Transcript of AfG Übersicht
-
8/4/2019 AfG bersicht
1/10
13.02.06 Kr
- Granular sugar reception and storage
- Sugar dissolving and pasteurisation
- Sugar syrup storage
- Beverage water de-aeration
- Concentrate and powder handling
- Final syrup preparation
- Continuous final beverage preparation
- Mixer Technology / Carbonation
- CIP
- Automation
The complete softdrinksproduction process
Softdrinks process
-
8/4/2019 AfG bersicht
2/10
13.02.06 Kr
BeverageProduction Room
Coca-Cola DryckerSverige, Sweden
Design, manufacturing, installation,start-up and commissioning
Softdrinks
Capacity: 160,000 l/h (6 Lines)
Coca-Cola Sweden
- Liquid Sugar Reception & Storage- Beverage Water Deaeration- 2 Powder Dissolvers- 6 Multiple Stream Final Beverage Blenders- 5 In-line Carbonators
- On-line Beverage Analysis- CIP- Automation System
Project Client Scope
-
8/4/2019 AfG bersicht
3/10
13.02.06 Kr
BeverageProduction Room
Coca-Cola AG,Germany
Design, manufacturing, installation,start-up and commissioning
Softdrinks
Capacity: 80,000 l/h (2 Lines)
- Granular Sugar Dissolving & Storage- Beverage Water Deaeration- 2 Powder Dissolvers- 2 Multiple Stream Final Beverage Blenders- 2 In-line Carbonators
- On-line Beverage Analysis- CIP- Automation System
Project Client Scope
Coca-Cola Genshagen
-
8/4/2019 AfG bersicht
4/10
13.02.06 Kr
BeverageProduction Room
Vrumona,Netherlands
Design, manufacturing, installation,start-up and commissioning
Softdrinks
Capacity: 180,000 l/h (6 Lines)
- 1 Granular Sugar Dissolving and Liquid Sugar
Storage
- 3 Beverage Water De-aerators
- 14 Tanks for Fruit Concentrates
- 2 Powder Dissolvers
- 2 Batching Units for Final Syrup
- 12 Final Syrup Tanks
- 1 Four Stream Blender for Final Syrup
- 1 De-aerator for Fruit Juices
- 5 Two Stream Final Beverage Blenders
- On-line Beverage Analysis
- CIP
- Automation System
Project Client Scope
More information?
Vrumona
http://99_beispiel%20vrumona.ppt/http://99_beispiel%20vrumona.ppt/http://99_beispiel%20vrumona.ppt/http://99_beispiel%20vrumona.ppt/ -
8/4/2019 AfG bersicht
5/10
13.02.06 Kr
Project Client Scope
Ready to DrinkProduction Line(Rigo, Breezer)
Bacardi,Buxtehude Design, manufacturing, installation,start-up and commissioning
Alcopops
Line capacity: 16,500 l/h (1 Line)
- Liquid Sugar Storage- Beverage Water Deaeration- 7-Stream Final Beverage Blender- In-line Carbonator- On-line Beverage Analysis
- CIP- Automation System
Bacardi
-
8/4/2019 AfG bersicht
6/10
13.02.06 Kr
The Goals
Goals
Highest accuracy and repeatability
Safety against unintentional mixings between products
Low losses - high yields
Accurate quantity measurement and batch reporting
Easy and quick product change-overs
Safety against wrong operations
Automatic product quality checks
Checks against faulty connections and measuring errors
Easy operation
Automatic CIP procedures
Upgradeable to new products
-
8/4/2019 AfG bersicht
7/10
13.02.06 Kr
Product Quality Checks
Brix of simple syrup within the dissolving unit.
Brix of simple syrup in the DICON with automatic correction.
Density of all concentrates.
Provers for check of the concentrate flow meters.
Flow rate control for flow meters.
Brix of finished beverage.
Conductivity measurement of finished beverage (acidity).
CO2 content in finished beverage.
Quality checks
-
8/4/2019 AfG bersicht
8/10
13.02.06 Kr
- In line blending systems
- Batching systems
- Water de-aeration systems- Carbonating systems
- Sugar and powder dissolving systems
- CIP-systems
- Alcohol reception and blending systems
- Yeast propagation systems
Units
Benefits: Ready for integration into the process
Short installation and commissioning time
High degree of standardization
Low risk
Units
-
8/4/2019 AfG bersicht
9/10
13.02.06 Kr
Production of soft drinks (Coke, Pepsi etc.)
- Production of alcopops and spirits
- Spec. feature: direct final product mixing
without syrup production
Customer Specific Solutions
Turn Key projects, extension of existinginstallations, customer specific solutions for:
Remarks: High level of experience and processknow how
Cover the complete supply chain Good market reputation and references
Wide range of installations
Turn key projects
-
8/4/2019 AfG bersicht
10/10
13.02.06 Kr
Process control at its best
In-line Blending
Clear image structure with allrequired information,
Recipe memory protected againstunauthorized access,
Simple extensions by modern bustechnology,
Central operation from PC,
Detailed process visualisation,
Batch reporting