AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial...

29
AES Gener S.A. May 2011

Transcript of AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial...

Page 1: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

AES Gener S.A.AES Gener S.A.May 2011

Page 2: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

AES Gener Creating Value – Our Pillars

2

Solid Track Record in Attractive Markets

Solid Track Record in Attractive Markets

Attractive Growth Potential

Attractive Growth Potential

Diversified Operating Portfolio

Diversified Operating Portfolio

Successful Business Model

Successful Business Model

Financial StrengthFinancial Strength

¿Why invest in AES Gener?

Page 3: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Diversified Operating Portfolio

Diversified Operating Portfolio

Attractive Growth Potential

Attractive Growth Potential

Financial StrengthFinancial Strength

Successful Business Model

Successful Business Model

Solid Track Record in Attractive Markets

Solid Track Record in Attractive Markets

3

Page 4: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Important Presence in Three Major Markets

SIC SING COLOMBIA

2,361 MW in operation• 52% coal

• 11% hydro (run-of-river)

• 16% gas/diesel

1,184 MW in operation• 46% coal

• 54% gas/diesel

1,000 MW in operation• 100% hydro (dam)

• 16% gas/diesel

• 20% diesel

• 1% biomass

270 MW in construction• coal

259 MW in construction• coal

TermoAndes is connected to the SING and the Argentine system (SADI).

4

4,545 MW in operation & 529 MW in construction

Page 5: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Solid Presence in Attractive and Stable Markets

• Credit Rating:

> BBB-, Ba1

• Rapidly growing and liquid capital market

• Established (1994) market-oriented and

• Credit Rating:

> A+, Aa2

• Developed and liquid domestic capital market

• Pioneer (1982) market-oriented and

Chile Colombia

• Established (1994) market-oriented and transparent regulatory framework

• Low per capita electricity consumption and steady industry growth

> Average 5-year projected energy demand growth: 4% p.a.

• Pioneer (1982) market-oriented and transparent regulatory framework

• Resilient electric sector with growth potential

> Average 5-year projected energy demand growth

– SIC: 6.4% p.a.

– SING: 6.2% p.a.

Page 6: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

3,000

4,000

5,000

6,000

71%14%

15%

AES Gener Shareholders(as of March 31, 2011)

Growing Shareholder Returns

Other

Pension Funds

AES Gener Market Capitalization(US$ Million)

2,3392,698

2,087

3,601

4,425

4,945

0

1,000

2,000

2005 2006 2007* 2008 2009* 2010 Abr-11

6

AES

Note: *Primary equity offerings executed in 2007 and 2009

1,147

2,087

Page 7: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Economic Advantages from AES

� Construction and financing expertise

� Construction contractors

� Equipment and fuel suppliers

� Engineering, consulting and

Global Access to:

5 2

3

8 2 6

62 24

34 2

2

5 2

3

8 2 6

62 24

34 2

2

In OperationIn Construction

7

� Engineering, consulting and insurance services

� International commercial bank markets, specifically project finance

3

3

3

2

2

3

5

2

2

4

4

5

24

2

2

3

34 2

44

2

2

3

3

3

2

2

3

5

2

2

4

4

5

24

2

2

3

34 2

44

2

2

• Operation in 28 countries

• 132 generation plants with > 40,000 MW installed capacity– 1,755 MW wind generation

– 37 MW solar generation

• 14 distribution companies with annual sales of 78,000 GWh

Page 8: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Diversified Operating Portfolio

Diversified Operating Portfolio

Attractive Growth Potential

Attractive Growth Potential

Financial StrengthFinancial Strength

Successful Business Model

Successful Business Model

Solid Track Record in Attractive Markets

Solid Track Record in Attractive Markets

8

Page 9: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

300

400

500

600

Diversified Portfolio by Market Mitigates Risk

Installed Capacity by Market

SICSING

EBITDA by Market(US$ Million)

27%

31%28%

39%

40% 41%

43%

277331

270

397

528

474

0

100

200

2005 2006 2007 2008 2009 2010

SIC SING Colombia

9

Colombia

Diversification reduces earnings and cash flow volatility

44% 47%

16%18%

32%17%

25%

25%

45%

42%40%

31%39%

Page 10: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Diversified Portfolio by Energy Source Guarantees Reliability

Coal 40%

Hydro 28%

10

Gas/Diesel 22%

Diesel 9%

Biomass 1%

Note: Percentages based on installed capacity as of April 30, 2011

Page 11: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Diversified Operating Portfolio

Diversified Operating Portfolio

Attractive Growth Potential

Attractive Growth Potential

Financial StrengthFinancial Strength

Successful Business Model

Successful Business Model

Solid Track Record in Attractive Markets

Solid Track Record in Attractive Markets

11

Page 12: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Commercial Strategy Maximizes Cash Flow, Minimizing Risk and Reducing Uncertainty

• Long-term contracts with indexed prices for efficient units (hydro, coal)

• Spot market sales with back-up units

• Contracts for 70-80% of projected generation

• Remaining generation for spot sales

Chile Colombia

74%

22%

4%

84%

16%

12

2010 Physical Sales: 2010 Physical Sales :

Distcos

Unregulated customers

Spot (Net)Spot (Net)

Customers

Page 13: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Comprehensive Operational Excellence for Sustainable Generation

• Experienced management and extensive operating expertise

• Continuous operating and quality improvement programs

• Safety is first corporate value

• Implementation of world-class safety programSafety

Operational Efficiency

13

• Maintenance and operational enhancements to guarantee commercial availability

• Community relations policy to guide interaction between company and surrounding communities

• Proactive engagement programs

• Integrated environmental management

• Continual environmental improvements and investmentsEnvironment

Community

Efficiency

Page 14: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Diversified Operating Portfolio

Diversified Operating Portfolio

Attractive Growth Potential

Attractive Growth Potential

Financial StrengthFinancial Strength

Successful Business Model

Successful Business Model

Solid Track Record in Attractive Markets

Solid Track Record in Attractive Markets

14

Page 15: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

- Baa3 by Moody’s

- BBB- by S&P

- BBB- by Fitch Ratings

Sound Financial Strategy

- Equity offerings

- Corporate debt

- Project finance

Balanced Capital Structure

Investment Grade Rating

US$816 million as of December 31, 2010- US$593 million cash balance- US$223 million committed credit facilities

- BBB- by Fitch Ratings

Manageable maturities and amortization schedule

15

Amortization Schedule

Liquidity and Committed Credit Facilities

Risk mitigation strategy to minimize earnings and cash flow volatility Active Risk Management

Page 16: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

809 853 930 1,155

1,789

2,120

-

500

1,000

1,500

2,000

2,500

2005 2006 2007 2008 2009 2010

US

$ M

illion

Total Debt

277 331

270

397

528 474

-

100

200

300

400

500

600

2005 2006 2007 2008 2009 2010

US

$ M

illion

EBITDA

Consistent Growth of Financial Results

EBITDA increased 71% in the last 5 years Debt increase associated with projects

54 70

218

657

865

511

-

200

400

600

800

1,000

2005 2006 2007 2008 2009 2010

US

$ M

illion

CAPEX4.6%

4.0%

1.6%

2.2%

3.7%4.0%

0%

1%

2%

3%

4%

5%

2005 2006 2007 2008 2009 2010

%

Dividend Yield

16

EBITDA increased 71% in the last 5 years Debt increase associated with projects

EBITDA = Gross Profit + Administrative Expenses + Depreciation + Minor Adjustments2008, 2009, 2010: Based on IFRS Financial Statements2005-2007: Based on CHGAAP Financial Statements. 12 Month Average FX

Page 17: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

AES Gener 2010 Highlights

� AES Gener earthquake deployment rapid recovery of our plants

� AES Chivor record financial results in Colombia

� Initiation of five new long-term distco supply contracts (~3,600 GWh/year)

� Start of commercial operation of new efficient capacity in the SIC:• Nueva Ventanas (272 MW a coal)

• Guacolda IV (152 MW a coal)• Guacolda IV (152 MW a coal)

� Completion of Electrica Santiago restructuring:• Settlements with four gas transport companies significant reduction in fixed costs

• Purchase of CGE minority share (7%)

• Agreement with local supplier for purchase of LNG

� Resumption of Campiche construction in the SIC (270 MW - coal)• Estimated commercial operation: 1Q-2013

Page 18: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

626

400

600

800

1,000

1,200

Manageable & Diversified Debt Profile

1,135

Amortization Schedule(US$ Million)Total Debt US$ 2.1 Billion

Project Finance US$1,067 Million Gener Senior Notes

US$400 Million

Chivor Senior NotesUS$170 Million

38 45 59 105

57 68 -

200

400

2011 2012 2013 2014 2015 2016 2017 2018+

Project Finance Subsidiaries Corporate

18

Local BondsUS$463 Million

Syndicated Credit US$33 Million

97% denominated in USD / 87% at fixed interest rate

Note: Debt as of December 31, 2011

Page 19: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Diversified Operating Portfolio

Diversified Operating Portfolio

Attractive Growth Potential

Attractive Growth Potential

Financial StrengthFinancial Strength

Successful Business Model

Successful Business Model

Solid Track Record in Attractive Markets

Solid Track Record in Attractive Markets

19

Page 20: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Successful Expansion Plan

• Market presence and know-how

• Extensive experience in project management

• Active engagement with communities and interest groups

48% Increase

5,094 MW

1,660 MW

20

communities and interest groups

• Integrated approach to mitigate transition from construction to operation

• Total investment: US$ 3 billion

3,434 MW

5,094 MW

Installed Capacity2006

Expansion plan Installed Capacity2013

Page 21: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Efficient Capacity

BESS Norgener – SING: 12 MW battery

• Start date : November 2009

Guacolda III – SIC: 152 MW coal

• Start date: July 2009

Nueva Ventanas – SIC: 272 MW coal

• Start date : February 2010

Los Vientos – SIC: 132 MW diesel

• Start date : January 2007

Santa Lidia – SIC: 139 MW diesel

• Start date : April 2009

Projects for 1,123 MW Completed On-time and On-budg et

Innovative CapacityBack-up Capacity

Guacolda IV – SIC: 152 MW coal

• Start date: March 2010

Angamos I – SING: 264 MW coal

• Start date : April 2011

21

Page 22: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

SING

Projects for 529 MW in Construction

Efficient capacity:

Angamos II – 259 MW coal

• Start date: October 2011

Innovative Capacity:

BESS Angamos – 20 MW battery

SIC

Efficient Capacity:

Campiche – 270 MW coal

Antofagasta

Santiago

22

• Start date: November 2011 • Start date : 1Q-2013Santiago

Page 23: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

• 531 MW hydro run-of-river (2 units)- Alfalfal II: 275 MW

- Las Lajas: 256 MW

• Environmental approval obtained in 2009

• Located 50 km east of Santiago

Principal Projects in Development

Alto Maipo - SIC

Santiago

Antofagasta

• Located 50 km east of Santiago

• Same river basin as Gener’s 178 MW Alfalfal I facility

• Minimal new transmission lines (17 km)

• Low environmental impact for large hydro: - No reservoir dams

- Over 90% of works underground

- No impact on indigenous communities or native forests (no re-settlement)

- No impact on Santiago’s water supply

23

Santiago

Page 24: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

• 560 MW coal

• Environmental approval obtained in 2009

• Similar to Angamos facility

• Located adjacent to Angamos units- Synergies related to port services and coal yard, among others

• Pulverized coal technology, with use of bituminous and sub-

Cochrane - SING

Antofagasta

Santiago

Principal Projects in Development

• Pulverized coal technology, with use of bituminous and sub-bituminous coal

• Includes emissions reduction equipment to control SO2, NOx, and particulate emissions

24

Santiago

Page 25: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

• 152 MW coal

• Environmental approval obtained in 2010

• 50% ownership

• Similar to existing facilities

• Located adjacent to existing facilities- Synergies related to port services and coal yard, among others

Guacolda V - SIC

Antofagasta

Santiago

Principal Projects in Development

• Pulverized coal technology, with use of bituminous and sub-bituminous coal

• Includes emissions reduction equipment to control SO2, NOx, and particulate emissions

25

Santiago

Page 26: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

• 20 MW hydro run-of-river (2 units)

• AES Chivor’s Esmeralda Reservoir

• Use of flows from Tunjita river deviation

Tunjita - Colombia

Bogotá

Principal Projects in Development

26

Page 27: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Los Robles - SIC• 750 MW

• 2 coal units

• Environmental approval obtained in 2008

• Includes the construction and operation of port

Other Renewables

> 2,000 MW in Development

Other Projects in Development

Other Renewables• Existing water rights

• Battery Storage (BESS)

• Wind

• Solar

27

1,992 MW with environmental approval

Page 28: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

Attractive Growth Potential

Attractive Growth Potential

Financial StrengthFinancial Strength

� Sound strategy

� Growing financial results

Creating Shareholder Value

Solid Track Record in Attractive Markets

Solid Track Record in Attractive Markets

Diversified Operating Portfolio

Diversified Operating Portfolio

Successful Business Model

Successful Business Model

28

� 4,545 MW in installed operating capacity

� Chile & Colombia are stable markets with growing demand

� Geographical and technological diversification

� Diversification reduces risk

� Maximization of cash flow, minimization of uncertainty

� Comprehensive operational excellence

results

Page 29: AES Gener S.A. Gener earthquake deployment rapid recovery of our plants AES Chivor record financial results in Colombia Initiation of five new long-term distco supply contracts (~3,600

reliable energy

29

www.aesgener.com

reliable energy