Airport Division - jpz.com.myjpz.com.my/wp-content/uploads/2018/01/URB.pdf · International Airport...

6
F e a t u r e d P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd. *Cost in Malaysian Ringgit (Million) Airport Division Start End Project Cost (mil) Client 1994 1998 Kuala Lumpur International Aiport, Sepang, Selangor. (Project Management) 9,000.0 Ministry of Transport 2001 2003 Terminal 3, Subang Airport (Design Consultancy Including Pre-Planning Study) 150.0 Ministry of Transport 2005 2005 The Upgrading Works For The New Large Aircraft (Nla) Ab-380 Operations at Kl International Airport, Sepang (Up To Tender Stage Only) - Design Consultancy (In Conjunction With Design-And-Build Contractor) 88.0 Trans Resources Corporation Sdn. Bhd. Malaysia Airports Sdn. Bhd. 2005 2007 External Parking Apron for MAS Hangar at KLIA 25.0 Malaysia Airlines System 2006 2008 Rehabilitation And Strengthening Of Runway Pavement at Penang International Airport - Design Consultancy (In Conjunction With Design-And- Build Contractor) 15.0 SM Pelangi Sdn. Bhd. and Malaysia Airports Sdn. Bhd. 2006 2009 Rehabilitation Of Airfield Pavement For Parking Apron and Deepening Of The Parking Apron Operations at Penang International Airport 25.0 Malaysia Airports Sdn. Bhd 2006 2009 Redevelopment of Penang International Airport User Requirement and Pre-Planning Study Study Malaysia Airports Sdn. Bhd 2006 2009 Rehabilitation of Air-field Pavement For Parking Apron Bay 3,4,5 & 6 at Penang International Airport 36 Malaysia Airports Holding Berhad 2007 2008 DCA Project In Relation To LCAT at Kl International Airport, Sepang Package B (In Conjunction With Design-And-Build Contractor 20.0 Ministry of Transport Department of Civil Aviation 2007 2009 Rehabilitation Of Taxiways At Penang International Airport ( Design Consultancy) 12.0 Malaysia Airports Sdn. Bhd 2007 2007 Upgrading of Miri Airport 20.0 Binapuri Holdings Berhad 2007 2008 Senai International Airport, Johor Bharu, Johor 90 Senai Airport Teriminal Services Sdn.Bhd. 2008 2009 Upgrading of Kuala Terengganu Air-port, Terengganu: Package IV(a) & IV(b) Sea Reclamation & Coastal Erosion Risk Managemen t Inai Kiara Sdn. Bhd. 2008 2010 Upgrading Of Kuala Terengganu Airport, Terengganu: Package IV(A) - Runway Extension and Associated Works 250.0 Trans Resources Corporation Sdn.Bhd. 2008 2010 The proposed of aerodrome certification in Kerteh Airport 1.6 Petronas 2008 2009 Rehabilitation Of Airfield Pavement For Runway, Taxiways And Parking Apron And All Associated Facilities At Sultan Abdul Aziz Shah International Airport, Subang 28 Malaysia Airports Holding Berhad 2009 2013 KLIA2 Detail Design and Construction Supervision for Package AF01 Runway 3, Taxiway and Drainage 336.0 Malaysia Airports Holdings Berhad 2009 2011 Upgrading of Sultan Ismail Petra Airport, Kota Bharu, Kelantan 50.0 Ministry of Transport 2010 2012 Upgrading of Sultan Azlan Shah Airport, Ipoh ,Perak 47.8 Ministry of Transport 2010 2011 Privatisation Of The Proposed Rehabilitation Expansion, Development, Operation And Maintenance Of Prince Mohammed Bin Abdulaziz International Airport, Madinah Al-Munawarah, Kingdom Of Saudi Arabia Masterplan and Preliminary Design Al-Bakri and Sons Holdings Co. Malaysia Airports Holdings Berhad 58

Transcript of Airport Division - jpz.com.myjpz.com.my/wp-content/uploads/2018/01/URB.pdf · International Airport...

F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.

*Cost in Malaysian Ringgit (Million)

Airport Division

Start End Project Cost (mil) Client

1994 1998Kuala Lumpur International Aiport, Sepang, Selangor. (Project

Management)9,000.0 Ministry of Transport

2001 2003Terminal 3, Subang Airport (Design Consultancy Including Pre-Planning

Study)150.0 Ministry of Transport

2005 2005

The Upgrading Works For The New Large Aircraft (Nla) Ab-380 Operations

at Kl International Airport, Sepang (Up To Tender Stage Only) - Design

Consultancy (In Conjunction With Design-And-Build Contractor)

88.0

Trans Resources

Corporation Sdn. Bhd.

Malaysia Airports Sdn. Bhd.

2005 2007 External Parking Apron for MAS Hangar at KLIA 25.0 Malaysia Airlines System

2006 2008

Rehabilitation And Strengthening Of Runway Pavement at Penang

International Airport - Design Consultancy (In Conjunction With Design-And-

Build Contractor)

15.0SM Pelangi Sdn. Bhd. and

Malaysia Airports Sdn. Bhd.

2006 2009Rehabilitation Of Airfield Pavement For Parking Apron and Deepening Of

The Parking Apron Operations at Penang International Airport 25.0 Malaysia Airports Sdn. Bhd

2006 2009Redevelopment of Penang International Airport – User Requirement and

Pre-Planning StudyStudy Malaysia Airports Sdn. Bhd

2006 2009Rehabilitation of Air-field Pavement For Parking Apron Bay 3,4,5 & 6 at

Penang International Airport36

Malaysia Airports Holding

Berhad

2007 2008DCA Project In Relation To LCAT at Kl International Airport, Sepang

Package B (In Conjunction With Design-And-Build Contractor20.0

Ministry of Transport

Department of Civil Aviation

2007 2009Rehabilitation Of Taxiways At Penang International Airport ( Design

Consultancy) 12.0 Malaysia Airports Sdn. Bhd

2007 2007 Upgrading of Miri Airport 20.0 Binapuri Holdings Berhad

2007 2008 Senai International Airport, Johor Bharu, Johor 90Senai Airport Teriminal

Services Sdn.Bhd.

2008 2009Upgrading of Kuala Terengganu Air-port, Terengganu: Package IV(a) &

IV(b) Sea Reclamation & Coastal Erosion

Risk

Managemen

t

Inai Kiara Sdn. Bhd.

2008 2010Upgrading Of Kuala Terengganu Airport, Terengganu: Package IV(A) -

Runway Extension and Associated Works250.0

Trans Resources

Corporation Sdn.Bhd.

2008 2010 The proposed of aerodrome certification in Kerteh Airport 1.6 Petronas

2008 2009

Rehabilitation Of Airfield Pavement For Runway, Taxiways And Parking

Apron And All Associated Facilities At Sultan Abdul Aziz Shah International

Airport, Subang

28Malaysia Airports Holding

Berhad

2009 2013KLIA2 – Detail Design and Construction Supervision for Package AF01 –

Runway 3, Taxiway and Drainage336.0

Malaysia Airports Holdings

Berhad

2009 2011 Upgrading of Sultan Ismail Petra Airport, Kota Bharu, Kelantan 50.0 Ministry of Transport

2010 2012 Upgrading of Sultan Azlan Shah Airport, Ipoh ,Perak 47.8 Ministry of Transport

2010 2011

Privatisation Of The Proposed Rehabilitation Expansion, Development,

Operation And Maintenance Of Prince Mohammed Bin Abdulaziz

International Airport, Madinah Al-Munawarah, Kingdom Of Saudi Arabia

Masterplan

and

Preliminary

Design

Al-Bakri and Sons Holdings

Co.

Malaysia Airports Holdings

Berhad

58

F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.

*Cost in Malaysian Ringgit (Million)

Airport Division

Start End Project Cost (mil) Client

2010 2014Proposed of design & consultancy services for Apron Widening, Kerteh

Airport, Keerteh, Kemaman, Terengganu7.0 Petronas

2011 2012

A Study On Proposed Expansion And Upgrading Of Facilities To

Accommodate The Growth Of Cebu Pacific Air At Ninoy Aquino International

Airport In The Philippines

Study Cebu Pacific

2011 2012

Rehabilitation, Expansion, Development, Operation And Maintenance Of

Proposed Upgrading and Extension Works, Development, Operation And

Maintenance Of Iranian Imam Khomeini International Airport , Islamic

Republic Of Iran

– Airport Master Plan For China Railway, Amona and Imam Khomeini

International Airport Consortium

Masterplan

Amona Holdings Berhad

China Railway Group

Limited

Imam Khomeni International

Airport, Iran.

2012 2012 Upgrading of The Existing Suai Aiport, Timor-Leste 300.0

Ministry of Petroleum and

Mineral Resources,

Republic Democratic of

Timor-Leste

2012 2013

Privatisation Of The New Al-Maty International Airport, Kazakhstan

- Technical Feasibility Study And Airport Master Plan

- Detail Engneering Design

Masterplan

The Government of

Kazakhstan

Airport Limo(M) Sdn.Bhd

Malaysia Airports Holdings

Berhad

2013 2013Redang Airport, Technical feasibility study for the upgrading of the airport for

option B-737 operations and option – ATR72-600 operationsStudy

Destination Resorts and

Hotel Sdn.Bhd.

2013 2014Senai Airport Aviation Park

Planning and Detail Design Of Aviation Park36.0

Senai Airport Terminal

Services Sdn.Bhd

2013 2014 Upgrading of Sandakan Airport, Sandakan, Sabah 60.0 Ministry of Transport

2013 2017Study On The Proposed Facilities For The Development Of Subang

Skypark, Sultan Abdul Aziz International Airport, Subang145 Subang Skypark Sdn Bhd.

2013 2014

Senai Business Aviation Centre – Proposed Phase 1 Development

Construction Of Hangars and General Aviation At Senai International

Airport

40.0Senai Airport Terminal

Services Sdn. Bhd.

2014 2015 The upgrading of Sultan Ahmad Shah Airport, Kuantan, Pahang 16.9 Ministry of Transport

2014 2015

Senai Business Aviation Centre-Proposed Phase 2 development

construction of hangars and general aviation at Senai International Airport –

VVIP hangar

64MMC Engineering Services

Sdn.Bhd.

2016 2017Development Plan for Batu Berendam Airport (Land Development and Pre-

Planning Study)165.0 Ministry of Transport

2016 2017Pre-feasibility study for Thakhek Airport, Khammoun District, Lao People’s

Democratic RepublicStudy Inovica Global Sdn.Bhd.

59

KLIA2 – Runway 3, Taxiways, Drainage and Associated Works

F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.

Upgrading Of Kuala Terengganu Airport, Terengganu -

Runway Extension On Reclaimed Area and Associated

Works.

Senai Airport - VVIP Hangar and Associated Services

KLIA2 - Official Opening of Runway 3 - Trial Landing.

Airport Division

60

Sandakan Airport Passenger - Terminal Building Upgrading

F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.

Penang International Airport – Pavement Rehabilitation

Upgrading of Sultan Azlan Shah Airport, Ipoh ,Perak – Landside and Airside

Airport Division

61

Airport Division

F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.

Suai Airport, Timor-Leste - Under Construction

Suai Airport, Timor-Leste – Overall Upgrading Scope

62

Kota Bharu runway reposition and helipad

Senai Hangar, view from outside and inside of hangar.

F e a t u r e d P r o j e c t sJurutera Perunding Zaaba Sdn. Bhd.

Privatisation Project for The Expansion, Upgrading Operation And Maintenance Of Iranian Imam Khomeini International

Airport , Islamic Republic Of Iran – Airport Master Plan For China Railway, Amona and Imam Khomeini International

Airport Consortium

Privatisation Project For Prince Mohammed Bin Abdulaziz International Airport - Madinah Al-Munawarah, Kingdom Of Saudi Arabia - Airport Masterplan For Al-Bakry and Malaysia Consortium

Airport Division

63