Air SNUG foils

40
1 Implementation Methodology for Dual-Mode GPS Receiver David T ester, Founder & CTO, Air Semicon ducto r Jon Young, Chris Atkinso n & Tom Ryan, Synopsys

Transcript of Air SNUG foils

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 1/40

1

Implementation Methodologyfor Dual-Mode GPS Receiver

David Tester, Founder & CTO, Air Semiconductor

Jon Young, Chris Atkinson & Tom Ryan, Synopsys

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 2/40

2

Overview of Presentation

- GPS 101Quick overview of GPS

- AirGlimpse into life inside a start-up

- Low Power Methodology ChallengesAspects of low power IC implementationthat we care about that may interest you

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 3/40

3

GPS 101Receive Power is -130dBm to -160dBm … 20dB to 50dB below the Thermal Noise Floor!

Regional geo-stationary augmentation satellites 

WAAS Wide Area Augmentation System  – USA

EGNOS European Geostationary Navigation OverlaySystem  – Europe

Earth radius

6378 km

 1 9 1 0

 0   k m

 2 0 2 0 0  k m

23222 km

Galileo 

GPS Orbit 11 hours 58 minutes

13900 km/h

GLONASS 

Moon Approx. 400000 km

 3 5 7 8 6  k

 m

Geo-stationary 

GPS 6 orbital planes; 55°to equator

Galileo 3 orbital planes; 56°to equator

GLONASS 3 orbital planes; 65°to equator

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 4/40

4

GPS 101Triangulation allows Receiver Position to be Calculated

 r 4r 1

   r 3

r    2     

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 5/40

5

300m

3x108 ms-11µs

1 _.@ DEF32ABC

4GHI MNO65JKL

7PQRS WXYZ98TUV

#0+*

MOBILE 

GPS 101Satellite transmits essential information required for Receiver Positioning

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 6/40

6

Air Invents Continuous Adaptive GPS… offers both Low-Power & Position Accuracy

Competitor

Air

Low-Power

      A    c

    c    u    r    a    c    y

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 7/407

air wave architecture enables useful geofences

A-GPS geofence

Air geofence

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 8/408

View from the office window of a start-up…

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 9/409

David TesterCo-Founder & CTO

Stephen GrahamCo-Founder & VP Marketing

Staff

Employee #1 (20 years experience)

Employee #2 (20 years experience)

Contract

Contract #1 (15 years experience)

Contract #2 (15 years experience)

Staff

Employee #3 (20 years experience)

Employee #1 (20 years experience)

Staff

Employee #4 (10 years experience)

Employee #5 (15 years experience)

Employee #6 (15 years experience)

Contract

Contract #3 (20 years experience)

Contract #4 (20 years experience)

Contract #5 (20 years experience)

2x Synopsys IC layout contractors

Staff

Employee #7 (20 years experience)

Employee #8 (15 years experience)

Contract

Contract #8 (20 years experience)

Contract #9 (15 years experience)

RFIC Design System Design ASIC Design Software Design

ex-CEO Andromedia (acquired Macromedia ‘99)

ex-CEO Frictionless Commerce (acquired SAP ‘06)

Andy HeatonVP Operations & Development

ex-CEO PortalPlayer (NASDAQ: PLAY)

ex-CEO S3 (NASDAQ: SIII)

Kent Godfrey

Michael Gera

David Tester

Board of Directors

Gary Johnson

Pond Ventures

Independent

Pond Ventures

ex-CEO TapRootHugh Thomas

Hugh ThomasCEO

Support Staff

1x General Admin

1x Finance ManagerCTO

CEO

The A Development Team

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 10/4010

Concept to Engineering Sample Silicon

Red Herring 100 Europe 2008April „08

Series-A TermsheetApril „06

Prof Izzet Kale joins Technical Advisory BoardOctober „08

Demonstrate GPS technologyJuly „08

Recruit external CEOMay „08

Exit stealth modeAnnounce 1st product

January „08

Gary Johnson joins Board of Directors2x NASDAQ CEO (PortalPlayer & S3)

May „07

A1225 RFIC (v1)April „07

A1250 single die GPS receiverJanuary „09

A1225 RFIC (v2)February „08

J F M A M J J A S O N D

J F M A M J J A S O N D

J F M A M J J A S O N D

J F M A M J J A S O N D

2006 2007

J F M A M J J A S O N D

J F M A M J J A S O N D

J F M A M J J A S O N D

J F M A M J J A S O N D

2008 2009

Air Inc + Ltd incorporatedMay „06

Development starts!June „06

Engage with TSMC for siliconSept „06

IET Start-Up of the Year 2008

November '08

Electra Start-Up of the Year 2008

November „08

RFIC + FGPA platformMay „08

Air tracks GPS satellites with RFICMarch „08

Air tracks GPS satellites with RFIC + FPGAJune „08

Air first PVT, confirms lab in Swindon

June „08

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 11/4011

Concept to Engineering Sample Silicon

Red Herring 100 Europe 2008April „08

Series-A TermsheetApril „06

Prof Izzet Kale joins Technical Advisory BoardOctober „08

Demonstrate GPS technologyJuly „08

Recruit external CEOMay „08

Exit stealth modeAnnounce 1st product

January „08

Gary Johnson joins Board of Directors2x NASDAQ CEO (PortalPlayer & S3)

May „07

A1225 RFIC (v1)April „07

A1250 single die GPS receiverJanuary „09

A1225 RFIC (v2)February „08

J F M A M J J A S O N D

J F M A M J J A S O N D

J F M A M J J A S O N D

J F M A M J J A S O N D

2006 2007

J F M A M J J A S O N D

J F M A M J J A S O N D

J F M A M J J A S O N D

J F M A M J J A S O N D

2008 2009

Air Inc + Ltd incorporatedMay „06

Development starts!June „06

Engage with TSMC for siliconSept „06

IET Start-Up of the Year 2008

November '08

Electra Start-Up of the Year 2008

November „08

RFIC + FGPA platformMay „08

Air tracks GPS satellites with RFICMarch „08

Air tracks GPS satellites with RFIC + FPGAJune „08

Tracking DSPArchitecture

Acquisition DSPArchitecture

Air first PVT, confirms lab in Swindon

June „08

Acquisition DSP

Implementation

Tracking DSPArchitecture

Tracking DSPImplementation

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

Radio IC

Implementation

PVT &Kalman Filter

Tracking DSP

Implementation

Radio IC

ImplementationA1250

IC design

Dual-Mode GPS

system design

Dual-Mode GPSsoftware design

A1250 silicon evaluation

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 12/4012

BACK

air wave1 system development platformand engineering sample silicon module

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 13/4013

air wave1 engineering siliconQFN bonding photo

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 14/4014

GPS with air wave1 silicon

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 15/4015

Air Technical Demonstration Platform … in Japan

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 16/4016

Low-Power Implementation ChallengesWhat is necessary for low-power silicon implementation of a system?

- Low-Power is no exception and requires …

- Example: air wave1 and low-power GPS optimization

- Today we will not discuss GPS system implementation!

- Instead let‟s look at silicon methodology and challenges

Let‟s consider an alternative question:

“How did you create the silicon implementation of alow power architecture? What are the challenges?”

Q1. Lazy is OK. How do you know when you‟re done?

Q2. Did you survive (or avoid) the pain a PMK can offer?

Q3. Can clock tree power consumption be predicted?

Q4. Multi-DVDD chips – Where EDA meets reality …

Q5. Is timing-optimized and power-optimized the same?

Here are five … not in any order and not an exhaustive list …

Disruptive products demand system-level optimizations

-

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 17/40

17

Optimize Power Everywhere, Earlier is BetterEfficient algorithms provide more power saving than optimized circuits

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 18/40

18

System

Design &Verification

Simplified Air System + Silicon Design Flow(Does not include any analog or custom IC aspects!)

System-LevelSimulation

FPGAPrototype

SiliconPlatform

Logical

Design &Verification

Physical

Design &Verification

System-LevelArchitecture

Trial P&Rfor blocks

Trial CTSfor blocks

Trial STA(Post-P&R)

Final P&Rfor blocks

Final CTSfor blocks

Final STA(Post-P&R)

Trial P&R(top level)

Trial CTS(top-level)

Trial STA(top level)

Final P&R

(top level)

Final CTS

(top-level)

Final STA

(top level)

DRC(top level)

LVS(top-level)

Trial LogicSynthesis

Pre-P&RCircuit Sim

Final LogicSynthesis

Pre-P&RCircuit Sim

Logic LevelArchitecture

Logic LevelRTL Design

Logic LevelSimulation

Logic LevelVerification

Power Level

Verification

Top-LevelFloorplan

Pad RingDesign

FirmwareDesign

FirmwareDesign

MoreFirmware

GDSII

PowerDomains

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 19/40

19

air wave1 engineering siliconQFN bonding diagram

i

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 20/40

20

air wave1 engineering siliconDevice Floorplan (No Global Routing)

i i i ili

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 21/40

21

air wave1 engineering siliconDevice Floorplan (with Global Routing)

i 1 i i ili

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 22/40

22

air wave1 engineering silicon44 independent digital power domains

2 3 45

76 89

1110 1213

1514 1617

44

34 35 36 37 38

39 40 41

2524

3332

2322

3130

2120

2928

1918

2726

1

4243

i 1 i i ili

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 23/40

23

air wave1 engineering siliconRadio Macro + Analog Support Macro

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 24/40

24

Quick Review on Where Power is ConsumedDynamic (switching) and static (leakage) power from DVDD to DVSS

Example circuit taken from:Source: http://www.dti.unimi.it/~liberali/papers/c63.pdf

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 25/40

25

Routing Capacitance is the EnemyParasitic capacitance significantly alters logic switching power

How can you verify post-layout parasitic routing capacitance is acceptable?

St h “L P ” i l h?

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 26/40

26

Stop when “Low-Power” is low enough?Products need to get to market …

Stop when you‟ve verified it‟s good enough

“I‟d like the lowest possible power consumption, please”“I‟d also like to get that product to market on time, please”

Do you have a power budget? When should verification STOP ?

Track and predict power performance at all levels of abstraction:

- Architecture / Algorithm / System Partitioning- Pre-Synthesis RTL and Post-Synthesis Gates

- Pre-Layout and Post-Layout

“… but verification is never really complete…”

True… what is the milestone for sufficient

confidence that power meets budget?

Can you spot the conflict between the following two statements?

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 27/40

27

Less Complexity, Less Transitions = Low PowerReduce depth of logic and switching activity to minimise power

How to verify switching

activity level on budget?

How to verify the original

complexity assumptions?

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 28/40

28

“Custom” Cells rather than “Standard” Cells?„Optimized for Power‟ and „Optimized for Timing‟ might not be the same

Example

- Custom flip-flop used in air wave1 datapath- Relaxed timing enabled >40% power improvement!- Also provided die area and P&R enhancements

- Knowledge of “use” offer options for power optimized gates

- Power optimized and timing optimized are not always the same

Wh ‟ Y M h d l B ild Cl k T ?

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 29/40

29

What‟s Your Methodology to Build Clock Trees?Not all clock tree‟s are low power … can you trust the tools?

- Power depends on conflicting constraints: skew, rise time, load, etc

- CTS tools build functional but over-designed, high-power clock trees- Can‟t verify power until P&R started ... but is that too late for market?

- Clock tree can pass functional verification but fail power verification!

Example:

air wave1 contains

400+ clock domains

More a clock forest

than a clock tree ...

P M t Kit H dl C f ll !

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 30/40

30

Power Management Kit - Handle Carefully!… rather like a chainsaw with all the safety features removed …

- Standard cell library assumes single DVDD supply voltage

- Power management library enables multiple voltage domains

- Voltage domain control cells – DVDD and DVSS switch

- P&R “optimisation” can pull cells from PMK library by mistake!

- Can simulation identify these problems?…

- Signal isolation cells (for crossing voltage domains)

- Must verify P&R didn‟t “optimise” these!

- PMK also adds more back-end DRC and LVS

verification issues simulation can‟t solve…

M l i DVDD Sili Wh EDA R li !

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 31/40

31

Multi-DVDD Silicon: Where EDA meets Reality!Circuit level functionality that needs to be verified at RTL level

- How, and when, are cells instanced in the design?

- Manually by logic designer or layout team?

- Automatically by EDA tool? Do you trust it?

- Yet another task to verify before tape-out !!!

- Control signal active sense depends on cell used:

- Active low for PMOS but active high for NMOS

- Are control signal wired correctly?

- How many cells for each domain?

- “Power Aware” design flows try to plug the hole!

… but don‟t address all the issues !!!Example:

air wave1: 44x digital, 8x analog voltage domains

- DVDD functionality in “HEAD” and “FOOT” cells

… but DVDD not represented in non-UPF flow logic simulation!

DVDD d DVSS ti

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 32/40

32

DVDD and DVSS power routingmetal5 and “thick” metal6 reserved for power routing

airwave1 engineering silicon

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 33/40

33

air wave1 engineering silicon44 independent digital power domains

2 3 45

76 89

1110 1213

1514 1617

44

34 35 36 37 38

39 40 41

2524

3332

2322

3130

2120

2928

1918

2726

1

4243

Power Domains Some Issues to Watch

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 34/40

34

Power Domains - Some Issues to WatchDon‟t forget substrate, N-well and control signal polarity

Power Domains Some Issues to Watch

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 35/40

35

Power Domains - Some Issues to WatchDon‟t forget substrate, N-well and control signal polarity

Automatic vs Manual Cell Placement

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 36/40

36

Automatic vs Manual Cell PlacementP&R placement algorithm is not always optimum

Manual Placement

Automatic Placement

Impact of UTM metal on P&R efficiency

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 37/40

37

Impact of UTM metal on P&R efficiencyMetal pitch + spacing rules directly impact P&R result

“thin”

metal5

“thick”metal6

Post P&R Optimization? Roll the Dice Again!

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 38/40

38

Post-P&R Optimization? Roll the Dice Again!Development on-schedule and on-budget?

“Here‟s the final netlist,

it meets the power spec‟sand just needs to go through P&R”

- Pre-Layout gate level power estimates are estimates

- Routing capacitance impacts both timing and power

- P&R optimization resizes gates to close timing

… almost certainly ignoring circuit power 

… so power estimates on pre-P&R netlist

are exactly that, estimates

Verification Issue:How to verify post-layout power still hits

the target specification …

… and hit your schedule

P&R “optimization” can solve that…

“Blind Faith and Ignorance”

8/8/2019 Air SNUG foils

http://slidepdf.com/reader/full/air-snug-foils 39/40

39

Blind Faith and Ignorance

Low-Power can be broken anywhere:

- Architecture

- Hardware (RTL) or Software

- Logic Synthesis

- P&R and CTS- Cell library and macros choices

- Process technology

Each step needs differing levels of implementation and verification

activity, but verification of power needs more than just logicsimulation and must include power budgets and circuit simulation

CPU power alone can‟t solve the problems, brain power is needed!

or “Informed Decision”?

Don‟t forget to be paranoid about power, if you care about power 