AHCAL Electronics.SPIROC2 and HBU measurement results
Mathias Reinecke CALICE main meetingUniv. HASSAN II, Casablanca, MoroccoSept. 23rd, 2010
![Page 2: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/2.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 2
Outline
> Setup Electronics for Charge Injection
> SPIROC2 measurement results
Compensation capacitors
HOLD Scans, Dynamic Range
Autotrigger / Testbeam / MIP Efficiency
Rate Dependency
> Results from LED system
> Outlook
> Conclusions
![Page 3: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/3.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 3
Charge Injection Setup I – HBU_I in laboratory
Looks like an easy setup, but ….
![Page 4: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/4.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 4
Charge Injection Setup II
HBU has not been designed for charge-injection tests!Initial idea: Analogue SPIROC tests => LAL testboards, HBU => tests of digital part / readout chain / DAQ / system (SiPMs)
Due to new effects: HBU is used for analogue tests as well…
SiPM termination @ SPIROC2 input
![Page 5: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/5.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 5
SP2 PA compensation capacitors
Problem: Cell dependent amplitude
Amplitude decay in first LG memory cells
HG histogram‘bleeds out’ to the left
correct position
Effect cannot be eliminated as at LAL by a high blocking-cap on VDDD2 (R. Honda)
Effect = f(amplitude, input signal shape, PA comp. caps)Effect != f(trigger rate, block-caps@100µF)
HG PA=100fF, LG PA=200fF50 ns shaping, ext. Hold/Trig.hold-time=95ns (LG), 130ns (HG)Charge Injection with 5ns risetime.No PA compCs
![Page 6: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/6.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 6
SP2 PA compensation capacitors
Holdscan w/o compensation capacitors (CompC)
compensation caps change input signal shape….
HG PA=100fF, LG PA=200fF50 ns shaping, ext. Hold/Trig.Charge Injection with 2ns risetime.
![Page 7: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/7.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 7
SP2 PA compensation capacitors
Dynamic Range HG and LG
HG
LG, no compC
LG, with compC
HG PA=100fF, LG PA=200fF50 ns shaping, ext. Hold/Trig.Charge Injection with 2ns risetime.
CompCs improve severely cell uniformity,CompCs increase HG dynamic range,CompC=3pF still not large enough for very fast signals
=> Input signal shape changes amplitude.
![Page 8: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/8.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 8
SP2 Holdscans
Problem: Position of Hold-Maximum depends on signal amplitude. Position is different for HG and LG
By Mark Terwort, Mathias Reinecke
Compensation capacitors do not improve this behaviour.HG PA=100fF, LG PA=200fF50 ns shaping, ext. Hold/Trig.Charge Injection with 2ns risetime.No PA compCs
![Page 9: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/9.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 9
SP2 Holdscans
Problem: Position of Hold-Maximum depends on preamp. setting (left) and varies from ASIC to ASIC (right)
By Jeremy Rouene
Charge Injection with 5ns risetime.50ns shaping, ext. Hold/TrigNo PA compCs
ASIC1 ASIC2
![Page 10: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/10.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 10
SP2 Rate dependency
Injected Charge: 10.47pC (LG)
Good behaviour at small signals:-no discharge of analogue memory-no rate dependency
Fairly good behaviour at large signals:-no discharge of analogue memory-low rate dependency in last mem.-cells-amplitude decay in first mem.-cells
HG PA=100fF, LG PA=200fF50 ns shaping, ext. Hold/Trig.hold-time=95ns (LG),Charge Injection with 5ns risetime.No PA compCs
![Page 11: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/11.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 11
DESY Testbeam – ext. Trig vs. Autotrigger
black curve:ASIC triggers itself(autotrigger)
threshold
Results byJeremy Rouene
MIP peak
Set threshold to:-minimize noise hits-maximize MIP detection efficiency
![Page 12: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/12.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 12
Autotrigger MIP efficiency
A MIP efficiency of ~95% can be achieved for a threshold-pedestal- cut at 10^(-4) for most channels (autotrigger mode).
See more results in the report:‘Analysis of the autotrigger of the read out chip of the front-end electronics for the HCAL of the ILC.’ (Hamburg, Aug. 2010)by Jeremy ROUENE
![Page 13: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/13.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 13
SP2 autotrigger threshold definition
~172 DACtics / pC (ASIC1)~182 DACtics / pC (ASIC2)
pedestal 2.5 MIP (1.602pC)
by charge injection…by testbeam…
(8pixels and 350ADCcounts per MIP, SiPM gain of 5*10^5)
~191 DACtics / pC (chn 8)~120 DACtics / pC (chn 33)
Spread: Channel-wise threshold adjustment necessary!Results byJeremy Rouene
~ok!
![Page 14: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/14.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 14
LED Calibration Systems II – DESY + Uni Wuppertal
> LED uniformity under investigation
> Wuppertal recommended new LED driving circuit and new LED type with lower spread in output.
> HBU2 will contain solder parameter field in order to adjust LED power per channel.
> Problems: LED light output spread, dynamic range (saturation)
LED 1 Cent
![Page 15: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/15.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 15
LED Calibration System – Current Activities
green: good single-pixel spectrumred: SiPM does not show single-pixelsblue: LED or SIPM dead(to be analyzed …)
SPIROC2_2 SPIROC2_1HBU-wide charact. ofSiPM single-pixel spectra
Development of:Automatic FIT andgain extraction routines(here: for testbeam MIP signals)
Results byJulian Sauer
![Page 16: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/16.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 16
Next important steps (the last two big points):
SPIROC2 TDC characterization
SPIROC2power pulsing
first results already there….
DIF firmwareneeds update…
autotrigger!
HG PA=100fF, LG PA=200fF50 ns shaping, ext. Hold/Trig.hold-time=130ns (HG/TDC),Charge Injection with 5ns risetime.No PA compCs
![Page 17: AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.](https://reader033.fdocuments.net/reader033/viewer/2022051417/5697c0061a28abf838cc5ace/html5/thumbnails/17.jpg)
Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 17
Conclusions and Outlook
> Ongoing system tests are important, but delay redesigns as well.
> Current effects should be visualized by SPIROC2 simulations (LAL).
> Studies from R. Honda at LAL show very similar effects => origin SPIROC2 ?
> Not much activity on DIF/DAQ development at DESY currently.