AEG Power Solutions Protect Blue - ARTronic · 2016. 2. 24. · Protect Blue – Customer Benefits...
Transcript of AEG Power Solutions Protect Blue - ARTronic · 2016. 2. 24. · Protect Blue – Customer Benefits...
-
1AEG PS Strategy Planning Standard Slides incl OPR EMS workfile Office2003.ppt
Protect Blue
Ralf Schulz PM Commercial UPS (Data&IT)
Renewable Energy Solutions Power Control Systems
Solar Systems
Energy Efficiency Solutions Energy Management Systems
Communication Systems
AEG Power Solutions
-
AEG PS Strategy Planning Standard Slides incl OPR EMS workfile Office2003.ppt 2
Protect Blue – Technical Concept
1
-
3
Protect Blue – Technical Concept: Single UPS
250 kVA „Base“ Power Block
+
1-4 „Extension“ Power Blocks
-
4
Protect Blue – Technical Concept: Single UPS 250 kVA
– HWD: 1.900 x 1.000 x 900 mm– Weight: 900 kg
500 kVA– HWD: 1.900 x 2.000 x 900 mm– Weight: 1.800 kg
750 kVA– HWD: 1.900 x 3.000 x 900 mm– Weight: 2.700 kg
1000 kVA– HWD: 1.900 x 4.000 x 900 mm– Weight: 3.600 kg
1250 kVA– HWD: 1.900 x 5.000 x 900 mm– Weight: 4.500 kg
-
5
Protect Blue – Technical Concept: Parallel UPS
4x 250 kVA
4x 500 kVA
4x 750 kVA
Parallel Operation up to 4 UPS
-
6
Protect Blue – Technical Concept: Parallel UPS
4x 1000 kVA
3x 1250 kVA
Max. 16 Power Blocks per UPS System
-
7
Protect Blue – Battery Concept 250 kVA
500 kVA
750 kVA
1000 kVA
1250 kVA
One central Battery per „Base“ Power
Block
BatteryUPS
-
8
Protect Blue – Battery Concept
Example: 4x 750 kVA
Non-Central Battery Concept
Battery Battery Battery Battery
UPS 1 UPS 2 UPS 3 UPS 4
-
9
Protect Blue – Distribution Cabinets
Distribution Cabinets (including Breakers)
up to 500 KVA 750 - 1250 KVA
-
10
Protect Blue – Power Block Assembly
Contactors and Fuses
Communication Options
Input Assembly
Display Unit
-
11
Protect Blue – Power Block Assembly
Flip-Down Frame (Controllers)
SBS Stack
Rectifier Stack
Inverter Stack
-
12
Protect Blue – Alternative Design
-
AEG PS Strategy Planning Standard Slides incl OPR EMS workfile Office2003.ppt 13
Technical Features
2
-
14
Protect Blue – Features
Rectifier and Inverter built with the newest “3-Level” IGBT technology
– Very high efficiency: 95% from 20% load 96% from 40% load– Real online operation– 99% efficiency in ECO Mode– Low THDI max. 3%– Input Power Factor >0,99
These pictures are for information only and are not contractually binding
2-Level IGBT
3-Level IGBT
-
15
Protect Blue – Features
These pictures are for information only and are not contractually binding
“Building Block” - Architecture
– Up to 16 Power Blocks (250kVA) per UPS– N+1 Redundancy– Output Power-Factor 0,9 ind./cap. (225 kW)– Front access to all important components (Rectifier,
Inverter, SBS)– Air exhaust at the top of the cabinet
-
16
Protect Blue – Features
7” wide-screen LCD TouchDisplay
– Intuitive screen design based on folders
– “One-Touch” philosophy for the most important events and measuring values
– Urgent messages will be displayed directly
– Additional 3 LED’s show theUPS status even if LCD is in standby mode
These pictures are for information only and are not contractually binding
Settings Lock screen Help Screenshot
Overall System status
Additional folders for Power Blocks will appear here if connected
Communication Status
Simulated Power Flow
-
17
Protect Blue – Features
These pictures are for information only and are not contractually binding
Prepared to work with alternative battery concepts- Super Caps - Flywheel- Fuel cells
Prepared for Smart Grid / µ Grid- Bi-directional rectifier - Prepared for IEC 61850
communication protocol
-
AEG PS Strategy Planning Standard Slides incl OPR EMS workfile Office2003.ppt 18
Customer Benefits
3
-
19
Protect Blue – Customer Benefits
These pictures are for information only and are not contractually binding
Return on Investment
Securing 500kVA load each percentage better efficiency saves 6.000 €* energy costs per year
Example:
The replacement of a 94% efficiency UPS by a 96% saves 12.000 € energy costsevery year.
Assumed invest for the whole system: 100.000 €Annual amortization: 10.000 €Annual saved energy costs: 12.000 €
Annual benefit: 2.000 €* Assumed energy price: 0,15€ per kW/h
-
20
Protect Blue – Customer Benefits
These pictures are for information only and are not contractually binding
Made in Germany– Developed and built with over 60 years AEG experience in Power Supply Systems
High reliability, long lifetime- Developed by engineers with industrial experience- High Quality components (Capacitors, Fans, Chokes).- Designed for a lifetime of more than 15 years.
• Short delivery time- Planned batch production, Building Blocks are available from stock
Easy to maintain– Power blocks can be repaired on site or with the “Building Block” concept parts of
the power electronic can be exchanged easily.
-
21
Protect Blue – Technical Data 1/2
These pictures are for information only and are not contractually binding
-
22
Protect Blue – Technical Data 2/2
These pictures are for information only and are not contractually binding
-
23
Protect Blue – Questions left?
-
24
AEG PS IGBT UPS
Thanks for your attention