AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air...

11
ODGEREL CHAGNAADORJ DIRECTOR OF ATFM DIVISION AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA CPWG 26

Transcript of AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air...

Page 1: AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air traffic flow management division, mcaa. cpwg 2. 6

ODGEREL CHAGNAADORJDIRECTOR OF ATFM DIVISION

AIR TRAFFIC FLOW

MANAGEMENT DIVISION, MCAA

CPWG 26

Page 2: AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air traffic flow management division, mcaa. cpwg 2. 6

AIRSPACE STRUCTURE

15 EXIT/ENTRY POINT 61 AIRWAYS 23 AIRPORTS 5 SECTOR

RUSSIA AND MONGOLIA : 9

CHINA AND MONGOLIA: 6

POLHO

INTIK

NIXAL

Page 3: AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air traffic flow management division, mcaa. cpwg 2. 6

SURVEILLANCE SYSTEM COVERAGE

Automatic dependent surveillance – broadcast ADS-B system SITUATION AWARENESS

2015 2018

Automatic dependent surveillance – broadcast ADS-B system IMPLEMENTED

Page 4: AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air traffic flow management division, mcaa. cpwg 2. 6

SEPARATION

Чойбалсан

Өндөрхаан

БаруунУрт

Сайншанд

Мандалговь

Даланзадгад

Арвайхээр

Булган

Улаанбаатар

Мөрөн

Цэцэрлэг

Баянхонгор

Доной

Улаангом

Алтай

Ховд

Булган(Ховд)

ДадалТосонцэнгэл

Далан

Баян-Өлгий

Ургамал

AMUTA SERNA

BAMUKGINOM

DARNO SULOK

INTIKNIXAL

MORIT

NIGORNOPUS

TEBUS

SARUL

POLHO

Chinese separation 20 km

Russian separation 30 km

30 km since 2015

Page 5: AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air traffic flow management division, mcaa. cpwg 2. 6

PROJECTS

201820172016 2017

PBN II phase

ADS-BSSR for APP OLDI AIDC

Page 6: AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air traffic flow management division, mcaa. cpwg 2. 6

STATISTICS

85%

5457061244

6554360786

6793477981

82626856898711790686

99210110953

2016

2010

2009

2008

2007

2006

2015

2014

2013

2012

2011

Number of flights

15.8

12.2

7.0 7.3

11.814.8

6.03.7

1.74.1

9.411

0.02.04.06.08.0

10.012.014.016.018.0

2006YEAR

2007YEAR

2008YEAR

2009YEAR

2010YEAR

2011YEAR

2012YEAR

2013YEAR

2014YEAR

2015YEAR

2016YEAR

2017YEAR

Traffic increase

2017

OVER FLIGHT41,9%

LANDING & TAKING OFF

25,6%

DOMESTIC8,3%

TOTAL GROWTH FROM YEAR 2014

45%

Page 7: AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air traffic flow management division, mcaa. cpwg 2. 6

CROSS POLAR ROUTESIN YEAR 2018 CROSS POLAR ROUTE

FLIGHTS WERE 8122

SOUTH BOUND 6851NORTH BOUND 1271

Чойбалсан

Өндөрхаан

БаруунУрт

Сайншанд

Мандалговь

Даланзадгад

Арвайхээр

Булган

Улаанбаатар

Мөрөн

Цэцэрлэг

Баянхонгор

Доной

Улаангом

Алтай

Ховд

Булган

(Ховд)

ДадалТосонцэнгэл

Далан

Баян-Өлгий

Ургамал

AMUTASERNA

BAMUKGINOM

DARNOSULOK

INTIK

NIXAL

MORIT

NIGOR

NOPUS

TEBUS

SARUL

POLHO

Page 8: AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air traffic flow management division, mcaa. cpwg 2. 6

CROSS POLAR ROUTESAIRLINERS-13

2448

1784875

694

634

554521

369 8577 67 7

7 CATHAY PACIFIC

UNITED AIRLINES

AIR CANADA

HAINAN AIRLINES HOLDINGCOMPANY LIMITEDCHINA SOUTHERN AIRLINES

AMERICAN AIRLINES

DELTA AIR LINES

AIR CHINA

Page 9: AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air traffic flow management division, mcaa. cpwg 2. 6

USAGE OF POLAR ROUTE

3557, 44%

3084, 38%

1264, 16%

79; 1% 52; 1%48; 0%

SULOK POLHOSERNA POLHOSERNA INTIKNIGOR MORITSERNA MORITLETBI MORIT

Page 10: AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air traffic flow management division, mcaa. cpwg 2. 6

Priority jobs to be implemented in the years 2018-2020

2018

2018 2019 2019

2015 2018

ATFM IMPLEMENTATION

ROAD MAP

New Ulaanbaatar airport

FREE ROUTING

The new building of the RATCC

ATFM-Cross border

The secondary center of the

RATCC2019

CROSS-BORDER ATFM

RATCC-Regional Air Traffic Control Center

FLEXIBLE AIRSPACE

2019

Page 11: AIR TRAFFIC FLOW MANAGEMENT DIVISION, MCAA...odgerel chagnaadorj. director of atfm division. air traffic flow management division, mcaa. cpwg 2. 6

Thank you