AdvanTEC Solutions · AdvanTEC Solutions. CASE STUDY ON TAJ PALACE. 40%. ORGANIZATION. Buildings....
Transcript of AdvanTEC Solutions · AdvanTEC Solutions. CASE STUDY ON TAJ PALACE. 40%. ORGANIZATION. Buildings....
-
AdvanTEC Solutions
CASE STUDY ON TAJ PALACE
-
40%
ORGANIZATION
-
Buildings
16% Lighting
9% IT / electronics
10% Water heating
25% Other
40%
32%
28%
Transportation
Industry
100%
ENERGY CONSUMPTION
Energy Pockets
Chiller70%
Chilled Water Pump12%
Condenser Water Pump
12%
Cooling Tower6%
40% HVAC
-
SUCCESS STORIES
4
-
CASE STUDY - TAJ PALACE, NEW DELHI
5
-
6
METHODOLOGY
-
Min Load: 200 TR, Maximum Load: 1100 TR
PLANT PERFORMANCE PROFILE
58%
5%
20%
12% 5%AC Plant Power Consumption
Chiller CHWP CHWS
0.57
1.00
0.70
1.17 1.1
-
0.20
0.40
0.60
0.80
1.00
1.20
1.40
Chiller 1# Chiller 2# Chiller 3# Chiller 4# Chiller 5#
IKW
/TR
Individual Chiller Performance
-
Plant Room Upgrade/ECM IMPLEMENTED
Equipment
• High Efficient Chiller • New Variable Pumps• CTI certified Cooling Tower• Anti Fouling Devices on heat exchanger
System Level
• Dedicated Pumping for Zero Bypass/Leakage• All Variable system design to sustain plant performance• System Designed for < 0.8 IKW/Tr Performance
Integration
• Chiller Plant optimizer• Real Time data logging• Advance Remote monitoring• Adaptive Algorithms for continuous performance improvement
-
PLANT ROOM OPTIMIZATIONINTEGRATED SYSTEM
9
-
10
ENERGY SUSTENANCE
Carrier RMS Center / Customer Center ADSL ModemWireless Modem 3G Router
A remote monitoring unit SIM/LGR (iVu/WebCTRL) is installed in your chiller plant
A communication link with the Chillers / Pumps / Cooling Tower / AHU / Others
Option
Internet
Site3 Site2 Site1
Varity Internet access typesDedicated IP
RMS - Help to know the chiller plant status & performance from anywhere through variety of devices, from PCs to web-based cell phones.
SIM/LGR
OR+
WebCTRLi-Vu
Remote Monitoring / Diagnostics
http://www.dell.com/content/products/category.aspx/precn?c=us&cs=04&l=en&s=bsdhttp://www.dell.com/content/products/category.aspx/precn?c=us&cs=04&l=en&s=bsd
-
C0MPLETE SYSYTEM SOLUTIONS
11
Visualization Optimization Benchmark Diagnostics
Plant system manager
+
Chiller plant health manager
Focus on
• Cost / Energy savings
• System performance
• Diagnostics
-
ENERGY SAVINGS ACHIEVED
ikW/ton
Over 37% Improvement
1.1
0.7
Chiller Plant Efficiency Chart(As per current performance)
0.6
Actual 0.64
Old 1.44
Target0.65
12
-
PLANT ROOM PERFORMANCE
-
VERIFICATION –EARTHCHECK DATA
-
RECOGNISED BY BEE
15
-
RECOGNISED BY BEE
-
Thank you
Retrofitting Existing Building = Asset Enhancement
Integrated Solution for Building = Sustainability
Benefits - Integrated System Concept
Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6PLANT PERFORMANCE PROFILEPlant Room Upgrade/ECM IMPLEMENTEDSlide Number 9ENERGY SUSTENANCEC0MPLETE SYSYTEM SOLUTIONSENERGY SAVINGS ACHIEVEDPLANT ROOM PERFORMANCEVERIFICATION – EARTHCHECK DATASlide Number 15RECOGNISED BY BEESlide Number 17