Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman...

41
Advisor Dr. Liguang Tan (http://www.jlab.org/~tangl Dr. Dave Mac (http://www.jlab.org/~mack/ or the beam modulation team Nuruzzama n (http:// www.jlab.org/~nur/) Collaboration Meeting 18 th September 2010 An Update on Beam Modulation for the Q p weak Experiment

Transcript of Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman...

Page 1: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

AdvisorsDr. Liguang Tang

(http://www.jlab.org/~tangl)

Dr. Dave Mack(http://www.jlab.org/~mack/)

for the beam modulation team

Nuruzzaman

(http://www.jlab.org/~nur/)

Collaboration Meeting18th September 2010

An Update on Beam Modulation

for the Qpweak

Experiment

Page 2: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Overview

OPTIM Simulation

Hardware Issues

Diagnostics

Analysis

Future Plans

Page 3: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Optics Changed – August Current

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

3

Page 4: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Upcoming Fall Run Prediction

4

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 5: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Upcoming Run Currents

Beam Parameter

Modulation Amplitude

Current through 1st Coil I1

(A)

Field Integrals

for 1st CoilBdL1 (G-cm)

Current through

2nd Coil I2 (A)

Field Integrals

for 2nd Coil

BdL2 (G-cm)

Tune Parameters

(BdL2 / BdL1)

X 250 μm 0.16 52 -0.30 -99 -1.885

X΄ 4 μrad 0.078 26 -0.30 -99 -3.808

Y 160 μm -0.30 -99 0.11 36 -0.364

Y΄ 3μrad -0.30 -99 0.25 84 -0.848

N.B: Assuming 1 A= 330 G-cm

Calculation scaled to move beam by X= 250μm, X´= 4μrad, Y= 160 μm and Y´= 3μrad

5

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 6: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Beamline

CoilsX1

Y1

Y2

X2

SRFE

BSY Service Building

BMOD1

X1Y1X2Y2

LEMCurrent

Transducer

X1

Y1

Y2

X2

TRIM-IPower Amp.

BPMs

BMOD2

Hall-C

GUI

CONSOLE

Qpweak PV

Daq.Qpweak Cage

IOChCnmr

TRIUMF

ADC

JLAB

ADC

Hardware Sketch

6

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 7: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

0.015 V 1.65 G-cm=

DC Shift Due to Relay

7

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 8: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Predicted Effect from OPTIM for DC Shift

X110 μm

Target

2ndCoil

1st Coil-10 μm

2.5 μm

IC IC

Dump

8

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 9: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Edge Effect in Rampwave Signal

9

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 10: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Modulation Cycle

10

Run # 5230Raster: 2x2Beam Current: 5 μATarget: OUTMain Detector: ONMode: Single Coil ModulationModulation Current: 0.06 A

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Dedicated test runs for beam modulation taken during the summer are 5230-5235 on 08/09/2010

Page 11: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Modulation Cycle

11

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 12: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Function Generator Signals

12

FG X

FG Y

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 13: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Current Transducer Signals

13

LEM X

LEM Y

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 14: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Response of BPM 3H09 for FGX1

14

3H09X3H09Y

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 15: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Response of Main Detector for FGX1

15

+PMT-PMT

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 16: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Response of Main Detector for FGX1

16

(+PMT)+ (-PMT)

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Target OUT

Page 17: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Main Detector Sensitivity with BPM 3H09 for FGX1

17

3H09X3H09Y

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Target OUT

3

7

1 5

4

6

2

8

Page 18: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Future Plans

•Hardware connections were checked and verified several times. Necessary corrections are being modified in software.

•Do test runs after all the corrections (with beam and without beam).

•Analyze data and verify everything is working.

•Need 2-3 hours test with beam to achieve desired tune parameters to get pure position and angle at target. (assuming beam modulation hardware, software, BPMs are in working condition)

•Extract detector sensitivities.

18

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 19: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Extra

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

19

Page 20: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Future Plans

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

20

Page 21: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Future Plans

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

21

3

7

1 5

4

6

2

8

Page 22: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Beamline

CoilsX1

Y1

Y2

X2

SRFE

22

BSY Service Building

BMOD1

X1Y1X2Y2

LEMCurrent

Transducer

X1

Y1

Y2

X2

TRIM-IPower Amp.

BPMs

BMOD2

Hall-C

GUI

CONSOLE

Qpweak PV

Daq.Qpweak Cage

IOChCnmr

TRIUMF

ADC

JLAB

ADC

Extra

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 23: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

23

Extra

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 24: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

24

Extra

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 25: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

25

Extra

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 26: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

26

Extra

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 27: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

27

Extra

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 28: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

28

3h09

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

3H09X3H09Y

Page 29: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

29

Extra

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Page 30: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

X1

X2

07A

XY

07A

09B090807C07B07A

09B090807C07B07A

Target

cosθ sinθcosθ -sinθ

XY

07C

X

E

YY´

i

X

E

YY´

T

YX

07A

YX

07C

Edge Effect in Rampwave Signal

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

30

Page 31: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

FG vs LEM

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

31

Page 32: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Response of Combined BPM for FGX1

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

32

Page 33: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Response of BPM 3H08 for FGX1

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

33

Page 34: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Main Detector Sensitivity with BPM 3H08 for FGX1

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

34

Page 35: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Main Detector Sensitivity with Combined BPM for FGX1

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

35

Page 36: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

General

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

36

Page 37: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Basics

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

θ1

θ2

Z=0 Z=d1

Z=d2

2 1 1

1 1

(d d ) 1θ = T T

d d

2

2 1 1

d 1θ = T T

d d

m m

m m

T = X Y

T = X Y

Where

z

x / y

Forward Beamline

37

Page 38: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Basics

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

We are squeezing our function generators, etc, into a VME crate already in the BSY. We may be asked to upgrade the IOC in that crate.(All the hardware are installed for modulation)

Need to pull some cables from the BSY service building to our parity DAQ in the Qp

weak cage(All the cables are pulled and connections are checked several times)

GUI need to be tested(Its working fine)

LEM rack under construction in Accelerator Division.(Constructed and installed)

38

Page 39: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Basics

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

39

Page 40: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Optics Changed – August Current

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

1 mm

-1 mm

-1 mm

1 mm

-1 mm

1 mm

-1 mm

1 mmX X´

Y Y´

40

Page 41: Advisors Dr. Liguang Tang (tangl) Dr. Dave Mack (mack/) for the beam modulation team Nuruzzaman (nur/)

Upcoming Fall Run Prediction

1 mm

-1 mm

-1 mm

1 mm

-1 mm

1 mm

-1 mm

1 mmX X´

Y Y´

41

OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans