Advancing Opportunities: Cleveland's Opportunity Corridor

13
OPPORTUNITIES Cleveland’s Opportunity Corridor prepared by: ADVANCING MARCH 2014 cudc.kent.edu + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +

description

The report includes a general assessment of Cleveland's proposed Opportunity Corridor project and offers a forward-looking vision for maximizing the potential benefits of this large investment. The illustrated document outlines a range of strategies for improving the project's return on investment, including links to surrounding neighborhoods, multi-modal connectivity, green infrastructure benefits, and overall identity. The report was self-initiated by Kent State University's Cleveland Urban Design Collaborative (CUDC) in order to meaningfully contribute to the ongoing conversations about the Opportunity Corridor's future. Development of the report supports the CUDC's mission; "advocacy to impact urban design decisions and land use policy in Cleveland and throughout Northeast Ohio." For inquiries regarding the report, please contact the CUDC at: [email protected]

Transcript of Advancing Opportunities: Cleveland's Opportunity Corridor

Page 1: Advancing Opportunities: Cleveland's Opportunity Corridor

OPPORTUNITIES

Cleveland’s Opportunity Corridor

prepared by:

ADVANCING

MARCH

2014

cudc.kent.edu

+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +

Page 2: Advancing Opportunities: Cleveland's Opportunity Corridor

2

+ A $330 million investment

+ Critically important connection between the Airport, I-490, and University Circle

+ Opens up acres of vacant land in one of the most distressed areas of the city

+ Large parcels can be assembled for development that creates jobs

+ Infrastructure investment will drive economic development

+ Transit-rich area of the city–potential for job-centric, transit-oriented development

+ Huge potential for shared green infrastructure/green space network

WHY OPPORTUNITY CORRIDOR MATTERS

+

Page 3: Advancing Opportunities: Cleveland's Opportunity Corridor

3

There’s no comprehensive vision. An

integrated plan is needed to maximize

economic development potential and create

lasting benefits for the neighborhoods most

impacted by Opportunity Corridor.

WHERE IT FALLS SHORT

Employment, environmental remediation,

and public health concerns of existing

city residents must be addressed through

the Opportunity Corridor investment.

Opportunity Corridor is currently

designed for conveyance of cars and

trucks. Transit connections are weak.

Intersections should better accommodate

pedestrians and bicyclists.

Proposed green infrastructure projects

are scattered, not designed as a green

space system. Green infrastructure should

manage stormwater and serve as an

amenity for residents and workers.

Page 4: Advancing Opportunities: Cleveland's Opportunity Corridor

4

WHAT IS NEEDED

1 Neighborhood focus

• Integrated Development & Amenities Plan for the entire swath along the Opportunity Corridor, spanning the Fairfax, Central, Kinsman, and Slavic Village neighborhoods.

Page 5: Advancing Opportunities: Cleveland's Opportunity Corridor

5

WHAT IS NEEDED

• Thoughtful design of the public realm with a clear focus on providing benefits to the people who live in the neighborhoods along Opportunity Corridor.

Science Park | New Haven, CT Kendall Square | Cambridge, MA

1 Neighborhood focus

Page 6: Advancing Opportunities: Cleveland's Opportunity Corridor

6

WHAT IS NEEDED

• Implement Complete & Green Street standards and intersection improvements for existing north/south streets that intersect with Opportunity Corridor.

2 Multi-modal approachCleveland Complete & Green Streets Typologies Plan

Page 7: Advancing Opportunities: Cleveland's Opportunity Corridor

7

WHAT IS NEEDED

• Sound walls, dead-end streets, and wide turning radii should be removed from the Opportunity Corridor plan. Highway-inspired elements will make the new roadway function as a high-speed bypass, rather than an integral part of the surrounding neighborhoods.

2 Multi-modal approach

Page 8: Advancing Opportunities: Cleveland's Opportunity Corridor

8

WHAT IS NEEDED

3 Development guidelines

• Green Overlay Zoning District including standards for development and stormwater management, and design guidelines for buildings and sites.

Page 9: Advancing Opportunities: Cleveland's Opportunity Corridor

9

WHAT IS NEEDED

TRANSIT & NEIGHBORHOOD CONNECTIONS

NEW BUILDINGS FRONT ON EXISTING STREETS

SHARED DETENTION BASIN

SUSTAINABLE TECHNOLOGIES

COMBINED GREEN INFRASTRUCTURE & GREENWAY

PUBLIC PLAZA WITH GREEN INFRASTRUCTURE

3 Development guidelines

Page 10: Advancing Opportunities: Cleveland's Opportunity Corridor

10

WHAT IS NEEDED

• Multi-tasking green infrastructure investments that manage stormwater, reduce combined sewer overflows, create usable and beautiful public spaces, and enable new development projects to direct runoff to a shared system.

4 Green System

Menomonee Valley Redevelopment & Park | Milwaukee, WI

Page 11: Advancing Opportunities: Cleveland's Opportunity Corridor

11

WHAT IS NEEDED

• Deeper understanding of neighborhood needs, priorities, and values.

• Greater involvement of Bike Cleveland and RTA in planning for an integrated, multi-modal system.

• Productive engagement with people opposed to the Opportunity Corridor, leading to a shared vision for how we can make the project better.

5 Meaningful Engagement

Page 12: Advancing Opportunities: Cleveland's Opportunity Corridor

12

A VISION IS NEEDED

GuidelinesZoning overlay districtLow-impact developmentForm-based codes

Green SystemsShared green infrastructure for stormwater runoffPublicly accessible paths & green spaces

Multi-modalComplete & Green north/south streetsBike and pedestrian friendly intersections

Transit AccessDensity around transit connectionsMaximize use of transit infrastructure

NeighborhoodsKnit corridor development into neighborhoodsDesign for maximum connectivity & access

INNOVATION ZONE

RED LINE

E. 79 St.

E. 75 St.

BLUE/G

REEN LINE

URBAN AGRICULTURE

Page 13: Advancing Opportunities: Cleveland's Opportunity Corridor

OPPORTUNITIESCOMMENTS ?

Cleveland’s

Opportunity Corridor

ADVANCING

cudc.kent.edu

[email protected]