AGENDA

Page 3: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

3

AGENDA

Page 4: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

4

AGENDA

Page 5: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

5

AGENDA

Page 6: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

6

AGENDA

Page 7: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

7

AGENDA

Page 8: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

8

AGENDA

Page 9: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

9

AGENDA

Page 10: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

10

AGENDA

Page 11: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

11

AGENDA

Page 12: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

12

AGENDA

Page 13: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

13

AGENDA

Page 14: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Prepared By:

City of Ithaca

Asset Management Plan Storm Sewer Collection System

December 2019 16M0145

14

AGENDA

Page 15: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Plan City of Ithaca

Page i

Utility Information

Utility Name: Storm Sewer Address: 129 W. Emerson Street

Ithaca, MI 48847 Phone Number: (989) 875-3200 Email: [email protected]

Personnel

Contact Person: Jamey Conn Title: City Manager Email: [email protected] Contact Person: Barbara Fandell Title: Clerk-Treasurer Email: [email protected]

Contact Person: Bob Studt Title: Director of Public Works Email: [email protected] Contact Person: Aaron Wendzel Title: Professional Engineer Email: [email protected]

15

AGENDA

Page 16: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Plan City of Ithaca

Page ii

TABLE OF CONTENTS

I. Introduction .......................................................................................................................................... 1

A. Mission Statement ............................................................................................................................ 1

B. Storm Sewer System ......................................................................................................................... 1

II. Asset Inventory ..................................................................................................................................... 1

A. Collection .......................................................................................................................................... 1

1. Sewer ............................................................................................................................................ 2

2. Manholes ...................................................................................................................................... 3

III. Level of Service ................................................................................................................................. 4

IV. Critical Assets .................................................................................................................................... 5

A. Probability of Failure ......................................................................................................................... 5

B. Criticality of Asset ............................................................................................................................. 6

C. Consequence of Failure..................................................................................................................... 7

V. Capital Improvement Project Plan ........................................................................................................ 8

A. 5-Year CIP .......................................................................................................................................... 8

B. 20-Year Plan .................................................................................................................................... 10

C. Intersection Drainage Assessment .................................................................................................. 11

VI. Revenue Structure .......................................................................................................................... 12

VII. Conclusion ....................................................................................................................................... 13

16

AGENDA

Page 17: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Plan City of Ithaca

Page iii

LIST OF TABLES

Table 1: Storm Sewer Inventory Summary ........................................................................................ 2

Table 2: NASSCO’s PACP Grading System .......................................................................................... 5

Table 3: Probability of Failure ............................................................................................................ 6

Table 4: Criticality of Asset ................................................................................................................. 7

Table 5: Consequence of Failure Rating ............................................................................................. 8

Table 6: 5-Year Capital Improvement Plan ........................................................................................ 9

Table 7: 20-Year Capital Improvement Plan Cost Opinion ................................................................ 10

Table 8: Intersection Improvement Cost Opinion ............................................................................. 11

ACRONYMS

AMP Asset Management Plan

CCTV Closed Circuit Televised

CIP Capital Improvement Plan

DPW Department of Public Works

EGLE Michigan Department of Environment, Great Lakes, and Energy

GPS Global Positioning System

MACP Manhole Assessment and Certification Program

NASSCO National Association of Sewer Service Companies

PACP Pipeline Assessment and Certification Program

17

AGENDA

Page 18: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Plan City of Ithaca

Page iv

LIST OF APPENDICES

Appendix A: Storm Sewer Inventory Maps

1. Exhibit 1A, 1B, 1C, and 1D – Storm Sewer Collection System Inventory Maps

2. Exhibit 2A, 2B, 2C, and 2D – Drainage Structure Inventory Maps

Appendix B: NASSCO Pipe Assessment Maps

1. Exhibit 3A, 3B, 3C, and 3D – Storm Sewer and Drainage Structure Condition Map

Appendix C: Inventory Assessment Spreadsheets

1. Storm Sewer Collection System Inventory Condition Assessment Summary

2. Drainage Structure Inventory Condition Assessment Summary

Appendix D: Storm System Improvement Maps

1. Exhibit 4A, 4B, 4C, and 4D – Storm System Improvement Maps

Appendix E: City Prioritization of Capital Funding and Financing Options

18

AGENDA

Page 19: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 1

Ap

pe

nd

ix

I. INTRODUCTION

In accordance with the Michigan Department of Environment, Great Lakes, and Energy (EGLE), the

City of Ithaca has prepared an Asset Management Plan (AMP) for its storm sewer system. The purpose

of the AMP is to define a method of cataloging, evaluating, and maintaining the system.

As part of this plan, the City of Ithaca has begun to have its storm sewer collection system analyzed

through the National Association of Sewer Service Companies (NASSCO) Assessment Programs.

Additional input on other aspects of the city’s collection system has been analyzed by the city’s

Department of Public Works (DPW) and independent engineers.

A. Mission Statement

The City of Ithaca is committed to providing its residents and customers with quality infrastructure

system that meet regulatory requirements and to providing excellent customer service in a timely

and cost-efficient manner.

B. Storm Sewer System

The city’s storm sewer system is a collection of pipes used to collect and transport water runoff.

All the water collected is then discharged to county drains. To maintain efficient flow, the city

plans to carry out a new storm system cleaning plan that would allow the pipe segments and catch

basins to be cleaned on a 4-year rotation. Maps (Exhibits 1A-1D and 2A-2D) depicting the assets

of the storm system can be found in Appendix A.

II. ASSET INVENTORY

The city’s storm system was independently investigated through a Closed Circuit Televised (CCTV)

survey in general accordance with the NASSCO pipe rating system (storm sewer) and Manhole

Assessment and Certification Program (MACP) Level 1 standards for the identification of features,

defects, and observations (manholes). The reports generated during these investigations were used

to develop an inventory of the city’s storm sewer assets.

A. Collection

The city’s storm sewer collection system totals 83,633 feet, with 977 drainage structures and is

composed of the following list of storm sewer pipe.

19

AGENDA

Page 20: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 2

Ap

pe

nd

ix

Table 1: Storm Sewer Inventory Summary

Storm Sewer

Diameter (in) Length (ft)

Percent

of Total

46

341 0.5% 2.5 0.5 0.2 1.5

41 2,030 2.5%

40 406 0.5%

36 145 0.2%

30 1,287 1.5%

24 3,202 3.8%

23

357 0.4%

21 936 1.1%

18 6,660 8%

15 4,886 5.8%

12

27,432 32.8%

10 5,858 7.0%

8

14,318 17.1%

6 15,314 18.3%

5 120 0.1%

4 341 0.4%

Total 83,633 100%

1. Sewer The primary focus of this portion of the AMP was to develop a storm sewer system map. The

goal of the project was to televise 100 percent of the storm collection system, however sewer

4 inches and less in diameter and some sections of failed pipes in the storm collection system

could not be fully surveyed. The independent survey videoed 83,633 feet of storm collection

system piping. An examination was performed on each gravity pipe televised with each defect

being rated and the condition of the pipe being assigned an overall rating.

Reviewing the storm sewer reports from the video survey shows the system is mostly in

working order with some areas requiring replacement. Issues can be seen ranging from debris

in the pipe to crushed pipe segments. The system shall be continually upgraded and

maintained with proper maintenance and planned improvements to work towards a properly

working system for the city.

20

AGENDA

Page 21: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 3

Ap

pe

nd

ix

2. Manholes

During televising procedures of the storm collection system, 919 (94 percent) of the city’s

storm manholes were evaluated in general accordance with the NASSCO’s MACP Level 1

inspection standards. As part of the evaluation, all storm manholes were Global Positioning

System (GPS) located and assigned structure numbers based on which quadrant of the city

they were located in. The remaining balance of manholes not inspected were inaccessible or

have been replaced in the last 20 years, and therefore a Level 1 inspection was not critical for

preparation of this report.

Most of the storm manholes throughout the city were found to be in relatively sound

condition. The primary maintenance needed for the manholes include repairs around pipe

penetrations. Other minor issues discovered were minor root intrusion, weeping, and

cleanup of some debris that has entered the structures.

21

AGENDA

Page 22: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 4

Ap

pe

nd

ix

III. LEVEL OF SERVICE

A robust storm system exists throughout the city and the best way to keep costs low and customers

satisfied is to maintain the existing system. Through periodic inspections and proactive repairs,

minimal interruption can be achieved, and costly system failures can be avoided.

The Ithaca DPW realizes that to maintain a positive relationship with residents and regulators, it must

maintain a knowledgeable staff. Keeping aware of the conditions of the storm system and up to date

with best management practices allows for problems that arise to be handled in a quick and effective

manner.

22

AGENDA

Page 23: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 5

Ap

pe

nd

ix

IV. CRITICAL ASSETS

Ideally, through regular maintenance and inspection, the storm system would continuously function

as designed. However, this is not always the case as unforeseen events can cause components of a

system to fail unexpectedly. The best way to help deter this from happening, while working within

budgetary means, is prioritizing maintenance and inspections on the areas of the system that would

have the most devastating effect upon failure.

Prioritization is based on the asset rating in probability of failure and criticality of the asset. These

two categories consider, asset condition, size of asset, and streets that the asset services. To develop

a comprehensive list of prioritized assets, a spreadsheet is maintained rating the condition, probability

of failure, and criticality of asset on a scale of 1 to 5. Multiplying these factors gives an individual

score for each asset’s consequence of failure; the higher the score, the more important it is to address

the issue.

A. Probability of Failure

Determining the probability of failure begins with determining the condition of the asset.

NASSCO’s Pipeline Assessment and Certification Program (PACP) and Manhole Assessment and

Certification Program (MACP) ratings are the primary focus for the ratings as they relate to the

pipe and manhole assets. These ratings are shown below in Table 2.

Table 2: NASSCO’s PACP Grading System

Severity Grade Description

5 Pipe segment has failed or will likely fail within the next five years - requires immediate attention.

4 Pipe segment has severe defects - risk of failure within the next five to ten years.

3 Pipe segment has moderate defects - deterioration may continue, at a ten to twenty-year timeframe.

2 Pipe segment has minor defects - pipe unlikely to fail for at least 20 years.

1 Pipe segment has minor defects - failure unlikely in the foreseeable future.

0 Pipe segment has no defects – failure unlikely in the foreseeable future.

The PACP grading system is utilized to determine each pipe segment’s score. The segment score

is made up of a four-digit number. The first number is the highest severity grade observed in the

pipe segment, the second number is the number of occurrences of which the highest severity

grade is observed, the third number is the second highest severity grade observed in the pipe

segment, and the fourth number is the number of occurrences of which the second highest

severity grade is observed. The NASSCO PACP grading segment score is then related to the

probability of failure utilizing four different scenarios.

23

AGENDA

Page 24: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 6

Ap

pe

nd

ix

• Condition assessment not performed

• Condition assessment performed and no defects were found

• Condition assessment performed and the highest severity defect observed occurred

less than nine times

• Condition assessment performed and the highest severity defect observed occurred

more than nine times

The four different scenarios allowed us to relate each pipe segments NASSCO PACP grade to a

probability of failure based on the severity and number of occurrences of the pipe’s defects. The

worse the condition, the more likely the asset is to fail. The asset’s probability of failure was rated

on a 1 to 5 scale with 1 meaning failure is improbable to 5 meaning failure is imminent (see Table

3).

Table 3: Probability of Failure

Performance Rating Description

5 Imminent – Likely to occur in the life of the item

4 Probable – Will occur several times in the life of an item

3 Occasional – Likely to occur at some time in the life of an item

2 Remote – Unlikely but possible to occur in the life of an item

1 Improbable – So unlikely, it can be assumed occurrence may not be experienced

Much of the City of Ithaca’s drainage structures and storm pipes have a probability of failure

performance rating of “1”, however 15 percent of the storm sewer assets have an imminent

probability of failure as can be seen from the asset inventory found in Appendix C. Of the assets

surveyed, 27,278 feet of storm garner a rating above 3. This accounts for approximately 33

percent of the storm system surveyed. All other aspects of the system have been rated with a

probability score of 3 or lower and have a relatively low probability of failure.

B. Criticality of Asset

The criticality of asset rating is most correlated to the asset’s size and location. These factors were

used to calculate the criticality of the asset with more weight being given to the asset’s size. Often

the type of sewer would also be considered (different types of trunk lines and leads) however the

City of Ithaca’s system is unique in that most of the city’s storm sewers outlet directly to county

drains. The county drains serve as the storm sewer trunk lines that convey most of the storm

water away from the city. Ratings of 1 represent an insignificant disruption to the system and

would correlate to an asset with a smaller diameter and outside of major roadways; where 5

would mean a catastrophic disruption, affecting a large diameter storm sewer that would be

within the footprint of a major roadway. Table 4 further shows the rating structure.

24

AGENDA

Page 25: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 7

Ap

pe

nd

ix

Table 4: Criticality of Asset

Performance Rating Description

5 Catastrophic Disruption

4 Major Disruption

3 Moderate Disruption

2 Minor Disruption

1 Insignificant Disruption

C. Consequence of Failure

Probability of failure and criticality of an asset determine its consequence of failure. Multiplying

the two factors together gives a numerical representation of the priority of individual assets.

Ranging from 1 to 25, importance is arranged so that ratings 1 through 8 are considered minor, 9

through 16 are important, and anything greater than 16 is critical. Appendix C shows the details

of the consequence of failure analysis for the storm sewer and drainage structures.

25

AGENDA

Page 26: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 8

Ap

pe

nd

ix

V. CAPITAL IMPROVEMENT PROJECT PLAN

Maintaining a municipal system means always planning for future needs. The storm sewer system is

no exception with growing and/or changing needs of the population it serves and the constant wear

and tear of the system it undergoes providing its service.

Understanding how the system functions and its condition is crucial to planning a Capital

Improvement Plan (CIP). This is then used to categorize each asset into one of the three categories

as can be seen in Table 5.

Table 5: Consequence of Failure Rating

Category Rating Description

Acceptable 1-8 Moderate Disruption

Protentional 20-Year Projects 9-16 Major Disruption

5-Year CIP 17-25 Catastrophic Disruption

An asset falling into the consequence rating of 1 to 8 represents that the asset’s failure is unlikely

and/or insignificant to the daily operation of the system. This puts the asset in the acceptable

category as in its current state; it does not demand attention. The next tier of 9 to 16 represents an

increase in the importance of the asset to the daily functioning of the system and/or deterioration of

that asset’s condition. Assets falling in this range are put in the 20-year plan since, based on its

consequence rating, it can be assumed that over the next 20 years it will continue to deteriorate and

need repair or replacement. If an asset falls into the 17 to 25 range, it represents the most

deteriorated and is critical to the continued operation of the system. The most severe ranked assets

make up the projects identified in the 5-year CIP. Assets found to have a consequence between 9-16

were identified as potential 20-year projects that the city should start budgeting for.

As the system continues to be monitored, investigated, and maintained, these ratings will need to be

updated to reflect the most recent needs of the community with assets able to be added, dropped,

or shifted as work is done and as demands determine.

Once the consequence of failure rating was derived and the assets were sorted into its prospective

categories, the work needed to improve these assets was determined. Using professional judgement,

each asset was evaluated to determine if it needed inspection, replacement, or repair and, if in need

of repair, what repair is required.

A. 5-Year CIP

Evaluated assets with a consequence of failure rating of 17 or greater typically make up the

projects proposed for the 5-year CIP. Fortunately for the city, there were only eleven storm sewer

segments and no storm manholes that fell into this category. After reviewing the televising

reports of the sections identified, each segment was given a recommended action and a cost

opinion was developed which is shown in Table 6. The cost opinions include work to replace the

storm system only and do not include other utilities. The work includes road patches, curb and

gutter replacement as required for manhole replacement, and storm sewer items.

26

AGENDA

Page 27: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 9

Ap

pe

nd

ix

The segments include 2,339 feet of storm sewer replacement, cleaning, or lining. A map (Exhibit

5A, 5B, 5C, and 5D) depicting the location of the storm segments improvements can be found in

Appendix D.

Table 6: 5-Year Capital Improvement Plan

Project

Number Pipe Segment

Existing

Dia. (in)

Proposed

Dia. (in) Recommended Action Cost Opinion

1 ST-NW-058_

ST-NW-059 12 12 Replace pipe segment $ 71,000

2

ST-NE-026_

RZ-838 12 12 Replace pipe segment

$ 216,000 ST-NE-026_

ST-NE-032 12 18 Replace pipe segment

ST-NE-032_

RZ-830 12 18 Replace pipe segment

3 ST-NE-040_

ST-NE-042 18 42 Replace pipe segment $ 107,000

4 ST-NE-173_

ST-NE-174 21 48 Replace pipe segment $ 37,000

5 ST-NE-210_

ST-NE-212 24 N/A

Clean sewer segment and fix tap

intrusion $ 18,000

6 ST-NE-244_

ST-NE-240 41 N/A

Clean sewer segment and line

sewer pipe $ 216,000

7 ST-NE-292_

ST-NE-031 18 24 Replace pipe segment $ 48,000

8 ST-NE-325_

ST-NE-071 15 48 Replace pipe segment $ 158,000

9 ST-SW-083_

ST-SW-097 24 N/A Fix Tap Intrusion $ 14,000

5-Year CIP Subtotal $ 885,000

Notes

1. Projects identified based on Consequence of Failure Rating

2. Cost Opinion determined from 2019 unit prices.

3. Cost Opinion determined on a project by project basis based on the recommended action. The costs include the minimal

replacement of roadways and curb and gutter to replace the storm structures and system. The costs do not include

engineering, survey, legal and administrative fees, or other incidental costs. The costs can vary based on fluctuation of

material prices.

27

AGENDA

Page 28: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 10

Ap

pe

nd

ix

B. 20-Year Plan

A consequence of failure between 9 and 16 qualifies an asset as a potential 20-year project. These

assets are important to the system’s operation that have fallen out of its prime condition. These

can vary from more deteriorated assets playing less critical roles in the system to less deteriorated

assets in critical roles. As assets fall into this category, the city will have time to budget for the

improvements. It is recommended that all replaced assets less than 12-inch diameter be upgraded

to 12-inch diameter. This is a standard that other governmental agencies have adopted and

provides a certain level of service to its customers.

Table 7 below shows the cost to replace storm sewer and manholes with a consequence of failure

between 9 and 16. The costs represent the price to replace the storm sewer assets with a

minimum diameter of 12 inch, or at its current size, and include budgets for engineering, legal,

and contingency costs. All storm sewer assets should be sized before they are constructed to

ensure their current size is adequate to provide the level of service intended. The costs assume

that the existing storm sewer will be replaced with new infrastructure and will be paired with road

improvement projects or are currently located outside the roadway, so road restoration is not

included. The costs are provided for planning purposes only and are in 2019 dollars. Actual costs

will be affected by a variety of factors, including prices at the time of construction, whether the

work is completed as a large project or several smaller ones, etc.

Table 7: 20-Year Capital Improvement Plan Cost Opinion

Storm Sewer

Existing Dia. (in) Length of Sewer Replacement (ft) Cost Opinion

6 5,141 $ 1,996,000

8 3,666 $ 1,422,000

10 2,552 $ 991,000

12 12,214 $ 4,707,000

15 2,648 $ 1,098,000

18 3,358 $ 1,665,000

24 565 $ 326,000

42 1,031 $ 1,131,000

48 1,046 $ 1,232,000

Manholes

Number of Manholes (ea) Cost Opinion

62 $354,000

20-Year CIP Subtotal $ 14,922,000 Notes

1. Pipe segments and manholes identified based on Consequence of Failure Rating.

2. Cost Opinion assumes that manholes are replaced separately from storm sewer replacement.

3. Cost Opinion determined from 2019 unit prices.

28

AGENDA

Page 29: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 11

Ap

pe

nd

ix

Any important issues that are discovered while maintaining the system should be added to this

plan. In addition, upgrades to the existing storm system should be considered an integral part of

any road improvement project. Ultimately the 20-year CIP needs to plan and budget for the

replacement of all storm sewers within a road improvement project.

C. Intersection Drainage Assessment

As part of the storm sewer analysis, we analyzed the roadway intersections without existing storm

sewer infrastructure to determine if storm sewer improvements were warranted. The analysis

utilized storm sewer inventory maps, contour data, client input, and images to determine if storm

sewer assets should be added. Table 8 below shows the intersections found to need storm sewer

assets.

Table 8: Intersection Improvement Cost Opinion

North/South

Road

East/West

Road

Improvement Summary Cost

Opinion

Brown St E. Center St 6 Dr Structures & 334 Ft of Storm Sewer $ 207,000

N Elm St W. Arcada St 4 Dr Structures & 420 Ft of Storm Sewer $ 162,000

Union St Westwind Ln 2 Dr Structures & 133 Ft of Storm Sewer $ 69,000

Union St E. Barber St 2 Dr Structures & 100 Ft of Storm Sewer $ 60,000

N Ithaca St E. North St 2 Dr Structures & 37 Ft of Storm Sewer $ 33,000

E Newark St S. Jeffery Ave 4 Dr Structures & 320 Ft of Storm Sewer $ 137,000

Intersection Improvement Subtotal $668,000

Notes

1. Cost Opinion determined from 2019 unit prices.

2. Cost Opinion determined on a project by project basis based on the recommended action. The costs

include the minimal replacement of roadways and curb and gutter to replace the storm structures and

system. The costs do not include engineering, survey, legal and administrative fees, or other incidental

costs. The costs can vary based on fluctuation of material prices.

29

AGENDA

Page 30: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 12

Ap

pe

nd

ix

VI. REVENUE STRUCTURE

It is important to the City of Ithaca to maintain and improve its assets. The city’s storm system is no

exception. However, storm sewer systems do not have a funding mechanism or rate structure that

fund its improvements, contrary to sanitary sewer and water systems that allow for a rate structure

to be calculated based on operating costs and usage. Most often funds for storm sewer improvements

are taken from the city’s road or general funds. The city was presented other funding options that it

could utilize to upgrade its storm system and a letter discussing their prioritization of funding options

is in Appendix E.

30

AGENDA

Page 31: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Page 13

Ap

pe

nd

ix

VII. CONCLUSION

Investigation and inventory of the City of Ithaca’s storm system assets lay the groundwork for the

successful management of the city’s storm system assets. Assessment of these assets has allowed

the city to understand the criticality of their assets and helped develop options for capital funding and

financing options to put forth a plan to generate funds for expenses related to the investigation,

maintenance, and replacement of the storm system in the future. This framework allows the City of

Ithaca to cost-effectively provide its services to the residents.

Extensive investigation and analysis show the city’s system to be in satisfactory condition overall.

However, deficiencies throughout the storm system were evident. These deficiencies have been

identified by showing the criticality of the assets to prioritize short and long-term needs.

The city has always strived to provide the best service for its community. This plan puts forth a

framework to allow the DPW to continue its work and provide the citizens of the city with the services

they expect in the most cost-effective manner.

31

AGENDA

Page 32: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Ap

pe

nd

ix

Appendix A: Storm Sewer Inventory Maps

1. Exhibit 1A, 1B, 1C, & 1D – Storm Sewer Collection System Inventory Maps

2. Exhibit 2A, 2B, 2C, & 2D – Drainage Structure Inventory Maps

32

AGENDA

Page 33: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

EW

ER

C

OL

LE

CT

IO

N S

YS

TE

M - E

XH

IB

IT

1

A

NO

RT

HW

ES

T Q

UA

D - S

EW

ER

L

AB

EL

1 4

33

AGENDA

Page 34: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

EW

ER

C

OL

LE

CT

IO

N S

YS

TE

M - E

XH

IB

IT

1

B

NO

RT

HE

AS

T Q

UA

D - S

EW

ER

L

AB

EL

2 4

34

AGENDA

Page 35: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

EW

ER

C

OL

LE

CT

IO

N S

YS

TE

M - E

XH

IB

IT

1

C

SO

UT

HW

ES

T Q

UA

D - S

EW

ER

L

AB

EL

3 4

35

AGENDA

Page 36: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

EW

ER

C

OL

LE

CT

IO

N S

YS

TE

M - E

XH

IB

IT

1

D

SO

UT

HE

AS

T Q

UA

D - S

EW

ER

L

AB

EL

4 4

36

AGENDA

Page 37: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

DR

AIN

AG

E S

TR

UC

TU

RE

IN

VE

NT

OR

Y M

AP

S- E

XH

IB

IT

2

A

NO

RT

HW

ES

T Q

UA

D - M

AN

HO

LE

L

AB

EL

1 4

37

AGENDA

Page 38: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

DR

AIN

AG

E S

TR

UC

TU

RE

IN

VE

NT

OR

Y M

AP

S- E

XH

IB

IT

2

B

NO

RT

HE

AS

T Q

UA

D - M

AN

HO

LE

L

AB

EL

2 4

38

AGENDA

Page 39: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

DR

AIN

AG

E S

TR

UC

TU

RE

IN

VE

NT

OR

Y M

AP

S- E

XH

IB

IT

2

C

SO

UT

HW

ES

T Q

UA

D - M

AN

HO

LE

L

AB

EL

3 4

39

AGENDA

Page 40: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

DR

AIN

AG

E S

TR

UC

TU

RE

IN

VE

NT

OR

Y M

AP

S- E

XH

IB

IT

2

D

SO

UT

HE

AS

T Q

UA

D - M

AN

HO

LE

L

AB

EL

4 4

40

AGENDA

Page 41: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Ap

pe

nd

ix

Appendix B: NASSCO Pipe Assessment Maps

1. Exhibit 3A, 3B, 3C, & 3D – Storm Sewer Condition Map

41

AGENDA

Page 42: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

EW

ER

C

ON

DIT

IO

N M

AP

- E

XH

IB

IT

3

A

NO

RT

HW

ES

T Q

UA

D - N

AS

SC

O P

IP

E A

SS

ES

SM

EN

T

1 4

42

AGENDA

Page 43: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

EW

ER

C

ON

DIT

IO

N M

AP

- E

XH

IB

IT

3

B

NO

RT

HE

AS

T Q

UA

D - N

AS

SC

O P

IP

E A

SS

ES

SM

EN

T

2 4

43

AGENDA

Page 44: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

EW

ER

C

ON

DIT

IO

N M

AP

- E

XH

IB

IT

3

C

SO

UT

HW

ES

T Q

UA

D - N

AS

SC

O P

IP

E A

SS

ES

SM

EN

T

3 4

44

AGENDA

Page 45: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

EW

ER

C

ON

DIT

IO

N M

AP

- E

XH

IB

IT

3

D

SO

UT

HE

AS

T Q

UA

D - N

AS

SC

O P

IP

E A

SS

ES

SM

EN

T

4 4

45

AGENDA

Page 46: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Ap

pe

nd

ix

Appendix C: Inventory Assessment Spreadsheets

1. Storm Sewer Collection System Inventory Condition Assessment Summary

2. Drainage Structure Inventory Condition Assessment Summary

46

AGENDA

Page 47: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureRZ-259 Washington Rd 0 2 0ST-NE-001 Center St 1 2 2ST-NE-002 Center St 3 4 12ST-NE-003 Center St 1 2 2ST-NE-004 Center St 1 3 3ST-NE-005 Center St 1 3 3ST-NE-006 Center St 1 3 3ST-NE-007 Center St 4 3 12ST-NE-008 Center St 2 3 6ST-NE-010 Center St 3 3 9ST-NE-013 Center St 1 2 2ST-NE-014 Emerson St 4 2 8ST-NE-015 Emerson St 5 2 10ST-NE-016 Center St 3 3 9ST-NE-017 Center St 2 3 6ST-NE-018 Barnes St 1 2 2ST-NE-019 Barnes St 5 2 10ST-NE-020 Center St 1 2 2ST-NE-021 Center St 3 2 6ST-NE-022 Center St 0 2 0ST-NE-024 Center St 1 3 3ST-NE-025 Center St 3 3 9ST-NE-026 Center St 5 2 10ST-NE-027 Union St 3 2 6ST-NE-028 Union St 5 2 10ST-NE-029 Union St 1 2 2ST-NE-030 Center St 1 2 2ST-NE-031 Nelson St 1 3 3ST-NE-032 Center St 1 3 3ST-NE-033 Center St 0 2 0ST-NE-034 Nelson St 1 2 2ST-NE-035 Nelson St 1 2 2ST-NE-036 Center St 2 2 4ST-NE-037 Center St 3 2 6ST-NE-038 Center St 4 2 8ST-NE-039 Center St 1 2 2ST-NE-040 Center St 4 3 12ST-NE-041 Center St 5 3 15ST-NE-042 Center St 4 3 12ST-NE-043 Center St 1 2 2ST-NE-044 Center St 5 2 10ST-NE-045 Catherine St 1 2 2ST-NE-046 Center St 4 3 12ST-NE-047 Center St 3 3 9ST-NE-048 Center St 0 2 0ST-NE-049 Center St 1 2 2ST-NE-050 Center St 3 2 6ST-NE-051 Center St 3 3 9ST-NE-052 Center St 3 2 6ST-NE-053 Center St 3 3 9

47

AGENDA

Page 48: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NE-054 Center St 1 2 2ST-NE-055 Commerce Dr 1 2 2ST-NE-056 Center St 1 2 2ST-NE-057 Center St 1 2 2ST-NE-058 Center St 3 3 9ST-NE-059 Center St 4 2 8ST-NE-060 Center St 1 2 2ST-NE-061 Center St 2 2 4ST-NE-063 Center St 2 2 4ST-NE-064 Center St 3 2 6ST-NE-065 Center St 3 2 6ST-NE-066 Center St 1 2 2ST-NE-067 Center St 1 2 2ST-NE-069 Industrial Pkwy 1 2 2ST-NE-070 Washington Rd 1 2 2ST-NE-071 Washington Rd 3 3 9ST-NE-072 Washington Rd 1 2 2ST-NE-073 Washington Rd 3 3 9ST-NE-074 Washington Rd 3 3 9ST-NE-075 Washington Rd 0 2 0ST-NE-076 Washington Rd 3 2 6ST-NE-077 Washington Rd 2 2 4ST-NE-078 Washington Rd 3 2 6ST-NE-079 Washington Rd 3 3 9ST-NE-080 Washington Rd 3 2 6ST-NE-081 Washington Rd 3 3 9ST-NE-082 Washington Rd 2 2 4ST-NE-083 Washington Rd 1 2 2ST-NE-084 Washington Rd 3 3 9ST-NE-085 Washington Rd 1 2 2ST-NE-086 Washington Rd 4 2 8ST-NE-087 Washington Rd 3 2 6ST-NE-088 Washington Rd 1 2 2ST-NE-089 Washington Rd 5 2 10ST-NE-090 Washington Rd 1 2 2ST-NE-091 Washington Rd 3 2 6ST-NE-092 Washington Rd 1 2 2ST-NE-093 Washington Rd 1 3 3ST-NE-094 Washington Rd 2 2 4ST-NE-095 Washington Rd 1 3 3ST-NE-096 Washington Rd 1 2 2ST-NE-097 Washington Rd 0 2 0ST-NE-098 Washington Rd 3 2 6ST-NE-099 Washington Rd 4 3 12ST-NE-100 Washington Rd 1 2 2ST-NE-101 Center St 4 2 8ST-NE-102 Washington Rd 5 2 10ST-NE-103 Washington Rd 1 2 2ST-NE-104 Washington Rd 0 2 0ST-NE-105 Washington Rd 0 2 0ST-NE-106 Washington Rd 0 2 0

48

AGENDA

Page 49: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NE-107 Washington Rd 1 2 2ST-NE-108 Washington Rd 5 2 10ST-NE-111 Catherine St 1 2 2ST-NE-112 Catherine St 1 2 2ST-NE-113 Catherine St 1 2 2ST-NE-114 Catherine St 1 2 2ST-NE-115 Catherine St 1 2 2ST-NE-116 Emerson St 1 2 2ST-NE-117 Emerson St 1 2 2ST-NE-118 Emerson St 2 2 4ST-NE-119 Emerson St 3 2 6ST-NE-120 Emerson St 1 2 2ST-NE-121 Emerson St 1 2 2ST-NE-122 Emerson St 3 2 6ST-NE-123 Union St 1 2 2ST-NE-124 Union St 1 2 2ST-NE-125 Union St 1 2 2ST-NE-126 Emerson St 1 2 2ST-NE-127 Barnes St 1 2 2ST-NE-128 Barnes St 1 2 2ST-NE-129 Barnes St 1 2 2ST-NE-130 Barnes St 1 2 2ST-NE-131 Emerson St 1 2 2ST-NE-132 Emerson St 1 2 2ST-NE-133 Emerson St 1 2 2ST-NE-134 St Johns St 3 2 6ST-NE-135 St Johns St 1 2 2ST-NE-136 St Johns St 2 2 4ST-NE-137 Emerson St 2 2 4ST-NE-138 Ithaca St 1 2 2ST-NE-139 Ithaca St 1 2 2ST-NE-140 Ithaca St 4 2 8ST-NE-141 Ithaca St 0 2 0ST-NE-142 Ithaca St 1 3 3ST-NE-143 Ithaca St 1 2 2ST-NE-144 Ithaca St 1 3 3ST-NE-145 Ithaca St 2 2 4ST-NE-146 Ithaca St 1 2 2ST-NE-147 Ithaca St 2 2 4ST-NE-148 St Johns St 1 2 2ST-NE-149 St Johns St 1 2 2ST-NE-150 St Johns St 3 2 6ST-NE-151 St Johns St 3 2 6ST-NE-152 North St 3 2 6ST-NE-153 North St 1 2 2ST-NE-154 North St 1 2 2ST-NE-155 Union St 1 2 2ST-NE-156 Union St 1 2 2ST-NE-157 Union St 4 2 8ST-NE-158 Union St 1 2 2ST-NE-159 North St 1 2 2ST-NE-160 North St 1 2 2ST-NE-161 North St 1 2 2

49

AGENDA

Page 50: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NE-162 Nelson St 1 2 2ST-NE-163 Nelson St 1 2 2ST-NE-164 North St 2 2 4ST-NE-165 North St 3 2 6ST-NE-166 North St 1 2 2ST-NE-167 North St 1 2 2ST-NE-168 Edgar St 1 2 2ST-NE-169 Edgar St 1 2 2ST-NE-170 North St 2 2 4ST-NE-171 North St 1 2 2ST-NE-172 North St 2 2 4ST-NE-173 Catherine St 1 2 2ST-NE-174 Catherine St 4 2 8ST-NE-175 Catherine St 2 2 4ST-NE-176 Alley Off Catherine 1 2 2ST-NE-177 Alley Off Catherine 2 2 4ST-NE-178 Alley Off Catherine 1 2 2ST-NE-179 Alley Off Catherine 1 2 2ST-NE-180 North St 2 2 4ST-NE-181 North St 5 3 15ST-NE-182 North St 1 2 2ST-NE-183 North St 2 2 4ST-NE-184 North St 2 2 4ST-NE-185 North St 1 2 2ST-NE-186 Avenue B 1 2 2ST-NE-187 Avenue B 1 2 2ST-NE-188 Avenue B 1 2 2ST-NE-189 Avenue A 1 3 3ST-NE-190 Avenue A 1 3 3ST-NE-191 Avenue A 2 2 4ST-NE-192 Alley Off Avenue A 1 2 2ST-NE-193 Alley Off Avenue A 1 2 2ST-NE-194 Alley Off Avenue A 1 2 2ST-NE-195 Alley Off Avenue A 1 2 2ST-NE-196 Alley Off Avenue A 1 2 2ST-NE-197 Alley Off Avenue A 1 2 2ST-NE-198 Alley Off Avenue A 1 2 2ST-NE-199 Alley Off Avenue A 3 2 6ST-NE-200 Avenue A 1 3 3ST-NE-201 Avenue A 5 2 10ST-NE-202 Avenue A 4 2 8ST-NE-203 Avenue A 1 2 2ST-NE-204 Industrial Pkwy 1 2 2ST-NE-205 Industrial Pkwy 4 2 8ST-NE-206 Industrial Pkwy 1 2 2ST-NE-207 Industrial Pkwy 1 2 2ST-NE-208 Avenue D 1 2 2ST-NE-209 Industrial Pkwy 1 2 2ST-NE-210 Industrial Pkwy 1 2 2ST-NE-211 Industrial Pkwy 2 2 4ST-NE-212 Industrial Pkwy 1 2 2ST-NE-213 Avenue C 1 2 2

50

AGENDA

Page 51: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NE-214 Industrial Pkwy 1 2 2ST-NE-215 Industrial Pkwy 1 2 2ST-NE-216 Industrial Pkwy 1 2 2ST-NE-217 Industrial Pkwy 1 2 2ST-NE-218 Industrial Pkwy 1 2 2ST-NE-219 Industrial Pkwy 3 2 6ST-NE-220 Avenue B 2 2 4ST-NE-221 Alley Off North 1 3 3ST-NE-222 Arcada St 0 2 0ST-NE-223 Alley Off North 1 3 3ST-NE-224 Alley Off North 2 2 4ST-NE-225 Alley Off North 1 2 2ST-NE-226 Arcada St 1 3 3ST-NE-227 Arcada St 1 2 2ST-NE-228 Arcada St 1 2 2ST-NE-229 Arcada St 1 2 2ST-NE-230 Arcada St 4 2 8ST-NE-231 Arcada St 1 2 2ST-NE-232 Arcada St 1 2 2ST-NE-233 Arcada St 1 3 3ST-NE-234 Arcada St 2 2 4ST-NE-235 Arcada St 1 2 2ST-NE-236 Arcada St 3 2 6ST-NE-237 Arcada St 2 2 4ST-NE-238 Arcada St 3 2 6ST-NE-240 Arcada St 1 2 2ST-NE-241 Arcada St 1 3 3ST-NE-242 Arcada St 1 2 2ST-NE-243 Arcada St 1 2 2ST-NE-244 Arcada St 1 3 3ST-NE-245 Arcada St 1 2 2ST-NE-246 Arcada St 1 4 4ST-NE-247 Arcada St 1 2 2ST-NE-248 Arcada St 1 2 2ST-NE-249 Ithaca St 1 2 2ST-NE-250 Ithaca St 2 2 4ST-NE-251 Ithaca St 1 2 2ST-NE-252 Seaver St 1 2 2ST-NE-253 Seaver St 1 2 2ST-NE-254 Seaver St 1 2 2ST-NE-255 Seaver St 1 2 2ST-NE-256 Seaver St 1 3 3ST-NE-257 Seaver St 2 4 8ST-NE-258 Seaver St 1 2 2ST-NE-259 Seaver St 1 2 2ST-NE-260 Ithaca St 1 2 2ST-NE-261 Ithaca St 1 2 2ST-NE-262 Alley Off Seaver 1 4 4ST-NE-263 Barber St 1 2 2ST-NE-264 Barber St 1 2 2ST-NE-265 Barber St 1 2 2ST-NE-266 Alley Off Seaver 1 2 2ST-NE-267 Alley Off Seaver 3 2 6

51

AGENDA

Page 52: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NE-268 Alley Off Seaver 5 2 10ST-NE-269 Alley Off Seaver 5 2 10ST-NE-270 Seaver St 1 2 2ST-NE-271 Alley Off Seaver 1 2 2ST-NE-272 Seaver St 1 2 2ST-NE-273 Seaver St 1 2 2ST-NE-274 Seaver St 3 2 6ST-NE-275 Union St 1 2 2ST-NE-276 Union St 1 2 2ST-NE-277 Union St 3 2 6ST-NE-278 Union St 1 2 2ST-NE-279 Union St 1 2 2ST-NE-284 Union St 1 2 2ST-NE-285 Union St 2 2 4ST-NE-286 Union St 1 2 2ST-NE-287 Center St 0 2 0ST-NE-289 Barnes St 0 2 0ST-NE-290 Center St 1 2 2ST-NE-291 Union St 0 2 0ST-NE-292 Nelson St 1 2 2ST-NE-293 Nelson St 0 2 0ST-NE-294 Center St 0 2 0ST-NE-295 Center St 1 3 3ST-NE-296 Center St 0 2 0ST-NE-297 Center St 0 2 0ST-NE-298 Dilts Rd 3 3 9ST-NE-299 Center St 3 2 6ST-NE-300 Washington Rd 0 2 0ST-NE-301 Washington Rd 1 2 2ST-NE-302 Washington Rd 3 2 6ST-NE-303 Washington Rd 3 2 6ST-NE-304 Emerson St 3 2 6ST-NE-305 Ithaca St 3 3 9ST-NE-306 Avenue A 5 3 15ST-NE-307 Industrial Pkwy 2 2 4ST-NE-308 Industrial Pkwy 3 2 6ST-NE-309 Industrial Pkwy 1 2 2ST-NE-310 Industrial Pkwy 5 2 10ST-NE-311 Industrial Pkwy 1 2 2ST-NE-312 Arcada St 3 2 6ST-NE-313 Arcada St 1 2 2ST-NE-314 Arcada St 2 2 4ST-NE-315 Arcada St 2 2 4ST-NE-316 Arcada St 1 2 2ST-NE-317 Arcada St 1 2 2ST-NE-318 Ithaca St 1 2 2ST-NE-319 Washington Rd 1 2 2ST-NE-320 Washington Rd 1 2 2ST-NW-001 Center St 1 2 2ST-NW-002 Center St 2 2 4ST-NW-004 Center St 1 2 2ST-NW-005 Center St 3 2 6

52

AGENDA

Page 53: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-006 Center St 2 3 6ST-NW-007 Center St 3 2 6ST-NW-008 Elm St 1 2 2ST-NW-009 Elm St 3 2 6ST-NW-010 Center St 1 3 3ST-NW-011 Center St 1 2 2ST-NW-012 Maple St 2 2 4ST-NW-013 Maple St 1 2 2ST-NW-014 Maple St 3 2 6ST-NW-015 Maple St 1 2 2ST-NW-016 Maple St 3 2 6ST-NW-017 Maple St 1 2 2ST-NW-018 Alley Off Center 3 2 6ST-NW-019 Alley Off Center 1 2 2ST-NW-020 Alley Off Center 1 2 2ST-NW-021 Alley Off Center 1 2 2ST-NW-022 Center St 0 2 0ST-NW-023 Center St 1 2 2ST-NW-024 Center St 5 2 10ST-NW-025 Center St 3 2 6ST-NW-026 Pine River St 2 2 4ST-NW-027 Center St 3 2 6ST-NW-030 Pine River St 1 2 2ST-NW-031 Pine River St 1 3 3ST-NW-035 Main St 4 2 8ST-NW-041 Alley Off Center 1 2 2ST-NW-052 Main St 0 2 0ST-NW-053 Main St 1 2 2ST-NW-054 Center St 1 2 2ST-NW-055 Center St 1 2 2ST-NW-057 Alley Off Main 1 2 2ST-NW-058 Main St 3 2 6ST-NW-059 Main St 2 3 6ST-NW-060 Main St 1 3 3ST-NW-061 Center St 2 3 6ST-NW-062 Alley Off Center 1 2 2ST-NW-063 Alley Off Center 1 2 2ST-NW-064 Center St 4 3 12ST-NW-065 Center St 2 2 4ST-NW-066 Center St 1 3 3ST-NW-067 Center St 1 2 2ST-NW-068 Jeffery St 5 2 10ST-NW-069 Jeffery St 2 2 4ST-NW-070 Center St 1 3 3ST-NW-071 Jeffery St 1 2 2ST-NW-072 Center St 1 3 3ST-NW-075 Emerson St 1 2 2ST-NW-076 Jeffery St 1 2 2ST-NW-077 Jeffery St 1 2 2ST-NW-078 Emerson St 1 2 2ST-NW-079 Emerson St 3 2 6ST-NW-080 Alley Off Emerson 1 2 2

53

AGENDA

Page 54: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-081 Emerson St 1 2 2ST-NW-082 Emerson St 1 2 2ST-NW-083 Emerson St 1 2 2ST-NW-084 Center St 3 2 6ST-NW-085 Main St 5 3 15ST-NW-086 Main St 1 2 2ST-NW-087 Main St 2 2 4ST-NW-088 Main St 1 3 3ST-NW-089 Main St 1 3 3ST-NW-090 Main St 1 2 2ST-NW-091 Main St 3 2 6ST-NW-092 Main St 2 2 4ST-NW-093 Main St 5 3 15ST-NW-094 Alley Off Emerson 1 2 2ST-NW-095 Emerson St 1 2 2ST-NW-096 Emerson St 4 3 12ST-NW-097 Emerson St 2 2 4ST-NW-098 Emerson St 2 2 4ST-NW-099 Emerson St 4 2 8ST-NW-100 Emerson St 5 2 10ST-NW-101 Emerson St 4 3 12ST-NW-102 Emerson St 3 3 9ST-NW-106 Pine River St 2 3 6ST-NW-107 Pine River St 1 2 2ST-NW-108 Pine River St 1 3 3ST-NW-109 Alley Off Emerson 1 2 2ST-NW-110 Emerson St 5 2 10ST-NW-111 Alley Off Emerson 1 2 2ST-NW-112 Emerson St 1 2 2ST-NW-113 Maple St 1 2 2ST-NW-114 Maple St 1 2 2ST-NW-115 Emerson St 1 2 2ST-NW-116 Emerson St 1 2 2ST-NW-117 Emerson St 2 2 4ST-NW-118 Emerson St 2 2 4ST-NW-119 Emerson St 1 2 2ST-NW-120 Emerson St 1 2 2ST-NW-121 Emerson St 1 2 2ST-NW-122 Emerson St 1 2 2ST-NW-123 Elm St 2 2 4ST-NW-124 Elm St 1 2 2ST-NW-125 Elm St 3 2 6ST-NW-126 Emerson St 1 2 2ST-NW-127 Emerson St 1 2 2ST-NW-128 North St 2 2 4ST-NW-129 North St 1 2 2ST-NW-130 North St 1 2 2ST-NW-131 Elm St 1 2 2ST-NW-132 Elm St 1 2 2ST-NW-133 North St 1 2 2ST-NW-134 North St 1 2 2ST-NW-135 North St 2 2 4

54

AGENDA

Page 55: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-136 Maple St 1 2 2ST-NW-137 Maple St 1 2 2ST-NW-138 Pine River St 1 3 3ST-NW-139 North St 1 2 2ST-NW-140 North St 1 2 2ST-NW-141 Pine River St 1 3 3ST-NW-142 Pine River St 3 2 6ST-NW-143 Pine River St 2 3 6ST-NW-145 Alley Off North 2 2 4ST-NW-146 Alley Off North 1 2 2ST-NW-147 Main St 1 2 2ST-NW-148 Main St 1 2 2ST-NW-149 North St 1 2 2ST-NW-151 Jeffery St 1 2 2ST-NW-152 Jeffery St 1 2 2ST-NW-153 Jeffery St 1 2 2ST-NW-155 North St 1 2 2ST-NW-156 North St 2 2 4ST-NW-157 North St 1 2 2ST-NW-158 Jeffery St 1 2 2ST-NW-159 Jeffery St 1 2 2ST-NW-160 North St 2 2 4ST-NW-161 Arcada St 3 2 6ST-NW-162 Main St 1 2 2ST-NW-163 Main St 1 2 2ST-NW-164 Arcada St 1 2 2ST-NW-165 Arcada St 1 2 2ST-NW-166 Arcada St 1 2 2ST-NW-167 Arcada St 1 2 2ST-NW-168 Arcada St 4 2 8ST-NW-169 Arcada St 3 2 6ST-NW-170 Pine River St 1 2 2ST-NW-171 Pine River St 1 2 2ST-NW-172 Arcada St 1 2 2ST-NW-173 Arcada St 1 2 2ST-NW-174 Arcada St 2 2 4ST-NW-175 Arcada St 1 2 2ST-NW-176 Arcada St 1 2 2ST-NW-177 Arcada St 1 2 2ST-NW-178 Elm St 1 2 2ST-NW-179 Elm St 1 2 2ST-NW-180 Elm St 1 2 2ST-NW-181 Elm St 1 2 2ST-NW-182 Seaver St 1 2 2ST-NW-183 Seaver St 1 2 2ST-NW-184 Seaver St 1 2 2ST-NW-185 Seaver St 1 2 2ST-NW-186 Seaver St 1 2 2ST-NW-187 Seaver St 1 2 2ST-NW-188 Seaver St 5 2 10ST-NW-189 Seaver St 1 2 2ST-NW-190 Seaver St 1 2 2ST-NW-191 Seaver St 1 2 2

55

AGENDA

Page 56: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-192 Seaver St 1 2 2ST-NW-193 Seaver St 1 2 2ST-NW-194 Pine River St 2 3 6ST-NW-195 Pine River St 1 3 3ST-NW-196 Seaver St 1 2 2ST-NW-197 Pine River St 2 2 4ST-NW-198 Pine River St 2 2 4ST-NW-199 Pine River St 1 3 3ST-NW-200 Seaver St 3 2 6ST-NW-201 Seaver St 1 2 2ST-NW-202 Seaver St 1 2 2ST-NW-203 Seaver St 2 2 4ST-NW-204 Seaver St 3 2 6ST-NW-205 Jeffery St 1 2 2ST-NW-206 Jeffery St 1 2 2ST-NW-207 Jeffery St 1 2 2ST-NW-208 Jeffery St 1 2 2ST-NW-209 Jeffery St 1 2 2ST-NW-210 Jeffery St 1 2 2ST-NW-211 Alley Off Barber 1 2 2ST-NW-212 Barber St 1 2 2ST-NW-213 Barber St 1 2 2ST-NW-214 Barber St 1 2 2ST-NW-215 Barber St 1 3 3ST-NW-216 Main St 1 2 2ST-NW-217 Main St 1 2 2ST-NW-218 Main St 1 2 2ST-NW-219 Main St 1 2 2ST-NW-220 Main St 1 2 2ST-NW-221 Pine River St 3 2 6ST-NW-222 Pine River St 2 3 6ST-NW-223 Pine River St 1 2 2ST-NW-224 Pine River St 1 2 2ST-NW-225 Pine River St 2 2 4ST-NW-226 Pine River St 1 2 2ST-NW-227 Pine River St 1 2 2ST-NW-228 Pine River St 1 3 3ST-NW-229 Pine River St 2 3 6ST-NW-230 Pine River St 5 2 10ST-NW-231 Pine River St 3 2 6ST-NW-232 Pine River St 1 2 2ST-NW-233 Pine River St 1 3 3ST-NW-234 Pine River St 5 2 10ST-NW-235 Pine River St 1 3 3ST-NW-236 Pine River St 1 2 2ST-NW-237 Pine River St 1 2 2ST-NW-238 Pine River St 1 3 3ST-NW-239 Pine River St 1 3 3ST-NW-240 Pine River St 1 2 2ST-NW-241 Pine River St 1 2 2ST-NW-242 Pine River St 1 2 2ST-NW-243 Pine River St 1 2 2

56

AGENDA

Page 57: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-244 Pine River St 2 3 6ST-NW-245 Pine River St 3 2 6ST-NW-246 Pine River St 1 2 2ST-NW-247 Arcada St 0 2 0ST-NW-248 Pine River St 1 2 2ST-NW-249 St Charles Rd 1 2 2ST-NW-250 St Charles Rd 1 2 2ST-NW-251 St Charles Rd 1 2 2ST-NW-252 Whispering Pines 4 2 8ST-NW-253 Norton Gibbs Dr 2 2 4ST-NW-254 Norton Gibbs Dr 1 2 2ST-NW-255 Norton Gibbs Dr 1 2 2ST-NW-256 Norton Gibbs Dr 1 2 2ST-NW-257 Norton Gibbs Dr 1 2 2ST-NW-258 Norton Gibbs Dr 1 2 2ST-NW-259 Norton Gibbs Dr 1 2 2ST-NW-260 Norton Gibbs Dr 1 2 2ST-NW-261 Norton Gibbs Dr 1 2 2ST-NW-262 Norton Gibbs Dr 1 2 2ST-NW-263 Alley Off Norton Gibbs 1 2 2ST-NW-264 Alley Off Norton Gibbs 1 2 2ST-NW-265 Norton Gibbs Dr 1 2 2ST-NW-266 Norton Gibbs Dr 1 2 2ST-NW-267 Norton Gibbs Dr 1 2 2ST-NW-268 Norton Gibbs Dr 3 2 6ST-NW-269 Norton Gibbs Dr 1 2 2ST-NW-270 Norton Gibbs Dr 1 2 2ST-NW-271 Norton Gibbs Dr 2 2 4ST-NW-272 Norton Gibbs Dr 2 2 4ST-NW-273 Norton Gibbs Dr 1 2 2ST-NW-274 Norton Gibbs Dr 1 2 2ST-NW-275 Norton Gibbs Dr 1 2 2ST-NW-276 Norton Gibbs Dr 3 2 6ST-NW-277 Norton Gibbs Dr 4 2 8ST-NW-278 Norton Gibbs Dr 1 2 2ST-NW-279 Norton Gibbs Dr 1 2 2ST-NW-280 Norton Gibbs Dr 1 2 2ST-NW-281 Westwind Ln 1 2 2ST-NW-282 Norton Gibbs Dr 1 2 2ST-NW-283 Norton Gibbs Dr 3 2 6ST-NW-284 Norton Gibbs Dr 1 2 2ST-NW-285 Norton Gibbs Dr 2 2 4ST-NW-286 Alley Off Norton Gibbs 4 2 8ST-NW-287 Norton Gibbs Dr 1 2 2ST-NW-288 Norton Gibbs Dr 1 2 2ST-NW-289 Norton Gibbs Dr 1 2 2ST-NW-290 Norton Gibbs Dr 1 2 2ST-NW-291 Norton Gibbs Dr 1 2 2ST-NW-292 Alley Off Norton Gibbs 2 2 4ST-NW-293 Norton Gibbs Dr 1 2 2ST-NW-294 Alley Off Norton Gibbs 1 2 2ST-NW-295 Alley Off Norton Gibbs 2 2 4ST-NW-296 Norton Gibbs Dr 1 2 2

57

AGENDA

Page 58: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-297 Norton Gibbs Dr 1 2 2ST-NW-298 Norton Gibbs Dr 3 2 6ST-NW-299 Norton Gibbs Dr 1 2 2ST-NW-300 Alley Off Norton Gibbs 1 2 2ST-NW-301 Alley Off Norton Gibbs 3 2 6ST-NW-302 Alley Off Norton Gibbs 3 2 6ST-NW-303 Alley Off Norton Gibbs 3 2 6ST-NW-304 Norton Gibbs Dr 1 2 2ST-NW-307 Norton Gibbs Dr 1 2 2ST-NW-308 Union St 1 2 2ST-NW-309 Union St 1 2 2ST-NW-310 Union St 1 2 2ST-NW-311 Union St 1 2 2ST-NW-313 Union St 2 2 4ST-NW-314 Union St 1 2 2ST-NW-315 Westwind Ln 1 2 2ST-NW-316 Westwind Ln 1 2 2ST-NW-317 Westwind Ln 1 3 3ST-NW-318 Westwind Ln 1 2 2ST-NW-319 Westwind Ln 1 2 2ST-NW-320 Leeward Ct 1 2 2ST-NW-321 Leeward Ct 1 2 2ST-NW-322 Leeward Ct 1 2 2ST-NW-323 Leeward Ct 2 2 4ST-NW-324 Leeward Ct 1 2 2ST-NW-325 Leeward Ct 3 2 6ST-NW-326 Leeward Ct 1 2 2ST-NW-327 Leeward Ct 1 2 2ST-NW-328 Leeward Ct 1 2 2ST-NW-329 Leeward Ct 1 2 2ST-NW-330 Westwind Ln 2 2 4ST-NW-331 Westwind Ln 5 2 10ST-NW-332 Westwind Ln 1 2 2ST-NW-333 Westwind Ln 1 2 2ST-NW-334 Westwind Ln 2 3 6ST-NW-335 Westwind Ln 4 3 12ST-NW-336 Westwind Ln 4 2 8ST-NW-337 Westwind Ln 1 2 2ST-NW-338 Gale Ct 1 2 2ST-NW-339 Gale Ct 2 2 4ST-NW-340 Westwind Ln 1 2 2ST-NW-341 Westwind Ln 0 2 0ST-NW-342 Westwind Ln 0 2 0ST-NW-343 Westwind Ln 3 2 6ST-NW-344 Leeward Ct 1 2 2ST-NW-345 Leeward Ct 1 2 2ST-NW-346 Leeward Ct 1 2 2ST-NW-347 Leeward Ct 2 2 4ST-NW-348 Union St 5 2 10ST-NW-351 Barber St 1 2 2ST-NW-352 Barber St 2 2 4ST-NW-353 Barber St 1 3 3

58

AGENDA

Page 59: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-354 Barber St 2 2 4ST-NW-355 Alley Off Barber 1 3 3ST-NW-356 Center St 2 3 6ST-NW-357 Pine River St 0 2 0ST-NW-358 Pine River St 3 2 6ST-NW-359 Center St 1 2 2ST-NW-360 Emerson St 1 2 2ST-NW-361 Emerson St 3 3 9ST-NW-362 Pine River St 1 2 2ST-NW-363 Elm St 3 3 9ST-NW-364 Elm St 1 2 2ST-NW-365 Elm St 2 2 4ST-NW-367 Pine River St 1 2 2ST-NW-368 Jeffery Ave 2 2 4ST-NW-369 Arcada St 0 2 0ST-NW-370 Arcada St 0 2 0ST-NW-371 Seaver St 3 2 6ST-NW-373 At The School 4 3 12ST-NW-375 Barber St 0 2 0ST-NW-376 Arcada St 0 2 0ST-NW-377 Arcada St 0 2 0ST-NW-379 Pine River St 1 2 2ST-NW-380 Norton Gibbs Dr 0 2 0ST-NW-381 Norton Gibbs Dr 1 2 2ST-NW-382 Norton Gibbs Dr 1 2 2ST-NW-383 Westwind Ln 3 2 6ST-NW-384 Norton Gibbs Dr 1 2 2ST-NW-385 Norton Gibbs Dr 1 2 2ST-NW-386 Norton Gibbs Dr 1 2 2ST-NW-387 Norton Gibbs Dr 1 2 2ST-NW-388 Norton Gibbs Dr 1 2 2ST-NW-389 Norton Gibbs Dr 1 2 2ST-NW-390 Norton Gibbs Dr 1 2 2ST-NW-391 Union St 3 2 6ST-NW-392 Westwind Ln 2 2 4ST-NW-394 Arcada St 0 2 0ST-NW-395 Barber St 1 3 3ST-NW-396 Alley Off Barber 1 2 2ST-NW-397 Barber St 2 3 6ST-NW-398 Norton Gibbs Dr 1 2 2ST-NW-399 Norton Gibbs Dr 3 2 6ST-SE-001 Ithaca St 1 2 2ST-SE-002 Ithaca St 1 2 2ST-SE-003 Gwinner St 1 2 2ST-SE-004 Gwinner St 1 2 2ST-SE-005 Nelson St 1 2 2ST-SE-006 Nelson St 1 2 2ST-SE-007 Nelson St 1 2 2ST-SE-008 Center St 3 2 6ST-SE-009 Center St 3 2 6ST-SE-010 Brown St 1 2 2ST-SE-011 Newark St 1 2 2

59

AGENDA

Page 60: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-SE-012 Alley Off Brown 1 2 2ST-SE-013 Alley Off Brown 1 2 2ST-SE-014 Alley Off Brown 1 2 2ST-SE-015 Catherine St 3 2 6ST-SE-016 Catherine St 1 2 2ST-SE-017 Catherine St 2 2 4ST-SE-018 Catherine St 1 2 2ST-SE-019 Commerce Dr 1 2 2ST-SE-020 Commerce Dr 1 2 2ST-SE-021 Commerce Dr 1 2 2ST-SE-022 Alley Off Center 1 2 2ST-SE-023 Center St 1 2 2ST-SE-024 Commerce Dr 1 2 2ST-SE-026 Dilts Rd 2 2 4ST-SE-027 Dilts Rd 1 2 2ST-SE-028 Dilts Rd 2 2 4ST-SE-029 Dilts Rd 3 2 6ST-SE-030 Dilts Rd 3 2 6ST-SE-031 Dilts Rd 1 2 2ST-SE-032 Dilts Rd 1 2 2ST-SE-033 Washington Rd 1 2 2ST-SE-035 Croswell Rd 3 2 6ST-SE-036 Croswell Rd 1 2 2ST-SE-037 Dilts Rd 1 2 2ST-SE-038 Dilts Rd 1 2 2ST-SE-039 Dilts Rd 1 2 2ST-SE-040 Dilts Rd 1 2 2ST-SE-041 Dilts Rd 1 2 2ST-SE-042 Dilts Rd 1 2 2ST-SE-043 South St 3 3 9ST-SE-044 Commerce Dr 1 3 3ST-SE-045 Commerce Dr 1 2 2ST-SE-046 Commerce Dr 2 2 4ST-SE-047 Commerce Dr 1 2 2ST-SE-048 Catherine St 2 2 4ST-SE-049 Catherine St 1 2 2ST-SE-050 Newark St 1 2 2ST-SE-051 Catherine St 2 2 4ST-SE-052 Newark St 1 2 2ST-SE-053 Newark St 3 2 6ST-SE-054 Newark St 1 2 2ST-SE-055 Newark St 1 2 2ST-SE-056 Newark St 1 2 2ST-SE-057 Newark St 1 2 2ST-SE-058 Newark St 3 2 6ST-SE-059 Newark St 1 2 2ST-SE-060 Nelson St 1 2 2ST-SE-061 Nelson St 1 2 2ST-SE-062 Nelson St 1 2 2ST-SE-063 Nelson St 3 2 6ST-SE-064 Nelson St 1 2 2ST-SE-065 Newark St 1 2 2ST-SE-066 Newark St 1 2 2

60

AGENDA

Page 61: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-SE-067 Gwinner St 1 2 2ST-SE-070 Gwinner St 3 2 6ST-SE-071 Gwinner St 1 2 2ST-SE-072 Gwinner St 1 2 2ST-SE-079 Ithaca St 1 2 2ST-SE-080 Ithaca St 1 2 2ST-SE-081 Ithaca St 5 2 10ST-SE-082 Ithaca St 1 2 2ST-SE-083 Ithaca St 4 2 8ST-SE-084 Ithaca St 1 2 2ST-SE-085 Ithaca St 1 2 2ST-SE-086 Ithaca St 1 2 2ST-SE-087 Ithaca St 1 2 2ST-SE-088 Ithaca St 1 2 2ST-SE-089 St Johns St 1 2 2ST-SE-090 St Johns St 1 3 3ST-SE-091 St Johns St 1 2 2ST-SE-092 St Johns St 1 4 4ST-SE-093 St Johns St 1 2 2ST-SE-094 Gwinner St 1 2 2ST-SE-095 Gwinner St 2 2 4ST-SE-096 Gwinner St 1 2 2ST-SE-097 Gwinner St 1 2 2ST-SE-098 Gwinner St 1 2 2ST-SE-099 Gwinner St 1 2 2ST-SE-100 South St 1 2 2ST-SE-101 Nelson St 1 2 2ST-SE-102 Nelson St 1 2 2ST-SE-103 Nelson St 2 2 4ST-SE-104 Nelson St 3 2 6ST-SE-105 Nelson St 1 2 2ST-SE-106 Brown St 2 2 4ST-SE-107 Brown St 1 2 2ST-SE-108 Catherine St 2 2 4ST-SE-109 South St 1 2 2ST-SE-110 Brown St 4 2 8ST-SE-111 South St 0 2 0ST-SE-112 South St 1 2 2ST-SE-113 South St 1 2 2ST-SE-114 South St 1 2 2ST-SE-115 Meadow Ln 1 2 2ST-SE-116 Meadow Ln 1 2 2ST-SE-117 Meadow Ln 1 2 2ST-SE-119 St Johns St 2 4 8ST-SE-120 St Johns St 1 3 3ST-SE-121 St Johns St 1 3 3ST-SE-122 St Johns St 1 4 4ST-SE-123 St Johns St 3 5 15ST-SE-124 Ithaca St 2 3 6ST-SE-125 Ithaca St 1 2 2ST-SE-126 Ithaca St 2 2 4ST-SE-127 Ithaca St 2 2 4

61

AGENDA

Page 62: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-SE-128 Ithaca St 1 2 2ST-SE-129 Ithaca St 1 2 2ST-SE-130 St Johns St 1 3 3ST-SE-134 St Johns St 2 3 6ST-SE-135 St Johns St 2 2 4ST-SE-136 St Johns St 1 3 3ST-SE-137 St Johns St 1 2 2ST-SE-139 St Johns St 1 2 2ST-SE-140 St Johns St 1 3 3ST-SE-141 St Johns St 1 2 2ST-SE-146 Ithaca St 1 2 2ST-SE-147 Ithaca St 1 2 2ST-SE-148 Ithaca St 1 2 2ST-SE-149 St Johns St 2 3 6ST-SE-151 St Johns St 1 2 2ST-SE-154 St Johns St 3 3 9ST-SE-155 St Johns St 1 2 2ST-SE-156 Commerce Dr 1 2 2ST-SE-157 Commerce Dr 1 2 2ST-SE-158 Dilts Rd 3 2 6ST-SE-159 Dilts Rd 0 2 0ST-SE-160 Washington Rd 2 2 4ST-SE-161 Washington Rd 3 2 6ST-SE-162 Croswell Rd 0 2 0ST-SE-163 Dilts Rd 0 2 0ST-SE-164 Dilts Rd 3 2 6ST-SE-165 Dilts Rd 3 2 6ST-SE-166 Commerce Dr 0 2 0ST-SE-167 Commerce Dr 3 2 6ST-SE-168 Catherine St 1 2 2ST-SE-169 Nelson St 1 2 2ST-SE-170 Brown St 1 2 2ST-SE-171 Brown St 2 2 4ST-SE-172 South St 0 2 0ST-SE-173 Meadow Ln 3 2 6ST-SE-175 Meadow Ln 1 2 2ST-SE-176 Arcada St 0 2 0ST-SE-177 Ithaca St 1 2 2ST-SE-178 St Johns St 2 4 8ST-SE-179 Webster St 3 4 12ST-SW-001 Center St 1 2 2ST-SW-002 Center St 2 2 4ST-SW-003 Elm St 4 2 8ST-SW-004 Elm St 0 2 0ST-SW-005 Center St 1 2 2ST-SW-006 Maple St 1 2 2ST-SW-007 Maple St 1 2 2ST-SW-008 Newark St 1 2 2ST-SW-009 Newark St 2 2 4ST-SW-010 Alley Off Maple 1 2 2ST-SW-011 Newark St 2 2 4ST-SW-012 Newark St 5 2 10

62

AGENDA

Page 63: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-SW-013 Newark St 1 2 2ST-SW-014 Alley Off Maple 5 2 10ST-SW-015 Center St 1 2 2ST-SW-017 Newark St 1 2 2ST-SW-018 Newark St 1 2 2ST-SW-019 Newark St 1 2 2ST-SW-020 Newark St 1 2 2ST-SW-021 Newark St 3 2 6ST-SW-022 Newark St 1 2 2ST-SW-023 Newark St 1 2 2ST-SW-024 Newark St 4 2 8ST-SW-025 Newark St 1 2 2ST-SW-027 Main St 1 2 2ST-SW-028 Main St 2 2 4ST-SW-029 Main St 2 2 4ST-SW-030 Main St 1 2 2ST-SW-031 Main St 3 2 6ST-SW-032 Main St 3 3 9ST-SW-033 Main St 2 3 6ST-SW-034 Main St 1 2 2ST-SW-035 Main St 1 2 2ST-SW-036 Main St 1 2 2ST-SW-037 Main St 2 2 4ST-SW-038 Newark St 2 2 4ST-SW-039 Center St 1 2 2ST-SW-040 Center St 1 2 2ST-SW-041 Jeffery St 3 2 6ST-SW-042 Jeffery St 1 2 2ST-SW-043 Jeffery St 2 2 4ST-SW-044 South St 1 2 2ST-SW-046 South St 5 2 10ST-SW-047 Main St 3 2 6ST-SW-048 South St 4 2 8ST-SW-049 Main St 1 2 2ST-SW-050 South St 3 2 6ST-SW-051 South St 1 2 2ST-SW-052 South St 3 2 6ST-SW-053 South St 1 2 2ST-SW-054 Pine River St 1 2 2ST-SW-055 South St 1 2 2ST-SW-056 South St 1 2 2ST-SW-057 South St 1 2 2ST-SW-058 Pine River St 1 2 2ST-SW-059 Pine River St 4 2 8ST-SW-060 South St 5 2 10ST-SW-061 South St 1 2 2ST-SW-062 South St 1 2 2ST-SW-063 South St 1 2 2ST-SW-064 Maple St 3 2 6ST-SW-065 Maple St 0 2 0ST-SW-066 South St 5 2 10ST-SW-067 Maple St 1 2 2

63

AGENDA

Page 64: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-SW-068 Elm St 2 2 4ST-SW-069 Elm St 3 2 6ST-SW-070 Elm St 1 2 2ST-SW-071 Elm St 0 2 0ST-SW-072 South St 1 2 2ST-SW-073 Pine River St 1 2 2ST-SW-074 Pine River St 2 2 4ST-SW-075 Pine River St 2 2 4ST-SW-080 Pine River St 1 2 2ST-SW-081 Pine River St 1 2 2ST-SW-082 Pine River St 1 2 2ST-SW-083 Alley Off John St 1 2 2ST-SW-084 Alley Off South St 1 2 2ST-SW-085 Main St 2 2 4ST-SW-086 Main St 1 2 2ST-SW-087 Main St 1 2 2ST-SW-089 Main St 1 2 2ST-SW-090 Jeffery Ave 3 2 6ST-SW-091 Jeffery Ave 1 2 2ST-SW-092 Jeffery St 1 2 2ST-SW-093 Jeffery St 1 2 2ST-SW-094 Main St 1 2 2ST-SW-095 Main St 1 2 2ST-SW-096 Alley Off John St 1 2 2ST-SW-097 Alley Off John St 1 2 2ST-SW-098 Alley Off John St 1 2 2ST-SW-099 Maple St 1 2 2ST-SW-100 Elm St 2 2 4ST-SW-107 Main St 2 2 4ST-SW-108 Main St 1 2 2ST-SW-109 Main St 1 2 2ST-SW-110 Main St 5 2 10ST-SW-111 Main St 3 2 6ST-SW-112 Main St 2 2 4ST-SW-113 Jeffrey St 5 2 10ST-SW-114 Jeffery Ave 3 2 6ST-SW-115 Jeffrey St 3 2 6ST-SW-116 Jeffrey St 3 2 6ST-SW-117 Jeffrey St 3 2 6ST-SW-118 Jeffery Ave 3 2 6ST-SW-119 Jeffrey St 3 2 6ST-SW-120 Jeffrey St 1 2 2ST-SW-121 Jeffrey St 1 2 2ST-SW-122 Webster St 1 2 2ST-SW-123 Webster St 1 2 2ST-SW-124 Webster St 3 2 6ST-SW-125 Webster St 1 2 2ST-SW-126 Webster St 1 3 3ST-SW-127 Webster St 2 3 6ST-SW-128 Webster St 1 2 2ST-SW-129 Webster St 2 2 4ST-SW-130 Webster St 1 2 2

64

AGENDA

Page 65: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-SW-131 Webster St 1 2 2ST-SW-132 Webster St 1 2 2ST-SW-133 Webster St 1 2 2ST-SW-137 Elm St 1 2 2ST-SW-138 Elm St 1 2 2ST-SW-143 Elm St 1 2 2ST-SW-144 Arcada St 0 2 0ST-SW-145 Arcada St 0 2 0ST-SW-146 Center St 2 2 4ST-SW-148 Newark St 0 2 0ST-SW-149 Newark St 0 2 0ST-SW-150 Newark St 0 2 0ST-SW-151 Newark St 0 2 0ST-SW-152 Newark St 0 2 0ST-SW-153 Arcada St 0 2 0ST-SW-154 Meadow Ln 1 2 2ST-SW-155 Main St 1 2 2ST-SW-157 Pine River St 4 2 8ST-SW-158 Pine River St 1 2 2ST-SW-159 Pine River St 2 2 4ST-SW-161 Arcada St 0 2 0ST-SW-162 South St 2 2 4ST-SW-163 Arcada St 0 2 0ST-SW-164 Arcada St 0 2 0ST-SW-165 South St 1 2 2ST-SW-166 Arcada St 0 2 0ST-SW-167 Arcada St 0 2 0ST-SW-168 Arcada St 0 2 0ST-SW-169 Arcada St 0 2 0ST-SW-170 Jeffery Ave 3 2 6ST-SW-171 Pine River St 0 2 0ST-SW-172 Pine River St 2 2 4ST-SW-173 Elm St 1 2 2ST-SW-174 Main St 0 2 0ST-SW-175 Main St 0 2 0ST-SW-176 Jeffery Ave 0 2 0ST-SW-177 Jeffery Ave 0 2 0ST-SW-178 Webster St 0 2 0ST-SW-179 Elm St 0 2 0

65

AGENDA

Page 66: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureRZ-1048_ST-NW-129 Vitrified Clay Pipe Elm St 1 2 2RZ-1059_ST-NW-187 Vitrified Clay Pipe Maple St 1 2 2RZ-1072_ST-NW-184 Vitrified Clay Pipe Maple St 1 2 2RZ-108_ST-SE-012 Vitrified Clay Pipe Parking Lot Off Center 3 2 6RZ-1125_ST-NW-058 Vitrified Clay Pipe Main St 1 2 2RZ-113_ST-SE-059 Vitrified Clay Pipe Newark St 5 2 10RZ-1141_ST-NW-098 Vitrified Clay Pipe Emerson St 5 2 10RZ-124_ST-SW-038 Polyethylene Newark St 1 2 2RZ-143_ST-SW-096 Polypropylene Off Pine River St 5 2 10RZ-147_ST-SW-107 Vitrified Clay Pipe Off Webster St 1 3 3RZ-149_ST-SW-107 Concrete Pipe (non-reinforced) Off Webster St 5 3 15RZ-150_ST-SW-126 Vitrified Clay Pipe Webster St 2 3 6RZ-151_ST-SW-124 Vitrified Clay Pipe Webster St 1 3 3RZ-166_ST-SW-021 Concrete Pipe (non-reinforced) Newark St 5 3 15RZ-177_ST-SW-066 Vitrified Clay Pipe South St 1 2 2RZ-178_ST-SW-066 Vitrified Clay Pipe Maple St 3 3 9RZ-189_ST-SW-013 Polyethylene Newark St 1 2 2RZ-192_ST-SW-012 Polyethylene Newark St 1 2 2RZ-2_ST-SW-041 Vitrified Clay Pipe Jeffery Ave 3 2 6RZ-200_ST-NW-127 Polyvinyl Chloride Emerson St 1 2 2RZ-21_ST-SW-080 Polypropylene Pine River St 1 3 3RZ-211_ST-NW-019 Vitrified Clay Pipe Alley Off Center 1 2 2RZ-222_ST-NW-177 Polypropylene Arcada St 5 2 10RZ-223_ST-NW-177 Polypropylene Arcada St 5 2 10RZ-224_ST-NW-177 Polypropylene Arcada St 5 2 10RZ-226_ST-NW-131 Polypropylene Elm St 1 2 2RZ-236_ST-NE-261 Polypropylene Ithaca St 5 2 10RZ-246_ST-NE-119 Polyvinyl Chloride Emerson St 1 2 2RZ-249_ST-NE-174 Vitrified Clay Pipe Catherine St 5 3 15RZ-252_ST-NE-111 Polyethylene Catherine St 1 2 2RZ-277_ST-NE-204 Vitrified Clay Pipe Industrial Pkwy 5 2 10RZ-281_ST-NE-198 Polyvinyl Chloride Industrial Pkwy 2 2 4RZ-283_ST-NE-196 Polypropylene Industrial Pkwy 1 2 2RZ-287_ST-NE-201 Polyethylene Industrial Pkwy 1 2 2RZ-293_ST-NE-219 Polypropylene Industrial Pkwy 1 3 3RZ-295_ST-NE-218 Polypropylene Industrial Pkwy 4 2 8RZ-297_ST-NE-216 Polypropylene Industrial Pkwy 1 2 2RZ-299_ST-NE-213 Polypropylene Industrial Pkwy 5 3 15RZ-303_ST-NE-188 Concrete Pipe (non-reinforced) Avenue B 1 3 3RZ-307_ST-NW-418 Vitrified Clay Pipe Alley Off Emerson 3 3 9RZ-311_ST-NW-211 Polypropylene Easement Off Barber 4 2 8RZ-315_ST-NE-172 Polypropylene Easement Off North 4 2 8RZ-328_ST-NW-311 Concrete Pipe (non-reinforced) St Charles Rd 1 3 3RZ-34_ST-NW-242 Polyethylene Pine River St 4 3 12RZ-344_ST-NW-094 Concrete Pipe (non-reinforced) Emerson St 1 2 2RZ-375_ST-NE-020 Vitrified Clay Pipe Center St 5 3 15RZ-377_ST-NE-125 Vitrified Clay Pipe Union St 1 2 2RZ-397_ST-NE-157 Vitrified Clay Pipe Union St 5 2 10RZ-415_ST-NW-164 Vitrified Clay Pipe Arcada St 5 2 10RZ-418_ST-NW-201 Vitrified Clay Pipe Seaver St 2 2 4

66

AGENDA

Page 67: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureRZ-42_ST-SE-141 Polyethylene St Johns St 1 2 2RZ-420_ST-NW-201 Vitrified Clay Pipe Seaver St 3 2 6RZ-427_ST-NW-196 Concrete Pipe (non-reinforced) Emerson St 3 3 9RZ-433_ST-NW-220 Polypropylene Main St 1 2 2RZ-437_ST-NW-208 Vitrified Clay Pipe Jeffery Ave 5 2 10RZ-439_ST-NW-208 Vitrified Clay Pipe Jeffery Ave 1 2 2RZ-442_ST-NE-253 Polypropylene Seaver & Ithaca 5 2 10RZ-449_ST-NE-249 Polypropylene Ithaca St 4 2 8RZ-457_ST-NE-279 Concrete Pipe (non-reinforced) Union St 1 3 3RZ-460_ST-NE-270 Concrete Pipe (non-reinforced) Seaver St 1 2 2RZ-461_ST-NE-270 Concrete Pipe (non-reinforced) Seaver St 1 2 2RZ-468_ST-NW-230 Polyethylene Pine River St 1 2 2RZ-469_ST-NW-230 Polyethylene Pine River St 1 2 2RZ-472_ST-NW-234 Polyethylene Pine River St 1 2 2RZ-474_ST-NW-234 Polyethylene Pine River St 3 2 6RZ-475_ST-NW-233 Polypropylene Pine River St 1 2 2RZ-518_ST-NW-281 Other Westwind Ln 5 2 10RZ-519_ST-NW-281 Other Westwind Ln 5 2 10RZ-524_ST-NW-281 Polyvinyl Chloride Westwind Ln 1 2 2RZ-530_ST-NW-310 Vitrified Clay Pipe Union St 3 3 9RZ-533_ST-NW-308 Polypropylene Union St 4 2 8RZ-537_ST-NW-289 Polyethylene Norton Gibbs Dr 1 2 2RZ-54_ST-SE-100 Polyethylene South St 4 2 8RZ-546_ST-NW-261 Other Norton Gibbs Dr 3 2 6RZ-561_ST-NE-107 Polyethylene Washington Rd 1 4 4RZ-591_ST-NE-095 Concrete Pipe (non-reinforced) Washington Rd 1 3 3RZ-624_ST-SW-143 Vitrified Clay Pipe Off Pine River St 5 3 15RZ-66_ST-SE-020 Polyethylene Commerce Dr 1 2 2RZ-663_ST-SE-121 Concrete Pipe (non-reinforced) St Johns St 3 3 9RZ-670_ST-NE-057 Vitrified Clay Pipe Center St Parking Lot 1 3 3RZ-675_ST-NE-059 Vitrified Clay Pipe Center St 1 2 2RZ-694_ST-NE-142 Polypropylene Ithaca St 1 2 2RZ-695_ST-NE-142 Vitrified Clay Pipe Ithaca St 1 2 2RZ-710_ST-SE-104 Polyethylene Nelson St 1 3 3RZ-713_ST-SE-103 Vitrified Clay Pipe South St 3 3 9RZ-714_ST-SE-101 Vitrified Clay Pipe South St 1 2 2RZ-723_ST-SE-061 Polyethylene Newark St 1 2 2RZ-733_ST-SE-072 Vitrified Clay Pipe Gwinner St 1 2 2RZ-735_ST-SE-097 Polyethylene Gwinner St 1 2 2RZ-750_ST-NE-246 Vitrified Clay Pipe Arcada & St Johns 1 2 2RZ-783_ST-SE-008 Vitrified Clay Pipe Brown St 5 2 10RZ-828_ST-NW-156 Vitrified Clay Pipe North St 5 2 10RZ-83_ST-SE-039 Polyvinyl Chloride Dilts Rd 5 2 10RZ-840_ST-SE-006 Reinforced Concrete Pipe Nelson St 1 4 4RZ-843_ST-NE-038 Concrete Pipe (non-reinforced) Center St 1 3 3RZ-861_ST-SE-125 Polyethylene Ithaca St 1 2 2RZ-862_ST-SW-091 Vitrified Clay Pipe Jeffery Ave 4 3 12RZ-867_ST-SW-043 Vitrified Clay Pipe Jeffery Ave 5 2 10RZ-893_ST-SW-061 Vitrified Clay Pipe South St 1 2 2RZ-9_ST-NW-240 Polypropylene Easement Off Pine River 1 4 4

67

AGENDA

Page 68: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureRZ-902_ST-SW-100 Polypropylene Elm St 1 2 2RZ-903_ST-SW-100 Vitrified Clay Pipe Elm St 4 3 12RZ-904_ST-NW-147 Vitrified Clay Pipe North St 1 2 2RZ-905_ST-NW-156 Vitrified Clay Pipe North St 1 2 2RZ-906_ST-NE-151 Vitrified Clay Pipe North St 1 2 2RZ-907_ST-NE-153 Concrete Pipe (non-reinforced) North St 5 3 15RZ-908_ST-NE-152 Vitrified Clay Pipe Barnes St 4 2 8RZ-914_ST-NE-166 Polypropylene North St 4 2 8RZ-915_ST-NE-167 Vitrified Clay Pipe North St 1 3 3RZ-916_ST-NE-167 Polypropylene North St 1 2 2RZ-919_ST-SE-081 Vitrified Clay Pipe Ithaca St 1 2 2RZ-923_ST-NE-134 Vitrified Clay Pipe Emerson & St Johns 1 2 2RZ-926_ST-NE-149 Vitrified Clay Pipe St Johns St 4 3 12RZ-927_RZ-448 Polypropylene Jeffery Ave 5 2 10RZ-929_ST-NW-206 Vitrified Clay Pipe Jeffery Ave 5 2 10RZ-952_ST-NW-252 Vitrified Clay Pipe Whispering Pines 1 2 2RZ-957_ST-NW-249 Polyethylene St Charles Rd 1 2 2RZ-96_ST-SE-049 Polypropylene Newark St 5 2 10RZ-963_ST-NW-251 Vitrified Clay Pipe Main St 2 2 4RZ-969_ST-NW-014 Vitrified Clay Pipe Elm St 1 2 2RZ-98_ST-SE-049 Polyethylene Catherine St 1 2 2RZ-994_ST-NW-115 Polyethylene Emerson St 1 2 2RZ-996_ST-NW-116 Polyethylene Emerson St 1 2 2ST-NE-001_ST-NE-002 Polyethylene Center St 1 4 4ST-NE-002_RZ-335 Polyethylene Center St 1 4 4ST-NE-004_ST-NE-005 Polyethylene Center St 1 4 4ST-NE-005_ST-NE-006 Polyethylene Center St 1 4 4ST-NE-007_ST-NE-010 Polyethylene Center St 1 4 4ST-NE-017_ST-NE-126 Vitrified Clay Pipe Barnes St 5 3 15ST-NE-018_ST-NE-288 Vitrified Clay Pipe Barnes St 4 2 8ST-NE-019_ST-NE-289 Vitrified Clay Pipe Barnes St 2 2 4ST-NE-020_ST-NE-024 Concrete Pipe (non-reinforced) Center St 4 4 16ST-NE-021_ST-NE-022 Concrete Pipe (non-reinforced) Center St 4 3 12ST-NE-022_ST-NE-020 Polyethylene Center St 1 4 4ST-NE-024_ST-NE-025 Reinforced Concrete Pipe Center St 2 4 8ST-NE-025_ST-NE-026 Concrete Pipe (non-reinforced) Center St 4 4 16ST-NE-025_ST-NE-031 Vitrified Clay Pipe Union St 3 4 12ST-NE-026_RZ-838 Vitrified Clay Pipe Center St 5 4 20ST-NE-026_ST-NE-032 Concrete Pipe (non-reinforced) Center St 5 4 20ST-NE-027_RZ-379 Vitrified Clay Pipe Union St 1 2 2ST-NE-028_ST-NE-029 Vitrified Clay Pipe Union St 1 2 2ST-NE-031_ST-NE-036 Reinforced Concrete Pipe Center St 3 4 12ST-NE-032_RZ-830 Concrete Pipe (non-reinforced) Center St 5 4 20ST-NE-033_ST-NE-031 Concrete Pipe (non-reinforced) Center St 1 4 4ST-NE-034_ST-NE-033 Vitrified Clay Pipe Jeffery Ave 1 3 3ST-NE-034_ST-NE-035 Vitrified Clay Pipe Nelson St 1 2 2ST-NE-035_ST-NE-118 Vitrified Clay Pipe Nelson St 5 2 10ST-NE-036_ST-NE-038 Concrete Pipe (non-reinforced) Center St 4 4 16ST-NE-038_ST-NE-040 Concrete Pipe (non-reinforced) Center St 4 4 16ST-NE-039_ST-NE-038 Concrete Pipe (non-reinforced) Center St 1 3 3

68

AGENDA

Page 69: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NE-040_ST-NE-042 Concrete Pipe (non-reinforced) Center St 5 4 20ST-NE-041_ST-NE-040 Concrete Pipe (non-reinforced) Center St 2 4 8ST-NE-042_ST-NE-046 Concrete Pipe (non-reinforced) Center St 3 4 12ST-NE-043_ST-NE-042 Concrete Pipe (non-reinforced) Center St 1 4 4ST-NE-045_ST-NE-296 Polyethylene Catherine St 1 3 3ST-NE-046_ST-NE-053 Concrete Pipe (non-reinforced) Center St 3 4 12ST-NE-048_ST-NE-046 Concrete Pipe (non-reinforced) Center St 3 4 12ST-NE-049_ST-NE-297 Vitrified Clay Pipe Center St 1 4 4ST-NE-050_ST-NE-051 Concrete Pipe (non-reinforced) Center St 1 4 4ST-NE-051_ST-NE-052 Reinforced Concrete Pipe Center St 1 3 3ST-NE-052_ST-NE-054 Reinforced Concrete Pipe Center St 1 4 4ST-NE-054_ST-NE-061 Concrete Pipe (non-reinforced) Center St 2 3 6ST-NE-056_ST-NE-054 Concrete Pipe (non-reinforced) Washington Rd 1 4 4ST-NE-057_ST-NE-056 Reinforced Concrete Pipe Center St Parking Lot 1 3 3ST-NE-059_ST-NE-060 Concrete Pipe (non-reinforced) Center St 3 4 12ST-NE-060_ST-NE-061 Concrete Pipe (non-reinforced) Center St 1 3 3ST-NE-061_ST-NE-066 Concrete Pipe (non-reinforced) Dilts & Center 1 3 3ST-NE-064_ST-NE-065 Concrete Pipe (non-reinforced) Dilts Rd 3 4 12ST-NE-065_ST-NE-066 Concrete Pipe (non-reinforced) Dilts Rd 1 3 3ST-NE-066_ST-NE-298 Concrete Pipe (non-reinforced) Dilts & Center 2 3 6ST-NE-067_ST-NE-066 Concrete Pipe (non-reinforced) Dilts & Center 5 3 15ST-NE-068_ST-NE-064 Concrete Pipe (non-reinforced) Industrial Pkwy 1 3 3ST-NE-071_ST-NE-077 Concrete Pipe (non-reinforced) Center St 3 4 12ST-NE-072_ST-NE-074 Concrete Pipe (non-reinforced) Dilts & Center 1 3 3ST-NE-075_ST-NE-074 Concrete Pipe (non-reinforced) Center St 1 4 4ST-NE-076_ST-NE-075 Concrete Pipe (non-reinforced) Center St 5 3 15ST-NE-077_ST-NE-081 Concrete Pipe (non-reinforced) Center St 3 4 12ST-NE-078_ST-NE-085 Concrete Pipe (non-reinforced) Center St 1 3 3ST-NE-079_ST-NE-078 Concrete Pipe (non-reinforced) Washington Rd 1 3 3ST-NE-080_ST-NE-079 Concrete Pipe (non-reinforced) Center St 2 4 8ST-NE-081_ST-NE-088 Concrete Pipe (non-reinforced) Center St 4 4 16ST-NE-085_ST-NE-090 Concrete Pipe (non-reinforced) Center St 1 3 3ST-NE-086_ST-NE-084 Concrete Pipe (non-reinforced) Center St 1 4 4ST-NE-087_ST-NE-086 Concrete Pipe (non-reinforced) Center St 1 3 3ST-NE-088_ST-NE-090 Concrete Pipe (non-reinforced) Center St 3 4 12ST-NE-089_ST-NE-088 Concrete Pipe (non-reinforced) Washington Rd 1 3 3ST-NE-090_ST-NE-092 Concrete Pipe (non-reinforced) Center St 3 3 9ST-NE-091_ST-NE-090 Concrete Pipe (non-reinforced) Center St 1 3 3ST-NE-095_ST-NE-300 Concrete Pipe (non-reinforced) Washington Rd 1 4 4ST-NE-096_ST-NE-097 Concrete Pipe (non-reinforced) Center St 1 3 3ST-NE-098_ST-NE-099 Concrete Pipe (non-reinforced) Washington Rd 1 4 4ST-NE-099_RZ-587 Polypropylene Washington Rd 5 2 10ST-NE-102_ST-NE-303 Polyethylene Washington Rd 1 3 3ST-NE-107_ST-NE-108 Polyethylene Washington Rd 3 4 12ST-NE-111_ST-NE-115 Vitrified Clay Pipe Catherine St 5 2 10ST-NE-112_ST-NE-113 Polypropylene Emerson St 3 2 6ST-NE-113_ST-NE-114 Polypropylene Emerson St 1 2 2ST-NE-114_ST-NE-174 Vitrified Clay Pipe Catherine St 5 3 15ST-NE-115_ST-NE-175 Vitrified Clay Pipe Catherine St 5 2 10ST-NE-116_RZ-231 Polypropylene Emerson St 1 2 2

69

AGENDA

Page 70: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NE-116_RZ-248 Polypropylene Emerson St 1 2 2ST-NE-117_ST-NE-118 Polyethylene Nelson St 1 2 2ST-NE-118_ST-NE-119 Vitrified Clay Pipe Emerson St 4 3 12ST-NE-119_ST-NE-114 Vitrified Clay Pipe Emerson St 5 3 15ST-NE-121_ST-NE-119 Polyethylene Emerson St 5 2 10ST-NE-122_ST-NE-120 Polyethylene Emerson St 2 3 6ST-NE-123_ST-NE-122 Vitrified Clay Pipe Emerson St 5 2 10ST-NE-124_RZ-378 Vitrified Clay Pipe Union St 5 2 10ST-NE-125_ST-NE-124 Vitrified Clay Pipe Union St 3 2 6ST-NE-126_RZ-375 Polypropylene Emerson & Barnes 5 3 15ST-NE-126_RZ-376 Polyethylene Emerson St 1 3 3ST-NE-128_ST-NE-126 Polyethylene Emerson St 1 3 3ST-NE-129_RZ-374 Vitrified Clay Pipe Barnes St 3 2 6ST-NE-130_ST-NE-129 Vitrified Clay Pipe Barnes St 1 2 2ST-NE-131_ST-NE-128 Polyethylene Emerson St 1 3 3ST-NE-132_ST-NE-133 Vitrified Clay Pipe Emerson St 1 2 2ST-NE-133_ST-NE-134 Vitrified Clay Pipe Emerson & St Johns 1 2 2ST-NE-133_ST-NE-326 Polypropylene Emerson St 5 2 10ST-NE-134_ST-NE-135 Polypropylene St Johns St 2 2 4ST-NE-135_ST-NE-136 Polypropylene St Johns St 5 3 15ST-NE-136_ST-NE-149 Polypropylene St Johns St 4 2 8ST-NE-140_ST-NE-139 Polyvinyl Chloride Ithaca St 4 2 8ST-NE-141_ST-NE-140 Polyvinyl Chloride Ithaca St 1 2 2ST-NE-142_ST-NE-144 Vitrified Clay Pipe Ithaca St 3 3 9ST-NE-143_ST-NE-142 Polypropylene Ithaca St 1 2 2ST-NE-144_ST-NE-136 Vitrified Clay Pipe Ithaca St 4 3 12ST-NE-146_ST-NE-142 Concrete Pipe (non-reinforced) Ithaca St 4 3 12ST-NE-148_ST-NE-150 Polypropylene St Johns St 1 3 3ST-NE-149_ST-NE-148 Polypropylene St Johns St 1 3 3ST-NE-150_ST-NE-151 Polypropylene St Johns St 1 3 3ST-NE-151_ST-NE-152 Polypropylene North St 5 2 10ST-NE-151_ST-NE-244 Polypropylene Arcada St 1 3 3ST-NE-153_ST-NE-154 Polyethylene North St 5 2 10ST-NE-154_ST-NE-158 Vitrified Clay Pipe North St 1 3 3ST-NE-155_ST-NE-157 Vitrified Clay Pipe Union St 1 2 2ST-NE-156_ST-NE-155 Reinforced Concrete Pipe Union St 1 2 2ST-NE-157_ST-NE-158 Vitrified Clay Pipe North St 5 3 15ST-NE-158_ST-NE-159 Vitrified Clay Pipe North St 5 3 15ST-NE-159_ST-NE-160 Polyethylene North St 4 3 12ST-NE-160_ST-NE-165 Vitrified Clay Pipe North St 5 3 15ST-NE-161_ST-NE-160 Polypropylene North St 1 2 2ST-NE-162_ST-NE-163 Polyvinyl Chloride Nelson St 1 3 3ST-NE-163_ST-NE-230 Polyvinyl Chloride Nelson St 2 3 6ST-NE-165_ST-NE-166 Vitrified Clay Pipe North St 4 3 12ST-NE-166_ST-NE-171 Polyethylene Catherine St 5 3 15ST-NE-167_ST-NE-170 Vitrified Clay Pipe North St 3 3 9ST-NE-168_ST-NE-168A Polyvinyl Chloride Edgar St 1 3 3ST-NE-169_ST-NE-168 Polyvinyl Chloride Edgar St 1 3 3ST-NE-170_RZ-917 Concrete Pipe (non-reinforced) Catherine St 5 3 15ST-NE-171_ST-NE-173 Polyethylene Catherine St 4 3 12

70

AGENDA

Page 71: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NE-172_ST-NE-171 Polypropylene Easement Off North 4 2 8ST-NE-173_ST-NE-174 Vitrified Clay Pipe Catherine St 5 4 20ST-NE-175_ST-NE-174 Vitrified Clay Pipe Catherine St 5 3 15ST-NE-178_RZ-245 Polypropylene Easement Off Avenue A 3 3 9ST-NE-178_ST-NE-175 Vitrified Clay Pipe Catherine St 4 3 12ST-NE-178_ST-NE-179 Concrete Pipe (non-reinforced) Easement Off Avenue A 1 3 3ST-NE-179_ST-NE-173 Reinforced Concrete Pipe Avenue B 1 4 4ST-NE-179_ST-NE-180 Reinforced Concrete Pipe Avenue B 1 5 5ST-NE-180_ST-NE-181 Reinforced Concrete Pipe Avenue A 1 5 5ST-NE-181_ST-NE-189 Reinforced Concrete Pipe Avenue A 1 5 5ST-NE-182_ST-NE-183 Polyethylene North St 1 3 3ST-NE-182_ST-NE-306 Polyethylene North & Avenue A 1 3 3ST-NE-183_ST-NE-171 Polyethylene North St 1 3 3ST-NE-185_ST-NE-182 Polypropylene Avenue A 4 2 8ST-NE-186_ST-NE-187 Polypropylene Avenue B 1 3 3ST-NE-187_ST-NE-189 Concrete Pipe (non-reinforced) Avenue B 3 3 9ST-NE-188_ST-NE-187 Concrete Pipe (non-reinforced) Avenue B 2 3 6ST-NE-189_ST-NE-190 Reinforced Concrete Pipe Avenue A 1 5 5ST-NE-190_ST-NE-200 Reinforced Concrete Pipe Avenue A 3 5 15ST-NE-191_ST-NE-192 Polypropylene Off Industrial Pkwy 1 3 3ST-NE-192_ST-NE-193 Polypropylene Off Industrial Pkwy 1 3 3ST-NE-193_ST-NE-194 Polypropylene Off Industrial Pkwy 1 3 3ST-NE-194_ST-NE-195 Polypropylene Off Industrial Pkwy 1 3 3ST-NE-196_ST-NE-195 Polypropylene Off Industrial Pkwy 1 3 3ST-NE-197_ST-NE-195 Polyvinyl Chloride Industrial Pkwy 1 4 4ST-NE-197_ST-NE-198 Polyvinyl Chloride Industrial Pkwy 1 4 4ST-NE-198_ST-NE-199 Polyvinyl Chloride Industrial Pkwy 1 4 4ST-NE-199_ST-NE-209 Polyvinyl Chloride Industrial Pkwy 1 4 4ST-NE-200_ST-NE-308 Reinforced Concrete Pipe Avenue A 1 5 5ST-NE-201_ST-NE-200 Concrete Pipe (non-reinforced) Industrial Pkwy 1 3 3ST-NE-202_ST-NE-200 Concrete Pipe (non-reinforced) Industrial Pkwy 3 3 9ST-NE-203_ST-NE-200 Concrete Pipe (non-reinforced) Industrial Pkwy 1 3 3ST-NE-204_ST-NE-329 Vitrified Clay Pipe Industrial Pkwy 1 3 3ST-NE-205_ST-NE-204 Vitrified Clay Pipe Industrial Pkwy 1 3 3ST-NE-206_ST-NE-203 Polyethylene Industrial Pkwy 1 2 2ST-NE-207_ST-NE-309 Polyethylene Industrial Pkwy 1 2 2ST-NE-208_ST-NE-206 Polyethylene Industrial Pkwy 5 2 10ST-NE-209_ST-NE-210 Polyvinyl Chloride Industrial Pkwy 1 4 4ST-NE-210_ST-NE-212 Reinforced Concrete Pipe Industrial Pkwy 5 4 20ST-NE-213_ST-NE-212 Concrete Pipe (non-reinforced) Industrial Pkwy 2 3 6ST-NE-214_ST-NE-212 Concrete Pipe (non-reinforced) Industrial Pkwy 1 3 3ST-NE-215_ST-NE-212 Polypropylene Industrial Pkwy 5 3 15ST-NE-216_ST-NE-217 Polypropylene Off Industrial Pkwy 1 2 2ST-NE-217_ST-NE-214 Vitrified Clay Pipe Industrial Pkwy 4 3 12ST-NE-218_RZ-296 Polypropylene Industrial Pkwy 2 2 4ST-NE-219_ST-NE-215 Polypropylene Industrial Pkwy 1 3 3ST-NE-220_RZ-300 Polypropylene Avenue B 1 2 2ST-NE-221_ST-NE-185 Reinforced Concrete Pipe Avenue B 3 5 15ST-NE-222_ST-NE-223 Concrete Pipe (non-reinforced) Easement Off Avenue A 1 3 3ST-NE-223_ST-NE-221 Reinforced Concrete Pipe Arcada St 1 5 5

71

AGENDA

Page 72: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NE-224_ST-NE-223 Reinforced Concrete Pipe Arcada St 1 5 5ST-NE-225_RZ-320 Polypropylene Edgar St 5 2 10ST-NE-226_ST-NE-169 Polyvinyl Chloride Edgar St 1 3 3ST-NE-226_ST-NE-224 Concrete Pipe (non-reinforced) Easement Off Edgar 3 5 15ST-NE-228_ST-NE-226 Concrete Pipe (non-reinforced) Easement Off Edgar 2 3 6ST-NE-229_ST-NE-226 Reinforced Concrete Pipe Arcada St 1 5 5ST-NE-230_ST-NE-229 Polyvinyl Chloride Arcada St 1 3 3ST-NE-231_ST-NE-229 Concrete Pipe (non-reinforced) Arcada St 1 3 3ST-NE-232_ST-NE-229 Concrete Pipe (non-reinforced) Arcada St 1 3 3ST-NE-233_ST-NE-155 Polypropylene Union St 5 2 10ST-NE-233_ST-NE-229 Reinforced Concrete Pipe Arcada St 2 5 10ST-NE-233_ST-NE-235 Reinforced Concrete Pipe Union St 1 3 3ST-NE-234_ST-NE-233 Vitrified Clay Pipe Union St 1 3 3ST-NE-238_ST-NE-233 Reinforced Concrete Pipe Union St 1 3 3ST-NE-240_ST-NE-241 Concrete Pipe (non-reinforced) Arcada St 1 3 3ST-NE-242_ST-NE-241 Concrete Pipe (non-reinforced) Arcada St 1 3 3ST-NE-243_ST-NE-244 Concrete Pipe (non-reinforced) Arcada St 1 3 3ST-NE-244_ST-NE-240 Reinforced Concrete Pipe Arcada St 4 5 20ST-NE-245_ST-NE-244 Concrete Pipe (non-reinforced) Arcada St 1 3 3ST-NE-246_ST-NE-244 Reinforced Concrete Pipe Arcada St 1 5 5ST-NE-247_ST-NE-246 Concrete Pipe (non-reinforced) Arcada & St Johns 1 3 3ST-NE-248_ST-NE-246 Polypropylene Arcada St 1 2 2ST-NE-248_ST-NE-247 Polypropylene Arcada & St Johns 1 3 3ST-NE-249_RZ-450 Polypropylene Ithaca St 5 2 10ST-NE-249_ST-NE-318 Polypropylene Ithaca St 1 2 2ST-NE-250_ST-NE-249 Polypropylene Ithaca St 5 2 10ST-NE-252_RZ-442 Polypropylene Seaver St 5 2 10ST-NE-253_ST-NE-255 Polypropylene Seaver St 1 3 3ST-NE-254_ST-NE-253 Polypropylene Seaver & Ithaca 1 3 3ST-NE-255_ST-NE-256 Polypropylene Seaver St 1 3 3ST-NE-256_ST-NE-257 Reinforced Concrete Pipe Seaver St 3 5 15ST-NE-257_ST-NE-246 Reinforced Concrete Pipe Arcada St 3 5 15ST-NE-257_ST-NE-259 Concrete Pipe (non-reinforced) Maple St 1 3 3ST-NE-258_ST-NE-257 Vitrified Clay Pipe Maple St 1 3 3ST-NE-261_ST-NE-255 Polypropylene Ithaca & Seaver 4 3 12ST-NE-261_ST-NE-262 Vitrified Clay Pipe Ithaca St 5 2 10ST-NE-262_ST-NE-256 Reinforced Concrete Pipe Seaver St 1 5 5ST-NE-262_ST-NE-266 Vitrified Clay Pipe Ithaca St 3 3 9ST-NE-263_RZ-237 Vitrified Clay Pipe Barber St 1 2 2ST-NE-263_ST-NW-353 Reinforced Concrete Pipe Barber St 1 2 2ST-NE-264_ST-NE-265 Vitrified Clay Pipe Barber & Ithaca 3 2 6ST-NE-266_ST-NE-267 Vitrified Clay Pipe Union St 5 2 10ST-NE-267_ST-NE-268 Polyethylene Union St 2 2 4ST-NE-268_ST-NE-269 Polyethylene Union St 1 2 2ST-NE-269_ST-NE-272 Vitrified Clay Pipe Seaver St 2 3 6ST-NE-270_ST-NE-269 Concrete Pipe (non-reinforced) Seaver St 1 3 3ST-NE-271_ST-NE-270 Polyvinyl Chloride Union St 1 2 2ST-NE-272_ST-NE-274 Vitrified Clay Pipe Seaver St 5 3 15ST-NE-274_ST-NE-275 Vitrified Clay Pipe Off Seaver Dr 1 3 3ST-NE-275_ST-NE-275A Vitrified Clay Pipe Union St 3 3 9

72

AGENDA

Page 73: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NE-275_ST-NE-276 Vitrified Clay Pipe Union St 3 3 9ST-NE-276_ST-NE-279 Vitrified Clay Pipe Union St 3 3 9ST-NE-277_ST-NE-276 Vitrified Clay Pipe Union St 2 2 4ST-NE-279_ST-NE-234 Vitrified Clay Pipe Union St 5 3 15ST-NE-286_ST-NE-334 Vitrified Clay Pipe Union St 1 2 2ST-NE-288_ST-NE-019 Vitrified Clay Pipe Barnes St 1 2 2ST-NE-291_ST-NE-028 Polyethylene Union St 1 3 3ST-NE-292_ST-NE-031 Reinforced Concrete Pipe Center St 5 4 20ST-NE-292_ST-NE-032 Concrete Pipe (non-reinforced) Nelson St 1 3 3ST-NE-294_ST-NE-038 Concrete Pipe (non-reinforced) Center St 1 4 4ST-NE-295_ST-NE-040 Concrete Pipe (non-reinforced) Center St 4 4 16ST-NE-299_ST-NE-077 Polyvinyl Chloride Center St 1 2 2ST-NE-301_ST-NE-098 Polyethylene Washington Rd 1 3 3ST-NE-302_ST-NE-100 Polyethylene Washington Rd 1 3 3ST-NE-304_ST-NE-122 Reinforced Concrete Pipe Emerson St 5 3 15ST-NE-305_ST-NE-142 Vitrified Clay Pipe Ithaca St 5 3 15ST-NE-307_ST-NE-191 Polypropylene Off Industrial Pkwy 1 2 2ST-NE-309_ST-NE-204 Polyethylene Industrial Pkwy 1 2 2ST-NE-310_ST-NE-205 Reinforced Concrete Pipe Industrial Pkwy 3 3 9ST-NE-311_ST-NE-207 Polypropylene Industrial Pkwy 5 2 10ST-NE-312_ST-NE-223 Polypropylene Easement Off Avenue A 1 3 3ST-NE-317_ST-NE-248 Polypropylene Arcada St 1 2 2ST-NE-320_ST-NE-319 Polyethylene Washington Rd 1 3 3ST-NE-321_ST-NE-024 Concrete Pipe (non-reinforced) Center St 3 4 12ST-NE-322_ST-NE-029 Vitrified Clay Pipe Union St 3 2 6ST-NE-323_ST-NE-039 Polyethylene Center St 1 3 3ST-NE-324_ST-NE-059 Polyvinyl Chloride Center St 1 2 2ST-NE-325_ST-NE-071 Concrete Pipe (non-reinforced) Center St 5 4 20ST-NE-327_ST-NE-134 Polypropylene St Johns St 1 3 3ST-NE-328_ST-NE-190 Concrete Pipe (non-reinforced) Avenue A 1 4 4ST-NE-330_ST-NE-217 Vitrified Clay Pipe Industrial Pkwy 3 3 9ST-NE-331_ST-NE-219 Polypropylene Industrial Pkwy 1 3 3ST-NE-332_ST-NE-260 Vitrified Clay Pipe Ithaca St 5 2 10ST-NE-333_ST-NE-267 Polyethylene Union St 1 2 2ST-NE-335_ST-NE-312 Polypropylene Easement Off Avenue B 1 3 3ST-NW-004_ST-NW-356 Vitrified Clay Pipe Elm St 3 3 9ST-NW-006_ST-NW-010 Vitrified Clay Pipe Elm St 3 3 9ST-NW-007_ST-NW-009 Vitrified Clay Pipe Elm St 3 3 9ST-NW-009_ST-NW-010 Vitrified Clay Pipe Elm St 3 3 9ST-NW-010_RZ-1012 Vitrified Clay Pipe Elm St 3 3 9ST-NW-010_RZ-1015 Vitrified Clay Pipe Elm St 1 4 4ST-NW-013_ST-NW-012 Vitrified Clay Pipe Elm St 1 3 3ST-NW-014_ST-NW-012 Vitrified Clay Pipe Elm St 2 3 6ST-NW-015_ST-NW-014 Polypropylene Elm St 1 2 2ST-NW-018_ST-NW-019 Vitrified Clay Pipe Parking Lot West 0F Pine River4 2 8ST-NW-019_ST-NW-023 Vitrified Clay Pipe Parking Lot West 0F Pine River4 2 8ST-NW-023_RZ-939 Vitrified Clay Pipe Center St 3 3 9ST-NW-054_ST-NW-402 Polyethylene Main St 1 2 2ST-NW-057_ST-NW-058 Vitrified Clay Pipe Main St 1 4 4ST-NW-058_ST-NW-059 Vitrified Clay Pipe Main St 5 4 20

73

AGENDA

Page 74: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-062_RZ-338 Polyvinyl Chloride Center St Parking Lot 2 2 4ST-NW-062_ST-NW-061 Polyvinyl Chloride Center St Parking Lot 1 4 4ST-NW-064_ST-SW-041 Vitrified Clay Pipe Jeffery Ave 5 3 15ST-NW-070_ST-NE-002 Polyethylene Center St 1 4 4ST-NW-075_ST-NW-076 Polyethylene Jeffery Ave 5 2 10ST-NW-084_ST-NW-085 Vitrified Clay Pipe Main St 4 2 8ST-NW-084_ST-NW-089 Reinforced Concrete Pipe Main St 1 3 3ST-NW-085_RZ-353 Reinforced Concrete Pipe Main St 3 3 9ST-NW-086_ST-NW-085 Vitrified Clay Pipe Main St 1 2 2ST-NW-088_ST-NW-085 Reinforced Concrete Pipe Main St 4 3 12ST-NW-089_ST-NW-093 Reinforced Concrete Pipe Main St 1 3 3ST-NW-090_ST-NW-091 Vitrified Clay Pipe Main St 1 2 2ST-NW-091_ST-NW-089 Reinforced Concrete Pipe Main St 1 3 3ST-NW-092_ST-NW-089 Vitrified Clay Pipe Main St 1 3 3ST-NW-093_ST-NW-088 Vitrified Clay Pipe Emerson St 1 3 3ST-NW-094_ST-NW-088 Vitrified Clay Pipe Westwind Ln 5 3 15ST-NW-095_ST-NW-096 Vitrified Clay Pipe Emerson St 1 2 2ST-NW-096_ST-NW-094 Concrete Pipe (non-reinforced) Emerson St 4 3 12ST-NW-097_ST-NW-095 Vitrified Clay Pipe Emerson St 1 3 3ST-NW-098_RZ-1140 Vitrified Clay Pipe Emerson St 1 2 2ST-NW-100_ST-NW-099 Concrete Pipe (non-reinforced) Emerson St 1 3 3ST-NW-101_ST-NW-096 Vitrified Clay Pipe Emerson St 4 4 16ST-NW-102_ST-NW-101 Concrete Pipe (non-reinforced) Emerson St 1 3 3ST-NW-106_ST-NW-101 Concrete Pipe (non-reinforced) Emerson St 1 4 4ST-NW-107_ST-NW-108 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-NW-108_ST-NW-106 Concrete Pipe (non-reinforced) Pine River St 3 3 9ST-NW-108_ST-NW-141 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-NW-109_RZ-214 Polypropylene Alley Off Emerson 1 2 2ST-NW-110_RZ-220 Vitrified Clay Pipe Emerson St 1 2 2ST-NW-111_RZ-216 Vitrified Clay Pipe Newark St 1 2 2ST-NW-113_RZ-221 Vitrified Clay Pipe Maple St 1 2 2ST-NW-113_ST-NW-112 Vitrified Clay Pipe Maple St 5 2 10ST-NW-114_RZ-1006 Polypropylene Maple And Emerson 1 2 2ST-NW-114_ST-NW-117 Vitrified Clay Pipe Emerson & Maple 3 2 6ST-NW-115_RZ-205 Polypropylene Emerson St 4 2 8ST-NW-116_ST-NW-115 Polyethylene Emerson St 1 2 2ST-NW-119_ST-NW-122 Polypropylene Elm St 1 2 2ST-NW-122_ST-NW-121 Polyethylene Emerson St 1 2 2ST-NW-122_ST-NW-124 Polypropylene Elm St 1 2 2ST-NW-123_ST-NW-124 Polypropylene Elm St 5 2 10ST-NW-124_ST-NW-125 Vitrified Clay Pipe Elm St 1 2 2ST-NW-125_ST-NW-364 Vitrified Clay Pipe Elm St 3 2 6ST-NW-126_ST-NW-403 Vitrified Clay Pipe Emerson St 3 3 9ST-NW-127_ST-NW-126 Polypropylene Emerson St 3 3 9ST-NW-129_ST-NW-130 Vitrified Clay Pipe Elm St 1 2 2ST-NW-129_ST-NW-132 Vitrified Clay Pipe Elm St 1 2 2ST-NW-130_ST-NW-132 Vitrified Clay Pipe Elm St 1 2 2ST-NW-131_ST-NW-130 Vitrified Clay Pipe Elm St 5 2 10ST-NW-133_ST-NW-129 Concrete Pipe (non-reinforced) North St 4 2 8ST-NW-134_ST-NW-133 Vitrified Clay Pipe North St 1 2 2

74

AGENDA

Page 75: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-135_ST-NW-137 Polypropylene North St 1 2 2ST-NW-136_ST-NW-135 Vitrified Clay Pipe North St 1 2 2ST-NW-139_ST-NW-138 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-NW-140_ST-NW-139 Concrete Pipe (non-reinforced) North St 1 3 3ST-NW-141_ST-NW-138 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-NW-141_ST-NW-142 Concrete Pipe (non-reinforced) North St 1 3 3ST-NW-146_RZ-404 Polyethylene Emerson St 1 2 2ST-NW-146_ST-NW-145 Polypropylene Ithaca St 1 2 2ST-NW-147_ST-NW-148 Vitrified Clay Pipe North St 1 2 2ST-NW-148_ST-NW-157 Polypropylene North St 4 2 8ST-NW-151_ST-NW-153 Polyethylene Jeffery Ave 1 2 2ST-NW-152_ST-NW-153 Concrete Pipe (non-reinforced) Jeffery Ave 3 3 9ST-NW-153_ST-NE-142 Vitrified Clay Pipe Jeffery Ave 4 3 12ST-NW-155_RZ-827 Vitrified Clay Pipe Jeffery Ave 5 2 10ST-NW-155_ST-NW-156 Concrete Pipe (non-reinforced) North St 3 3 9ST-NW-156_ST-NW-157 Concrete Pipe (non-reinforced) North St 2 3 6ST-NW-158_RZ-393 Polypropylene Jeffery Ave 5 2 10ST-NW-159_ST-NW-158 Polypropylene Jeffery Ave 3 2 6ST-NW-160_ST-NW-406 Polypropylene Jeffery Ave 1 2 2ST-NW-162_ST-NW-148 Vitrified Clay Pipe Arcada St 5 2 10ST-NW-163_ST-NW-162 Vitrified Clay Pipe Arcada St 5 2 10ST-NW-164_ST-NW-163 Vitrified Clay Pipe Arcada St 3 2 6ST-NW-165_RZ-414 Vitrified Clay Pipe Arcada St 1 2 2ST-NW-165_ST-NW-164 Vitrified Clay Pipe Arcada St 5 2 10ST-NW-166_RZ-413 Vitrified Clay Pipe Arcada St 1 2 2ST-NW-168_ST-NW-164 Vitrified Clay Pipe Barber St 5 2 10ST-NW-170_ST-NW-169 Concrete Pipe (non-reinforced) Arcada St 1 3 3ST-NW-171_ST-NW-170 Concrete Pipe (non-reinforced) Arcada St 1 3 3ST-NW-171_ST-NW-173 Reinforced Concrete Pipe Arcada St 1 3 3ST-NW-172_ST-NW-173 Reinforced Concrete Pipe Arcada St 1 3 3ST-NW-174_ST-NW-175 Vitrified Clay Pipe Arcada St 1 2 2ST-NW-175_ST-NW-176 Vitrified Clay Pipe Arcada St 2 2 4ST-NW-176_ST-NW-133 Vitrified Clay Pipe Arcada St 4 2 8ST-NW-178_ST-NW-180 Polyvinyl Chloride Seaver St 1 2 2ST-NW-180_ST-NW-181 Polypropylene Seaver St 1 2 2ST-NW-182_ST-NW-181 Polypropylene Seaver St 1 2 2ST-NW-184_ST-NW-187 Vitrified Clay Pipe Maple St 2 2 4ST-NW-185_ST-NW-186 Vitrified Clay Pipe Maple St 4 2 8ST-NW-186_ST-NW-187 Vitrified Clay Pipe Maple St 1 2 2ST-NW-187_ST-NW-189 Vitrified Clay Pipe Seaver St 5 2 10ST-NW-188_RZ-1078 Vitrified Clay Pipe Seaver St 5 2 10ST-NW-189_ST-NW-191 Vitrified Clay Pipe Seaver St 5 2 10ST-NW-190_ST-NW-191 Polyethylene Seaver St 1 3 3ST-NW-191_ST-NW-192 Vitrified Clay Pipe Seaver St 1 2 2ST-NW-192_ST-NW-193 Reinforced Concrete Pipe Seaver St 1 3 3ST-NW-196_ST-NW-194 Reinforced Concrete Pipe Seaver St 1 3 3ST-NW-197_ST-NW-199 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-NW-198_ST-NW-199 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-NW-199_ST-NW-222 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-NW-201_RZ-419 Vitrified Clay Pipe Seaver St 1 3 3

75

AGENDA

Page 76: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-202_ST-NW-201 Polyvinyl Chloride Seaver St 1 2 2ST-NW-203_ST-NW-373 Polyvinyl Chloride Elementary School Parking Lot1 2 2ST-NW-203_ST-NW-410 Polyvinyl Chloride Arcada St 1 2 2ST-NW-204_RZ-416 Polyvinyl Chloride Arcada St 1 2 2ST-NW-205_RZ-927 Polypropylene Jeffery Ave 4 2 8ST-NW-206_RZ-928 Polypropylene Jeffery Ave 5 3 15ST-NW-208_ST-NW-210 Polypropylene Jeffery Ave 4 2 8ST-NW-209_ST-NW-210 Polypropylene Jeffery Ave 2 2 4ST-NW-211_ST-NW-396 Vitrified Clay Pipe Easement Off Barber 5 2 10ST-NW-212_ST-NW-397 Vitrified Clay Pipe Barber St 1 2 2ST-NW-213_ST-NW-212 Vitrified Clay Pipe Barber St 5 2 10ST-NW-214_ST-NW-215 Vitrified Clay Pipe Barber St 1 2 2ST-NW-215_RZ-481 Vitrified Clay Pipe Barber St 5 2 10ST-NW-216_ST-NW-217 Polypropylene Main St 2 2 4ST-NW-218_ST-NW-219 Polypropylene Main St 1 2 2ST-NW-219_ST-NW-220 Polypropylene Main St 1 2 2ST-NW-221_ST-NW-222 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-NW-222_ST-NW-227 Concrete Pipe (non-reinforced) Pine River St 3 3 9ST-NW-223_ST-NW-222 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-NW-225_ST-NW-226 Vitrified Clay Pipe Pine River St 1 3 3ST-NW-226_ST-NW-227 Polyethylene Pine River St 1 3 3ST-NW-227_ST-NW-224 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-NW-227_ST-NW-228 Vitrified Clay Pipe Off Pine River St 4 4 16ST-NW-228_ST-NW-211 Polypropylene Easement Off Barber 3 3 9ST-NW-229_ST-NW-228 Vitrified Clay Pipe Off Pine River St 1 3 3ST-NW-230_ST-NW-231 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-NW-232_ST-NW-231 Polyethylene Pine River St 1 2 2ST-NW-233_ST-NW-229 Concrete Pipe (non-reinforced) Pine River St 2 3 6ST-NW-235_ST-NW-253 Polypropylene Norton Gibbs Dr 1 4 4ST-NW-236_ST-NW-235 Polypropylene Pine River St 1 4 4ST-NW-239_ST-NW-236 Polypropylene Pine River St 1 4 4ST-NW-240_ST-NW-239 Polypropylene Easement Off Pine River 1 4 4ST-NW-241_RZ-38 Polypropylene Pine River St 5 3 15ST-NW-242_RZ-35 Corrugated Metal Pipe Pine River St 1 3 3ST-NW-245_ST-NW-244 Vitrified Clay Pipe Off Pine River St 3 3 9ST-NW-246_RZ-26 Polyvinyl Chloride Off Pine River St 1 3 3ST-NW-247_ST-NW-245 Ductile Iron Pipe Off Pine River St 1 2 2ST-NW-247_ST-NW-248 Ductile Iron Pipe Off Pine River St 1 3 3ST-NW-249_ST-NW-250 Polyethylene St Charles Rd 1 3 3ST-NW-251_ST-NW-250 Vitrified Clay Pipe Main St 5 3 15ST-NW-252_RZ-955 Vitrified Clay Pipe Whispering Pines 3 2 6ST-NW-253_ST-NW-255 Polypropylene Norton Gibbs Dr 2 3 6ST-NW-254_RZ-552 Polyvinyl Chloride Norton Gibbs Dr 1 2 2ST-NW-255_ST-NW-257 Polypropylene Norton Gibbs Dr 1 3 3ST-NW-256_RZ-550 Polyvinyl Chloride Norton Gibbs Dr 1 2 2ST-NW-257_ST-NW-258 Polypropylene Norton Gibbs Dr 1 3 3ST-NW-258_ST-NW-259 Polypropylene Norton Gibbs Dr 1 3 3ST-NW-258_ST-NW-380 Brick Norton Gibbs Dr 1 3 3ST-NW-259_ST-NW-261 Other Norton Gibbs Dr 1 3 3ST-NW-260_ST-NW-259 Other Norton Gibbs Dr 1 3 3

76

AGENDA

Page 77: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-262_ST-NW-261 Other Norton Gibbs Dr 1 3 3ST-NW-263_ST-NW-262 Other Norton Gibbs Dr 1 3 3ST-NW-264_ST-NW-263 Other Norton Gibbs Dr 1 3 3ST-NW-265_ST-NW-266 Other Norton Gibbs Dr 1 3 3ST-NW-266_ST-NW-268 Other Norton Gibbs Dr 1 3 3ST-NW-267_ST-NW-266 Other Norton Gibbs Dr 1 2 2ST-NW-268_ST-NW-269 Other Norton Gibbs Dr 1 3 3ST-NW-269_ST-NW-272 Other Norton Gibbs Dr 1 3 3ST-NW-270_ST-NW-269 Other Norton Gibbs Dr 1 2 2ST-NW-271_RZ-540 Other Norton Gibbs Dr 1 2 2ST-NW-272_ST-NW-274 Polyvinyl Chloride Norton Gibbs Dr 1 5 5ST-NW-273_ST-NW-272 Other Norton Gibbs Dr 5 2 10ST-NW-274_ST-NW-275 Polyvinyl Chloride Norton Gibbs Dr 1 5 5ST-NW-275_ST-NW-279 Polyvinyl Chloride Norton Gibbs Dr 1 5 5ST-NW-277_ST-NW-276 Other Norton Gibbs Dr 3 3 9ST-NW-278_ST-NW-277 Other Norton Gibbs Dr 1 3 3ST-NW-279_ST-NW-382 Polyvinyl Chloride Norton Gibbs Dr 1 5 5ST-NW-280_ST-NW-278 Other Norton Gibbs Dr 1 3 3ST-NW-280_ST-NW-382 Other Norton Gibbs Dr 1 3 3ST-NW-281_ST-NW-331 Polyethylene Westwind Ln 5 2 10ST-NW-282_ST-NW-283 Polyvinyl Chloride Norton Gibbs Dr 1 4 4ST-NW-284_ST-NW-282 Polyvinyl Chloride Norton Gibbs Dr 1 4 4ST-NW-285_ST-NW-283 Other Norton Gibbs Dr 1 3 3ST-NW-285_ST-NW-287 Other Norton Gibbs Dr 1 3 3ST-NW-286_ST-NW-285 Other Norton Gibbs Dr 1 2 2ST-NW-288_ST-NW-287 Other Norton Gibbs Dr 1 3 3ST-NW-289_ST-NW-293 Other Norton Gibbs Dr 5 3 15ST-NW-290_ST-NW-386 Polyvinyl Chloride Norton Gibbs Dr 1 5 5ST-NW-291_ST-NW-386 Other Norton Gibbs Dr 1 3 3ST-NW-292_ST-NW-291 Other Norton Gibbs Dr 1 3 3ST-NW-293_ST-NW-387 Other Norton Gibbs Dr 1 3 3ST-NW-294_ST-NW-293 Other Norton Gibbs Dr 1 3 3ST-NW-295_ST-NW-294 Other Norton Gibbs Dr 1 3 3ST-NW-296_ST-NW-398 Polyvinyl Chloride Norton Gibbs Dr 1 5 5ST-NW-297_ST-NW-398 Polypropylene Norton Gibbs Dr 3 2 6ST-NW-298_ST-NW-389 Polypropylene Norton Gibbs Dr 2 2 4ST-NW-299_ST-NW-399 Polypropylene Norton Gibbs Dr 1 3 3ST-NW-300_ST-NW-299 Polypropylene Norton Gibbs Dr 2 3 6ST-NW-304_ST-NW-304A Polypropylene Norton Gibbs Dr 1 2 2ST-NW-308_ST-NW-307 Polypropylene Union St 1 2 2ST-NW-309_ST-NW-308 Polypropylene Union St 1 2 2ST-NW-310_ST-NW-413 Vitrified Clay Pipe Union St 5 3 15ST-NW-311_ST-NW-414 Concrete Pipe (non-reinforced) St Charles Rd 1 3 3ST-NW-313_ST-NW-314 Vitrified Clay Pipe Union St 1 2 2ST-NW-313_ST-NW-415 Vitrified Clay Pipe Union St 2 2 4ST-NW-316_ST-NW-315 Polypropylene Westwind Ln 1 3 3ST-NW-316_ST-NW-317 Polypropylene Leeward Ct 1 3 3ST-NW-317_ST-NW-344 Polypropylene Leeward Ct 1 3 3ST-NW-318_ST-NW-317 Polypropylene Leeward Ct 1 3 3ST-NW-319_ST-NW-317 Polypropylene Leeward Ct 1 3 3

77

AGENDA

Page 78: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-320_ST-NW-321 Reinforced Concrete Pipe Leeward Ct 1 3 3ST-NW-321_ST-NW-317 Polypropylene Leeward Ct 1 3 3ST-NW-323_ST-NW-321 Reinforced Concrete Pipe Leeward Ct 1 3 3ST-NW-324_ST-NW-323 Concrete Pipe (non-reinforced) Leeward Ct 1 3 3ST-NW-325_ST-NW-323 Concrete Pipe (non-reinforced) Leeward Ct 1 3 3ST-NW-326_ST-NW-325 Concrete Pipe (non-reinforced) Leeward Ct 1 3 3ST-NW-327_ST-NW-326 Concrete Pipe (non-reinforced) Leeward Ct 1 3 3ST-NW-328_ST-NW-326 Reinforced Concrete Pipe Leeward Ct 1 3 3ST-NW-330_ST-NW-333 Other Westwind Ln 1 3 3ST-NW-331_ST-NW-330 Brick Westwind Ln 1 3 3ST-NW-333_ST-NW-334 Other Westwind Ln 1 3 3ST-NW-334_ST-NW-335 Other Westwind Ln 1 3 3ST-NW-335_ST-NW-340 Other Westwind Ln 1 3 3ST-NW-336_ST-NW-335 Other Westwind Ln 1 3 3ST-NW-337_ST-NW-336 Other Gale Ct 1 3 3ST-NW-338_ST-NW-335 Concrete Pipe (non-reinforced) Gale Ct 1 3 3ST-NW-338_ST-NW-339 Other Gale Ct 1 3 3ST-NW-339_ST-NW-416 Other Gale Ct 1 3 3ST-NW-340_ST-NW-341 Other Westwind Ln 1 3 3ST-NW-341_ST-NW-343 Polyvinyl Chloride Westwind Ln 1 4 4ST-NW-343_ST-NW-317 Polyvinyl Chloride Westwind Ln 1 4 4ST-NW-344_ST-NW-347 Polyvinyl Chloride Leeward Ct 1 4 4ST-NW-345_ST-NW-344 Polypropylene Leeward Ct 1 3 3ST-NW-346_RZ-501 Corrugated Metal Pipe Seaver St 1 2 2ST-NW-347_RZ-499 Polyvinyl Chloride Leeward Ct 1 4 4ST-NW-351_ST-NW-347 Vitrified Clay Pipe Barber St 5 2 10ST-NW-352_RZ-486 Vitrified Clay Pipe Barber St 1 2 2ST-NW-352_ST-NW-351 Vitrified Clay Pipe Barber St 1 2 2ST-NW-353_ST-NE-262 Concrete Pipe (non-reinforced) Easement Off Barber 3 4 12ST-NW-354_ST-NW-353 Reinforced Concrete Pipe Barber St 4 2 8ST-NW-356_ST-NW-006 Vitrified Clay Pipe Elm St 3 3 9ST-NW-358_ST-NW-023 Vitrified Clay Pipe Center St 1 2 2ST-NW-359_ST-NW-063 Polyvinyl Chloride Center St Parking Lot 1 2 2ST-NW-363_ST-NW-119 Polypropylene Emerson & Maple 3 2 6ST-NW-364_ST-NW-129 Vitrified Clay Pipe Elm St 1 3 3ST-NW-365_ST-NW-127 Polypropylene Emerson St 5 3 15ST-NW-368_ST-NW-158 Polypropylene Jeffery Ave 1 2 2ST-NW-369_ST-NW-180 Polypropylene Seaver St 5 2 10ST-NW-370_ST-NW-181 Polypropylene Seaver St 3 2 6ST-NW-373_ST-NW-204 Polyvinyl Chloride Arcada At Elem School 3 2 6ST-NW-375_ST-NW-211 Polypropylene Easement Off Barber 2 3 6ST-NW-376_ST-NW-220 Polypropylene Main St 5 2 10ST-NW-377_ST-NW-228 Polyethylene Pine River St 1 4 4ST-NW-378_ST-NW-228 Corrugated Metal Pipe Off Pine River St 3 2 6ST-NW-379_ST-NW-240 Polypropylene Easement Off Pine River 1 3 3ST-NW-381_ST-NW-260 Other Norton Gibbs Dr 1 3 3ST-NW-382_ST-NW-284 Polyvinyl Chloride Norton Gibbs Dr 1 4 4ST-NW-383_ST-NW-289 Vitrified Clay Pipe Norton Gibbs Dr 1 2 2ST-NW-384_ST-NW-287 Other Norton Gibbs Dr 1 3 3ST-NW-384_ST-NW-290 Polyvinyl Chloride Norton Gibbs Dr 1 5 5

78

AGENDA

Page 79: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-NW-385_ST-NW-388 Polyvinyl Chloride Norton Gibbs Dr 1 5 5ST-NW-386_ST-NW-385 Polyvinyl Chloride Norton Gibbs Dr 1 5 5ST-NW-388_ST-NW-296 Polyvinyl Chloride Norton Gibbs Dr 1 5 5ST-NW-390_ST-NW-304A Polypropylene Norton Gibbs Dr 2 2 4ST-NW-391_ST-NW-313 Vitrified Clay Pipe Union St 5 3 15ST-NW-392_ST-NW-321 Reinforced Concrete Pipe Leeward Ct 1 3 3ST-NW-393_ST-NW-331 Other Westwind Ln 5 2 10ST-NW-395_ST-NW-355 Concrete Pipe (non-reinforced) Off Barber St 1 3 3ST-NW-396_ST-NW-397 Brick Barber St 1 2 2ST-NW-397_ST-NW-215 Vitrified Clay Pipe Union St 1 2 2ST-NW-398_ST-NW-399 Polyvinyl Chloride Norton Gibbs Dr 1 5 5ST-NW-399_ST-NW-304 Polyvinyl Chloride Norton Gibbs Dr 1 5 5ST-NW-400_ST-NW-010 Vitrified Clay Pipe Elm St 1 4 4ST-NW-401_ST-NW-022 Polyvinyl Chloride Pine River St 1 3 3ST-NW-404_ST-NW-130 Vitrified Clay Pipe Elm St 1 2 2ST-NW-405_ST-NW-152 Polyvinyl Chloride Jeffery Ave 1 2 2ST-NW-407_ST-NW-168 Vitrified Clay Pipe Barber St 4 2 8ST-NW-408_ST-NW-184 Vitrified Clay Pipe Maple St 1 2 2ST-NW-409_ST-NW-196 Vitrified Clay Pipe Seaver St 5 3 15ST-NW-411_ST-NW-217 Polypropylene Main St 5 2 10ST-NW-412_ST-NW-251 Polypropylene Main St 4 3 12ST-NW-417_ST-NW-379 Polypropylene Easement Off Pine River 1 3 3ST-NW-418_ST-NW-155 Polypropylene Alley Off Emerson 5 3 15ST-SE-001_ST-SE-002 Vitrified Clay Pipe Ithaca St 1 2 2ST-SE-003_ST-NE-022 Vitrified Clay Pipe Gwinner St 5 2 10ST-SE-004_RZ-725 Polypropylene Gwinner St 1 2 2ST-SE-004_ST-NE-022 Vitrified Clay Pipe Center St 5 2 10ST-SE-006_ST-SE-005 Reinforced Concrete Pipe Nelson St 1 3 3ST-SE-007_ST-SE-005 Polypropylene Nelson St 5 2 10ST-SE-010_RZ-46 Concrete Pipe (non-reinforced) Brown St 4 2 8ST-SE-010_RZ-47 Concrete Pipe (non-reinforced) Brown St 2 2 4ST-SE-011_RZ-106 Corrugated Metal Pipe Brown St 1 2 2ST-SE-012_ST-SE-013 Polypropylene Parking Lot Off Center 1 3 3ST-SE-018_ST-SE-015 Vitrified Clay Pipe Catherine St 1 2 2ST-SE-018_ST-SE-049 Polypropylene Newark St 1 2 2ST-SE-020_ST-SE-021 Concrete Pipe (non-reinforced) Commerce Dr 1 3 3ST-SE-021_ST-SE-046 Concrete Pipe (non-reinforced) Commerce Dr 3 3 9ST-SE-023_ST-SE-181 Vitrified Clay Pipe Dilts Rd 4 2 8ST-SE-026_ST-SE-027 Polyvinyl Chloride Dilts Rd 1 2 2ST-SE-027_ST-SE-039 Polypropylene Dilts Rd 5 3 15ST-SE-028_ST-SE-027 Polypropylene Dilts Rd 1 3 3ST-SE-029_ST-SE-027 Polypropylene Dilts Rd 1 3 3ST-SE-030_ST-SE-160 Concrete Pipe (non-reinforced) Mcdonald'S Parking Lot 1 3 3ST-SE-031_RZ-75 Polyethylene Dilts Rd 4 2 8ST-SE-036_ST-SE-185 Polyethylene Croswell Rd 1 4 4ST-SE-037_ST-SE-038 Polyvinyl Chloride Dilts Rd 1 2 2ST-SE-038_RZ-81 Polyvinyl Chloride Dilts Rd 4 2 8ST-SE-039_ST-SE-037 Polyvinyl Chloride Dilts Rd 1 2 2ST-SE-039_ST-SE-040 Polypropylene Dilts Rd 3 3 9ST-SE-040_ST-SE-164 Polyethylene Dilts Rd 1 3 3

79

AGENDA

Page 80: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-SE-041_ST-SE-040 Polyvinyl Chloride Dilts Rd 1 3 3ST-SE-042_ST-SE-040 Polypropylene Dilts Rd 1 3 3ST-SE-043_ST-SE-186 Concrete Pipe (non-reinforced) Commerce Dr 1 3 3ST-SE-044_ST-SE-043 Concrete Pipe (non-reinforced) Commerce Dr 1 3 3ST-SE-045_ST-SE-044 Concrete Pipe (non-reinforced) Commerce Dr 1 3 3ST-SE-046_ST-SE-044 Concrete Pipe (non-reinforced) Commerce Dr 2 3 6ST-SE-047_ST-SE-046 Concrete Pipe (non-reinforced) Commerce Dr 3 3 9ST-SE-048_ST-SE-049 Concrete Pipe (non-reinforced) Catherine St 1 3 3ST-SE-048_ST-SE-168 Concrete Pipe (non-reinforced) Catherine St 3 3 9ST-SE-048_ST-SE-187 Polypropylene Catherine St 1 2 2ST-SE-049_RZ-97 Polypropylene Catherine St 5 2 10ST-SE-050_ST-SE-049 Polypropylene Catherine St 1 2 2ST-SE-052_ST-SE-050 Polypropylene Catherine St 1 2 2ST-SE-053_ST-SE-054 Polypropylene Catherine St 5 2 10ST-SE-054_ST-SE-051 Polypropylene Catherine St 1 2 2ST-SE-054_ST-SE-052 Polypropylene Catherine St 1 2 2ST-SE-056_ST-SE-052 Polypropylene Newark St 5 2 10ST-SE-058_RZ-111 Vitrified Clay Pipe Brown St 1 2 2ST-SE-059_ST-SE-056 Polypropylene Catherine St 5 2 10ST-SE-060_ST-SE-006 Vitrified Clay Pipe Nelson St 1 3 3ST-SE-060_ST-SE-189 Polypropylene Newark St 1 2 2ST-SE-061_ST-SE-007 Polypropylene Nelson St 4 2 8ST-SE-061_ST-SE-060 Concrete Pipe (non-reinforced) Catherine St 3 2 6ST-SE-064_ST-SE-190 Polypropylene Nelson St 3 2 6ST-SE-065_ST-SE-066 Polyethylene Newark St 5 2 10ST-SE-070_ST-SE-097 Vitrified Clay Pipe Gwinner St 3 3 9ST-SE-071_ST-SE-072 Polyethylene Gwinner St 1 2 2ST-SE-079_ST-SE-080 Vitrified Clay Pipe Ithaca St 1 2 2ST-SE-080_ST-SE-081 Vitrified Clay Pipe Ithaca St 5 2 10ST-SE-082_ST-SE-084 Polyvinyl Chloride Ithaca St 5 2 10ST-SE-083_ST-SE-082 Vitrified Clay Pipe Ithaca St 3 2 6ST-SE-084_ST-SE-089 Polyethylene St Johns St 1 2 2ST-SE-085_ST-SE-086 Polyethylene Ithaca St 1 2 2ST-SE-086_ST-SE-087 Vitrified Clay Pipe Ithaca St 1 2 2ST-SE-088_ST-SE-087 Polyethylene Ithaca St 4 2 8ST-SE-089_ST-SE-090 Reinforced Concrete Pipe St Johns St 1 3 3ST-SE-090_ST-SE-091 Concrete Pipe (non-reinforced) St Johns St 2 4 8ST-SE-092_ST-SE-091 Concrete Pipe (non-reinforced) St Johns St 1 4 4ST-SE-093_ST-SE-092 Concrete Pipe (non-reinforced) St Johns St 1 3 3ST-SE-094_ST-SE-099 Polyethylene South St 1 2 2ST-SE-096_ST-SE-097 Polyethylene Gwinner St 1 2 2ST-SE-097_ST-SE-098 Polyethylene Gwinner St 1 2 2ST-SE-098_ST-SE-099 Polyethylene South St 1 2 2ST-SE-099_RZ-787 Polyethylene South St 1 2 2ST-SE-100_RZ-55 Vitrified Clay Pipe South St 5 2 10ST-SE-101_ST-SE-105 Vitrified Clay Pipe South St 2 3 6ST-SE-102_ST-SE-104 Polyethylene Nelson St 1 2 2ST-SE-103_RZ-712 Concrete Pipe (non-reinforced) South St 5 3 15ST-SE-104_ST-SE-109 Vitrified Clay Pipe Nelson St 2 3 6ST-SE-105_ST-SE-060 Vitrified Clay Pipe Nelson St 5 3 15

80

AGENDA

Page 81: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-SE-105_ST-SE-104 Concrete Pipe (non-reinforced) South St 1 3 3ST-SE-108_ST-SE-107 Vitrified Clay Pipe Brown St 5 2 10ST-SE-108_ST-SE-109 Vitrified Clay Pipe Brown St 5 2 10ST-SE-109_ST-SE-114 Vitrified Clay Pipe South St 1 3 3ST-SE-111_ST-SE-112 Polyethylene Catherine St 1 2 2ST-SE-112_ST-SE-113 Polypropylene Newark St 1 3 3ST-SE-113_ST-SE-114 Polyethylene Catherine St 1 2 2ST-SE-114_ST-SE-172 Polyethylene Catherine St 1 2 2ST-SE-115_ST-SE-173 Concrete Pipe (non-reinforced) Meadow St 3 3 9ST-SE-116_ST-SE-174 Concrete Pipe (non-reinforced) Meadow St 3 3 9ST-SE-117_ST-SE-175 Concrete Pipe (non-reinforced) Meadow St 2 3 6ST-SE-121_ST-SE-120 Polyvinyl Chloride St Johns St 1 2 2ST-SE-122_ST-SE-121 Concrete Pipe (non-reinforced) St Johns St 1 4 4ST-SE-124_ST-SE-176 Concrete Pipe (non-reinforced) St Johns St 1 3 3ST-SE-125_ST-SE-086 Reinforced Concrete Pipe Ithaca St 3 2 6ST-SE-127_ST-SE-129 Polypropylene Webster St 5 2 10ST-SE-130_ST-SE-178 Concrete Pipe (non-reinforced) St Johns St 2 4 8ST-SE-139_ST-SE-134 Polyvinyl Chloride St Johns St 1 2 2ST-SE-146_ST-SE-147 Polyethylene Ithaca St 1 2 2ST-SE-154_ST-SE-179 Polyvinyl Chloride St Johns St 1 3 3ST-SE-156_ST-SE-021 Polyvinyl Chloride Commerce Dr 1 3 3ST-SE-158_ST-SE-026 Polyethylene Dilts Rd 1 2 2ST-SE-161_ST-SE-030 Concrete Pipe (non-reinforced) Mcdonald'S Parking Lot 1 3 3ST-SE-162_ST-SE-032 Polyvinyl Chloride Croswell Rd 1 2 2ST-SE-163_ST-SE-038 Polyethylene Dilts Rd 1 2 2ST-SE-165_ST-SE-041 Polyvinyl Chloride Dilts Rd 1 2 2ST-SE-166_ST-SE-044 Polyvinyl Chloride Commerce Dr 1 2 2ST-SE-171_ST-SE-109 Vitrified Clay Pipe South St 5 3 15ST-SE-180_ST-SE-003 Polypropylene Gwinner St 2 2 4ST-SE-182_ST-SE-028 Polyethylene Dilts Rd 1 2 2ST-SE-183_ST-SE-029 Polypropylene Dilts Rd 1 3 3ST-SE-184_ST-SE-031 Polyethylene Dilts Rd 3 2 6ST-SE-188_ST-SE-054 Polypropylene Catherine St 1 2 2ST-SE-192_ST-SE-100 Polyethylene South St 1 2 2ST-SE-193_ST-SE-125 Polypropylene Ithaca St 3 2 6ST-SE-194_ST-SE-155 Concrete Pipe (non-reinforced) Webster St 1 4 4ST-SW-004_ST-SW-003 Steel Pipe Elm St 1 3 3ST-SW-006_ST-SW-007 Vitrified Clay Pipe Maple St 1 2 2ST-SW-007_ST-SW-009 Vitrified Clay Pipe Newark & Maple 1 2 2ST-SW-008_ST-SW-009 Vitrified Clay Pipe Maple St 1 2 2ST-SW-009_ST-SW-011 Vitrified Clay Pipe Maple St 1 2 2ST-SW-010_ST-SW-011 Vitrified Clay Pipe Maple St 1 3 3ST-SW-011_ST-SW-013 Reinforced Concrete Pipe Newark St 1 3 3ST-SW-013_RZ-191 Reinforced Concrete Pipe Newark St 1 3 3ST-SW-013_ST-SW-017 Vitrified Clay Pipe Newark St 4 3 12ST-SW-014_RZ-180 Vitrified Clay Pipe Maple Parking Lot 1 2 2ST-SW-014_RZ-181 Vitrified Clay Pipe Center St 5 3 15ST-SW-015_ST-NW-025 Vitrified Clay Pipe Pine River St 4 3 12ST-SW-017_ST-SW-058 Vitrified Clay Pipe Pine River St 1 2 2ST-SW-019_ST-SW-021 Vitrified Clay Pipe Newark St 4 3 12

81

AGENDA

Page 82: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-SW-021_ST-SW-150 Vitrified Clay Pipe Newark St 5 3 15ST-SW-022_ST-SW-021 Vitrified Clay Pipe Newark St 1 2 2ST-SW-025_ST-SW-024 Vitrified Clay Pipe Newark St 5 3 15ST-SW-034_ST-SW-035 Polyethylene Main St 1 3 3ST-SW-036_ST-SW-035 Polyethylene Main St 2 3 6ST-SW-036_ST-SW-037 Polyethylene Main St 5 3 15ST-SW-040_ST-NW-064 Vitrified Clay Pipe Jeffery Ave 4 2 8ST-SW-042_ST-SW-043 Vitrified Clay Pipe Jeffery Ave 1 2 2ST-SW-043_ST-SW-044 Vitrified Clay Pipe South St 3 2 6ST-SW-044_ST-SW-044A Polyethylene Jeffery Ave 1 2 2ST-SW-044_ST-SW-047 Vitrified Clay Pipe Jeffery Ave 3 2 6ST-SW-044A_ST-SW-090 Polyethylene Jeffery Ave 1 3 3ST-SW-047_RZ-854 Polyethylene South St 5 2 10ST-SW-048_RZ-795 Polyvinyl Chloride Main St 1 2 2ST-SW-049_ST-SW-050 Vitrified Clay Pipe South St 4 2 8ST-SW-051_RZ-5 Concrete Pipe (non-reinforced) South St 3 3 9ST-SW-052_RZ-793 Concrete Pipe (non-reinforced) South St 3 2 6ST-SW-053_ST-SW-055 Vitrified Clay Pipe Pine River St 1 3 3ST-SW-054_ST-SW-055 Concrete Pipe (non-reinforced) Pine River St 1 3 3ST-SW-055_ST-SW-056 Concrete Pipe (non-reinforced) Pine River St 5 3 15ST-SW-056_ST-SW-058 Vitrified Clay Pipe Pine River St 4 3 12ST-SW-056_ST-SW-074 Concrete Pipe (non-reinforced) Pine River St 4 3 12ST-SW-057_ST-SW-056 Vitrified Clay Pipe Pine River St 4 3 12ST-SW-061_ST-SW-063 Polyethylene South St 1 3 3ST-SW-063_ST-SW-162 Polyethylene South St 1 3 3ST-SW-064_ST-SW-163 Vitrified Clay Pipe Maple St 5 3 15ST-SW-064_ST-SW-164 Vitrified Clay Pipe Maple St 5 3 15ST-SW-066_ST-SW-165 Vitrified Clay Pipe Maple St 5 2 10ST-SW-072_RZ-874 Corrugated Metal Pipe South St 1 3 3ST-SW-074_ST-SW-167 Vitrified Clay Pipe Pine River St 1 3 3ST-SW-080_ST-SW-081 Polypropylene Pine River St 2 3 6ST-SW-081_RZ-50 Polypropylene Pine River St 1 3 3ST-SW-083_ST-SW-097 Polyvinyl Chloride John St 5 4 20ST-SW-084_ST-SW-180 Polyvinyl Chloride Alley Off Pine River 1 2 2ST-SW-086_ST-SW-087 Polypropylene Main St 1 2 2ST-SW-087_ST-SW-094 Vitrified Clay Pipe Main St 3 3 9ST-SW-089_ST-SW-087 Vitrified Clay Pipe Main St 3 2 6ST-SW-090_ST-SW-091 Vitrified Clay Pipe Jeffery Ave 1 2 2ST-SW-091_ST-SE-125 Vitrified Clay Pipe Ithaca St 3 2 6ST-SW-093_ST-SW-169 Reinforced Concrete Pipe Ithaca St 1 3 3ST-SW-094_RZ-789 Vitrified Clay Pipe Main St 5 3 15ST-SW-095_RZ-137 Vitrified Clay Pipe Main St 1 2 2ST-SW-096_ST-SW-107 Reinforced Concrete Pipe John St 2 4 8ST-SW-097_ST-SW-096 Reinforced Concrete Pipe John St 2 4 8ST-SW-098_RZ-141 Polypropylene St Johns St 1 2 2ST-SW-099_ST-SW-181 Polyethylene Maple St 1 2 2ST-SW-100_ST-SW-173 Vitrified Clay Pipe Elm St 3 3 9ST-SW-107_ST-SW-127 Reinforced Concrete Pipe Webster St 1 4 4ST-SW-109_ST-SW-175 Vitrified Clay Pipe Main St 1 3 3ST-SW-110_ST-SW-109 Vitrified Clay Pipe Main St 1 3 3

82

AGENDA

Page 83: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Pipe Material LocationProbability of

FailureCriticality of

AssetConsequences

of FailureST-SW-111_ST-SW-175 Vitrified Clay Pipe Main St 1 2 2ST-SW-113_ST-SW-176 Concrete Pipe (non-reinforced) Jeffery Ave 1 2 2ST-SW-115_ST-SW-117 Vitrified Clay Pipe Jeffery Ave 1 3 3ST-SW-116_ST-SW-117 Vitrified Clay Pipe Jeffery Ave 1 3 3ST-SW-117_ST-SW-120 Vitrified Clay Pipe Webster St 4 3 12ST-SW-119_ST-SW-120 Vitrified Clay Pipe Webster St 1 2 2ST-SW-120_ST-SW-123 Vitrified Clay Pipe Webster St 1 3 3ST-SW-121_ST-SW-120 Vitrified Clay Pipe Webster St 1 2 2ST-SW-122_ST-SW-123 Vitrified Clay Pipe Webster St 1 2 2ST-SW-123_RZ-151 Vitrified Clay Pipe Webster St 5 3 15ST-SW-125_RZ-153 Vitrified Clay Pipe Webster St 1 3 3ST-SW-126_ST-SW-127 Vitrified Clay Pipe Webster St 4 3 12ST-SW-127_ST-SW-125 Vitrified Clay Pipe Webster St 4 4 16ST-SW-128_ST-SW-130 Polypropylene Webster St 1 2 2ST-SW-129_ST-SW-127 Vitrified Clay Pipe Webster St 1 3 3ST-SW-130_ST-SW-129 Concrete Pipe (non-reinforced) Webster St 1 3 3ST-SW-131_ST-SW-130 Polypropylene Webster St 1 2 2ST-SW-133_ST-SW-131 Polypropylene Webster St 1 2 2ST-SW-138_ST-SW-143 Vitrified Clay Pipe Off Elm St 5 3 15ST-SW-143_RZ-622 Vitrified Clay Pipe Off Pine River St 4 3 12ST-SW-144_ST-SW-004 Concrete Pipe (non-reinforced) Elm St 1 2 2ST-SW-145_ST-SW-006 Polyvinyl Chloride Maple St 5 2 10ST-SW-146_ST-SW-010 Polyvinyl Chloride Maple Parking Lot 1 3 3ST-SW-148_ST-SW-013 Reinforced Concrete Pipe Newark St 1 2 2ST-SW-150_ST-SW-051 Vitrified Clay Pipe Alley Off Newark 4 3 12ST-SW-154_ST-SW-047 Polyethylene South St 1 2 2ST-SW-155_ST-SW-050 Reinforced Concrete Pipe South St 1 2 2ST-SW-161_ST-SW-061 Polyethylene South St 1 3 3ST-SW-166_ST-SW-074 Reinforced Concrete Pipe Pine River St 3 3 9ST-SW-168_ST-SW-083 Polypropylene Pine River St 5 3 15ST-SW-170_ST-SW-093 Polyethylene Jeffery Ave 1 2 2ST-SW-172_ST-SW-097 Polyvinyl Chloride John St 1 2 2ST-SW-174_ST-SW-109 Vitrified Clay Pipe Main St 1 3 3ST-SW-177_ST-SW-113 Vitrified Clay Pipe Jeffery Ave 1 2 2ST-SW-178_ST-SW-025 Vitrified Clay Pipe Newark St 4 3 12ST-SW-179_ST-SW-035 Polyvinyl Chloride Main St 1 2 2ST-SW-182_ST-SW-122 Polypropylene Webster St 1 2 2

83

AGENDA

Page 84: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Ap

pe

nd

ix

Appendix D: 5-Year Capital Improvement Project Maps

1. Exhibit 5A, 5B, 5C, & 5D – Storm Sewer Improvement Maps

84

AGENDA

Page 85: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

YS

TE

M IM

PR

OV

EM

EN

T M

AP

- E

XH

IB

IT

4

A

NO

RT

HW

ES

T Q

UA

D

1 4

85

AGENDA

Page 86: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

YS

TE

M IM

PR

OV

EM

EN

T M

AP

- E

XH

IB

IT

4

B

NO

RT

HE

AS

T Q

UA

D

2 4

86

AGENDA

Page 87: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

YS

TE

M IM

PR

OV

EM

EN

T M

AP

- E

XH

IB

IT

4

C

SO

UT

HW

ES

T Q

UA

D

3 4

87

AGENDA

Page 88: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

ww

w.row

epsc.com

127 S

. M

ain S

treet

Mt. P

leasant, M

I 48858

O: (989) 772-2138

F: (989) 773-7757

ST

OR

M S

YS

TE

M IM

PR

OV

EM

EN

T M

AP

- E

XH

IB

IT

4

D

SO

UT

HE

AS

T Q

UA

D

4 4

88

AGENDA

Page 89: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

Asset Management Program City of Ithaca

Ap

pe

nd

ix

Appendix E: City Prioritization of Capital Funding and Financing Option

89

AGENDA

Page 90: AGENDA - Ithaca, Michigan · budgetary means, is prioritizing maintenance and inspections on the areas of the system that would have the most devastating effect upon failure. Prioritization

THE COUNTY SEAT

OF GRATIOT

CITY OF ITHACA 129 West Emerson Street

Ithaca, Michigan 48847-1017

www.ithacami.com

“CHERISHING THE PAST – EMBRACING THE FUTURE”

Ph. (989) 875-3200

Fax (989) 875-4064

June 21, 2019

Mr. Steve Clark

ROWE PSC

127 S. Main Street

Mt. Pleasant, MI 48858

Dear Mr. Clark:

At its special Committee of the Whole meeting on Thursday, June 18th, the City Council further discussed

its capital funding and financing options for future implementation of the SAW Stormwater Asset Manage-

ment Plan. The Council considered the following options and prioritized them in the order noted below.

• Citywide Special Dedicated Voted Millage

o A Citywide Millage that the city would tax property owners based on their property’s taxable

value. The collected tax would go toward the implementation of the identified projects.

o The city would need to request that voters approve a special millage as a special ballot

proposal at a public election.

• Citywide Special Assessment District (SAD)

o A SAD is an annual assessment that the city could charge parcels or in this case the entire

city for public projects because projects are thought to increase property values throughout

the city. Assessments could be based on the amount of impervious surface on each parcel.

o The city would need to create a SAD over the entire city with the intention that the entire city

is benefiting from each capital project being completed. Such a special assessment could be

subject to a citizen referendum petition to place it on a public ballot for approval.

• Creation of a Stormwater Enterprise Fund

o An enterprise fund is a self-supporting government fund that sells goods or services (projects)

following the accounting framework of public and private sector utilities. The fund identifies

the total direct and indirect costs to complete the projects and a fee is charged to the residents

for the service in relation to the benefit to their properties.

o The city would need to set up a utility enterprise fund and charge residents for the planned

and completed projects. Creation of the fund would depend on state authorizing legislation

allowing for such enterprise funds.

• Project-Specific SAD

o A project-specific SAD is an annual assessment that the city could charge to only those

specific parcels directly benefiting (increasing property value) from a specific project.

o The city would need to determine a SAD for each project as they are planned with each

district having different assessments based on the construction cost of the project and the

amount of benefits received. This may be difficult to implement due in part to the oversizing

of stormwater lines that benefit properties upstream from a specific parcel.

None of the above options were totally ruled out, and the City may use a combination of the options

depending on the specifics of a project and/or changes in State statutes that might authorize creation of a

true stormwater utility enterprise fund.

Sincerely,

Chris A. Yonker

City Manager

90

AGENDA