AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

62

Transcript of AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

Page 1: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 2: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 3: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 4: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 5: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 6: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 7: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 8: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 9: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

+3.35

Batang anak

hollow allumunium 2x4

Batang induk

hollow allumunium 4x4

Tripleks 6mm

Siku 2x2

List plafond

gypsum 6x6

907025

15

5

90

60

115

340370

20

90

55

340

57

5

Rangka kuda-kuda disesuaikandengan Desain Aplikator

Spesialis Rangka Baja Ringanberdasarkan Program/Software

yang disetujui oleh Engineer AIPMNH

ring balok 15/20

batang induk

hollow allumunium 4x4

batang anak

hollow allumunium 2x4

tripleks 6mm

lis plafond

gypsum 6x6

plesteran

diaci dan dicat

dinding

dinding keramik

20/25

dinding trasraam

Ruang

VIP

±0.00

plin lengkung

anti debu

keramik lantai

30x30

sloof

20/25

tanah urug

batu kali

aanstamping

pasir urug

907025

Skala 1 : 25

POTONGAN PRINSIP

+3.40

115

PO

TO

NG

AN

PR

IN

SIP

1 : 25

AR

-07B

rev.01

Page 10: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 11: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 12: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 13: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 14: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 15: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 16: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 17: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 18: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 19: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 20: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 21: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

100100

300

600

400

150

250

100

Selasar-0.30

Ramp

1300

Koridor±0.00

100 300 700 250 250 300 200 100

2150

250

200

200

150

150

1000

200 950 250 250 200 300 100100

2150

RuangJaga Bidan(Existing)

RuangIstirahat Bidan

(Existing)

RuangBayi

(Existing)

RuangBayi Isolasi(Existing)

Pantri

150

150

150

105

200

95 700 103250 147

200

200

200

300

Rangka Plafond AllumuniumBatang Induk = hollow 4x4 mm (setiap < 150cm)

Batang Anak = hollow 2x4dimensi = 60 x 60 cm

Penutup Plafond tripleks 6mm(120x240)

dicompound dan dicat

Skala 1 : 100DENAH RENCANA PLAFOND

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DENAH

RENCANA

PLAFOND

1 : 100

AR-12A rev.01

Page 22: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

60

60

60

B

A

batang siku allumunium 2x2

batang anak

hollow alluminium 2x4

38

batang induk

hollow allumunium 4x4

60

penggantung

hollow allumunium 2x2

batang induk

hollow

allumunium 4x4

batang anak

hollow allumunium 2x4

penggantung

hollow allumunium 2x2

batang anak

hollow allumunium 2x4

batang anak

hollow

allumunium 4x4

Skala 1 : 20

POTONGAN A

60

semua rangka di tepi harus >30cm

batang siku

allumunium 2x2

semua rangka tengah berjarak 60 cm

semua rangka tengah berjarak 60 cm

batang siku

allumunium 2x2

list plafond

gypsum profil 6x6

43

4

2

list plafond

gypsum profil 6x6

semua rangka tepi harus > 30 cm

40

semua rangka tepi harus > 30 cm

Skala 1 : 20

DENAH PLAFOND (tepi dinding)

Skala 1 : 20

POTONGAN B

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL PLAFOND

1 : 20

AR-12B rev.01

Page 23: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

60

batang induk

hollow allumunium 4x4

siku 2x2

batang induk

hollow allumunium

4x4

2

variabel sesuai kondisi

batang induk

setiap jarak 120 cm

batang anak

hollow allumunium 2x4

dicoak/digunting,

ditekuk

dan disekrup

penggantung

hollow allumunium 2x2

(digantung pada kuda-kuda

atau ikatan angin)

tripleks 6 mm

(disekrup pada

batang anak)

list plafond

gypsum 6x6

batang induk

setiap jarak 120 cm

semua rangka tengah berjarak 60 cm

Skala 1 : 5

DETAIL PLAFOND

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL PLAFOND

1 : 5

AR-12C rev.01

Page 24: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

NTS

PERSPEKTIF DETAIL RANGKA PLAFOND

penggantung hollow allumunium 2x2

(digantung pada kuda-kuda

atau ikatan angin setiap 150 cm)

list plafond

gypsum profil 6x6

dicoak/digunting ,

ditekuk dan disekrup

batang siku allumunium 2x2

dinding

batang induk

hollow allumunium 4x4

tripleks 6 mm disekrup,

dicompund dan dicat

batang anak

hollow allumunium 2x4

batang anak

hollow allumunium 2x4

batang anak hollow allumunium 2x4

dicoak/digunting , ditekuk dan

disekrup

tripleks 6 mm

disekrup, dicompund dan dicat

NTS

PERSPEKTIF DETAIL PLAFOND A

NTS

PERSPEKTIF DETAIL RANGKA PLAFOND BNTS

PERSPEKTIF DETAIL RANGKA PLAFOND CNTS

PERSPEKTIF DETAIL RANGKA PLAFOND D

penggantung

hollow allumunium 2x2

(digantung pada kuda-kuda

atau ikatan angin)

batang induk

hollow allumunium 4x4

batang induk

hollow allumunium 4x4

batang siku

allumunium 2x2

batang anak

hollow allumunium 2x4

batang siku

allumunium 2x2

list plafond

gypsum

6x6

dinding

4

4

4

2

4

2

4

4

4

2

sekrup setiap

jarak 30 cm

2

6

6

4

2

2

A

B

C

D

batang anak

disekrup pada

batang induk

4

2

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

PERSPEKTIF

DETAIL RANGKA

PLAFOND

NTS

AR-12D rev.01

Page 25: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

2

60

60

60

batang siku

allumunium 2x2

batang anak

hollow alluminium 2x4

38

batang anak

hollow allumunium 2x4

untuk rangka man hole

A

tripleks penutup man hole

60

64

48

2

60

48

batang anak

hollow alluminium 2x4

batang anak

hollow allumunium 4x4

untuk rangka man hole

tripleks penutup man hole

Skala 1 : 10

DETAIL MAN HOLE

batang siku allumunium 2x2

batang induk

hollow allumunium 4x4

list plafond

gypsum 6x6

A

Skala 1 : 10

DETAIL A

Skala 1 : 10

POTONGAN A (tertutup)

Skala 1 : 10

POTONGAN A (terbuka)

NTS

DENAH RENCANA PERLETAKANMAN HOLE PLAFOND

100100

300

600

400

150

250

100

Selasar-0.30

Ramp

1300

Koridor±0.00

100 300 700 250 250 300 200 100

250

200

200

150

150

1000

200 950 250 250 200 300 100100

2150

RuangJaga Bidan(Existing)

RuangIstirahat Bidan

(Existing)

RuangBayi

(Existing)

RuangBayi Isolasi(Existing)

Pantri

150

150

150

105

200

95 700 103250 147

200

200

200

300

MAN HOLE PLAFOND

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL

MAN HOLE

PLAFOND

NTS 1:10

AR-12E rev.01

Page 26: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

25

10

50

A

60 66

200

60

200

370

60

10

Sloof 20/25

closet duduktanpa tanki

dinding trasraam

dinding keramik20x25

dinding

tripleks 6mm

batang anakhollow allumunium 2x4

bak fiber50x50x60

keran

20

60

200

340

10

70

2540

200

tripleks 6mm

batang anakhollow allumunium 2x4

Skala 1 : 25

DENAH KAMAR MANDI

Skala 1 : 25

POTONGAN ASkala 1 : 25

POTONGAN B

B

batang indukhollow allumunium 4x4

40

150 Sloof 20/25

batang indukhollow allumunium 4x4

7258

15

39

74 41

-0.05 -0.05

+3.35

340

60 75150

60

10

20

ring balok 15/20

sisa keramik tepivariablesesuai kondisi harus>10 cm

pertemuandengan tali air

15

list plafondgypsum 6x6

ring balok 15/20

list plafondgypsum 6x6

20

lampu SL23 W

15 20

20

dinding trasraam

dinding

lampu SL23 W

+3.35

Toilet-0.05

Keramik(20x20)

kolom lama

kolom baru25x25

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL

KAMAR MANDI

1 : 25

AR-13 rev.01

Page 27: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

Ruang SH-0.05

Keramik(30x30)

Ruang Steril± 0.00

Toilet-0.05

Toilet-0.05

Meja Beton

B

A

108

200

93

200

150

150

300

border

wall hung lavatorySK 33

kolom praktis15/15

370

108

RuangBersalin± 0.00

150

batang anakhollow allumunium2x4

batang indukhollow allumunium4x4

+3.40

dinding trasraam

sisa keramik tepivariabelsesuai kondisiharus >10 cm

ringbalk 15/20

340

Sloof 20/25

list plafondgypsum 6x6

± 0.00

pertemuandengan tali air

14 20

25

tripleks 6 mm

80

meja beton tutupkeramik 20x20

60

12

68

-0.80

Skala 1 : 25

DENAH RUANG SPOOL HOEK DAN RUANG STERILSkala 1 : 25

POTONGAN A

C

Keramik(20x20)

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL RUANG

SPOOL HOEK

dan

RUANG STERIL

1 : 25

AR-14A rev.01

Page 28: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

375

108

RuangBersalin± 0.00

150

dinding

tripleks 6mm

batang anakhollow allumunium2x4

batang indukhollow allumunium4x4

wall hung lavatorySK 33

+3.35

dinding trasraam

sisa keramik tepivariabelsesuai kondisiharus >10 cm

ringbalk 15/20

340

Sloof 20/25

list plafondgypsum 6x6

-0.05

pertemuandengan tali air

13 20

25

50

34

3030150

150

68

12

80

50

150

150

375

meja betontutup keramik

20x20

RUANG SPOOL HOEKRUANG STERIL

340

34

sisa keramik tepivariabel

sesuai kondisiharus >10 cm

ringbalk 15/20

-0.05

lampu SL23 W

152015 20

±0.00

tripleks 6mm

rangka plafondhollow allumunium2x4

rangka plafondhollow allumunium4x4

list plafondgypsum 6x6

dinding

dinding trasraam

wall hung lavatorySK 33

Sloof 20/25

sisa keramik tepivariabel

sesuai kondisiharus >10 cm340

370

+3.35+3.40

dinding keramik20x25

tali air

Skala 1 : 25

POTONGAN BSkala 1 : 25

POTONGAN C

+ 0.80

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL RUANG

SPOOL HOEK

dan

RUANG STERIL

1 : 25

AR-14B rev.01

Page 29: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

B

60

250

150

Keramik(30x30)

Pantri± 0.00

kolom praktis15/15

kolom praktis25/25

A

5

10

13

80

12 150

250

12 150

dinding trasram

Kitchen Sink ModenaBOLSENA - KS 3101

93x45x20

370

150

340

list plafondgypsum 6x6

-0.05

sloof 15/20

1020

sisa keramik tepivariabel sesuai kondisi

harus >10 cm

pertemuandengan tali air

25

68

dinding

2020

tripleks 6mm

batang anakhollow allumunium 2x4

batang indukhollow allumunium 4x4

lampu SL23 W

130

80

150

batang indukhollow alllumunium 4x4

tripleks 6mm

batang anakhollow allumunium2x4

list plafongypsum 6x6

-0.05

sloof 15/20

15 20

dinding trasram

dinding

meja betonbertulangtutup keramik20x20

ring balk15/20

12

68

pertemuandengan tali air

1710

lampu SL23 W

Skala 1 : 25

DENAH PANTRI

Skala 1 : 25

POTONGAN ASkala 1 : 25

POTONGAN B

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL PANTRI

1 : 25

AR-15 rev.01

Page 30: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

DAFTAR GAMBAR STRUKTURJUDUL GAMBAR

RENCANA PONDASI

NO

1

GAMBAR

SR - 01 Rev 01

DETAIL PONDASI2SR - 02A Rev 01

5

6

7

8

9

10

11

SKALA

1 : 100

1 : 25

RSUD RUTENG - KABUPATEN MANGGARAI

NUSA TENGGARA TIMUR

RENCANA SLOOF S1SR - 03A Rev 01

RENCANA SLOOF S2SR - 03B Rev 01

RENCANA RING BALOKSR - 03C Rev 01

PENULANGAN PORTAL BALOK & KOLOM 1SR - 05A Rev 01

SR - 06A Rev 01

RENCANA PERLETAKAN KOLOMSR - 04 Rev 01

SR - 06B Rev 01

SR - 07 Rev 01

DETAIL SAMBUNGAN BALOK DAN KOLOM

DETAIL PEMBESIAN OVERLAP PADA BALOK

DETAIL PEMASANGAN DINDING BATAKO

1 : 100

1 : 100

1 : 100

1 : 100

1 : 50/1 : 12.5

1 : 25

1 : 25

1 : 25 / 1 : 10

DETAIL PONDASI FOOT PLATE3SR - 02B Rev 01

1 : 25

12

DETAIL SAMBUNGAN SLOOF DAN PLAT LANTAI4SR - 02C Rev 01

1 : 20

Page 31: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

SR - 01 Rev 01

1 : 100

DENAH

RENCANA

PONDASI

Skala 1 : 100DENAH RENCANA PONDASI

100100

300

600

400

150

250

100

1300

100 300 700 250 250 300 200 100

2150

250

200

200

150

150

1000

200 950 250 250 200 300 100100

2150

150

150

150

105

A

200

95 700 103250 147

B C D E F G

200

200

200

300

1

2

3

4

5

6

7

2

1 1

2

Page 32: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

RuangDokter

Koridor

90

20

52

5

spesi lantaiurugan pasir di bawah lantai

urugan peninggian lantai

± 0.00

250

± 0.00

30

80

100

dinding bata

30

80

100

Skala 1 : 25

POTONGAN 1 - 1

Keramik 30/30

RuangBersalin

DETAIL

PONDASI

SR - 02A Rev 01

1 : 25

75

15

75

15

pas. pondasibatu kali/gunung

Toilet RuangBersalin

20

52

55

spesi lantaiurugan pasir di bawah lantai

Lantai beton K300 tebal 7cmurugan peninggian lantai

± 0.00

aanstamping

200

- 0.05

30

80

100

Anker D 12perjarak 50 cm

Beton rabat K175tebal 7cm

- 0.50Muka Tanah

22

- 0.10

10

40

30

85

202520

30

80

100

Skala 1 : 25

POTONGAN 2 - 2

Keramik 30/30

Anker D 12perjarak 50 cm

75

15

75

15

73

85

2

Lapisan Plastic

SaluranDrainase

Urugan Pasir

118

2 2

75

Waremesh M-8

5

spesi lantaiurugan pasir di bawah lantai

Lantai beton K300 tebal 7cmurugan peninggian lantai

± 0.00

Keramik 30/30

Anker D 12perjarak 50 cm

75

90

Anker D 12perjarak 50 cm

Lapisan Plastic

Waremesh M-8

pas. pondasi batu kali/gunung

aanstampingUrugan Pasir

Lapisan Plastic

Waremesh M-8

± 0.00

Sloof S2 4D 12mmSloof S1 6D 12mm

Sloof S2 4D 12mmSloof S1 6D 12mm

A

B

Page 33: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

as ft plate

as ft plate

footplate 60x80cm

lantai kerjalapisan pasir

± 0.00

muka tanah

kolom struktur baru 25/25

8 D 12

D 12-11

25

30

10

5

130

25

25

25

D 12-113 D 12

2 D 12

3 D 12

Ø 8-12.5

6 D 12

80

60

DETAILPONDASIFOOT PLATE

7.5

7.5

7.5

6.5 footplate 80x80cm

lantai kerja Beton K 175lapisan pasir

± 0.00± 0.00

muka tanah

spesi lantai

6 D 12

8 D 12

D 12-11

80

32

30

10

5

130

7.5

6.5

7.5

7.5

as ft plate

as ft plate

as ft plate

D 12-11

D 12-11

80

7.5

7.5

32

32

7.5

7.5

kolom pedestal 32/32

17

spesi lantai

25

17

17

4 4

4

4

25

17

17

4 4

4

4

25

Menempel pada bangunan Existing

7.5 20 7.5

kolom pedestal 32/ 32(selimut beton 7.5 cm)

80

kolom pedestal 32/ 32(selimut beton 7.5 cm)

Ø 8 - 12.5

SR - 02B Rev 01

1 : 25

29

60

Skala 1 : 25

DETAIL FOOT PLATE 1Skala 1 : 25

DETAIL FOOT PLATE 2

Ø 8 - 12.5

Page 34: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

DETAIL A. POTONGAN SLOOF

20

Skala 1 : 20

1515 1515

3030

15 15

47

25

sloof 20/25spesi keramikplat lantai beton K 300

wiremesh M-8angker Ø 10 - 30

wiiremesh M-8

angker tanam padasloof, panjang 30 cm

15 15 15 15 15

15

20

15

SLOOF 20/25

30 30

lapisan plastic sheet

lapisan plastic sheetdi bawah wiremesh

DETAIL B. PENAMPANG ATAS SLOOFSkala 1 : 20

urugan tanah

pasangan pondasibt. gunugn/bt. pecah

15

beton decking 5/5/3 - 30 cm

beton decking 5/5/3 - 30lapisan pasir dibawah beton lantai5

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL

SAMBUNGAN

SLOOF DAN PLAT

LANTAI

SR - 02C Rev 01

1 : 20

Page 35: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

KETERANGAN

SLOOF S1

SR - 03A Rev 01

DENAH

RENCANA

SLOOF SI

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

1 : 100

Skala 1 : 100DENAH PERLETAKAN SLOOF S1

100100

300

600

400

150

250

100

1300

100 300 700 250 250 300 200 100

2150

250

200

200

150

150

1000

200 950 250 250 200 300 100100

2150

150

150

150

105

A

200

95 700 103250 147

B C D E F G

200

200

200

300

1

2

3

4

5

6

7

2

1 1

2

Page 36: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

KETERANGAN

SLOOF S2

SR - 03B Rev 01

DENAH

RENCANA

SLOOF SI

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

1 : 100

Skala 1 : 100DENAH PERLETAKAN SLOOF S2

100100

300

600

400

150

250

100

1300

100 300 700 250 250 300 200 100

2150

250

200

200

150

150

1000

200 950 250 250 200 300 100100

2150

150

150

150

105

A

200

95 700 103250 147

B C D E F G

200

200

200

300

1

2

3

4

5

6

7

2

1 1

2

Page 37: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

100100

300

600

400

150

250

100

1300

100 300 700 250 250 300 200 100

2150

250

200

200

150

150

1000

200 950 250 250 200 300 100100

2150

150

150

150

105

A

200

95 700 103250 147

B C D E F G

200

200

200

300

1

2

3

4

5

6

7

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

KETERANGAN

RINGBALK B1

DINDINGEXISTING

Skala 1 : 100DENAH PERLETAKAN RING BALK

SR - 03C Rev 01

1 : 100

DENAH

RENCANA

RING BALK

Page 38: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

100100

300

600

400

150

250

100

1300

100 300 700 250 250 300 200 100

2150

250

200

200

150

150

1000

200 950 250 250 200 300 100100

2150

150

150

150

105

A

200

95 700 103250 147

B C D E F G

200

200

200

300

1

2

3

4

5

6

7

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

KETERANGAN

KOLOM K2

KOLOM K1

KOLOMEXISTING

Skala 1 : 100DENAH PERLETAKAN KOLOM K1 & K2

SR - 04 Rev 01

1 : 100

DENAH

RENCANA

LETAK KOLOM

K1 DAN K2

Page 39: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

K1

ke pondasifootplate

25

360

20

± 0.00

anker Ø 8-50cm

Ø 8 - 12.5cm

50

+ 3.60+ 3.80

7

K1

ke pondasifootplate

25

360

20

± 0.00

50

+ 3.60+ 3.80

1

K1

ke pondasifootplate

K2K2K2 K2

600 400

50 50

tulangan utama masuk50 cm ke ringbalk

Skala 1 : 50

PENULANGAN PORTAL BALOK & KOLOM

AS A7 - A1

6 5 4 3

2

150 150 150 150

4 Ø 10mmbalok lintel 15/15

balok sill 15/15

B1B1

PENULANGAN

PORTAL BALOK

DAN KOLOM 1

SR - 05 Rev 01

1 : 50 / 1: 12.5

angker ke pondasi angker ke pondasi angker ke pondasi

KOLOM STRUKTUR 25/25 (K1)

sengkang dia. 8 mm jarak 12.5 cm

SLOOF 20/25 (S1)

SLOOF 20/25(S2)

KOLOM PRAKTIS 15/15 (K2)

sengkang dia. 8 mm jarak 10 cm

RINGBALK 15/20 (B1)

BALOK LINTEL 15/15 (B2)

sengkang dia. 8 mm jarak 10 cm

25

25

3D 12 mm

3D 12 mm

2D 12 mm

4

3D 12 mm

3D 12 mm

25

20

4

4

sengkang dia. 8 mm jarak 12.5 cm

sengkang dia. 8 mm jarak 12.5 cm

2D 12 mm

2D 12 mm

25

20

4

4

sengkang dia. 8 mm jarak 12.5 cm

2D 12 mm

2D 12 mm

15

20

4

4

15

15

3

3

2 Ø 10 mm2 Ø 10 mm

15

15

3

3

2 Ø 10 mm2 Ø 10 mm

5

5

5

5

5

5

Ø 8 - 10cmØ 8 - 12.5cm

anker Ø 8-50cm

balok lintel 15/15

Ø 8 - 12.5cm

172

86S1 S1 S1

8D 12 mm

8D 12 mm

4 Ø 10mm

8D 12 mm

4 Ø 10mm4 Ø 10mm

4 Ø 10mm

4 Ø 10mm

4 Ø 10mm

132 228

32

Ø 8 - 10cm

Ø 8 - 10cm Ø 8 - 10cm

Page 40: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

50

50

50

detail kolom strukturdan sloof

tampak atas kolom strukturdan sloof

1.251.25

detail kolom strukturdan ringbalk

1:25detail kolom dan ringbalk

1.25

detail kolom praktisdan sloof

1.25

tampak atas kolom praktisdan sloof

1.25

Skala 1 : 25

DETAIL SAMBUNGAN BALOK & KOLOM

Kolom Struktur 25/25

Angker kolom Ø8-50cm

Sloof struktur 20/25

Pondasi batu kalitulangan terus ke dalampondasi footplate

20

15

Angker kolom Ø8-50cm

Kolom struktur 25/25

Ring Balk 15/20

12.5

12.5

12.5 12.5

Tulangan utama masuk 50 cm ke ringbalk

20

15

Tulangan utama masuk 50 cm ke ringbalk

Kolom struktur 25/25

Ring Balk 15/20

12.5

12.512.5

Kolom Praktis 15/15

Sloof struktur 20/25

Pondasi batu kali

12.5

12.5

Kolom struktur 25/25

Sloof struktur 20/25

25

25

12.5 12.512.5

12.5

Kolom praktis 15/15

Sloof struktur 20/25

12.5 12.512.5

12.5

12.512.5 12.5

Sloof struktur 20/25

12.5

15

15

2 Ø 10 mm

25

3D 12 mm

25

25

3D 12 mm

25

3D 12 mm

20

25

3D 12 mm

20

25

3D 12 mm20

25

20

25

3D 12 mm

3D 12 mm20

25

20

25

3D 12 mm

25

3D 12 mm

12.512.5

12.5

12.5

25

Angker D 12 per jarak 50 cm

5

5

5

5

5

5

5

5

3D 12 mm

Angker kolom Ø8-50cm

3D 12 mm

3D 12 mm 3D 12 mm

3D 12 mm

2D 12 mm

2D 12 mm

2D 12 mm

2D 12 mm

3D 12 mm

3D

1

2 m

m

3D

1

2 m

m

2 Ø 10 mm

3D 12 mm

SR - 06A Rev 01

1 : 25

DETAIL

SAMBUNGAN

BALOK & KOLOM

2D 12 mm

10

10

Page 41: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

Skala 1 : 25

DETAIL PEMBESIAN OVERLAP PADA BALOK

5050

Tulangan utama masuk 50 cm ke ringbalk

Angker kolom Ø8-50cm

Kolom struktur 25/25

Ring Balk 15/20

12.512.5

12.5 12.5 12.5 12.5

12.5

OVERLAPING MINIMUM

50 50

12.5 12.5

12.512.512.512.5

OVERLAPING MINIMUM

Lap Splice mimimum 50 cm

Tulangan utama masuk 50 cm ke ringbalk

Kolom struktur 25/25

Ring Balk 15/20

25

25

2D 12 mm

15

20

2D 12 mm

15

20

25

25

12.5

5

5

5

5

2D 12 mm

2D 12 mm

20

4

4

15

512.5

12.5 Sloof 20/25

Kolom 25/25

Pasangan Batako38x18x8

Lubang Batako8 - D12

Ø8 - 12.5 (Pemasangansengkang harus selang selingarah hook - nya)

Skala 1 : 25DETAIL PERSPEKTIF

Skala 1 : 25

DETAIL PERSPEKTIF

25

25

3D 12 mm

3D 12 mm

2D 12 mm

4

5

Skala 1 : 25

DETAIL PERSPEKTIF

3D 12 mm

3D 12 mm

25

20

4

4

5

Ø8 - 12.5(Pemasangan

sengkang harus selangseling arah hook-nya)

Ø8 - 12.5 (Pemasangansengkang harusselang selingarah huknya)

6 - D 12

SLOOF 20/25

KOLOM STRUKTUR 25/25 RINGBALK 15/20

Angker kolom Ø8-50cm

SR - 06B Rev 01

1 : 25

DETAIL

PEMBESIAN

OVERLAP PADA

BALOK

Page 42: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL

PEMASANGAN

DINDING BATAKO

SR - 07 Rev 01

1 : 25 / 1 : 10

400

350

Kolom 25/ 25

Sloof 20/25

Plesteran + Aci

Pasangan Batako38x18x8

Siar 3 cm

A

Sloof 20/25

Siar 3 cm

Lubang batako

Besi Ø8mm

Angker Ø8mm jarak 50cm

Ring Balok 15/20

90-110cm

Besi Ø8 mm

91

91

Sloof 20/25

Kolom 25/25Pasangan Batako

38x18x8

Besi Ø8 mm

Besi Ø8 mm

Lubang Batako

8 - D12

Ø8 - 12.5

6 - D12

Ø8 - 12.5

30

90-110cm

Skala 1 : 25

DENAH PEMASANGAN DINDING BATAKO

Skala 1 : 10

DETAIL A-A

Skala 1 : 25

DETAIL PERSPEKTIF

Page 43: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

DAFTAR GAMBAR MEKANIKAL, ELEKTRIKAL & PLUMBINGJUDUL GAMBAR

DAFTAR GAMBAR

NO

1

GAMBAR

ME-00

SKEMATIK DIAGRAM AIR BERSIH2 PL-01

SKEMATIK PENGALIRAN AIR KOTOR & DRAINASE3

SISTEMATIKA PENGALIRAN AIR HUJAN4

5 PEMIPAAN DRAINASE LINGKUNGAN

6

PEMIPAAN DRAINASE GEDUNG7

8

9

10

11

12

PEMIPAAN AIR BERSIH GEDUNG

DETAIL PERALATAN SANITAIR

DETAIL TOILET

SKALA

NTS

RSU RUTENG - KABUPATEN MANGGARAI

NUSA TENGGARA TIMUR

13

DETAIL SEPTICTANK & SUMUR RESAPAN

14

DETAIL SPOOLHOEK TANK & SUMUR RESAPAN

15

16

17

18

19

20

DIAGRAM SKEMATIK DISTRIBUSI ALIRAN LISTRIK

DIAGRAM SKEMATIK PEMBUMIAN

DENAH TITIK STOP KONTAK & PEMBUMIAN

PL-02

PL-03

PL-04

PL-05

PL-06

PL-07

PL-08

PL-09

PL-10

PL-11

PL-12

PL-13

EL-01

EL-02

EL-03

EL-04

DETAIL SALURAN DRAINASE

NTS

NTS

NTS

1 : 50

1 : 100

1 : 100

1 : 250

1 : 25

1 : 100

1 : 100

NTS

1 : 25

1 : 25

PEMIPAAN AIR KOTOR GEDUNG 1 : 100

DETAIL VENTING & SANITAIR

DETAIL ALAT & KOMPONEN INSTALASI LISTRIK

EL-05

DENAH TITIK LAMPU

DIAGRAM PANEL LISTRIK

EL-06

1 : 25

NTS

NTS

NTS

NTS

Page 44: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

Skala NTS

AB - GIP Ø1 12 "

Keran Spoolhoek 1

R. SPOOLHOEK

-

Keran Washtafel 4

R. BERSALIN

Keran Bak Air 2

AB - P Ø1/2"

AB - P Ø1/2"

AB - GIP Ø3/4 "

AB - GIP Ø3/4"

R. VIP

AB - P Ø1/2"

AB - P Ø1/2"

R. DOKTER PANTRI

Keran Bak Air 1-

Keran Bak Air 1 Keran Sink 1

AB - P Ø1/2"

AB - P Ø1/2"

AB - P Ø1/2"

AB - GIP Ø3/4 "

GV GV

GVGV

GV

NO NONO

NO NO

AV

AV

NC

NC

DR

DR

AV

NCDR

Elv. +0.90

Elevasi -0.30Dari Muka Tanah

Elv. +0.90Elv. +0.80

Elv. +0.90 Elv. +0.90

Elv. +0.90

AV Automatic Vent

Gate Valve

Normaly Open

Normaly Closed

Drain

GIP Automatic Venting

GV

NO

NC

DR

Keterangan :

SKEMATIK DIAGRAM AIR BERSIH

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

SKEMATIK

DIAGRAM

AIR BERSIH

PL-01

NTS

Page 45: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

Septic Tank kap. 10 m3.Concrete dgn waterproofing

TL - 01INFLUENT

kotak periksa

RUANG DOKTERToilet duduk tanpa tangki 1

F-U

TOTAL FUTOTAL WATER FLOW (lpm)

-

-

2

R. VIP F-U

TOTAL FUTOTAL WATER FLOW (lpm)

-1 1

R BERSALIN F-U

TOTAL FUTOTAL WATER FLOW (lpm)

Wastafel

-4 1

R SPOOLHOEKBak Spoolhoek 1

F-U

TOTAL FUTOTAL WATER FLOW (lpm)

-

1

Venting

Venting Venting

2500 minimum

CO-4"

Venting

VT - Ø 2,5" PVC-AW

VT - Ø 1,5" PVC-AW

Spoolhoek Tank kap. 5 m3.Concrete dgn waterproofing

TL - 02

INFLUENT

kotak periksa

VentingVenting

2500 minimum

AK - Ø 2,5" PVC-AW AK - Ø 3" PVC-AW

Venting

AK - Ø 4" PVC-AW

VT - Ø 2,5" PVC-AW

Sumur rembesan kap. 5 m3.Cincing beton

TL - 03

Skala NTS

SKEMATIK PENGALIRAN AIR KOTOR & DRAINASE

PANTRI-

1

F-U

TOTAL FUTOTAL WATER FLOW (lpm)

-

Toilet duduk tanpa tangki 2 1

-

Sink Stainless 1

Toilet duduk tanpa tangki

-

Venting

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

SKEMATIK

PENGALIRAN

AIR KOTOR

DAN DRAINASE

PL-02

NTS

Page 46: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

Air hujan dialirkanmelalui Pipa Ø4"

dan jatuh ke salurandrainase

Skala NTS

SKEMATIK PENGALIRAN AIR HUJAN

Pasang talangtepi atap

Tanpa talang tegak.Air hujan jatuh bebas

Tanpa talang atap

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

SKEMATIK

PENGALIRAN

AIR HUJAN

PL-03

NTS

Page 47: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

PEMIPAAN DRAINASE LINGKUNGANSkala 1 : 250

A

B C DKORIDOR

KETERANGAN GAMBARA Gedung VK & Neonatus

BRencana Penempatan SeptictankCRencana bak Rembesan Air DrainaseD

Rencana Penempatan Spoolhoektank

S

U

TB

Drainase tepi dinding bangunan

Pasang talang tepi atap

Air hujan dan limbahdrainase disalurkan kesumur rembasan

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

PEMIPAAN

DRAINASE

LINGKUNGAN

PL-04

1 : 250

Page 48: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

RuangPiket Petugas

Ruang VIP

Toilet

RuangBersalin

Ruang Dokter

Koridor±0.00

ToiletPantri

RuangJaga Bidan(Existing)

RuangIstirahat Bidan

(Existing)

RuangBayi

(Existing)

RuangBayi Isolasi(Existing)

Pantri

RuangBersalin

Toilet

Spoolhoek

RuangSteril

Toilet

PØ3/4" - GIP

PØ3/4" - GIP

PØ3/4" - GIP PØ3/4" - GIP

Sumber AirDari Gedung Eksisting

SpoolhoekTank5M

SeptictankKap. 10M

LEGENDA : Bak air kamar mandi

Closet Jongkok

Closet Duduk

Zink

Washtafle Standar

Saluran air hujan & Draniase

Sumur Resapan

Pipa air bersih 1"

Pipa air bersih 1/2"

Washtafle Corner

Pipa air bersih 3/4"

Skala 1 : 100

PEMIPAAN AIR BERSIH GEDUNG

BakRembesanDrainase

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

PEMIPAAN

AIR BERSIH

GEDUNG

PL-05

1 : 100

Page 49: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 50: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815
Page 51: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

8-150

Openable 100 mm reinforced

concrete plate

(Plat beton bertulang

t=100mm yg bisa dibuka)

Minimum 2% Slope Pipe

PVC D 4" from closet

(Pipa PVC D4" dari closet

dgn kemiringan minimum 2%)

4D 12

10-100

10-100

10-100

10-100

Minimum 2% Slope Pipe

PVC D 4" from closet

(Pipa PVC D4" dari closet

dgn kemiringan minimum 2%)

Concrete

(Beton cor 1:2:3)

50 mm Sand fill

(Urugan pasir)

Minimum 0.2% Slope Pipe

PVC D 4" to disposal area

(Pipa PVC D4" menuju bak resapan

dgn kemiringan minimum 0,2%)

Reinforced concrete plate

(Plat beton bertulang) t = 100 mm

50 mm Sand fill

(Urugan pasir)

Wire Mesh

Wire Mesh

(Pipa hawa) alvanis 2"

alvanis 2"Air conduit

Reinforced concrete plate

(Plat beton bertulang) t = 100 mm

Openable 100mm reinforced

concrete plate

(Plat beton bertulang

t=100 mm yg bisa dibuka)

10-100

10-100

4D 12

8-150

Openable 100 mm reinforced

concrete plate

(Plat beton bertulang

t=100mm yg bisa dibuka)

150

213

150

213

150

5

15

176

175190

10

163

70117

15

30.5

19

53 213

155

106

20

5

226

226

Concrete

(Beton cor 1:2:3)

176

53

4D12

Openable 100 mm reinforced

concrete plate

(Plat beton bertulang

t=100mm yg bisa dibuka)

Minimum 2% Slope Pipe

PVC D 4" from closet

(Pipa PVC D4" dari closet

dgn kemiringan minimum 2%)

8-150

10-100

10-100

10-100

10-100

Beam

(Balk) 100/150

Minimum 2% Slope Pipe

PVC D 4" from closet

(Pipa PVC D4" dari closet

dgn kemiringan minimum 2%)

Concrete

(Beton cor 1:2:3)

50 mm Sand fill

(Urugan pasir)

Beam

(Balk) 100/150

4D 12

8-150

Reinforced concrete plate

(Plat beton bertulang) t = 100 mm

Wire Mesh

Wire Mesh

(Pipa hawa) alvanis 2"

alvanis 2"Air conduit

Reinforced concrete plate

(Plat beton bertulang) t = 100 mm

Openable 100mm reinforced

concrete plate

(Plat beton bertulang

t=100 mm yg bisa dibuka)

10-100

10-100

Openable 100 mm reinforced

concrete plate

(Plat beton bertulang

t=100mm yg bisa dibuka)

150

213

150

213

150

5

15

176

175190

10

7011740

15

30.5

19

53 213

155

106

20

5

10 10 10 10

226

226

Concrete

(Beton cor 1:2:3)

10

40

40 17666

53

53

20

SUMUR RESAPAN

10 m

Pipa 4"

80

Besi 12mm

Cincin Beton 80

Pipa 4"

250

808 8

Plat penutup

Plat beton penutup

Cincin Beton

80

80

20

30

100

Kerikil

Lapisan ijuk

Batu Kosong

Pipa 4"

Lapisan pasir

20

IN

OUT

A

B

Skala 1 : 20

POTONGAN B

Skala 1 : 20

POTONGAN A

Dinding

Cor Beton

15

Dinding

Cor Beton

Skala 1 : 25

DETAIL SUMUR RESAPANSkala 1 : 25

DETAIL SEPTIC TANK

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL

SEPTICTANK

DAN

SUMUR RESAPAN

PL-08

1 : 25

Page 52: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

Besi 12mm

Cincin Beton 80

Pipa 4"

Pipa Ï4"

KE PERESAPAN

Dinding Beton

Tutup Septictank

Beton bertulang

Pipa sambungan

udara Ï12"

SCHUM

Tutup beton

A

B

808 8

150 10 60220

8

10

10010 10

30

30

30

30

10 150 10 60 10220

120

120

10

10

Plat penutup

Plat beton penutup

TAMPAK ATAS

SPOOLHOEK TANK

POTONGAN A-A POTONGAN B-B

Skala 1 : 25

DETAIL SPOOLHOEK TANK

100

202

Pipa 4"

SUMUR RESAPAN

300Bak Kontrol

40

10

10

10

40

32

10

8

Bak Kontrol

IN

OUT

Pipa 4"

80

GIP Ï 2"

Besi Ï12

Ï8 - 15

Ï8 - 15

Ï8 - 15

2,5 m

10 10

Pipa Ï4"

2,5 mGIP Ï 2"

Besi Ï12

SCHUM

45

Ï8 - 15

Ï8 - 15

Ï8 - 15

Ï8 - 15

240

Dinding Beton Bertulang

160

B

Skala 1 : 25

DETAIL SUMUR RESAPAN

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

PL-09

1 : 25

DETAIL

SPOOLHOEKTANK

DAN

SUMUR RESAPAN

Page 53: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

Skala 1 : 25

DENAH KAMAR MANDI

Skala 1 : 25

POTONGAN ASkala 1 : 25

POTONGAN B

25

25

10

5050

200A

60 66

200

60

200

355

60

10

closet duduktanpa tanki

dindingtrasraam

dinding keramik20x25

dinding

20

60

200

355

10

70

balok lintel15/15

25

sisa keramik tepivariabel sesuai

kondisiharus >10 cm

35200

35

B

43 200Sloof 20/25

1320

72 113

13 20

-0.05

30 41

lantai keramik20x20

320

60 125

185

-0.05

15

20

bak fiber50x50x60

Sloof 20/25

2020

pertemuandengan tali air

lampu SL30 W

lampu SL30 W

border

kolom praktis15/15

Keramik(20x20)

Toilet± 0.00

Besi pegangan Ø1,5"(panjang disesuaikan)

Besi pegangan Ø1,5"Tinggi dari lantai 85 cm(panjang disesuaikan dinding)

85

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL

TOILET

PL-10

1 : 50

Page 54: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

40

30

20 2 8

60

10

2028

58

32

8

8

18

2

2

Tutup beton

50x60x8

8 - 14

Batako 38x18x8

Adukan Spesi

Rabat Beton

Pasir Grurg

Batako 38x18x8

Adukan Spesi +

Plester

Muka Tanah

Tutup beton

50x60x8

8 - 14

Lantai saluran

kemiringan max 0.1%

Rabat Beton

Pasir Grurg

58

30

8

2

50 50

50 50 5050

B B

A

A

Skala 1 : 10

POTONGAN A-A Skala 1 : 10

POTONGAN B-B

Skala 1 : 10

TAMPAK ATAS SALURAN DRAINASE

Lubang rembesan

Air Hujan

Handle

Pipa dari Floordrain / Washtafle

Pipa dari Floordrain / Washtafle

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL

SALURAN

DRAINASE

PL-11

1 : 25

Page 55: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

150

Closet duduk

tanpa tanki

TOTO C50

Lantai keramik

20x20

Dinding keramik

20x25

Dinding trasram

"Tee"

Pipa Venting 4"

Penutup pipa

(Wiremesh Galvanis

Anti Serangga)

Ke Septictank

Bracket

Dinding Trasram

Kolom

Lantai Toilet

Keramik 20x20

Pipa Venting

4"

Dari Closet Ke Septictank

Skala 1 : 10

DETAIL PEMASANGAN VENTING & SANITER

Skala 1 : 10

TAMPAK ATAS

Dinding

Bracket

20

Clean Out

Plafond Plafond

Kopling mengikuti

standar pabrik

15

39

49

10

35

Pipa 4" dipasang di bawah sloof

Bracket

max 80cm

Lantai Toilet Lantai Teras

35

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL VENTING

DAN SANITAIR

PL-12

1 : 25

Page 56: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

46195

245

270

7575

195

242 149

50

PASANGAN BATA

P 4"

245

178

76

80

P 4"

15447

145

90 50

113101134

89 54

75DINDING

420

213

280

137

18110026

131

108

151

275

220

185

127

20

140

DIN

DIN

G

520

DIN

DIN

G

150150

520

MEREK

JENIS

TYPE

PENEMPATAN

TOTO

C50 (Tanpa Tangki)

- Toilet Perawat

- Toilet Nifas

- Toilet Pemulihan

TOTO

Single Bowl (Closet Jongkok)

CE6

Toilet Umum

MEREK

JENIS

TYPE

PENEMPATAN

TOTO

Wall Hung Lavatory

FSW420GS

Ruang Cuci Alat

Single Bowl

(Closet Duduk Tanpa Tanki)

330

197 508

197

685

PT 1/2"

243

675

800

OPSIONAL

OPSIONAL

OPSIONAL

Dinding

930

450

MEREK

JENIS

TYPE

PENEMPATAN

TOTO

SK33

Ruang Spoolhoek

Wall Hung Lavatory

MEREK

JENIS

TYPE

TOTO

LW - 665 CJT1

Wall Hung Lavatory

PENEMPATAN

580

800

210

500

280

60

LW239FJ

TS90097

TX801L

15

LW241CJ

440

250

540

THX1A-3W

PT1/2

32

TL340C5

100

Bolsena KS 3101

- Ruang Bayi Isolasi

- Ruang Piket Petugas

- Koridor

MEREK

JENIS

TYPE

MODENA

Top Mount Sink

PENEMPATAN

- Ruang Laktasi

- Pantri

MEREK

JENIS

TYPE

PENEMPATAN

LW 7CJ

MEREK

JENIS

TYPE

TOTO

Wall Hung Lavatory

Corner

PENEMPATAN

- Ruang Bersalin

- Ruang Tindakan

430

4

7

5

6

0

1

430

820

850

55

150

TA2SV1

75

32

150

PT1/2 TX709AN

550

570

TS251FT2N

LANTAI

DIN

DIN

G

Skala NTS

DETAIL PERALATAN SANITAIR

25

25

2525

2525

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL

ALAT SANITAIR

PL-13

NTS

Page 57: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

PLN INCOOMING2200 Va; 380 / 220 V;

1 phase; 50 Hz

DAYA DIBUTUHKAN3200VA; DAYA

TERPASANG 2200 VA

GENERATING SET SYSTEM5000 Va; 220 Volts; 1 phase; 50 Hz

(SUPLAY OLEH PIHAK LAIN)

MESIN BENSIN6,5 HP

1 2 3 4 5 6

PENERANGANUMUM

PENERANGANDARURAT

STOP KONTAKUMUM

STOP KONTAKKRITISCADANGAN

PERALATANUTILITAS

IDENTIFIKASI WARNA PENGHANTAR - PUIL 2000 - SNI 04-0225-2000 - psl 7.2 Warna loreng hijau-kuning hanya untuk penghantar pembumian, pengaman &

penyama potensial ke bumi Warna biru hanya untuk penghantar netral atau kawat tengah. Tidak boleh untuk

menandai penghantar lain (fase) dan pembumian. Warna untuk fase, gunakan warna lain, dahulukan pegunaan warna coklat.

NYM 4x2,5 mm2

DIAGRAM SKEMATIK DISTRIBUSI ALIRAN LISTRIKSkala 1 : 300

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DIAGRAM

SKEMATIK

DISTRIBUSI

ALIRAN

LISTRIK

EL-01

NTS

Page 58: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

PLN INCOOMING2200 Va; 380 / 220 V;

1 phase; 50 Hz

1 2 3 4 5 6

PENERANGANUMUM

PENERANGANDARURAT

STOP KONTAKUMUM

STOP KONTAKKRITISCADANGAN

PERALATANUTILITAS

ALKES METAL& ELEKTRIK

BC 25 mm2

BC 25 mm2

BC 25 mm2

BC 25 mm2

BC 10 mm2

BC 10 mm2

BC 10 mm2

BC 10 mm2

BC 10 mm2

BC 10 mm2

BOX HAGER

DIAGRAM SKEMATIK PEMBUMIANSkala 1 : 300

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DIAGRAM

SKEMATIK

PEMBUMIAN

EL-02

NTS

Page 59: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

Ceiling mounted23W twisted SL

Ceiling mounted35W twisted SL

Stop kontak 1ph -150 W

Stop kontak Power1P 350 W

Exit luminaire 2x10 W- Acrilic 2 side

Emrgcy light 2x10 W -wall mounted+LiMh

Battery & autocharged

MCB 20 A3P,1 ph, 8kA

ELCB 3P20A,1 ph,

16kA

COS 35 A3P,1 ph, 20kA

STOP KONTAKTERMINAL GENSET

35A 1ph

NYY 3x25mm2oleh pengadaan genset

Surge arrester3P, 15kA, 1ph

BEBAN DAYA( WATT - W )

PHASE

Mini Circuit Breaker (MCB)

Residual Current Breaker With Overload (RCBO)

Surge Arrester

KETERANGANSIMBOL

Change Over Switch (COS)

RCBO1-ph

RCBO1-ph

RCBO1-ph

RCBO1-ph

9

4

7

4 2

4

2

1

6

6

24 6 2 1 6 6

112

392

207

911

0

900

2100

0

4622

6204

WATT

VA

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS KESEHATAN

DINAS PU NTT BIDANG CIPTA KARYA

DIAGRAM

PANEL LISTRIK

EL-03

NTS

Page 60: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

RuangPiket Petugas

Ruang VIP

Toilet

RuangBersalin

Ruang Dokter

Koridor±0.00

ToiletPantri

RuangJaga Bidan(Existing)

RuangIstirahat Bidan

(Existing)

RuangBayi

(Existing)

RuangBayi Isolasi(Existing)

Pantri

RuangBersalin

Toilet

Spoolhoek

RuangSteril

Toilet

Skala 1 : 100

DENAH TITIK LAMPU

KORIDOR

Stop kontak1P 250 WStop kontak Power 1P 500 W

Single switchDouble/multiple switch

Panel listrik

Exhaust fan, wall Mounted - changable

direction. 150cfm

Wall rotating fan Dia 120cm

Dimmer switch multi channel

Ceiling mounted Twisted / SL 35 W / 827 DIA 200mmDL-04DL-05

Ceiling mounted Twisted / SL 23 W / 827 DIA 150MM

Exit luminaire 2x10 W - Acrilic 2 sideEX-01

Meter PLNHotel switch / saklar oper

LEGENDA :

1/1

konsultasi IPSRS

saat penempatannya

Emrgcy light 2x10 W - wallmounted+LiMh Battery & autocharged

1/2

1/3

1/4

1/5

1/6

2/1

2/2

2/3

2/7

2/4

2/5

2/6

3/13/2 3/7

3/6

3/3

3/8

3/43/5

3/9

4/1

4/2

4/3 4/4

4/5

4/6

4/7

4/8

4/9

4/104/11

4/13

4/12

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS KESEHATAN

DINAS PU NTT BIDANG CIPTA KARYA

DENAH

TITIK LAMPU

EL-04

1 : 100

Page 61: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

RuangPiket Petugas

Ruang VIP

Toilet

RuangBersalin

Ruang Dokter

Koridor±0.00

ToiletPantri

RuangJaga Bidan(Existing)

RuangIstirahat Bidan

(Existing)

RuangBayi

(Existing)

RuangBayi Isolasi(Existing)

Pantri

RuangBersalin

Toilet

Spoolhoek

RuangSteril

Toilet

KORIDOR

Skala 1 : 100

DENAH TITIK STOP KONTAKDAN PEMBUMIAN

Stop kontak1P 250 WStop kontak Power 1P 500 W

Single switchDouble/multiple switch

Panel listrik

Exhaust fan, wall Mounted - changable

direction. 150cfm

Wall rotating fan Dia 120cm

Dimmer switch multi channel

Exit luminaire 2x10 W - Acrilic 2 sideEX-01

Meter PLNHotel switch / saklar oper

LEGENDA :

6/1

6/2

6/3

6/4

6/5

6/6

7/1

7/2

7/3

7/4

7/5

7/6

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS KESEHATAN

DINAS PU NTT BIDANG CIPTA KARYA

DENAH TITIK

STOP KONTAK

DAN PEMBUMIAN

EL-05

1 : 100

Page 62: AIPMNH_Gambar RSUD Ruteng_August 2012 20120815

80

160

AC POWER CHARGER

ON1

0

1

0

OFF OFF

TEST

Emergency Light

Detail Fitting Lampu SL

23W - 30W

DETAIL SHAKLAR

DETAIL POWER OUTLET

TYPE B

DETAIL POWER OUTLET

TYPE A

AIP-MNH NTT

AUSTRALIA INDONESIA PARTNERSHIP

FOR MATERNAL AND NEONATAL HEALTH

NUSA TENGGARA TIMUR

PERENCANAAN DAN RENOVASI PUSKESMAS DAN RUMAH SAKIT

PROPINSI NUSA TENGGARA TIMUR

SKALA

TANGGAL

DINAS

KESEHATAN

DINAS PU NTT

BIDANG CIPTA KARYA

DETAIL ALAT

DAN KOMPONEN

INSTALASI

LISTRIK

EL-06

NTS