Airport considerations and airport solutions
Session 5Presentation 3
![Page 2: Airport considerations and airport solutions Session 5 Presentation 3.](https://reader035.fdocuments.net/reader035/viewer/2022070307/551a298a550346545e8b4792/html5/thumbnails/2.jpg)
Construction plan
• Vehicle • access requirements determine standard routes• supervision requirement need for additional airport
safety officers
• Personnel • supervision requirement need for additional airport
safety officers• safety and security familiarization implement a training
program
![Page 3: Airport considerations and airport solutions Session 5 Presentation 3.](https://reader035.fdocuments.net/reader035/viewer/2022070307/551a298a550346545e8b4792/html5/thumbnails/3.jpg)
Construction plan
• Facilities • Taxiways, runways, lighting, signage determine
availability
• Communication requirements with ATC • Marking and Signage requirements• FOD develop a FOD control plan• Runway recall determine the recall time• Works develop and distribute NOTAMs
![Page 4: Airport considerations and airport solutions Session 5 Presentation 3.](https://reader035.fdocuments.net/reader035/viewer/2022070307/551a298a550346545e8b4792/html5/thumbnails/4.jpg)
Runway use
• Multiple runways • shortened runway considerations:
• Determine new effective operational dimensions
• Single runway• Airport congestion review movement numbers
and update SOPs as required
• Runway and taxiway availability coordinate and determine
• RFF runway access review and update as required
![Page 5: Airport considerations and airport solutions Session 5 Presentation 3.](https://reader035.fdocuments.net/reader035/viewer/2022070307/551a298a550346545e8b4792/html5/thumbnails/5.jpg)
Traffic Management
• Aircraft parking determine if additional parking is needed
• Change in aircraft type identify additional ground handling requirements
• extended airport operating hours identify the need for additional human resources
![Page 6: Airport considerations and airport solutions Session 5 Presentation 3.](https://reader035.fdocuments.net/reader035/viewer/2022070307/551a298a550346545e8b4792/html5/thumbnails/6.jpg)
Weather
• Determine the effect on:• the duration of the works update NOTAM if required• site access develop alternative access• condition of materials provide protection• safety of personnel develop a contingency plan• fuel stock availability with additional aircraft traffic
requirements coordinate with fuel providers
![Page 7: Airport considerations and airport solutions Session 5 Presentation 3.](https://reader035.fdocuments.net/reader035/viewer/2022070307/551a298a550346545e8b4792/html5/thumbnails/7.jpg)
Not common considerations
• Emergency response plan review and revise as required
• All changes to normal operations coordinate and communicate to all airport users
• extended airport operating hours coordinate and promulgate revised hours