Rosso-Llopart ©2013 1
Other Estimation Techniques
Part III
Mel Rosso-Llopart Carnegie Mellon University
Rosso-Llopart ©2013 2
Agenda
Other Estimation on estimation − Techniques − Exercises on estimation
Improving your Estimates − Case study – Estimation as a tool
Wrapup
Rosso-Llopart ©2013 3
D2-L2
© GIMETO, LLC
3
Session Objectives
Define what an estimate is one more time Definitions have been given to give perspective on how
many ways an estimate can viewed Define what metrics are and what metrics are
appropriate for software projects to improve future estimates
Cover what we have discussed make good estimates for software projects
Rosso-Llopart ©2013 4
D2-L2
© GIMETO, LLC
4
What is an estimate?
Estimate noun [C] “an approximate calculation or judgement of the size, value, amount, cost, etc. of something” Cambridge Dictionary
So how do we improve our approximations?
Historical Data of course
Rosso-Llopart ©2013 5
D2-L2
© GIMETO, LLC
5
How You Can Tell A Good Estimation Technique You can teach it You can use it in all phases of your work You can use it on all components You can use statistical evaluation of its results You can extend it into the future You can evaluate its accuracy
Rosso-Llopart ©2013 6
Estimate uncertainty
x
2x
4x
0.5x
0.25x
Feasibility Requirements Design Code Delivery
Rosso-Llopart ©2013 7
Inputs and Outputs to the Estimation Process
Classical view of software estimation process [Vigder/Kark]
Cost Estimation Process
Effort
Cost
Schedule
Size Estimator
Size Product Specs
Complexity Constraints Personnel Skill Environment
Size Drivers
Project Estimate
COST DRIVERS
Rosso-Llopart ©2013 8
Productivity
The output-input ratio within a time period with due consideration for quality.
Standard Productivity = outputs/inputs Software Productivity Process Productivity = (Size in SLOC) / (Effort)^(1/3)
x (Time)^(4/3)*
* Larry Putnam, QVC
Rosso-Llopart ©2013 9
Why is this important?
1) Time is part of the productivity relationship. 2) Time is a very important part with the exponents saying it
has four times the weight of Effort. So the longer it takes the more impact on productivity. Is this a good or bad impact?
Rosso-Llopart ©2013 10
Basic estimation process
First figure out what are the similarities Then look for differences
− Use these to determine the effort needed
Does effort equal progress? Amount of time invested
equal progress?
Rosso-Llopart ©2013 11
First look for “similarities” Have we done something similar Do we have data on that project How long ago was it
− Geometric loss of understanding
Do we still have the expertise − Expertise does not last
Do we have the artifacts from that project − Can we read them
Rosso-Llopart ©2013 12
Next look for “differences”
Do we understand the differences Do we have expertise in this new area
− Training cost time and money − Can we get the expertise quickly
Do we have a proxy for this difference − Have we done something similar on other projects
Rosso-Llopart ©2013 13
Function points Function point count modified by complexity of the project FPs can be used to estimate LOC depending on a language factor LOC = AVC * number of function points AVC is a language-dependent factor FPs can be very subjective, depend on estimator Automatic function-point counting maybe impossible
Rosso-Llopart ©2013 14
Function Point Estimation Step One – System Size
System Elements and their Complexity Description Low Medium High Total Inputs __x 3 __x 4 __x 6 ____ Outputs __x 4 __x 5 __x 7 ____ Queries __x 3 __x 4 __x 6 ____ Files __x 7 __x 10 __x 15 ____ Program __x 5 __x 7 __x 10 ____ Interfaces TOTAL UNADJUSTED FUNCTION POINTS ____
Rosso-Llopart ©2013 15
Function Point Basics Count the following: inputs outputs inquiries – Get info only logical internal files – Save state external interfaces Apply “simple, average, complex” multipliers (Low, Medium, High) Apply the 14 adjustment factors (such as designed for reuse? in a heavy traffic environment? etc.)
Rosso-Llopart ©2013 16
Function Points (14 factors)
Compute the technical complexity factor (TCF) Assign a value from 0 (“not
present”) to 5 (“strong influence throughout”) to each of 14 factors such as transaction rates, portability
Add 14 numbers ⇒ total degree of influence (DI)
TCF = 0.65 + 0.01 × DI
Technical complexity factor (TCF) lies between 0.65 and 1.35
The number of function points (FP) is given by FP = UFP × TCF
Rosso-Llopart ©2013 17
Converting Function Points to Lines of Code
Source: Quality Software Management (http://www.qsm.com/FPGearing.html)
Language LOC/Function Code Point
Access C C++ COBOL Excel HTML JAVA Javascript Oracle Perl Powerbuilder SQL VBScript Visual Basic Web Scripts
35 162 66 77 47 47 62 58 30 60 32 40 36 47 44
Rosso-Llopart ©2013 18
Function Points
FP are dimensionless numbers FP can have multiple uses as metrics: pages/FP defects/FP Cost/FP LOC/FP
Rosso-Llopart ©2013 19
The Downside of Function Points Difficult to be consistent across the set of counters Does not reflect internal complexity very well Adjustments needed Symons on complexity1 Reifer for real-time systems2 Must be converted to LOC; database needed for each language (Organizational) There is hope: IFPUG – Release of counting standard, but you must be member
1 - Reifer, Donald J., Asset-R IFPUG Spring Conference, Baltimore, Maryland, April, 1991. 2 - Symons, Charles R., Mark II Function Points IEEE Transactions on Software Engineering, Vol. SE-14, no. 1, January 1988
Rosso-Llopart ©2013 20
Algorithmic code modelling A formulaic approach based on historical cost information and which is generally based on the size of the software Examples are: Putnam’s Software Life-cycle Model (SLIM) COCOMO COCOMO II Advantages: Its results are repeatable Objectiveness
Disadvantages: Some subjective input is needed
Rosso-Llopart ©2013 21
Putnam’s Software LIfe-cycle Model (SLIM) Putnam used Software and
manpower-build Equation This method makes use of
a so-called Rayleigh curve to estimate project effort, schedule and defect rate
Supported by Quantitative Software Management (QSM)
www.qsm.com
D1-L3
© GIMETO, LLC
22 Most Common Size Estimation
Techniques The WAG Estimation by analogy Small Grain and Large Grain
“All analogy methods require a local, idiosyncratic, database”
Expert experience
D1-L3
© GIMETO, LLC
23
WAG - Wild Altogether Guess
Totally new environment No historical data No expertise in this area No experts to contact Research turns up no information …Guess, but make sure you record this
D1-L3
© GIMETO, LLC
24
Estimation by analogy
The method: The project manager identifies the
values of certain “similarity dimensions” dimensions are derived from the software
specification include application type, size of application,
language used, etc. The project manager compares with
other “similar projects” for a final estimate
D1-L3
© GIMETO, LLC
25
Estimation by analogy (2)
Advantages Data is derived in an easily understandable way Complex domain-knowledge is not required, since
information depends on historical data Avoids problems commonly associated with
knowledge elicitation (i.e. erroneous estimation) Can be applied at a very early stage in production
D1-L3
© GIMETO, LLC
26
Estimation by analogy (3) Disadvantages You need a historical database that contains a large
variety of past projects The accuracy of this method is directly related to
the size and quality of the database available There is generally no guarantee that the historical
information about any specific project is completely accurate
Any inaccuracies contained in the historical data will have an effect on the estimation for the current project
D1-L3
© GIMETO, LLC
27
Experts judgment Expert judgment involves consulting with human experts
to use their experience and understanding of a proposed project to provide an estimate for the cost of the project. The expert can factor in differences between past
project experiences and requirements of the proposed project
The expert can also factor in project impacts caused by new technologies, applications, and languages
Expert judgment always compliments other estimation methodologies
the estimates are no better than the expertise and judgment of the expert (hard to document)
D1-L3
© GIMETO, LLC
28 Parametric Or Algorithmic Methods
The algorithmic method uses equations to create software estimates
Advantages: being able to generate repeatable results easily modifying input data easily refining and customizing formulas understanding of the estimating methods as
formulas can be analyzed
D1-L3
© GIMETO, LLC
29
Technique comparison
May overlook system level costs
Requires more effort
More detailed basis More stable Fosters individual commitments
Bottom-up
Less detailed basis Less stable
System level focus Efficient
Top-down
Generally produces large overruns.
Often gets the contract Price to win
Reinforces poor practice Correlates with some experience Parkinson’s Law
Level of experience Based on representative experience Analogy
No better than participants Biases, incomplete recall
Assessment of representative, interactions, exceptional circumstance
Expert judgment
Subjective inputs Assessment of exceptional
circumstances Calibrated to past, not future
Objective, repeatable, analyzable formula
Efficient, good for sensitivity analysis Objectively calibrated to experience
Algorithmic Model
Weakness Strengths Method
Rosso-Llopart ©2013 30
Case Study Discussion
Estimation as a Tool
Rosso-Llopart ©2013 31
Discussion Questions What are the major decisions that the manager
must make to help him with his estimation problem?
What would you have done differently if you were in the manager’s place?
What estimation techniques from the case can you identify that are being used?
What information about estimation did you gather that you did not already know?
Rosso-Llopart ©2013 32
Questions? Comments?
Rosso-Llopart ©2013 33
Improving your Estimation Techniques
Mel Rosso-Llopart Carnegie Mellon University
Rosso-Llopart ©2013 34
D2-L2
© GIMETO, LLC
34
As a reminder, an estimate is:
Estimate noun [C] “an approximate calculation or judgement of the size, value, amount, cost, etc. of something” Cambridge Dictionary
So how do we improve our approximations?
Historical Data of course…and therefore metrics.
Rosso-Llopart ©2013 35
Agenda
Metrics and Estimation Cost estimation revisited Process maturity
Rosso-Llopart ©2013 36
D2-L2
© GIMETO, LLC
36
Metrics and Estimation
As you decide on your estimation process Remember you need data for it You need to be able to teach it You need everyone to understand it
Or it will fail to be used and improve what you do
Rosso-Llopart ©2013 37
D2-L2
© GIMETO, LLC
37
Scope of Software Metrics
Software Metrics have two main fields of application: Measure/assessment of a software product
or process e.g. a baseline – where are we now
Estimation of critical features involved in a software project (e.g. a future estimate) …And the reason why we are looking at this topic
Rosso-Llopart ©2013 38
D2-L2
© GIMETO, LLC
38
Software Product/Process Measurement
An integral part of the Project Plan Aims to provide data which can be used to better
evaluate (control) the production of software “You cannot control what you cannot measure” Tom de Marco (1982)
Rosso-Llopart ©2013 39
D2-L2
© GIMETO, LLC
39
The Need for Software Metrics
Software Production suffers from Excessive Costs Low Productivity Poor Quality Lack of Standards, Professionalism Poor estimates of when, what and how much
Rosso-Llopart ©2013 40
D2-L2
© GIMETO, LLC
40
The Need for Software Metrics.... Software production suffers...because we
fail to: Set measurable targets Measure the ‘real’ costs in projects Quantify the quality
Understand when it is “good enough” Properly evaluate new tools and techniques Use our own estimates
Rosso-Llopart ©2013 41
Cost Estimation Process (Revisited)
Cost Estimation Process
Effort
Cost
Schedule
Size Estimator
Size Product Specs
Complexity Constraints Personnel Skill Environment
Size Drivers
Historical Data
Project Estimate
Project Actuals
Rosso-Llopart ©2013 42
D2-L2
© GIMETO, LLC
42
Cost Estimation Process
To estimate the Cost of a system We can better know the cost if we know the size
of the system Typical size measures are: LOC – Lines of Code FP – Function Points
Rosso-Llopart ©2013 43
D2-L2
© GIMETO, LLC
43
Software Size and Complexity Estimating/Measuring Software Size Measures must be:
Useful for planning Precise Automatically countable
Estimate must be: Available early in the life-cycle
Estimation of Effort Requires system complexity understanding
For example: COCOMO II
Rosso-Llopart ©2013 44
D2-L2
© GIMETO, LLC
44
Software Metrics & Process Maturity
Critical activities for a mature process Set goals Measure progress Evaluate whether the goals have been met
Metrics provide input for planning measure the developed product measure the development process
Rosso-Llopart ©2013 45
D2-L2
© GIMETO, LLC
45
Define
Appropriate metrics for your group Keep in mind that data collection costs money Rule of thumb < 3% of project cost
Create a place to save data properly Make it a habit to use data early and often in
projects “Take care of schedule and budget will take
care of itself” Adtranz project binder cover
Rosso-Llopart ©2013 46
D2-L2
© GIMETO, LLC
46
Summary
You should be able to define what metrics are appropriate for software projects to improve future estimates
Understand the need for estimates at many times during the software development projects
Rosso-Llopart ©2013 47
Questions? Comments?
Rosso-Llopart ©2013 48
Wrap Up
Software Estimation Concepts (Agile) Other Estimation techniques Improving your estimation
Rosso-Llopart ©2013 49
Software Estimation Concepts Summary
What an estimate is and what it is not. The basic estimation techniques for Agile
− Planning poker − Time boxing
How to use the estimation data Concept of relative size estimation
Rosso-Llopart ©2013 50
Other Estimation Techniques Summary
Function points – Father of many techniques − Use case Points − Object points
None unit based estimation Analogy estimation Expert Judgement Algorithmic modeling
− Cocomo, Slim, others
Rosso-Llopart ©2013 51
Improving your estimation Summary
Using metrics and historical data to improve estimation
What are good metrics What do you look for in estimation techniques Who should the data be for
Rosso-Llopart ©2013 52
Questions? Comments?
Rosso-Llopart ©2013 53
References
Mike Cohn, “Agile Estimation and Planning”, Prentice Hall, 2006.
Watts Humphrey, “Introduction to the Personal Software Process”, Addison-Wesley, 1997.
Steve McConnell, “Software Estimation Demystifying the Black Art”, Microsoft press, 2006.