Aerodrome SafetyAerodrome Safety Certification CertificationAs seen by a Private Airport Operator in PeruAs seen by a Private Airport Operator in Peru
Lima AirportLima Airport P Partners artners
By: Michael NicolaasBy: Michael Nicolaas Chief Operating OfficerChief Operating Officer
ICAO NAM/CAR/SAM Aerodrome Certification WorkshopICAO NAM/CAR/SAM Aerodrome Certification Workshop
Port of Spain, Trinidad and TobagoPort of Spain, Trinidad and Tobago
13 to 16 May 200213 to 16 May 2002 11
Given the importance for Lima Airport Partners (LAP) to have an Airport Certification Program, LAP has stimulated the implementation of such procedures by seeking Certification of the Aeropuerto Internacional Jorge Chavez.
As a private Operator LAP feels that ALL Commercial Airports providing International Air Transport Service must meet Minimum Safety Standards. There should be NO compromise on Operational Safety issues.
22
Aerodrome Aerodrome CertificationCertification
AAerodromeerodrome Certification Certification
LAP has observed and will continue to observe ALL National and International Regulations
Applicable Applicable RegulationsRegulations in Peru are in Peru are:
1. Regulaciones Aeronauticas del Perú (RAP’s).
2. ICAO Convention/Annexes
3. The Aerodrome Certification Manual Doc. 9774 AN/969. First Edition 2001.
3
Aerodrome Aerodrome Certification ManualCertification Manual
Introduction
Aerodrome Certification Process.
Aerodrome Technical Conditions.
Responsibilities of the Aerodrome Operator
Restrictions to Regulations.
Aerodrome CertificationCommittee.
4
AerodromeAerodrome Certification Certification
““Jorge Chavez” Jorge Chavez”
International AirportInternational Airport (JCIA) (JCIA)
Lima Airport Partners, (LAP) as the airport operator, has complied with all of the conditions as set forth by the Civil Aviation Authority (DGAC) of Peru and the SARPS of ICAO, required for the Airport Certification.
5
AAerodromeerodrome Certification Certification
JCIA Certification ProcessJCIA Certification Process..
The Airport Operation : LAP initiated with it’s operations as the airport operator of the JCIA on February 14, 2001.Work Coordination : DGAC and LAP established working groups to determine the levels of technical details required for the Aerodrome certification manual.
66
AAerodromeerodrome Certification Certification
Peruvian Regulations:
Aviation Regulations of Peru (RAP-139).
Certification issued by DGAC to Lima Airport Partners : September 23, 2001
Permanent Review Committee : DGAC and LAP have agreed on audit/verification procedures as part of the certification manual, as per the Airport Master Plan.
7
AAerodromeerodrome Certification Certification
AAerodromeerodrome Certification CertificationContents of the Lima Airport Partners
Aerodrome Certification Manual (ACM)
Lines of Communications and levels of Operational Responsibility
Certain limitations as set forth by the authorities, e.g. ATC, Movement areas amongst others.
Aerodrome Layout. Maps and Grid Charts
Identification and Markings of the Maneuvering Area.
Description of the Maneuvering Area.
Air navigation Procedures
Procedures for Maintenance of unpaved areas.
8
AAerodromeerodrome Certification Certification
Contents of the Lima Airport Partners Certification Manual
Procedures for Maintenance of Security Areas.
Airport Security Program
Airport Emergency Plan
Procedures for Hazardous materials
Procedures for Vehicle Control
Procedures to protect Radio Navigational aids.
Wildlife Management Plan
Other relevant Procedures and Contingencies, e.g. Fuel Spill
9
Security MeasuresSecurity Measures
LAP, LAP, trusts that with this brief presentation trusts that with this brief presentation one can appreciate the efforts made by a one can appreciate the efforts made by a
Private Aerodrome Operator to secure it’s Private Aerodrome Operator to secure it’s Operation by working hand-in-hand with the Operation by working hand-in-hand with the
DGAC to establish basic Operating DGAC to establish basic Operating procedures for the well being of ALL our procedures for the well being of ALL our
users.users.