TECHNICAL DATATECHNICAL DATA
• Operational capacity:
• 42 movements/hour
• Aircraft parking platforms:
• 2, with a total of 45 parking positions
• Runways:
• 08R – 26L: 3500 x 45 m; CAT IIIB
• 08L – 25R: 3500 x 45 m; CAT IIIA
TECHNICAL DATATECHNICAL DATA
• Fire fighting and rescue:
• CAT 9 ICAO
• Terminals capacity: 4 500 000 passengers/year
• Peak hour processing capacity:
• international flights 1200 pax/flow
• domestic flights 270 pax/flow
INFRASTRUCTURE DEVELOPMENTINFRASTRUCTURE DEVELOPMENT
Main objectives (1):
• Extension of Finger, including implementation of Schengen flows
– 16.600 sq.m., from 5 to 14 air-bridges and from 9 to 24 gates
– 11 new escalators, 11 new lifts, 3 mobile sidewalks– Nov 2010/Apr 2011
• Extension of the International Departures Terminal (future Departures Terminal)
– 19.600 sq.m., 52 check-in desks– 8 new gates for non-Schengen flights– July 2012
Phase III of the airport development and modernization
INFRASTRUCTURE DEVELOPMENTINFRASTRUCTURE DEVELOPMENT
Main objectives (2): • Reconfiguration of the International Arrivals Terminal and Domestic Terminal building into the new Arrivals Terminal
– 2 500 sq.m. – 52 new check-in desks– January 2012
• Car parkings – 12 000 sq.m., 459 lots– October 2009
• Other works and access roads– 5.000 sq.m.
Phase III of the airport development and modernization
INFRASTRUCTURE DEVELOPMENTINFRASTRUCTURE DEVELOPMENT
Passengers terminals final capacity:• Passengers total capacity: 4500 pax/peak hour
• 86 check-in desks, 24 boarding gates, 4 baggage belts (international / Schengen)
• 18 check-in desks, 8 boarding gates, 2 baggage belts (domestic / non-Schengen)
• Over 6.000.000 pax/year
Phase III of the airport development and modernization
Phase III of the airport development and modernization project
INFRASTRUCTURE DEVELOPMENINFRASTRUCTURE DEVELOPMENTT
INFRASTRUCTURE DEVELOPMENINFRASTRUCTURE DEVELOPMENTT
Phase III of the airport development and modernization project
INFRASTRUCTURE DEVELOPMENTINFRASTRUCTURE DEVELOPMENT
Phase III of the airport development and modernization project