Air Transport Public Private Partnership (“PPP”)...

13
Air Transport Public Private Partnership (“PPP”) Model in the Emerging Markets May 2010

Transcript of Air Transport Public Private Partnership (“PPP”)...

Page 1: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Air Transport

Public Private Partnership (“PPP”) Model

in the Emerging Markets

May 2010

��������

��� ��� �

��������

���� ����

��� �

����

Page 2: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 1

Content

1. Key Highlights of an Airport PPP Model

2. Case Study: Bangalore International Airport

3. Case Study: Delhi International Airport

��������

��� ��� �

��������

���� ����

��� �

����

Page 3: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 2

� Sources of fund (debt and equity) extend beyond government funds to include airport operators, banks and other investor groups;� Government may not be required to guarantee debt provided by local and foreign banks / financial institutions. This enable the government to meet the infrastructure needs of the country to facilitate economic development without adversely affecting its fiscal budget;� Government acts as a shareholder / equity sponsor along with private parties in the Airport Company (Special Purpose Company).

– Similar to a private shareholder / investor, government gets a return on its investment / commitment in the airport

� Maximizing the lifespan of the airport system;� Optimizing the utilization of available airport land resources and existing facilities;� Safeguarding future development by means of a coherent and comprehensive phasing strategy; � Balancing airside and landside demand and capacity in each phase of development.

� Project risks (regulatory, construction, operating, revenue etc) are mitigated as various risks are allocated to private and public entities which are best equipped to manage those risks.

Key Highlights of an Airport PPP Model

Private sources as an alternative to government funding

Maximizing the airport potential

Enhanced risk allocation and mitigation

Page 4: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 3

A PPP model opens up a range of alternative funding options to ensure project implementation

Multi-Laterals - ADB, IFCMulti-Laterals - ADB, IFC

Financial InvestorsODA (loans and grants)

Vietnamese Government (via relevant authority/agency)

Export Credit Agencies / EXIM

Sources of Funding

Foreign Commercial Banks

Local Commercial Banks

Debt

Strategic Investors

Airport Operator

Equity

Public Private Partnership is a proven financing solution in emerging economies; it opens similar avenues across industries and projects and assists in economic and regulatory

development of the state

Page 5: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 4

Case Study: Bangalore International Airport (“BIAL”)1

Rationale for PPP� Government was the only source of funding. This limited investment to modernise the airport infrastructure;� Airport and service providers held monopoly power which led to high prices for low service standards;� PPP as a ‘fast track’ to modernising and improving the performance of airport;� PPP maximised investment efficiency in terms of risks allocation;� Dual till planning for sustainable airport development;� Combination of developmental experience, operational expertise and investment capability from the international arena with

reputable local stakeholders.

Legal Framework

LendersLendersLocal / International Contractors

Local / International Contractors International OperatorInternational Operator

Financing EPC Contract Operation & Management

Airport AuthorityAirport Authority

BIALBIALShareholders(74% Private)

Shareholders(74% Private) Local GovernmentLocal Government

Concession LoanNavigation

Land Lease

Local GovernmentLocal GovernmentCentral GovernmentCentral Government

Shareholders’Agreement

1) Zurich Airport, 18th April 2010, “Global PPP Experience in Aviation Infrastructure Development and Related Experience”

Page 6: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 5

Case Study: Bangalore International Airport (“BIAL”)1

Some Key Terms of the Concession Agreement for BIAL Greenfield Project

1) Zurich Airport, 18th April 2010, “Global PPP Experience in Aviation Infrastructure Development and Related Experience”

� Grant concession to build, operate airport;

� Close the existing airport;

� Grant exclusivity within 150 km;

� Allow the consortium to carry out business related to airport activities (including non-aviation);

� Allow the consortium to select service providers (e.g. cargo, ground handling, catering);

� Guarantee no discrimination;

� Disclaim explicitly any risk of project;

� No financial guarantees given.

�Open new airport within defined time frame

� Operate the airport according to high international standard

� Develop / expand the airport according to demand

� Pay concession fees to Government

� Take all risks

Government Private Consortium

Page 7: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 6

Case Study: Bangalore International Airport (“BIAL”)1

Sources of Fund

65 %Debt from lenders

Funding of Project Costs:

Equity 16 %

Loan from local government 14 %

Security from concessionaires 5 %

Total 100 %

1) Zurich Airport, 18th April 2010, “Global PPP Experience in Aviation Infrastructure Development and Related Experience”

• Start out with 4.5 (10) Million passengers

• Potential to go up to 40 Million

• Start out with 4.5 (10) Million passengers

• Potential to go up to 40 Million

Page 8: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 7

Case Study: Bangalore International Airport (“BIAL”)1

1) Zurich Airport, 18th April 2010, “Global PPP Experience in Aviation Infrastructure Development and Related Experience”

� Strong private consortium;

� Local and central government act as one entity and as one access point;

� No major change during construction;

� Reasonable concession fee, better obligation to future investment;

� Tariff under control of neutral regulator with clear guidelines;

� Airport is just one link of the air traffic infrastructure. Allied infrastructure (railways, roads, ATC etc.) should be part of

airport project;

� Airport city / economic zone planning to strengthen attraction / viability of airport

Key Success Factors

Page 9: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 8

Case Study: Delhi International Airport (“DIAL”)

Rationale for PPP� Similar to BIAL, the economic growth of India requires modernisation of India’s air transport infrastructure. The Government

recognised the need to bring the level of air transport services and facilities to be at par with international standards and tohandle increasing traffic volumes;

� PPP is seen as a ‘fast track’ to modernising and improving the performance of airport. Private sector participation is necessary for knowledge transfer and as a major source of funding to meet the massive infrastructure needs of an emerging economy.

� The liberalisation of the aviation industry creates a constructive cycle of economic growth by making the industry more competitive, efficient and increasing accessibility to a larger proportion of the population.

Legal Framework

Page 10: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 9

Case Study: Delhi International Airport (“DIAL”)

Some Key Terms of the Concession Agreement for DIAL Brownfield Expansion Project

� Grant concession to operate, maintain and develop airport and to provide Aeronautical and Non-aeronautical Services except Reserved Activities;

� Grant Right of First Refusal within 150 km;

� Allow for the selection of service providers through competitive bidding process;

� Transition / take-over arrangement for existing employees, third-party contracts and capital work-in-progress;

� Provide support for on-going operations and development;

� Defence Forces to have the right to use the Airport facilities free of charge and without any restriction;

� Step-in-rights in Emergency;

� Bear some limited risks under defined circumstances.

� Take-over full and uninterrupted control of the agreed Airport Site and Existing Assets ;

� Operate the airport according to high international standard;

� Develop / expand the airport according to demand;

� Pay concession fees to Government;

� Agreed formula on Aeronautical Charges with the Government.

Government Private Consortium

Page 11: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 10

Case Study: Delhi International Airport (“DIAL”)

Private Consortium

� Strong private consortium comprised of GMR Group, Fraport, Malaysia Airport Holdings Berhad acting through Malaysia Airport (Mauritius) Private Limited and India Development Fund;

� Fraport to provide management services for the operation of the Airport for 7 years. Thereafter, if the Government is agreeable, DIAL can take over as the Operator provided that DIAL enters into a technical airport advisory services agreement with Fraport for a minimum of 8 years;

� External bank borrowings in the range of 50% to finance the project.

Term and Expiry

� Concession for a period of 30 years with an option before the period ends to extend another 30 years;

� Right of first refusal for other airport developments within 150 m radius of the Delhi Airport for 30 years;

� Payment of Transfer Assets to be determined by related paid-up equity capital and / or debt;

� Payment of Non Transfer Assets, if any, will be based on Net Present Value.

Page 12: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 11

HSH Nordbank AG 33 Temasek Avenue #33-00 Centennial Tower Singapore 039190

John DuffyHead of Infrastructure and Rail International

Phone: +65 6550 9042Mobile: +65 9106 [email protected]

Your Contacts:

��������

��� ��� �

��������

���� ����

��� �

����

Page 13: Air Transport Public Private Partnership (“PPP”) …cleanairasia.org/wp-content/uploads/portal/files/presentations/...Air Transport Public Private Partnership (“PPP ... Strong

Page 12

Disclaimer

The market information contained in this presentation are for informational purposes only.

They can not substitute own market research or separate legal, tax and financial advice and information. This presentation does not constitute an offer to buy or sell certain assets. To use this presentation for advertising purposes is strictly prohibited.

HSH Nordbank AG points out that the herein published market information are only meant for investors with own economical experience, who are able to evaluate the risks and chances of the herein discussed market / markets and who are themselves able to conduct research through a variety of sources.

The statements and data contained in this presentation are based on either thorough research by HSH Nordbank AG or on sources that are considered reliable but cannot be verified. HSH Nordbank AG regards the sources used as reliable but can not assess their reliability with absolute certainty. Single pieces of information could only be assessed regarding their plausibility; an assessment regarding their accuracy has not been made. Furthermore, this presentation contains estimates and predictions based upon numerous assumptions and subjective evaluations made by HSH Nordbank AG as well as outside sources. These information are only meant to provide non-binding perceptions of markets and products as of the time this presentation was issued. HSH Nordbank AG and its respective employees thoroughly conducted work on this presentation but can not guarantee completeness, actuality and accuracy of the provided information and predictions.

This document may only be distributed in compliance with the legal regulations in the respective countries and persons obtaining possession of this document should inform themselves about and comply with the applicable local regulations.

This document does not contain all material information needed for economic decisions and the information and predictions provided can vary from those made by other sources / market participants. HSH Nordbank AG as well as their organizational bodies and employees can not be held responsible for losses resulting from the use of this presentation, its contents or for losses which in any way are connected to this presentation.

HSH Nordbank AG points out that it is not allowed to distribute this presentation or any of its contents to third parties. Damages to HSH Nordbank AG resulting from the unauthorised distribution of this presentation or any of its contents to third parties have to be compensated for by the distributor. The distributor has to keep HSH Nordbank AG free from all claims arising from the unauthorised distribution of this presentation or any of its contents to third parties and all legal cost in connection with those claims. This particularly applies to a distribution of this presentation to persons situated in the USA.