total number of effective days 8.0Average taxis per day 1314

Page 27: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

ZONAL DISTRIBUTION OF SAMPLE DATA

Page 28: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

ZONAL DISTRIBUTION OF SAMPLE DATA

Page 29: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

DISTRIBUTION OF TAXI DATA

Page 30: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

DISTRIBUTION OF TAXI DATA

Page 31: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

ROUTE & DEMAND ANALYSIS

Page 32: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE - ROUTE NETWORK

1

2

3

4

5

6

7

8

10

9

Page 33: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE - ROUTE NETWORK

  STAND ALONE STATION   BUS TERMINAL / DEPOT   HOTEL   RAILWAY STATION

ROUTE 1 27.75 km MAJNU KA TILA ISBT - KASHMERE

GATE (2.98)ODRS(4.02)

Airport(20.75)

ROUTE 2 22.72 km ROHINI PRITAMPURA

(4.76KM)

PUNJABI BAGH(3.8)

MAYAPURI (2.54)

Airport (11.62)

ROUTE 3 25.71 km SARITA VIHAR SOFITEL SURYA

(5.19)

HAUZ KHAZ DEPOT(8.13)

VASANT INTERCONTINENTAL

(5.38)

Airport(7.01)

ROUTE 4 34.1 km VASUNDHARA

ISBT - ANAND VIHAR(5.88)

TILAK BRIDGE(10.58)

Airport(17.64)

ROUTE 5 26.95 km MAYUR VIHAR 1

NIZAMUDDIN RLY ST

(6.0)

G K 1(6.78)

HYATT(5.22)

Airport(8.95)

ROUTE 6 21 km MARIOTT GRAND HYATT

(12.35)RADISSON

(3.55)Airport(5.2)

ROUTE 7 16.54 km SARAI ROHILLA

RLY STATIONSIDHARTH

(4.28)Airport(12.26)

ROUTE 8 17.68 km NDRS/

PAHARGANJSHANGRILA

(3.14)ASHOKA

(5.2)

TAJ PALACE

(3.11)

Airport(6.23)

ROUTE 9 17.33 km BRISTOL IFFCO CHOWK

(2.64)

LEELA KEMPINSKY

(4.28)

Airport(10.41)

ROUTE 10 17.33 km

UTTAM NAGARAirport(17.33)JANAKPURI -

DISTRICT CENTRE

Page 34: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE - ROUTE 1Majnu Ka Tila – ISBT Kashmere Gate – Old Delhi Rly Station - Airport

Route 1 Actual B/Y Taxi ridership

Majnu Ka Tila 59

Civil Lines 40

DU 19

ISBT-Kashmere Gate 735

Gujrati samaj 3

Tees Hazari 3

Rajpura Road 3

Kashmere Gate 59

Azad Market 3

ODRS 417

Chandni Chowk 54

Red Fort 13

Old Delhi 129

Chawdi bazar 27

Asaf Ali Road 8

Darya Ganj 89

Jama Masjid 24

Fatehpuri 3

Page 35: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Rohini0.0 km

Pritam Pura 5.0 km

Punjabi Bagh8.8km

Mayapuri12. 8km

Domestic Airport23.8 km

AIRPORT SHUTTLE - ROUTE 2Rohini – Pritampura – Punjabi Bagh – Mayapuri - Airport

Mayapuri 38

Rajouri Garden 132

Naraina 67

Hari Nagar 11

Mansarovar Garden 24

Ramesh Nagar 24

Tagore Garden 27

Bali Nagar 3

Kirti Nagar 22

Raja Garden 11

Route 2Actual B/Y Taxi ridership

Rohini 503

Buddha Vihar 11

Avantika 5

Madhuban Chowk 11

Prashant Vihar 11

Pritampura 361

Shalimar Bagh 118

Azadpur 16

Wazirpur 3

Keshavpura 22

Kanhaiyya 3

Trinagar 19

Ashok Vihar 183

Punjabi Bagh 102

Rani Bagh 11

Mahindra Park 3

Lawrence Road 11

Madhipur 3

Paschim Vihar 237

Moti Nagar 32

Route 2Actual B/Y Taxi ridership

Page 36: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE - ROUTE 3Sarita Vihar – Hotel Sofitel Surya – Hauz Khas Depot – Vasant Continental - Airport

Route 3 Actual B/Y Taxi ridership

Sarita Vihar 162

Abul Fazal 16

Jasola 22

Apolo hospital 35

Hotel Sofitel Surya 3

New Friends Colony 137

Okhla 121

Govindpuri 22

Hauz Khas Depot 105

Green Park 153

Sarvodya Enclave 32

Malviya Nagar 221

NCERT 5

Gulmour Park 16

Safdarjung Area 129

Ber Sarai 24

Katwaria Sarai 51

Vasant Continental 5

JNU 83

Vasant Vihar 205

R.K.Puram 113

Subroto Park 24

Munirka 3

RR Hospital 3

Page 37: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE - ROUTE 4Vasundhara - ISBT Anand Vihar - ITO - Airport

Route 4 Actual B/Y Taxi ridership

Vasundhra 70

Anand Vihar 436

Surajmal Vihar 11

Yojna Vihar 8

Shrestha Vihar 8

Vivek Vihar 83

Ghazipur 32

Preet Vihar 54

Patparganj 320

Kaushambi 5

Vaishali 3

ITO 92

Shakarpur 16

Raj Ghat 3

Delhi Gate 22

Minto Road 8

Yamuna Nagar 5

Maulana Azad College 3

Tilak Bridge 8

Supreme Court 24

Pragati Maidan 5

Patiyala House 8

Sunder Nagar 24

High Court 13

India Gate 48

Mandi House 16

Oberoi 22

Kakanagar 3

Laxminagar 172

IP extn 5

Page 38: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE - ROUTE 5Mayur Vihar – Nizamuddin Rly Station – Andrews Ganj – HYATT - Airport

Route 5 Actual B/Y Taxi ridership

Mayur Vihar 538

Trilokpuri 3

Akshardham 19

Kalyanpuri 5

Mother Dairy 13

Nizamuddin RS 740

sarai kalekhan 43

maharani bagh 24

Andrewsganj 16

GK I 288

East of Kailash 178

Kailash Colony 54

ansal Plaza 24

Sadiq Nagar 19

Khel Gaon 70

South Extension 202

Defence Colony 116

Lajpat Nagar 342

Jangpura 92

Kotla Mubarak 27

Panchsheel Enclave 32

Chirag Delhi 11

Siri Fort 3

Uday Park 13

HYATT 46

Yusuf Sarai 16

Mohammadpur 3

Gautam nagar 46

Africa Avenue 5

Arjun Nagar 3

AIIMS 32

S.J. enclave 245

Bhikaji Cama 65

Sarojini Nagar 62

Netaji Nagar 13

INA 24

Moti Bagh 46

Satya Niketan 19

RK Puram I 113

Page 39: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE - ROUTE 6Saket – Vasant Kunj – Radisson - Airport

Route 6 Actual B/Y Taxi ridership

Mariot/Saket 256

Lado Sarai 19

Neb Sarai 46

Khirki Extn 19

Sainik Farm 16

Khanpur 35

Sheikh Sarai 57

Grand Hyatt

Vasant Kunj 611

Kishan Garh 27

Radisson 32

Mahipalpur 245

Page 40: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE – ROUTE 7Paharganj (DB Gupta Rd) - Karol Bagh (Faiz Rd / Pusa Rd) - Airport

Route 7 Actual B/Y Taxi ridership

DB Gupta Road 5

Aaram Bagh 30

Panchkuin Road 3

Paharganj 1082

Main Bazaar 3

Sadar Bazar 13

Chemsford 5

Pusa Road 118

Karol Bagh 1142

Patel Nagar 226

Baljeet nagar 3

Old Rajinder Nagar 62

New Rajinder Nagar 57

Gangaram Hospital 13

Pusa Road 118

Shankar Road 11

Todapur 8

Birla Mandir 5

Jhandenwalan 11

Metro Hotel 3

Novelty 3

Pratap Garden 3

Page 41: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE - ROUTE 8NDRS/Paharganj - Hotel Shangri la– Hotel Ashoka – Hotel Taj Palace - Airport

Route 8Actual B/Y Taxi ridership

NDRS-Paharganj 1082

NDRS 1747

Main Bazar 3

Chemsford 5

Ajmere Gate 127

Aram bagh 30

Sadar bazar 13

Gupta Road 5

Chawdi bazar 27

Minto Road 8

DDU Road 3

Panchkuiyan Road 3

Gol Market 32

Bengali Market 3

Page 42: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Shangri la 5

GPO 35

RML hospital 3

Ashok road 30

YMCA 16

Patel Chowk 3

S.P.Bhawan 3

Kerala House 32

Parliament Street 13

Jantar Mantar 5

Bangla Sahib 5

K G Marg 22

Feroze Shah Road 16

Le Meridian 22

Krishi Bhawan 5

Rail Bhawan 13

Rafi marg 3

AP Bhawan 8

Ramada 3

Maharashtra Sadan 3

Central Secratariat 5

Hailey Road 11

Iran Embassy 3

Statesman Building 3

Lady Harding 3

Barakhamba road 59

Intercontinental 3

Cannaught Place 436

Hotel cannaught 3

Shivaji Stadium 3

National Museum 3

Janpath 105

Nirman Bhawan 8

Mansingh Road 3

Taj Mansingh 5

Aurangzeb Road 11

Pandara Road 13

Shahjahan Road 5

Hotel Imperial 3

Prithviraj Road 13

Khan Market 43

Rajasthan House 5

Hotel Ambassador 3

AIRPORT SHUTTLE - ROUTE 8NDRS/Paharganj - Hotel Shangri la– Hotel Ashoka – Hotel Taj Palace - Airport

Hotel Ashok 3

Tughlak Road 5

Claridges 3

Sena Bhawan 8

Raj Bhawan 5

South Block 3

South Avenue 27

Kautilya Marg 3

Orissa Bhawan 3

Malcha Marg 5

Samrat Hotel 3

Racecourse 8

Chanakyapuri 272

Maurya Sheraton 8

Bapu Dham 5

S.P Marg 27

Jor Bagh 16

Continued…

Page 43: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE - ROUTE 9Bristol – IFFCO Chowk – Leela Kempinski – Airport

Route 9 Actual B/Y Taxi ridership

Bristol

Gurgaon-4 3

Gurgaon-31 579

Gurgaon-18 1842

Gurgaon-22 3

Gurgaon 3

Manesar 8

IFFCO Chowk 3

DLF I/III 164

Golflinks 8

Sushant lok 19

Aya nagar 35

DLF IV/V 8

Leela Kempinski

Shankar chowk 8

Udyog vihar 40

Kapashera 13

Brijwasan 11

Page 44: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE - ROUTE 10Vikaspuri – Airport

Route 10 Actual B/Y Taxi ridership

Vikaspuri/Janakpuri 221

Uttam Nagar 48

Mahavir Nagar 13

Tilak Nagar 48

Shiv Nagar 5

Asha Park 3

Janakpuri 358

Ashok Nagar 40

Subhash Nagar 5

Page 45: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE – July 2006

Overall % of people opting for shuttle service1.From Airport to City - 9.10 %2.From City to Airport - 3.79 %

Page 46: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE – July 2006

Overall % of people opting for shuttle service1.From Airport to City - 9.62 %2.From City to Airport - 5.43 %

Page 47: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE – July 2006

0100 to 0700 hours is arrival lean time – service may be discontinued for maintenanceDeparture lean time staggered by 2 hrs – 1330 to 0500 hoursLeanest 4 hours of the day are 0100 to 0500 hours

Page 48: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE – July 2006

No Arrival lean period – spread out use over 24 hoursLean period (on 2 hourly average) – 2330 to 0100 hours & 1200 to 19:30 hoursDeparture Peak is 2 hours ahead of arrival peakLeanest 4 hours of the day – 1700 to 2100 hours

Page 49: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Service Planning

• Travel time

• Bus Schedule

• Fare Structure

Page 50: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Hourly Variations for Mayur Vihar Route

Mayur Vihar

Moolchand

Hauz Khaz

Parkland, Bhikaiji

Domestic Airport

Intl. Airport

1 hour frequency from 7am to 10pm

1 hour frequency from 7am to 10pm

30 min frequency- 4am to 7am

30 min frequency- 10pm to 1am

30 min frequency- 1am to 4am

Sarita Vihar

Page 51: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

Hourly Variations for Mayur Vihar Route

Bristol

Radisson

Leela

Domestic Airport

Intl. Airport

1 hour frequency from 7am to 10pm

1 hour frequency from 7am to 10pm

30 min frequency- 4am to 7am

30 min frequency- 10pm to 1am

30 min frequency- 1am to 4amMarriot

Iffco

Page 52: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE – NETWORKTRAVEL TIME

Average Speed(Km/hr) 18 Dwell time at station 5 to 10min

ROUTE SHUTTLE STATION

Running distance

(Km)

Distance between stations (Km)

Travel from Airport Travel to Airport

Route 1

Majnu ka tila 0   0 0

ISBT - kashmiri gate 2.98 2.98 19.93333333 14.93333333

ODRS 7.01 4.03 23.43333333 23.43333333

Airport 27.75 20.74 69.13333333 69.13333333

Total time (min)     112.5 107.5

Route 2

Rohini 0   0 0

Pitampura 4.76 4.76 25.86666667 20.86666667

Punjabi Bagh 8.56 3.8 22.66666667 17.66666667

Mayapuri 11.1 2.54 13.46666667 18.46666667

Airport 22.72 11.62 38.73333333 38.73333333

Total time (min)     100.7333333 95.73333333

Sarita Vihar 0   0 0

Surya 5.19 5.19 22.3 22.3

Hauz Khas Depot 13.32 8.13 37.1 32.1

Vasant Intercontinental 18.9 5.58 23.6 23.6

Airport 25.71 6.81 22.7 22.7

Total time (min)     105.7 100.7

Vasundhara 0   0 0

Anand Vihar 5.88 5.88 29.6 29.6

ITO 16.46 10.58 45.26666667 40.26666667

Airport 34.1 17.64 58.8 58.8

Total time (min)     133.6666667 128.6666667

Page 53: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE – NETWORKTRAVEL TIME

Average Speed(Km/hr) 18 Dwell time at station 5 to 10min

ROUTE SHUTTLE STATION

Running distance

(Km)

Distance between stations (Km)

Travel from Airport Travel to Airport

Route 5

Mayur Vihar 0   0 0

Nizamuddin 6 6 25 30

G.K. - I 12.78 6.78 32.6 27.6

Parkland Hotel, Africa Avenue 18 5.22 27.4 22.4

Airport 26.95 8.95 29.83333333 29.83333333

Total time (min)     114.8333333 109.8333333

Mariott, Saket 0   0 0

Grand Hyatt, Vasant Kunj 12.35 12.35 46.16666667 46.16666667

Radisson, NH8 15.9 3.55 16.83333333 16.83333333

Airport 21 5.1 17 17

Total time (min)     80 80

D B Gupta Road 0   0 0

Siddhartha 3.8 3.8 22.66666667 17.66666667

Airport 16.54 12.74 52.46666667 52.46666667

Total time (min)     75.13333333 70.13333333

NDRS, Ajmeri Gate 0 0 0 0

Hotel Janpath 3.14 3.14 15.46666667 20.46666667

Ashoka hotel 8.34 5.2 22.33333333 22.33333333

Airport 17.68 9.34 31.13333333 31.13333333

Total time (min)     68.93333333 73.93333333

Page 54: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

AIRPORT SHUTTLE – NETWORKTRAVEL TIME

Average Speed(Km/hr) 18 Dwell time at station 5 to 10min

ROUTE SHUTTLE STATION

Running distance

(Km)

Distance between stations

(Km)

Travel from Airport Travel to Airport

Route 9

Leela Kempinsky (Amby Mall)

0   0 0

Bristol, Gurgaon 4.91 4.91 21.36666667 21.36666667

IFFCO Chowk 7.27 2.36 12.86666667 12.86666667

Airport 21.81 14.54 48.46666667 48.46666667

  Total time (min)     82.7 82.7

Route 10

Jankpuri District Center 0 0 0 0

Airport 14.05 14.05 46.83333333 46.83333333

Total time (min)     46.83333333 46.83333333

Page 55: AIRPORT SHUTTLE SERVICE. Survey Objectives Demand assessment Finalization of routes Finalization of station locations Fare Structure.

List of hotels identifiedDB GUPTA RD

Durga HotelSingh HotelHotel Sita

Hotel Avtar

PUSA RD

La SuitSiddhartha Hotel

HYATT(near safdarjung

enclave)Hotel ParklandHotel Empire

Hotel Veera Place