Lean & AgileIIM 2014
Erasmus University College Brussels@bartvermijlen
Business Model
CanvasRecap
Lean Startup
Recap
MVP
BuildMeasure
Learn
Pivot
Hypotheses
ValueGrowth
Lean StartupRoots?
Agile & ScrumLean & Kanban
Agile & ScrumLean & Kanban
Agile
AgileManifesto
AgileManifesto
AgileManifesto
AgileManifesto
AgileManifesto
WaterfallPhase-gate
http://www.flickr.com/photos/cluczkow/8650038393/
ideation
design
production
WaterfallPhase-gate
http://www.flickr.com/photos/cluczkow/8650038393/
ideation
design
production
Feck Perfuction.
Begin before you’re ready.
WaterfallPhase-gate
ideation
design
production
AgileIterative
ideation
design
production
ideation
design
production
ideation
design
production
ideation
design
production
Pareto
Pareto80/20
80% of valuein
20% of functionality
20% of work/time/budgetin
80% of value
In strip clubs 80% of the money goes to 20% of the girls
Agile OK, but how?
- Interlude -
User Stories- link -
- User Stories Example -
Twitter- link -
Agile & ScrumLean & Kanban
Agile & ScrumLean & Kanban
Scrum
Scrum
http://www.flickr.com/photos/west_point/5506094415/
BAS 2013@bartvermijlen
timeboxes
● sprint planning● daily scrum● sprint review● sprint retrospective
roles
● team● product owner● scrum master
artefacts
● backlog● scrum board● burndown
BAS 2013@bartvermijlen
BAS 2013@bartvermijlen
BAS 2013@bartvermijlen
BAS 2013@bartvermijlen
Scrum for Rock Bands
link
Agile & ScrumLean & Kanban
Agile & ScrumLean & Kanban
Lean
Lean
Toyota Production
System
Optimize the whole
Focus on customers
Eliminate waste and create flow
Waste?Anything not adding value to the product.
_ Building the wrong thing_ Building the thing wrong_ Having too much work in progress waiting in a queue
Build fast, learn fast(PDCA)
PlanDo
CheckAct
iterative problem solving
The Lean Bicycle Factory
The story of Justin Time
_ it’s not working__ traffic jam___ visualize work in progress____ work in progress limits_____ pull vs push______ slack_______ cycle time________ stop starting, start finishing
Agile & ScrumLean & Kanban
Agile & ScrumLean & Kanban
Kanban
“Kan-ban is a Japanese word that literally means “signal card” in English. In a manufacturing
environment, this card is used as a signal to tell an upstream step in a process to produce more. The
workers at each step in the process are not allowed to do work unless they are signaled with a kanban
from a downstream step.”
David Anderson
Value Stream
Mapping
Bottlenecks
Agile & ScrumLean & Kanban
- Recap -
- Recap -
Lean & Agile Values
Transparency
Inspection
Adaptation
Trust
“Creativity is not a talent. It is a way of operating. It is not an ability that you either have or not have. It is not related to your IQ. The most creative have
acquired the ability to get themselves in a particular mood - a way of operating - which allows their
natural creativity to function. An ability to play.”
John Cleese
Must See video on http://vimeo.com/89936101
leanpub.com/theagileagency
Thank you!twitter: @bartvermijlen
email: [email protected]: www.bartvermijlen.comlinkedin.com/in/bartvermijlen