AIM Presentation

20
AIM 2013

Transcript of AIM Presentation

Page 1: AIM Presentation

AIM 2013

Page 2: AIM Presentation

OUR THEME

Page 3: AIM Presentation

The thread draws people holding hands representing the union at CISV.

People all over the wolrd who support social justice and equal opportunity for all.

The colored bars are passages to the future we desire – a future of peace, wellbeing, education and sustainability.

The colors represent the mix of Brazilian people – white, black and yellow.

It’s a lush nature – the green of forests, the yellow of the sun and natural resources, the bright blue sky.

But also the red of people’s passion for life and the purple of spirituality.

Brazil has something of the world !Brazil has something of you !!

Page 4: AIM Presentation

WHERE ?

Page 5: AIM Presentation

BRAZIL

Page 6: AIM Presentation

BAHIA

Page 7: AIM Presentation

SALVADOR

Page 8: AIM Presentation

SALVADOR

Page 9: AIM Presentation

HOW DO I GET THERE ?

Page 10: AIM Presentation

There are direct flights available from Europe and USA;

Easily connected from:‐ São Paulo, 2:30 hours by plane (2000 km);‐ Rio de Janeiro, 2:00 hours by plane (1700 km).

Page 11: AIM Presentation

AIM SITE

Page 12: AIM Presentation

THE HOTEL

http://www.solexpress.com.br/StellaMarisResortHotel.aspx

Page 13: AIM Presentation

ACCOMODATIONS

Page 14: AIM Presentation

CONVENTION CENTERdedicated to AIM

Page 15: AIM Presentation

WHEN ?

Page 16: AIM Presentation

IJBC01 Aug - 05 Aug 2013

PRE AIM02 Aug - 04 Aug 2013

AIM05 Aug - 11 Aug 2013

Page 17: AIM Presentation

HOW MUCH ?

Page 18: AIM Presentation

PRICESEVENT DATES NUMBER OF

NIGHTS ROOM TYPE PRICE PER NIGHT (USD)

TOTAL PRICE (USD)

IJBC 01 - 05 AUG 4 JUNIORDOUBLE

110,00120,00

440,00480,00

IJBC + AIM 01 - 11 AUG 10 JUNIORDOUBLE

110,00120,00

1.100,001.200,00

PRE AIM + AIM 02 - 11 AUG 9 SINGLE DOUBLE

170,00120,00

1.530,001.080,00

AIM (TRUSTEES) 04 -1 1 AUG 7 SINGLE

DOUBLE170,00120,00

1.190,00840,00

AIM (PARTICIPANTS) 05 - 11 AUG 6

SINGLEDOUBLEJUNIOR

170,00120,00110,00

1.030,00720,00660,00

IEC + IO STAFF 01 - 12 AUG 11 SINGLEDOUBLE

170,00120,00

1.870,001.320,00

EEC 02 – 11 AUG 9 SINGLEDOUBLE

170,00120,00

1.530,001.080,00

Page 19: AIM Presentation

TASK FORCE AIM 2013

Page 20: AIM Presentation