PT. WASA MITRA ENGINEERING MUARA KARANG GAS POWER PLANT PROJECT SUMMARY REPORT OF EXTRA WORK & EXTRA MATERIALS DATE QUOTATION NO REQUEST FOR EXTRA DOC NO DESCRIPTION REVISED REMARKS ISSUED DATE NUMBER AMOUNT 1 25Jul08 MK(PLTU)TSWME08001 Dismantle Existing CCTV Muara Karang PLTU Switchyard 22Aug08 135/WME/BDG/QPP/VIII/08 250.00 $ 130.00 $ 2 21Aug08 MK(PLTU)TSWME080011 Shifting of Overhead Cables (temporary work) 22Aug08 134/WME/BDG/QPP/VIII/08 250.00 $ 90.00 $ 3 27Oct08 MK(PLTU)TSWME080025 Request for Installation of the existing aluminium wire into new Tube conductor for main bus bar A 28Oct08 175/WME/BDG/QPP/XI/08 1,250.00 $ 660.00 $ NO. REQUEST FOR EXTRA DOC. NO. DESCRIPTION QUOTATION REMARKS 4 23Jan09 MK(PLTU)TSWME09007A Request modification of the support for cable tray at extension in PLTU site 23Jan09 013A/WME/BDG/QPP/I/09 780.00 $ 372.00 $ 5 27Jan09 MK(PLTU)TSWME09053 Request modification of the support for cable tray at extension in PLTU site 27Jan09 014A/WME/BDG/QPP/I/09 180.00 $ 80.00 $ 6 Quotation of Hole in Anchor 3Feb09 020/WME/BDG/QPP/II/09 1,350.00 $ 1,350.00 $ Material supply 7 27Feb09 MK(PLTU)TSWME090077 Request for change of 240sq grounding cable at GIS (Dia.9,10) in PLTU site 27Feb09 032A/WME/BDG/QPP/II/09 120.00 $ 45.00 $ 8 7Mar09 MK(PLTU)TSWME09085 Request for installation of lighting at extension area in PLTU site 7Mar09 034B/WME/BDG/QPP/III/09 1,320.00 $ 520.00 $ 9 10Mar09 MK(PLTU)TSWME09086 Request for installation of cover on the cable pit for GIS (Dia.9,10) 10Mar09 034C/WME/BDG/QPP/III/09 540.00 $ 240.00 $ 10 Quotation of provide Supporting Tools & Facilities for termination Work 27Mar09 039/WME/BDG/QPP/III/09 3,100.00 $ 3,100.00 $ Material supply 11 Rental for Chain Block and Nylon Sling for Cabling and Termination 150kV Power Cable 15Jun09 83/WME/MK/EXT/VI/09 780.00 $ 780.00 $ Rental tool 12 Rental for Container Office at PLTU 15Jun09 84/WME/MK/EXT/VI/09 850.00 $ 26,350.00 $ Rental for 28 UM (Dec.'08 ~ Dec.'10) SUB TOTAL I 33,717.00 $ 13 5Feb10 MK(PLTU)TSWME100142 Oil Drainage Work for STG Transformer 6,300.00 $ 5,900.00 $ 14 N2 Gas Refilling to Transformer 22Jun10 122/WME/BDG/QPP/VI/10 8,890.00 $ 8,500.00 $ 15 IPB Welding Works 26Jul10 134/WME/BDG/PP/VII/10 5,220.00 $ 5,140.00 $ 16 Transportation of Existing Material to D/K and Muara Angke S/S 10Feb11 023/WME/PNC/PP/I/11 8,988.00 $ 8,988.00 $ Period : January 2009 ~ Februari 2, 2011 SUB TOTAL II 28,528.00 $ GRAND TOTAL ( I + II ) 62,245.00 $ Excluded VAT 10% Remarks : Quotation Refer No.59/WME/MK/EXT/IV/09 Arrangement of Diesel Generator, Change from 100kVA to 60kVA for Muara Karang PLTU Site each 1 month is amount to = $ 1500.00 (Request use period from May 1, 2009 up to April 31, 2010) Quotation Refer No.84/WME/MK/EXT/VI/09 Rental Container office at PLTU are 2 units and 1 unit each 1 month is amount = $ 850.00 1. (1 unit) container office from December 2008 up to May 2009 = 6 months 2 (1 it) ti ffi f D b 2008 t 2. (1 unit) container office from December 2008 p to now

description

Additional Work

Transcript of Additional Work After Revision (040511)

Page 1: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGMUARA KARANG GAS POWER PLANT PROJECT

SUMMARYREPORT OF EXTRA WORK & EXTRA MATERIALS

DATE QUOTATIONNO REQUEST FOR EXTRA DOC NO DESCRIPTION

REVISED REMARKS

ISSUED DATE NUMBER AMOUNT

1 25‐Jul‐08 MK(PLTU)‐TS‐WME‐08‐001 Dismantle Existing CCTV Muara Karang PLTU Switchyard 22‐Aug‐08 135/WME/BDG/QPP/VIII/08 250.00$               130.00$              

2 21‐Aug‐08 MK(PLTU)‐TS‐WME‐08‐0011 Shifting of Overhead Cables (temporary work) 22‐Aug‐08 134/WME/BDG/QPP/VIII/08 250.00$               90.00$                

3 27‐Oct‐08 MK(PLTU)‐TS‐WME‐08‐0025 Request for Installation of  the existing aluminium wire into new

Tube conductor for main bus bar A 28‐Oct‐08 175/WME/BDG/QPP/XI/08 1,250.00$            660.00$              

NO. REQUEST FOR EXTRA DOC. NO. DESCRIPTIONQUOTATION

REMARKS

4 23‐Jan‐09 MK(PLTU)‐TS‐WME‐09‐007A Request modification of the support for cable tray at extension in PLTU site 23‐Jan‐09 013A/WME/BDG/QPP/I/09 780.00$               372.00$              

5 27‐Jan‐09 MK(PLTU)‐TS‐WME‐09‐053 Request modification of the support for cable tray at extension in PLTU site 27‐Jan‐09 014A/WME/BDG/QPP/I/09 180.00$               80.00$                

6 Quotation of Hole in Anchor 3‐Feb‐09 020/WME/BDG/QPP/II/09 1,350.00$            1,350.00$            Material supply

7 27‐Feb‐09 MK(PLTU)‐TS‐WME‐09‐0077 Request for change of 240sq grounding cable at GIS (Dia.9,10) in PLTU site 27‐Feb‐09 032A/WME/BDG/QPP/II/09 120.00$               45.00$                

8 7‐Mar‐09 MK(PLTU)‐TS‐WME‐09‐085 Request for installation of lighting at extension area in PLTU site 7‐Mar‐09 034B/WME/BDG/QPP/III/09 1,320.00$            520.00$              

9 10‐Mar‐09 MK(PLTU)‐TS‐WME‐09‐086 Request for installation of cover on the cable pit for GIS (Dia.9,10) 10‐Mar‐09 034C/WME/BDG/QPP/III/09 540.00$               240.00$              ( ) q p ( )

10 Quotation of provide Supporting Tools & Facilities for termination Work 27‐Mar‐09 039/WME/BDG/QPP/III/09 3,100.00$            3,100.00$            Material supply

11 Rental for Chain Block and Nylon Sling for Cabling and Termination 150kV Power Cable 15‐Jun‐09 83/WME/MK/EXT/VI/09 780.00$               780.00$               Rental tool

12 Rental for Container Office at PLTU 15‐Jun‐09 84/WME/MK/EXT/VI/09 850.00$               26,350.00$          Rental for 28 U‐M

(Dec.'08 ~ Dec.'10)

SUB TOTAL I 33,717.00$        ,$

13 5‐Feb‐10 MK(PLTU)‐TS‐WME‐10‐0142 Oil Drainage Work for STG Transformer 6,300.00$            5,900.00$           

14 N2 Gas Refilling to Transformer 22‐Jun‐10 122/WME/BDG/QPP/VI/10 8,890.00$            8,500.00$           

15 IPB Welding Works 26‐Jul‐10 134/WME/BDG/PP/VII/10 5,220.00$            5,140.00$           

16 Transportation of Existing Material to D/K and Muara Angke S/S 10‐Feb‐11 023/WME/PNC/PP/I/11 8,988.00$            8,988.00$            Period : January 2009 ~

Februari 2, 2011eb ua , 0

SUB TOTAL II 28,528.00$        

GRAND TOTAL ( I + II ) 62,245.00$         Excluded VAT 10%

Remarks :Quotation Refer No.59/WME/MK/EXT/IV/09 Arrangement of Diesel Generator, Change from 100kVA to 60kVA for Muara Karang PLTU Siteeach 1 month is amount to = $ 1500.00 (Request use period from May 1, 2009 up to April 31, 2010)

Quotation Refer No.84/WME/MK/EXT/VI/09 Rental Container office at PLTU are 2 units and 1 unit each 1 month is amount = $ 850.001. (1 unit) container office from December 2008 up to May 2009 = 6 months2 (1 it) t i ffi f D b 2008 t2. (1 unit) container office from December 2008 p to now

Page 2: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : Dismantle Existing CCTV in Muara Karang

Gas Power Plant Project

QUOTATION No. 1

1 MANPOWER Combined Main Work- Supervisor Agus Suwedi 1 Mds 80.00 - - Skill Junaidi, Wasjud 2 Mds 20.00 40.00 For Excavation- Electrician Agus Budiono, Supriyanto 2 Mds 20.00 -

2 TOOLS LS 20.00 Combination Plier 1 pcsFire Sealing 1 setShovel 2 pcsTester 1 pcsLadde 6 Meter 1 pcs

3 SITE TRANSPORTATION 1 Day 70.00 70.00

1 Lot 130.00 Excluded VAT 10%

REMARKS

T O T A L (US $)

NO. DESCRIPTION SPECIFICATION / NAME LIST QUANTITY Unit Price (US $)

AMOUNT (US $)

1 of 1

Page 3: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : Shifting of Overhead Cables (Temporary Work) at

Muara Karang PLTU Switchyard for Muara Karang Gas Power Plant Project

QUOTATION No. 2

1 MANPOWER Combined Main Work- Supervisor Paimin 1 Mds 80.00 - - Skill Supriyanto, Cecep, Priyo Rumhadi 2 Mds 20.00 - - Helper Dwi Satriawan, Mulyono 2 Mds 20.00 -

2 TOOLS LS 20.00 Scaffolding Frame 3 setScaffolding Pipe 5 pcsScaffolding Clamp 10 pcsRachet Wrench 1 pcsCombination Plier 1 pcs

3 SITE TRANSPORTATION 1 Day 70.00 70.00

1 Lot 90.00 Excluded VAT 10%

REMARKS

T O T A L (US $)

NO. DESCRIPTION SPECIFICATION / NAME LIST QUANTITY Unit Price (US $)

AMOUNT (US $)

1 of 1

Page 4: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : INSTALLATION OF EXISTING ALLUMINIUM WIRE INTO

NEW TUBE CONDUCTOR FOR MAIN BUS BAR A

QUOTATION No. 3

1 MANPOWER Combined Main Work- Cordinator AGUS SUWEDI 3 Mds 100.00 - - Rigger ADE SAIFUDIN 1 Mds 20.00 - - Rigger AGUS GUNAWAN 1 Mds 20.00 - - Helper SLAMEET WIDODO 1 Mds 14.00 - - Opr. Unic Crane ADE KHOLIL 1 Mds 20.00 - - Rigger M. YUSUF 1 Mds 20.00 - - Electrician KAMALUDIN 2 Mds 20.00 - - Electrician SUHENDAR 2 Mds 20.00 - - Electrician DEDEN 2 Mds 20.00 - - Electrician HERI SANTOSO 2 Mds 20.00 - - Electrician IWAN SETIAWAN 2 Mds 20.00 -

2 UNIC CRANE 1 Unitdays 350.00 350.00

3 TOOLS & CONSUMABLE 1 Lot LS 130.00

4 TRANSPORTATION Minibus 3 Unitdays 60.00 180.00

1 Lot 660.00 Excluded VAT 10%

REMARKS

T O T A L (US $)

NO. DESCRIPTION SPECIFICATION / NAME LIST QUANTITY Unit Price (US $)

AMOUNT (US $)

1 of 1

Page 5: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : Modification of The Support for Cable Tray

at Extension in PLTU Site

Ref. No. MK(PLTU)-TS-WME-09-007A

QUOTATION No. 4

1 MANPOWER Combined Main Work- Supervisor 4 Mds 48.00 - - Electrician 8 Mds 20.00 - - Helper 4 Mds 14.00 -

2 TOOLS & CONSUMABLE 1 Lot LS 132.00

3 OTHERS 1 Lot LS 240.00 - Transportation

1 Lot 372.00 Excluded VAT 10%

REMARKS

T O T A L

NO. DESCRIPTION QUANTITY Unit Price (US $)

AMOUNT (US $)

1 of 1

Page 6: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : Modification of The Support for Cable Tray

at Extension in PLTU Site Ref. No. MK(PLTU)-TS-WME-09-053

QUOTATION No. 5

1 MANPOWER Combined Main Work- Supervisor 1 Mds 48.00 - - Electrician 2 Mds 20.00 - - Helper 1 Mds 14.00 -

2 TOOLS & CONSUMABLE 1 Lot LS 20.40

3 OTHERS 1 Lot LS 60.00 - Transportation- Site Expenses

1 Lot 80.40

80.00 Excluded VAT 10%

REMARKS

T O T A L (US $)

R O U N D E D

NO. DESCRIPTION QUANTITY Unit Price (US $)

AMOUNT (US $)

1 of 1

Page 7: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : MATERIAL SUPPLY

HOLE IN ANCHOR (DYNA SET)

QUOTATION No. 6

Unit Price AMOUNT

( US $ ) ( US $ )

1 Supply Dyna Set M12 x 50 SUS 304 100 Set 8.00 800.00 Complete With Bolt & Washer

2 Supply Dyna Set M10 x 40 SUS 304 50 Set 7.60 380.00 Complete With Bolt & Washer

1 Lot 1,180.00

177.00

1,357.00

1,350.00 Excluded VAT 10%

Overhead 15 %

Total

Rounded

NO. DESCRIPTION SPECIFICATION QUANTITY REMARKS

Sub Total

1 of 1

Page 8: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : Change of 240 Sqmm Grounding Cable

at GIS (Dia. 9, 10) in PLTU Site Ref. No. MK(PLTU)-TS-WME-09-077

QUOTATION No. 7

1 MANPOWER- Supervisor - Mds 48.00 - - Electrician 4 Mds 20.00 - Combined Main Work- Helper - Mds 14.00 -

2 TOOLS & CONSUMABLE 1 Lot LS 15.00

3 OTHERS 1 Lot LS 30.00 - Transportation- Site Expenses

1 Lot 45.00 Excluded VAT 10%

REMARKS

T O T A L (US $)

NO. DESCRIPTION QUANTITY Unit Price (US $)

AMOUNT (US $)

1 of 1

Page 9: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : Installation of Lighting at Extension area

in PLTU site Ref. No. MK(PLTU)-TS-WME-09-085

QUOTATION No. 8

1 MANPOWER Combined Main Work- Supervisor 6 Mds 48.00 - - Electrician 26 Mds 20.00 - - Helper - Mds 14.00 -

2 TOOLS & CONSUMABLE 1 Lot LS 160.00

3 OTHERS 1 Lot LS 360.00 - Transportation- Site Expenses

1 Lot 520.00 Excluded VAT 10%

REMARKS

T O T A L (US $)

NO. DESCRIPTION QUANTITY Unit Price (US $)

AMOUNT (US $)

1 of 1

Page 10: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : Installation of Cable Pit Cover for GIS

Dia. 9, 10 Ref. No. MK(PLTU)-TS-WME-09-086

QUOTATION No. 9

1 MANPOWER Combined Main Work- Supervisor 3 Mds 48.00 - - Electrician 6 Mds 20.00 - - Helper - Mds 14.00 - - Support Welder 2 Mds 22.00 -

2 TOOLS & CONSUMABLE 1 Lot LS 60.00

3 OTHERS 1 Lot LS 180.00 - Transportation- Site Expenses

1 Lot 240.00 Excluded VAT 10%

REMARKS

T O T A L (US $)

NO. DESCRIPTION QUANTITY Unit Price (US $)

AMOUNT (US $)

1 of 1

Page 11: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : PROVIDE SUPPORTING TOOLS AND

FACILITIES FOR TERMINATION WORKS

QUOTATION No. 10

1 FLOOR STANDNG AIR CONDITIONER 5 HP 2 Set 500.00 1,000.00 2 BLUE SHEET 8 X 10 M 4 Pcs 85.00 340.00 3 BLUE SHEET 4 X 6 M 2 Pcs 25.00 50.00 4 TL LAMP 2 X 40 M 2 Set 25.00 50.00 5 TL LAMP 1 X 40 M 2 Set 17.00 34.00 6 POWER CABLE NYHY 2 x 2.5 SQMM 100 M 1.05 105.00 7 PICK UP CAR 1 Unit 1,600.00 1,600.00

1 Lot 3,179.00

3,100.00 Excluded VAT 10%

REMARKS

T O T A L (US $)

ROUNDED

NO. DESCRIPTION SPECIFICATION QUANTITY Unit Price (US $)

AMOUNT (US $)

1 of 1

Page 12: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGMUARA KARANG - GAS POWER PLANT PROJECT150KV A/S SWITCH YARD & SUBSTATION

LOADING OF ADDITIONAL CONTAINER OFFICE (USED BY TPSC)

QUOTATION No. 12

2008

Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apri May Jun Jul Aug Sept Oct Nov DecNO DESCRIPTION

2010REMARK

2009DURATION UNIT PRICE

(USD)AMOUNT

(USD)

1 1st CONTAINER OFFICE 20' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 22 U-M 850.00 18,700.00 Rental

2 2nd CONTAINER OFFICE 20' 1 1 1 1 1 1 6 U-M 850.00 5,100.00 Rental

28 U-M 23,800.00 Excluded VAT 10%T O T A L

Page 1 of 1

Page 13: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERING

CUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : OIL DRAINAGE WORK FOR STG TRANSFORMER

QUOTATION No. 13

Unit Price Amount RemarksUS $ US $

I. MANPOWER1 Supervisor 1 Psn Mds 48.00 0.00 Combined Main Work2 Surveyor 1 Psn 1 Mds 35.00 35.00 Add. MP3 Skill 4 Psn 32 Mds 20.00 640.00 Add. MP4 Helper 4 Psn 16 Mds 14.00 224.00 Add. MP

II HEAVY EQUIPMENT1 Truck Crane 20 Ton 1 Unit 4 Days 650.00 2,600.00 Included Fuel Oil & Operator

III TRANSPORTATIONMini Bus 10 Days 50.00 500.00

IV POWER SUPPLY1 Diesel generator 30 KVA 1 Unit 0.5 Mth 1,250.00 625.00 Included Fuel Oil & Operator2 Distribution Board 1 Set 1 Lot 250.00 250.00

& Cable 3Cx100sq

V TOOLSScaffolding Frame,Ladder 5 M, 1 Lot 400.00 400.00Regulator N2 Gas and Hose,General Tools

VI CONSUMABLE MATERIALSN2 Gas 10 Nos 60.00 600.00Waste Cloth,Bucket,etc 1 Lot 30.00 30.00

VII SITE EXPENSESDrinking Water 10 Btl 1.25 12.50

TOTAL ( US $ ) 1 Lot 5,916.50

ROUNDED 5,900.00 Excluded VAT 10%

NO. D E S C R I P T I O N QUANTITY

Page 14: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : SUMITOMO CORPORATIONPROJECT : MUARA KARANG GAS POWER PLANTWORKS : OIL FILLING WORK FOR TRANSFORMER

MAIN - TANK

QUOTATION No. 14

I. MANPOWER1 Supervisor 1 Psn Mds 48.00 - Combined Main Work2 Surveyor 1 Psn 1 Mds 35.00 35.00 Add. MP3 Skill 4 Psn 32 Mds 20.00 640.00 Add. MP4 Helper 4 Psn 16 Mds 14.00 224.00 Add. MP

II. HEAVY EQUIPMENT1 Truc Crane 20 Ton 1 Unit 4 Days LS 2,600.00 Included Fuel Oil2 Pick Up 1 Unit 8 Days 70.00 560.00 Included Fuel Oil

III. TEMPORARY FACILITYSite Office Container 20 Ft 8 Days Combine Main WorkFacility for above 1 Lot

IV. POWER SUPPLY1 Diesel Generator 50 KVA 1 Unit 1 Lot LS 2,500.00 Included Fuel Oil2 Distribution Board 1 Unit Included3 Power Cable 3c x 100sq 20 M Included

V. TOOLS1 Scaffolding Frame 1 Set 8 Days LS 1,150.00 2 Ladder 5 M 1 No 8 Days3 Regulator N2 Gas 1 No 8 Days4 General Tools 1 Lot

VI. CONSUMABLE MATERIALS1 N2 Gas 10 Nos LS 500.00 2 Waste Cloth, Bucket, etc. 1 Lot

VII. SITE EXPENSESDrinking Water and other expenses 20 Btl LS 300.00

1 Lot 8,509.00

8,500.00 Excluded VAT 10%

T O T A L (US $)

R O U N D E D

NO. DESCRIPTION QUANTITY Unit Price (US $)

AMOUNT (US $) REMARKS

1 of 1

Page 15: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGCUSTOMER : TOSHIBA PLANT SYSTEMS & SERV. CORP.PROJECT : MUARA KARANG GAS POWER PLANTWORKS : OIL FILLING WORK FOR TRANSFORMER

MAIN - TANK

QUOTATION No. 15

I. SITE COORDINATOR Weeks 1,200.00 - by TPSC

II. DIRECT MANPOWER1 WELDER 1 Psn 6 Mds 50.00 300.00 Add. MP2 PIPE FITTER 1 Psn 6 Mds 20.00 120.00 Add. MP3 HELPER 1 Psn 6 Mds 14.00 Combine Main Work

III. HEAVY EQUIPMENT

IV. TOOLS & MACHINERY 1 Lot LS 1,220.00

V. CONSUMABLE 1 Lot LS 1,090.00

VI. SITE TRANSPORTATION1 MINIBUS 1 Unit 1 U-M 1,800.00 1,800.00 Included Fuel Oil2 FUEL 150 Ltr 0.65 97.50 Included

VII. ACCOMMODATION 1 Lot LS 175.00

VIII. MOB./DEMOBILIZATION1 MAN POWER 1 Lot LS 200.00

VII. SITE RUNNING EXPENSES 1 Week LS 140.00

1 Lot 5,142.50

5,140.00 Excluded VAT 10%

T O T A L (US $)

R O U N D E D

NO. DESCRIPTION QUANTITY Unit Price (US $)

AMOUNT (US $) REMARKS

1 of 1

Page 16: Additional Work After Revision (040511)
Page 17: Additional Work After Revision (040511)
Page 18: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGMUARA KARANG GAS POWER PLANT PROJECT

1 001/SC-MK/DN/ I / 09 January 21, 2009 1 CVT QIJ-MK-PACK-D3-05/12 CASE 1 TRUCK B 9105 GJ GI DURI KOSAMBI S/S2 CT QIJ-MK-PACK-D3-9 CASE 1

2 002/SC-MK/DN/ I / 09 January 21, 2009 1 CT QIJ-MK-PACK-D3-16 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S2 CT QIJ-MK-PACK-D3-03 CASE 1

3 003/SC-MK/DN/ I / 09 January 28, 2009 1 CVT QIJ-MK-PACK-D3-13 CASE 1 TRUCK B 9105 GJ GI DURI KOSAMBI S/S2 CCVT & PANEL QIJ-MK-PACK-D3-19/8 CASE 1

4 004/SC-MK/DN/ I / 09 January 28, 2009 1 CB QIJ-MK-PACK-D3-8 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S

5 005/SC-MK/DN/ I / 09 January 28, 2009 1 AL CONDUCTOR PIPE BUS BAR 3 CASE 1 TRUCK RENTAL H 1989 UA GI DURI KOSAMBI S/S2 AL CONDUCTOR PIPE BUS BAR 7 CASE 13 AL CONDUCTOR PIPE BUS BAR 9 CASE 14 AL CONDUCTOR PIPE BUS BAR 14 CASE 15 AL CONDUCTOR PIPE BUS BAR 15 CASE 16 AL CONDUCTOR PIPE BUS BAR 16 CASE 17 AL CONDUCTOR PIPE BUS BAR 17 CASE 18 AL CONDUCTOR PIPE BUS BAR 18 CASE 19 AL CONDUCTOR PIPE BUS BAR 19 CASE 110 AL CONDUCTOR PIPE BUS BAR 20 CASE 111 AL CONDUCTOR PIPE BUS BAR 21 CASE 112 AL CONDUCTOR PIPE BUS BAR 22 CASE 1

6 006/SC-MK/DN/ I / 09 January 29, 2009 1 CB A3 SF-6 QIJ-MK-PACK-D3-02 CASE 1 TRUCK B 9105 GJ GI DURI KOSAMBI S/S

7 007/SC-MK/DN/ I / 09 January 29, 2009 1 CB A3 SF-6 QIJ-MK-PACK-D3-17 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S

8 008/SC-MK/DN/ I / 09 January 29, 2009 1 AL CONDUCTOR PIPE BUS BAR 1 CASE 1 TRUCK RENTAL H 1989 UA GI DURI KOSAMBI S/S2 AL CONDUCTOR PIPE BUS BAR 2 CASE 13 AL CONDUCTOR PIPE BUS BAR 4 CASE 14 AL CONDUCTOR PIPE BUS BAR 5 CASE 15 AL CONDUCTOR PIPE BUS BAR 6 CASE 16 AL CONDUCTOR PIPE BUS BAR 8 CASE 17 AL CONDUCTOR PIPE BUS BAR 10 CASE 18 AL CONDUCTOR PIPE BUS BAR 11 CASE 19 AL CONDUCTOR PIPE BUS BAR 12 CASE 110 AL CONDUCTOR PIPE BUS BAR 13 CASE 111 AL CONDUCTOR PIPE QIJ-MK-PACK-NO 3 CASE 112 AL CONDUCTOR PIPE QIJ-MK-PACK-NO 4 CASE 1

9 009/SC-MK/DN/ II / 09 February 2, 2009 1 L3-LINE TRAP QIJ-MK-PREDEM-D3-19 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S2 ANGLE SUPPORT (TUBE CONDUCTOR) QIJ-MK-PACK-NO 1 CASE 13 AL-TUBE CONDUCTOR QIJ-MK-PACK-NO 6 CASE 14 ANGLE SUPPORT (TUBE CONDUCTOR) QIJ-MK-PACK-NO 5 CASE 15 AL-TUBE CONDUCTOR QIJ-MK-PACK-BUS BAR-23 CASE 16 AL-TUBE CONDUCTOR QIJ-MK-PACK-BUS BAR-24 CASE 1

10 010/SC-MK/DN/ II / 09 February 6, 2009 1 SUPPORT TUBE CONDUCTOR QIJ-MK-PACK-NO 1 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S2 SUPPORT TUBE CONDUCTOR QIJ-MK-PACK-NO 2 CASE 13 DISCONNECTING SWITCH HAND QIJ-MK-PACK-D3-18/ CASE 1

NO. DELIVERIED DATE DESCRIPTION NO. CASE/ DRUM

SUMMARY OF TRANSPORT EXISTING MATERIAL

DELIVERIED BYNUMBER POLICE

DELIVERIED TO REMARKUNIT QTYNO.NO.

1 of 7

Page 19: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGMUARA KARANG GAS POWER PLANT PROJECT

NO. DELIVERIED DATE DESCRIPTION NO. CASE/ DRUM

SUMMARY OF TRANSPORT EXISTING MATERIAL

DELIVERIED BYNUMBER POLICE

DELIVERIED TO REMARKUNIT QTYNO.NO.

OPERATED AND MOTOR 10/1/7/6/14/15

11 011/SC-MK/DN/ II / 09 February 10, 2009 1 INSULATOR (SUPPORT TUBE CONDUCTOR) QIJ-MK-PACK-NO 4 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S2 INSULATOR (SUPPORT TUBE CONDUCTOR) QIJ-MK-PACK-NO 5 CASE 13 DISCONNECTING SWITCH HAND QIJ-MK-PACK-D3-18/ CASE 1

OPERATED AND MOTOR 10/1/7/6/14/15

12 012/SC-MK/DN/ II / 09 February 12, 2009 1 ANGLE SUPPORT (PIPE CONDUCTOR) QIJ-MK-PACK-NO 2 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S2 SA 3.2 SURGE ARRESTER COMMON QIJ-MK-PACK-D3-11 CASE 1

SECTION BUS B

13 013/SC-MK/DN/ II / 09 February 18, 2009 1 SUPPORT TUBE CONDUCTOR QIJ-MK-PACK-NO 3 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S2 SUPPORT CONDUCTOR QIJ-MK-PACK-NO 6 CASE 13 SUPPORT CONDUCTOR QIJ-MK-PACK-NO 7 CASE 14 STRUCTURE CT 3.2 QIJ-MK-PACK-NO 9 CASE 15 CONDUCTOR (WIRE) QIJ-MK-PACK-CONDUCTOR CASE 16 STRUCTURE CB A.3 QIJ-MK-PACK-D3.2 CASE 17 SUPPORT H-BEAM CIRCUIT BREAKER B3&AB3 QIJ-MK-PACK-D3-8/17 CASE 1 2 BUNDLE8 STEEL PIPE FOR HANDLE MOTOR DS QIJ-MK-PACK-D3-STEEL PIPE CASE 19 SUPPORT DISCONNECTING SWITCH QIJ-MK-PACK-NO 15/6/7/14/4/1 CASE 1

14 014/SC-MK/DN/ II / 09 February 23, 2009 1 H-BEAM GCB QIJ-MK-PACK-D3-NO 1 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S2 CONDUCTOR (WIRE) QIJ-MK-PACK-D3-NO 1 CASE 13 SUPPORT CONDUCTOR QIJ-MK-PACK-POLES DS CASE 14 CONDUIT PIPE FOR DS/CT QIJ-MK-PACK-D3-NO 3 CASE 1

15 015/SC-MK/DN/ II / 09 February 24, 2009 1 ORING ARRESTER & MECHANISM FOR DS QIJ-MK-PACK-D3-NO 2 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S2 CONDUCTOR (WIRE) QIJ-MK-PACK-D3-NO 2 CASE 13 BLADE DISCONNECTING SWITCH QIJ-MK-PACK-D3-15/6/7/14/4/1 CASE 1

16 016/SC-MK/DN/ V / 09 May 6, 2009 1 CIRCUIT BREEAKER AB-4 (R,S,T) QIJ-MK-PACK-07 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S # 4WITH WIRE CONDUCTOR FOR CB

2 CVT MAIN BUS A/B PHASE R QIJ-MK-PACK-00 CASE 1 BUS A/B3 LINE TRAP LA QIJ-MK-PACK-04 CASE 1 # 4

17 017/SC-MK/DN/ V / 09 May 6, 2009 1 CT 4.3 BUS SIDE ( R ) QIJ-MK-PACK-08 CASE 1 TRUCK B 9510 AJ GI DURI KOSAMBI S/S # 42 CT 4.3 BUS SIDE ( S ) QIJ-MK-PACK-09 CASE 1 # 4

18 018/SC-MK/DN/ V / 09 May 12, 2009 1 CVT 4.2.A (S & R) QIJ-MK-PACK-01 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S2 CVT 4.2.A (T) & 4.1 SINGLE ( R ) QIJ-MK-PACK-05 CASE 13 CT 4.3 ( T ) BUS B SIDE CT QIJ-MK-PACK-10 CASE 1

19 019/SC-MK/DN/ V / 09 May 13, 2009 1 CVT 4.2.B (R, S & T) QIJ-MK-PACK-02 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S2 CT 4.2 COMMON SECT CT (R, S & T) QIJ-MK-PACK-03 CASE 1

20 020/SC-MK/DN/ V / 09 May 20, 2009 1 CCVT 4.1 QIJ-MK-PACK-06 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S EXISTING # 42 CB B4 -SF6 QIJ-MK-PACK-13 CASE 1

21 021/SC-MK/DN/ V / 09 May 22, 2009 1 CB A4 - SF6 QIJ-MK-PACK-18 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S EXISTING # 42 SUPPORT CVT (R, S, T) QIJ-MK-PACK-14 PCS 33 SUPPORT FRAME DS QIJ-MK-PACK-14 PCS 21

2 of 7

Page 20: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGMUARA KARANG GAS POWER PLANT PROJECT

NO. DELIVERIED DATE DESCRIPTION NO. CASE/ DRUM

SUMMARY OF TRANSPORT EXISTING MATERIAL

DELIVERIED BYNUMBER POLICE

DELIVERIED TO REMARKUNIT QTYNO.NO.

4 MECHANISM DS QIJ-MK-PACK-14 PCS 215 FEMALE/ CONTACT DS QIJ-MK-PACK-14 PCS 20

22 022/SC-MK/DN/ V / 09 May 22, 2009 1.1 CONECTOR CB QIJ-MK-PACK-12 PCS 7 TRUCK B 9970 TA GI DURI KOSAMBI S/S EXISTING # 41.2 SUPPORT CVT (R, S, T) QIJ-MK-PACK-12 PCS 181.3 SUPPORT FRAME DS QIJ-MK-PACK-12 PCS 41.4 MECHANISM DS QIJ-MK-PACK-12 PCS 11.5 FEMALE/ CONTACT DS QIJ-MK-PACK-12 PCS 2

2 SA 4.3 & SA 4.2 (R, S, T) QIJ-MK-PACK-15 CASE 1

3.1 MECHANISM DS QIJ-MK-PACK-16 PCS 153.2 MECHANISM DS B 4.3 QIJ-MK-PACK-16 PCS 23.3 CONECTOR DS B 4.3 QIJ-MK-PACK-16 PCS 83.4 SUPPORT FRAME CB QIJ-MK-PACK-16 PCS 3

23 023/SC-MK/DN/ V / 09 May 25, 2009 1 CONDUCTOR PIPE QIJ-MK-PACK-17 PCS 18 TRUCK B 9970 TA GI DURI KOSAMBI S/S EXISTING # 4

24 117/SC-MK/DN/ VIII / 09 August 20, 2009 1.1 CONNECTOR ES QIJ-MK-PLTGU-PACK-03 SET 1 UNIC CRANE B 9970 TA GI DURI KOSAMBI S/S EXISTING # 41.2 TERMINAL CT SET 11.3 AL-WIRE CONDUCTOR SET 21.4 FLEXIBLE CONDUIT SET 11.5 CABLE (CONTROL & POWER) SET 2

2.1 DS/ES B2.3 (R, S, T) QIJ-MK-PLTGU-PACK-02 PCS 3

3.1 CT 2.1 (R, S, T) QIJ-MK-PLTGU-PACK-01 PCS 3

25 118/SC-MK/DN/ VIII / 09 August 21, 2009 1.1 ALUMUNIUM PIPE 1,2 x 6500 QIJ-MK-PACK-NO.28 PCS 2 TRUCK B 9970 TA GI DURI KOSAMBI S/S FROM # 81.2 ALUMUNIUM PIPE 1,2 x 5000 PCS 71.3 ALUMUNIUM PIPE 1,2 x 2500 PCS 41.4 ALUMUNIUM PIPE 8,0 x 3000 PCS 31.5 ALUMUNIUM PIPE 5,0 x 2000 PCS 101.6 ALUMUNIUM PIPE 1,5 x 95 PCS 8

2 CT 8.2 PHASE S QIJ-MK-PACK-NO.29 PCS 1

26 027/SC-MK/DN/ VIII / 09 September 1, 2009 1 CT 8.3 (R, S, T) QIJ-MK-PACK-NO.26 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. FROM # 82 CVT 8.2 (R, S, T) QIJ-MK-PACK-NO.29 CASE 13 SA 8.2 QIJ-MK-PACK-NO.30 SET 1

27 028/SC-MK/DN/ VIII / 09 September 2, 2009 1 FRAME DS QIJ-MK-PACK-NO.34 BUNDLE 4 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. FROM # 82 FRAME CB QIJ-MK-PACK-NO.34 BUNDLE 33 MECHANISM PIPE OF ES B8.3E QIJ-MK-PACK-NO.34 BUNDLE 34 AL-WIRE CONDUCTOR QIJ-MK-PACK-NO.33 BUNDLE 25 BLADE DS QIJ-MK-PACK-NO.33 BUNDLE 16 MECHANISM OF MOTOR DS QIJ-MK-PACK-NO.33 BUNDLE 17 CONDUIT DS & CVT 8.2 QIJ-MK-PACK-NO.33 BUNDLE 18 CONNECTOR OF DS QIJ-MK-PACK-NO.33 BUNDLE 29 MECHANISM DS QIJ-MK-PACK-NO.33 BUNDLE 210 JUNCTION BOX CT QIJ-MK-PACK-NO.33 BUNDLE 2

3 of 7

Page 21: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGMUARA KARANG GAS POWER PLANT PROJECT

NO. DELIVERIED DATE DESCRIPTION NO. CASE/ DRUM

SUMMARY OF TRANSPORT EXISTING MATERIAL

DELIVERIED BYNUMBER POLICE

DELIVERIED TO REMARKUNIT QTYNO.NO.

11 JUNCTION BOX DS B 8.3 QIJ-MK-PACK-NO.33 BUNDLE 1

28 029/SC-MK/DN/ IX / 09 September 4, 2009 1 CB AB.8 (PHASE R, S, T) QIJ-MK-PACK-NO.31 SET 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. FROM # 82 INSULATOR DS & SUPPORT BUS QIJ-MK-PACK-NO.33 BUNDLE 3

29 030/SC-MK/DN/ IX / 09 September 4, 2009 1 CB AB.8 (PHASE R, S, T) QIJ-MK-PACK-NO.32 SET 1 TRUCK B 9105 GJ GI DURI KOSAMBI S/S EX. FROM # 82 INSULATOR DS & SUPPORT BUS QIJ-MK-PACK-NO.33 BUNDLE 1

30 031/SC-MK/DN/ IX / 09 September 30, 2009 1 CT 4.2 (R, S, T) QIJ-MK-PLTGU-PACK-NO.04 PCS 3 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. # 4 PLTGU

31 032/SC-MK/DN/ X / 09 October 1, 2009 1 CT 4.3 (R, S, T) QIJ-MK-PLTGU-PACK-NO.05 CASE 3 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. # 4 PLTGU2 CT 4.4 (T) QIJ-MK-PLTGU-PACK-NO.06 CASE 1

32 033/SC-MK/DN/ X / 09 October 2, 2009 1 CENTER CB B.4 QIJ-MK-PLTGU-PACK-NO.07 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. # 4 PLTGU2 CT 4.4 (R, S) QIJ-MK-PLTGU-PACK-NO.06 CASE 2

33 034/SC-MK/DN/ X / 09 October 3, 2009 1 SUPPORT & AIR PRESSURE TUBE CB B.4 (R,S,T) QIJ-MK-PLTGU-PACK-NO.08 PCS 3 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. # 4 PLTGU2 INSULATOR OF DS (B4.1,B4.2,B4.3,AB4.1,AB4.2,A4.3) QIJ-MK-PLTGU-PACK-NO.09 BUNDLE 5

34 035/SC-MK/DN/ X / 09 October 6, 2009 1 JUNCTION BOX DS/ES (B4.1,B4.2,B4.3,AB4.1,AB4.2, QIJ-MK-PLTGU-PACK-NO.08 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. # 4 PLTGUA4.3) & (A4.3E, B4.3E)

2 FRAME OF DS QIJ-MK-PLTGU-PACK-NO.10 BUNDLE 4

35 036/SC-MK/DN/ X / 09 October 14, 2009 1 CB B4 (R,S,T) QIJ-MK-PLTGU-PACK-NO.07 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. # 4 PLTGU

36 037/SC-MK/DN/ X / 09 October 23, 2009 1 CT 4.1 (R,S,T) QIJ-MK-PLTGU-PACK-NO.12 CASE 3 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. # 4 PLTGU2 CVT AB 4 (S) QIJ-MK-PLTGU-PACK-NO.01 PCS 13 FRAME & ARM MECHANISM OF DS/ES QIJ-MK-PLTGU-PACK-NO.11 CASE 1

37 038/SC-MK/DN/ X / 09 October 26, 2009 1 FLEXIBLE CONDUIT, CONTROL & POWER CABLE QIJ-MK-PLTGU-PACK-NO.13 BOX 3 TRUCK B 9105 GJ GI DURI KOSAMBI S/S EX. # 4 PLTGU

38 038/SC-MK/DN/ XI / 09 November 18, 2009 1 CENTRAL BOX CB CB AB-4 & CB A-4 QIJ-MK-PLTGU-PACK-NO.16 BUNDLE 3 TRUCK B 9105 GJ GI DURI KOSAMBI S/S EX. # 4 PLTGU2 CT CT A8.1 (R,S,T) QIJ-MK-PLTGU-PACK-NO.36 CASE 1 EX. # 8A PLTU

39 039/SC-MK/DN/ XI / 09 November 19, 2009 1 CB CB AB-4 QIJ-MK-PLTGU-PACK-NO.14 CASE 1 TRUCK B 9105 GJ GI DURI KOSAMBI S/S EX. # 4 PLTGU2 CVT CVT 8.1 (R,S,T) QIJ-MK-PLTGU-PACK-NO.35 CASE 1 EX. # 8A PLTU

40 040/SC-MK/DN/ XI / 09 November 19, 2009 1 CB A8 (R,S,T) QIJ-MK-PLTGU-PACK-NO.37 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. # 8A PLTU

41 041/SC-MK/DN/ XI / 09 November 20, 2009 1 CB A4 (R,S,T) QIJ-MK-PLTGU-PACK-NO.15 CASE 1 TRUCK B 9970 TA GI DURI KOSAMBI S/S EX. # 4 PLTU

42 042/SC-MK/DN/ XI / 09 November 24, 2009 1 INSULATOR DS DS (A4.1, A4.3) QIJ-MK-PLTGU-PACK-NO.17 BUNDLE 2 TRUCK B 9105 GJ GI DURI KOSAMBI S/S EX. # 4 PLTGU2 BLADE AND ARM DS DS/ES (A4.1, A4.3, B1.3) QIJ-MK-PLTGU-PACK-NO.18 BUNDLE 1 EX. # 1&4 PLTGU3 FRAME OF DS DS/ES (A4.1, A4.3, B1.3) QIJ-MK-PLTGU-PACK-NO.19 BUNDLE 1 EX. # 4 PLTGU4 FLEXIBLE CONDUIT, CONTROL & POWER CABLE QIJ-MK-PLTGU-PACK-NO.20 BOX 1 EX. # 1 PLTGU

( CT & DS/ES )5 SURGE ARRESTER QIJ-MK-PLTU-PACK-NO.38 BUNDLE 1 EX. # 8A

43 043/SC-MK/DN/ XII / 09 December 5, 2009 1 INSULATOR DS DS/ES B1.3 (B1.3E) QIJ-MK-PLTGU-PACK-NO.21 BUNDLE 1 TRUCK B 9105 GJ GI DURI KOSAMBI S/S EX. # 1 PLTGU2 CURRENT TRANSFORMER CT 1.1 QIJ-MK-PLTGU-PACK-NO.22 BOX 3

4 of 7

Page 22: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGMUARA KARANG GAS POWER PLANT PROJECT

NO. DELIVERIED DATE DESCRIPTION NO. CASE/ DRUM

SUMMARY OF TRANSPORT EXISTING MATERIAL

DELIVERIED BYNUMBER POLICE

DELIVERIED TO REMARKUNIT QTYNO.NO.

3 BOX OF MECHANISM DS/ES A4.1, B1.3 (B1.3E) QIJ-MK-PLTGU-PACK-NO.23 BUNDLE 1

44 032/SC-MK/DN/ XII / 09 December 9, 2009 1 INSULATOR DS/ES DS (A8.1, A8.2, AB8.1, A8.3) QIJ-MK-PLTU-PACK-NO.39 BUNDLE 4 TRUCK B 9510 AJ GI DURI KOSAMBI S/S EX. # 8A

45 033/SC-MK/DN/ XII / 09 December 10, 2009 1 FRAME OF DS/ES DS (A8.1, A8.2, AB8.1, A8.3) QIJ-MK-PLTU-PACK-NO.40 BUNDLE 4 TRUCK B 9510 AJ GI DURI KOSAMBI S/S EX. # 8A2 BLADE OF DS/ES DS (A8.1, A8.2, AB8.1, A8.3) QIJ-MK-PLTU-PACK-NO.41 BUNDLE 43 PIPE CONDUIT ROD OF DS/ES QIJ-MK-PLTU-PACK-NO.43 BUNDLE 24 FRAME OF CB QIJ-MK-PLTU-PACK-NO.44 PCS 15 KIT CLAMP OF DS/ES DS (A8.1, A8.2, AB8.1, A8.3) QIJ-MK-PLTU-PACK-NO.45 BOX 16 BOX OF MECHANISM DS (A8.1, A8.2, AB8.1, A8.3) QIJ-MK-PLTU-PACK-NO.46 BUNDLE 1

46 049/SC-MK/DN/ IV / 10 April 28, 2010 1 INSULATOR / BUSHING OCB B DIA 7 QIJ-PLTU-DIA.7-PACK-NO.1-3-B CASE 1 TRUCK B 9510 AJ GI ANGKE S/S EX. # 7 PLTU2 INSULATOR / BUSHING OCB B DIA 7 QIJ-PLTU-DIA.7-PACK-NO.1-3-D CASE 1

47 050/SC-MK/DN/ IV / 10 April 28, 2010 1 INSULATOR / BUSHING OCB B DIA 7 QIJ-PLTU-DIA.7-PACK-NO.1-3-A CASE 1 TRUCK RENTAL B 9703 RU GI ANGKE S/S EX. # 7 PLTU2 INSULATOR / BUSHING OCB B DIA 7 QIJ-PLTU-DIA.7-PACK-NO.1-3-C CASE 13 INSULATOR / BUSHING OCB B DIA 7 QIJ-PLTU-DIA.7-PACK-NO.1-3-E CASE 14 INSULATOR / BUSHING OCB B DIA 7 QIJ-PLTU-DIA.7-PACK-NO.1-3-F CASE 1

48 494/WME/SJ/KL/IV/10 April 28, 2010 1 OIL TANK OCB (B) DIA 7 UNIT 1 TRUCK B 9703 RU GI ANGKE S/S EX. # 7 PLTU

49 496/WME/SJ/KL/ IV /10 April 29, 2010 1 ACCESSORIES OCB B-7 LOT 1 PICK UP F 8445 FR GI ANGKE S/S

50 500/WME/SJ/KL/ V /10 May 5, 2010 1 Bushing OCB A-7 PCS 3 TRUCK B 9510 AJ GI ANGKE S/S

51 503/WME/SJ/KL/ V /10 May 6, 2010 1 OCB AB7 UNIT 1 TRUCK RENTAL B 9798 RR GI ANGKE S/S EX. # 7 PLTU

52 504/WME/SJ/KL/ V /10 May 6, 2010 1 OCB A7 UNIT 1 TRUCK RENTAL B 9703 RU GI ANGKE S/S EX. # 7 PLTU

53 505/WME/SJ/KL/ V /10 May 6, 2010 1 Interupt OCB A7 UNIT 1 PICK UP F 8445 FR GI ANGKE S/S EX. # 7 PLTU

54 506/WME/SJ/KL/ V /10 May 6, 2010 1 BUSHING OCB A-7 PCS 3 TRUCK B 9703 RU GI ANGKE S/S2 BUSHING OCB AB-7 PCS 23 INTERUPTOR OCB A-7 PCS 6

55 507/WME/SJ/KL/ V /10 May 6, 2010 1 BUSHING OCB AB-7 PCS 4 TRUCK B 9798 RR GI ANGKE S/S EX. # 7 PLTU

56 508/WME/SJ/KL/ V /10 May 6, 2010 1 Oil OCB DRUM 23 TRUCK B 9510 AJ GI ANGKE S/S EX. # 7 PLTU

57 512/WME/SJ/KL/ V /10 May 7, 2010 1 Oil OCB DRUM 28 TRUCK B 9510 AJ GI ANGKE S/S EX. # 7 PLTU

58 514/WME/SJ/KL/ V /10 May 8, 2010 1 Oil OCB DRUM 26 TRUCK B 9510 AJ GI ANGKE S/S EX. # 7 PLTU

59 521/WME/SJ/KL/ V /10 May 10, 2010 1 Oil OCB DRUM 28 TRUCK B 9510 AJ GI ANGKE S/S EX. # 7 PLTU

60 524/WME/SJ/KL/ V /10 May 12, 2010 1 Oil OCB DRUM 30 TRUCK B 9510 AJ GI ANGKE S/S EX. # 7 PLTU

61 052/SC-MK/DN/ XII / 10 December 16, 2010 1 OIL CIRCUIT BREAKER DIA 5.B PLTU FN 80551 CASE 1 TRUCK (RENTAL) B 9075 JV GI ANGKE S/S

62 053/SC-MK/DN/ XII / 10 December 16, 2010 1 GCB A-1 QIJ-PLTU-DIA.1-PACK-NO. 9 UNIT 1 TRUCK (RENTAL) B 9075 JV GI ANGKE S/S2 BASE GCB QIJ-PLTU-DIA.1-PACK-NO. 7 PCS 3

5 of 7

Page 23: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGMUARA KARANG GAS POWER PLANT PROJECT

NO. DELIVERIED DATE DESCRIPTION NO. CASE/ DRUM

SUMMARY OF TRANSPORT EXISTING MATERIAL

DELIVERIED BYNUMBER POLICE

DELIVERIED TO REMARKUNIT QTYNO.NO.

3 SUPPORT GCB QIJ-PLTU-DIA.1-PACK-NO. 8 PCS 6

63 851/WME/SJ/KL/ XII /10 December 16, 2010 1 Oli Exs. OCB DRUM 18 TRUCK B 9510 AJ GI ANGKE S/S EX. DIA 5 PLTU

64 860/WME/SJ/KL/ XII /10 December 21, 2010 1 ACCESSORIES OCB 5B SET 3 PICK UP D 8494 SG GI ANGKE S/S

65 862/WME/SJ/KL/ XII /10 December 21, 2010 1 Oli Exs. OCB DRUM 18 TRUCK B 9510 AJ GI ANGKE S/S EX. DIA 5 PLTU

66 863/WME/SJ/KL/ XII /10 December 22, 2010 1 Oli Exs. OCB DRUM 23 TRUCK B 9510 AJ GI ANGKE S/S EX. DIA 5 PLTU

67 865/WME/SJ/KL/ XII /10 December 22, 2010 1 Oli Exs. OCB DRUM 16 TRUCK B 9510 AJ GI ANGKE S/S EX. DIA 5 PLTU

68 054/SC-MK/DN/ I / 11 January 7, 2011 1 INSULATOR & TOP DEVICE SA1.2 QIJ-PLTU-DIA.1-PACK-NO. 5 BUNDLE 1 TRUCK B 9510 AJ GI ANGKE S/S2 MECHANIC PIPE QIJ-PLTU-DIA.1-PACK-NO. 12 LOT 1

69 055/SC-MK/DN/ I / 11 January 8, 2011 1 INSULATOR DS A1.1, A1.2, A1.3 QIJ-PLTU-DIA.1-PACK-NO. 1 BUNDLE 1 TRUCK B 9510 AJ GI ANGKE S/S2 INSULATOR DS A1.1, A1.2, A1.3, AB1.1, AB1.2 QIJ-PLTU-DIA.1-PACK-NO. 3 BUNDLE 13 INSULATOR DS A1.1, A1.2, AB1.1, AB1.2 QIJ-PLTU-DIA.1-PACK-NO. 4 BUNDLE 1

70 056/SC-MK/DN/ I / 11 January 8, 2011 1 INSULATOR DS B1.2 QIJ-PLTU-DIA.1-PACK-NO. 14 BUNDLE 1 TRUCK B 9510 AJ GI ANGKE S/S2 INSULATOR DS B1.1 QIJ-PLTU-DIA.1-PACK-NO. 15 BUNDLE 13 DS/ES BASE ADAPTER QIJ-PLTU-DIA.1-PACK-NO. 23 BUNDLE 1

71 057/SC-MK/DN/ I / 11 January 8, 2011 1 DS/ES BLADES QIJ-PLTU-DIA.1-PACK-NO. 13 BUNDLE 1 TRUCK B 9510 AJ GI ANGKE S/S2 DS/ES BLADES QIJ-PLTU-DIA.1-PACK-NO. 22 BUNDLE 1

72 059/SC-MK/DN/ I / 11 January 10, 2011 1 SF6 CIRCUIT BREAKER AB.1 QIJ-PLTU-DIA.1-PACK-NO. 10 SET 1 TRUCK B 9510 AJ GI ANGKE S/S

73 060/SC-MK/DN/ I / 11 January 10, 2011 1 SF6 CIRCUIT BREAKER B.1 QIJ-PLTU-DIA.1-PACK-NO. 11 SET 1 TRUCK B 9510 AJ GI ANGKE S/S

74 058/SC-MK/DN/ I / 11 January 11, 2011 1 INSULATOR DS AB1.1, AB1.2, A1.3E QIJ-PLTU-DIA.1-PACK-NO. 2 BUNDLE 1 TRUCK B 9510 AJ GI ANGKE S/S2 INSULATOR DS/ES B1.3E QIJ-PLTU-DIA.1-PACK-NO. 21 BUNDLE 13 DS/ES BASE ADAPTER QIJ-PLTU-DIA.1-PACK-NO. 6 BUNDLE 1

75 061/SC-MK/DN/ I / 11 January 11, 2011 1 DS/ES PIPE CONDUCTOR QIJ-PLTU-DIA.1-PACK-NO. 24 BUNDLE 1 TRUCK B 9510 AJ GI ANGKE S/S2 CONDUIT & MECHANIC PIPE QIJ-PLTU-DIA.1-PACK-NO. 12 BUNDLE 1

76 062/SC-MK/DN/ I / 11 January 12, 2011 1 CT 1.1 ( Phase R, S, T ) QIJ-PLTU-DIA.1-PACK-NO. 18 Case 1 TRUCK B 9510 AJ GI ANGKE S/S

77 063/SC-MK/DN/ I / 11 January 12, 2011 1 CVT 1.2 ( Phase R, S, T ) QIJ-PLTU-DIA.1-PACK-NO. 16 Case 1 TRUCK B 9510 AJ GI ANGKE S/S

78 064/SC-MK/DN/ I / 11 January 13, 2011 1 CVT 1.1 ( Phase R ) QIJ-PLTU-DIA.1-PACK-NO. 17 Case 1 TRUCK B 9510 AJ GI ANGKE S/S2 CT 1.2 ( Phase R, S ) QIJ-PLTU-DIA.1-PACK-NO. 19 Case 1

79 065/SC-MK/DN/ I / 11 January 13, 2011 1 CT 1.3 ( Phase R, S, T ) QIJ-PLTU-DIA.1-PACK-NO. 20 Case 1 TRUCK B 9510 AJ GI ANGKE S/S

80 066/SC-MK/DN/ I / 11 January 18, 2011 1 INSULATOR DS A7.1 QIJ-PLTU-DIA.7-PACK-NO. 4 BUNDLE 1 TRUCK B 9510 AJ GI ANGKE S/S2 INSULATOR DS AB7.2 QIJ-PLTU-DIA.7-PACK-NO. 8 BUNDLE 13 INSULATOR DS B7.1 QIJ-PLTU-DIA.7-PACK-NO. 9 BUNDLE 14 INSULATOR DS B7.2 QIJ-PLTU-DIA.7-PACK-NO. 10 BUNDLE 1

6 of 7

Page 24: Additional Work After Revision (040511)

PT. WASA MITRA ENGINEERINGMUARA KARANG GAS POWER PLANT PROJECT

NO. DELIVERIED DATE DESCRIPTION NO. CASE/ DRUM

SUMMARY OF TRANSPORT EXISTING MATERIAL

DELIVERIED BYNUMBER POLICE

DELIVERIED TO REMARKUNIT QTYNO.NO.

81 067/SC-MK/DN/ I / 11 January 18, 2011 1 BASE ADAPTER A7.1, B7.2 & MECHANISM PIPES QIJ-PLTU-DIA.7-PACK-NO. 12 BUNDLE 1 TRUCK B 9510 AJ GI ANGKE S/S2 BASE ADAPTER A7.2, AB7.2 & A7.3/ A7.3E QIJ-PLTU-DIA.7-PACK-NO. 13 BUNDLE 13 OPERATING BOX QIJ-PLTU-DIA.7-PACK-NO. 16 BUNDLE 1

82 068/SC-MK/DN/ I / 11 January 31, 2011 1 INSULATOR DS A7.2 QIJ-PLTU-DIA.7-PACK-NO. 5 BUNDLE 1 TRUCK B 9510 AJ GI ANGKE S/S2 INSULATOR DS/ES A7.3E QIJ-PLTU-DIA.7-PACK-NO. 6 BUNDLE 13 BASE ADAPTER QIJ-PLTU-DIA.7-PACK-NO. 14 PALLET 1

83 069/SC-MK/DN/ I / 11 January 31, 2011 1 INSULATOR DS AB7.1 QIJ-PLTU-DIA.7-PACK-NO. 7 BUNDLE 1 TRUCK B 9510 AJ GI ANGKE S/S2 CVT 7.1 (Phase R) & CVT 7.2 (Phase R) QIJ-PLTU-DIA.7-PACK-NO. 11 case 1

84 070/SC-MK/DN/ I / 11 January 31, 2011 1 GCB AB2 QIJ-PLTU-DIA.2-PACK-NO. 3 SET 1 TRUCK B 9510 AJ GI ANGKE S/S2 POLE & SUPPORT BEAM GCB AB2 QIJ-PLTU-DIA.2-PACK-NO. 4 SET 1

85 071/SC-MK/DN/ II / 11 February 1, 2011 1 INSULATOR & BASE ADAPTER DS/ES A4.3E QIJ-PLTU-DIA.4-PACK-NO. 26 SET 1 TRUCK B 9510 AJ GI ANGKE S/S2 BLADE & MECHANICAL BOX QIJ-PLTU-DIA.4-PACK-NO. 27&28 SET 1

86 041/WME/SJ/KL/ II /11 February 2, 2011 1 INTERUPT OCB A-6 SET 1 PICK UP D 8494 SG GI ANGKE S/S

87 042/WME/SJ/KL/ II /11 February 2, 2011 1 INTERUPT OCB AB-6 SET 1 PICK UP D 8494 SG GI ANGKE S/S

88 042/WME/SJ/KL/ II /11 February 2, 2011 1 Oli Exs. OCB DRUM 23 TRUCK B 9510 AJ GI ANGKE S/S EX. DIA 5 PLTU

89 072/SC-MK/DN/ II / 11 February 2, 2011 1 OIL CIRCUIT BREAKER DIA 6A.B PLTU QIJ-PLTU-DIA.6-PACK-NO. 2 UNIT 1 TRUCK (RENTAL) B 9584 OD GI ANGKE S/S

90 073/SC-MK/DN/ II / 11 February 2, 2011 1 OIL CIRCUIT BREAKER DIA 6A PLTU QIJ-PLTU-DIA.6-PACK-NO. 1 UNIT 1 TRUCK (RENTAL) B 9075 JB GI ANGKE S/S

91 074/SC-MK/DN/ II / 11 February 2, 2011 1 GCB B2 QIJ-PLTU-DIA.2-PACK-NO. 16 SET 1 TRUCK (RENTAL) B 9584 OD GI ANGKE S/S2 BLADES DS A2.1, A2.2, AB2.1, AB2.2 QIJ-PLTU-DIA.2-PACK-NO. 24 BUNDLE 13 BLADES DS AB2.2, B2.1, B2.2 QIJ-PLTU-DIA.2-PACK-NO. 25 BUNDLE 1

92 075/SC-MK/DN/ II / 11 February 2, 2011 1 PIPE CONDUCTOR QIJ-PLTU-DIA.2-PACK-NO. 28 BUNDLE 1 TRUCK (RENTAL) B 9075 JV GI ANGKE S/S2 PIPE CONDUCTOR QIJ-PLTU-DIA.7-PACK-NO. 17 BUNDLE 1