h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx September 14, 2020 ADDENDUM NO. 1 Vanman Levee Repairs Drainage District No. 30 – DeSoto Bend Bid Date: Monday, September 28 th , 2020 Bid Time: 3:00 P.M. BMI Project No. A16.120834 This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to disqualification. For purpose of clarity, some Addendum items call for the complete replacement of a Specification section. The following item shall become part of the original Bidding Documents: Completion Date: Work on the improvement shall commence upon approval of the contract by the Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to beginning work on remaining levee repairs. All earthwork must be completed by December 31 st , 2020. Liquidated damages will be assessed for any earthwork not completed by December 31 st , 2020. All remaining work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30 th , 2021. CERTIFICATION: I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Iowa. By: Jonathan P. Rosengren, P.E. License No: 21661 Date: September 14, 2020 *** END OF ADDENDUM NO. 1 *** Attachments: None

Transcript of ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be...

Page 1: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 2: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 3: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 4: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 5: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 6: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 7: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 8: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 9: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 10: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 11: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 12: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 13: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 14: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 15: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 16: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 17: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 18: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 19: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 20: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 21: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 22: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 23: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 24: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 25: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 26: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 27: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 28: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 29: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 30: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 31: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***

Attachments:

None

Page 32: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

Name:

Date:

Page:

Page 33: ADDENDUM NO. 1 th , 2020 - pottcounty-ia.gov · I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly Licensed Professional Engineer

h:\pottawat_co_ia\a16120834\3_design\b_specs\addendum no. 1.docx

September 14, 2020

ADDENDUM NO. 1

Vanman Levee Repairs

Drainage District No. 30 – DeSoto Bend

Bid Date: Monday, September 28th, 2020

Bid Time: 3:00 P.M.

BMI Project No. A16.120834

This addendum forms a part of the Contract Documents and modifies the original Specifications. Acknowledge

receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to

disqualification.

For purpose of clarity, some Addendum items call for the complete replacement of a Specification section.

The following item shall become part of the original Bidding Documents:

Completion Date: Work on the improvement shall commence upon approval of the contract by the

Trustees, and as stated in the Notice to Proceed. Work on the levee breach areas shall be completed prior to

beginning work on remaining levee repairs. All earthwork must be completed by December 31st, 2020.

Liquidated damages will be assessed for any earthwork not completed by December 31st, 2020. All remaining

work under the Contract must be completed, per Iowa Code Section 468.101, no later than April 30th, 2021.

CERTIFICATION:

I hereby certify that this addendum was prepared be me or under my direct supervision, and that I am a duly

Licensed Professional Engineer under the laws of the State of Iowa.

By:

Jonathan P. Rosengren, P.E.

License No: 21661

Date: September 14, 2020

*** END OF ADDENDUM NO. 1 ***