Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
-
Upload
helena-montgomery -
Category
Documents
-
view
219 -
download
0
Transcript of Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
![Page 1: Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.](https://reader030.fdocuments.net/reader030/viewer/2022032705/56649dbc5503460f94aae775/html5/thumbnails/1.jpg)
Air traffic controllers (ATC) consideration and ATC solutions
Session 5Presentation 4
![Page 2: Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.](https://reader030.fdocuments.net/reader030/viewer/2022032705/56649dbc5503460f94aae775/html5/thumbnails/2.jpg)
Construction Plan
• When will construction begin?• What is the daily schedule for work?• Will construction vehicles have access to movement
areas?• Which ones?• Who is the point of contact?
• Telephone• Radio frequency
![Page 3: Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.](https://reader030.fdocuments.net/reader030/viewer/2022032705/56649dbc5503460f94aae775/html5/thumbnails/3.jpg)
Review Runway Use Plan
• How are runways typically assigned?• Is either a primary arrival or departure runway?• Are both runways typically active and used?
• Multiple or single runway?• Can a single runway support the expected traffic
volume?• How is RWY 6/24 typically used?• How is RWY 13/31 typically used?
![Page 4: Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.](https://reader030.fdocuments.net/reader030/viewer/2022032705/56649dbc5503460f94aae775/html5/thumbnails/4.jpg)
Traffic Management
• Anticipate potential delays capacity control or flow control, or a combination
• Change of aircraft type possible need to modify sequence
• Limited runway and taxiway availability develop procedures for the new layout
![Page 5: Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.](https://reader030.fdocuments.net/reader030/viewer/2022032705/56649dbc5503460f94aae775/html5/thumbnails/5.jpg)
Weather
• Determine the effect on:• Airport capacity• Runway configuration• Availability of precision instrument approaches• Visibility from the tower
![Page 6: Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.](https://reader030.fdocuments.net/reader030/viewer/2022032705/56649dbc5503460f94aae775/html5/thumbnails/6.jpg)
ATC specific considerations
• Review Tower Staffing Plan: additional staffing:• Manage flow control;• Coordinate a more complicated ground movement plan;• Accommodate more airborne holding;• Manage potential ground hold procedures• Control movement of construction vehicles to/from the
work site
![Page 7: Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.](https://reader030.fdocuments.net/reader030/viewer/2022032705/56649dbc5503460f94aae775/html5/thumbnails/7.jpg)
ATC specific considerations
• Need for up-to-date information Develop Briefing Package For Air Traffic Controllers :• High level briefing covering:
• Changes to current procedures;• Duration and schedule of planned closure;• Any changes made in the previous steps;
• Weekly and/or daily briefings:• Construction status;• Weather forecast and its possible impact;• Problems encountered/lessons learned.
![Page 8: Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.](https://reader030.fdocuments.net/reader030/viewer/2022032705/56649dbc5503460f94aae775/html5/thumbnails/8.jpg)
THANK YOU