![Page 1: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/1.jpg)
June 30, 2016Tokyo Electric Power Company Holdings, lnc.
Air Dose Rates inside the Buildings
Sampling Period
Unit 1: from April 1, 2016 to April 30, 2016
![Page 2: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/2.jpg)
FlammabilityControl System (B)
Fukushima Daiichi NPS Unit 1 Reactor Building 1st Floor [mSv/h]
PrimaryContainment Vessel
![Page 3: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/3.jpg)
Fukushima Daiichi NPS Unit 1 Reactor Building 2nd Floor [mSv/h]
PrimaryContainment Vessel
Heat Exchanger
Heat Exchanger
Primary Loop Recirculation System - Motor-Generation Set
![Page 4: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/4.jpg)
40mSv/h
Fukushima Daiichi NPS Unit 1 Reactor Building 3rd Floor [mSv/h]
Primary Containment Vessel
Spent FuelPool
Primary Loop Recirculation System -Motor-Generation Set
![Page 5: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/5.jpg)
Fukushima Daiichi NPS Unit 1 Reactor Building 4th Floor [mSv/h]
PrimaryContainment Vessel
Spent Fuel Pool
DryerSeparator
Pool
FlammabilityControl System (A)
![Page 6: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/6.jpg)
Fukushima Daiichi NPS Unit 1 Reactor Building 5th Floor [mSv/h]
Spent Fuel Pool
DryerSeparator
Pool
![Page 7: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/7.jpg)
Fukushima Daiichi NPS Unit 1 Turbine Building 1st Basement Floor [mSv/h]
Diesel Generator
Condenser Motor-DrivenReactor FeedWater Pump
Condensate Pump
![Page 8: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/8.jpg)
Fukushima Daiichi NPS Unit 1 Turbine Building 1st Floor [mSv/h]
Condenser
![Page 9: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/9.jpg)
Fukushima Daiichi NPS Unit 1 Turbine Building 2nd Floor [mSv/h]
MainGenerator
Low Pressure Steam Turbine High Pressure
Steam Turbine
![Page 10: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/10.jpg)
Fukushima Daiichi NPS Unit 1 Radioactive Waste Treatment Facility 1st Floor [mSv/h]
![Page 11: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/11.jpg)
Fukushima Daiichi NPS Unit 2 Radioactive Waste Treatment Facility 1st FloorUnits 1 and 2 Drum Loading Dock [mSv/h]
![Page 12: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/12.jpg)
Fukushima Daiichi NPS Units 1 and 2 Service Building 1st Floor [mSv/h]
![Page 13: Air Dose Rates inside the Buildings...June 30, 2016 Tokyo Electric Power Company Holdings, lnc. Air Dose Rates inside the Buildings Sampling Period Unit 1: from April 1, 2016 to April](https://reader034.fdocuments.net/reader034/viewer/2022042112/5e8dd8d10b3c220ae51b708b/html5/thumbnails/13.jpg)
Fukushima Daiichi NPS Units 1 and 2 Service Building 2nd Floor [mSv/h]