WatSan in Emergency Training – Austrian Red Cross Laubegg, Austria, 5 – 13 June 2011 Co-funded by Sunday, 5 Monday, 6 Tuesday, 7 Wednesday, 8 Thursday, 9 Friday, 10 Saturday, 11 Sunday, 12 Monday, 13 08:30 10:00 10:15 11:15 WatSan in emergencies (introduction) WatSan ERU modules Sphere / Assessment Field Work: Water testing, chemical treatment, Delagua Kit Mass water equipment: working on the tanks (incl. assembly of flange, repair work on liner) continue field work continue field work continue field work continue field work Dismanteling of equipment Technical Session: Pumps / Engine Telecom VHF Telecom other GPS/levelling Recap & summary of workshop Discussion Final Evaluation Closing of workshop 12:30 Lunch Lunch Lunch Lunch Lunch Lunch Lunch Lunch 13:30 15:30 16:00 Sanitation (introduction) Chemical treatment Preparing exercise in the field Sanitation, latrines, vector control Distribution: Bladder tanks, pipes, pumps, trucking of water, tapstand, filtration unit (sand, carbon filter) Software aspects: Assessment and Hygiene Promotion continue field work continue field work continue field work continue field work continue technical session Presentation Case Study 18:30 Arrival Welcome and Introduction WatSan related diseases WatSan mission assistant CD ROM Case Study 19.30 Dinner 19.30 Dinner 19.30 Dinner 19.30 Dinner 20.00 Dinner 19:30 Dinner 19.30 Dinner 20.00 Red Cross response structures 20.00 Field Experience 20.00 Field Experience Dinner

description

bgbf

Transcript of Agenda AutRC GF WatSan Training2011

  • WatSan in Emergency Training Austrian Red Cross Laubegg, Austria, 5 13 June 2011

    Co-funded by

    Sunday, 5 Monday, 6 Tuesday, 7 Wednesday, 8 Thursday, 9 Friday, 10 Saturday, 11 Sunday, 12 Monday, 13 08:30

    10:00

    10:15

    11:15

    WatSan in emergencies (introduction) WatSan ERU modules Sphere / Assessment

    Field Work: Water testing,

    chemical treatment, Delagua Kit

    Mass water equipment: working on the tanks (incl. assembly of flange, repair work on liner)

    continue field work continue field work continue field work continue field work Dismanteling of equipment Technical Session: Pumps / Engine Telecom VHF Telecom other GPS/levelling

    Recap & summary of workshop Discussion Final Evaluation Closing of workshop

    12:30 Lunch Lunch Lunch Lunch Lunch Lunch Lunch Lunch 13:30

    15:30 16:00

    Sanitation (introduction) Chemical treatment Preparing exercise in the field

    Sanitation, latrines, vector control

    Distribution: Bladder tanks, pipes, pumps, trucking of water, tapstand, filtration unit (sand, carbon filter)

    Software aspects: Assessment and Hygiene Promotion

    continue field work continue field work continue field work continue field work continue technical session Presentation Case Study

    18:30 Arrival Welcome and Introduction

    WatSan related diseases

    WatSan mission assistant CD ROM Case Study

    19.30 Dinner 19.30 Dinner 19.30 Dinner 19.30 Dinner

    20.00 Dinner 19:30 Dinner 19.30 Dinner 20.00 Red Cross response structures

    20.00 Field Experience

    20.00 Field Experience