ADB CV Format Individual 10June08 Tri1
Click here to load reader
Transcript of ADB CV Format Individual 10June08 Tri1
Based on ADB_CV-format-10June08
CURRICULUM VITAE (CV)
1. Proposed Position: GIS/ Database Manager
2. Name of Firm: Vietnam National Museum of Nature
3. Name of Expert: Ngo Dang Tri
4. Current Residential Address:
Telephone No.Fax No.:E-Mail Address:
26 Ngoc Ha, Ba Dinh, Hanoi, Vietnam
(0084)976502092
5. Date of Birth:
Citizenship:
21/06/1979
Vietnamese
6. Education
7. Membership in Professional Associations: Vietnam National Museum of Nature
8. Other Trainings Certificate for WISDOM training – “Wisdom prototype and semi-automated geo-data integration methods” (September 23 to September 26, 2009)
9. Countries of Work Experience: Vietnam
10. Languages and computer Skills
a. Language skill
Language Reading Speaking Writing
English Good Faire Good
Vietnamese Mother tongue
b. Computer skill
Operations Windows, Linux
MS. Offices MS. Word, MS. Excel, MS. Power point, MS. Access.
Programming VB.Net, C#, Visual Basic, Avenue, ArcGIS ArcObject, MapExtreme ...
RS & GIS Envi 4.3; ArcView3.x, Mapinfo, ArcGIS (Desktop; Server; Workstation) ...
11. Employment Record From / To 2001 – 2005
Employer Institute of Geography
Positions held Researcher
From / To 2007 – 2009
Employer Vietnam National Museum of Nature
Positions held Researcher
1
1
Institution: Date from – Date to Degree(s) or Diploma(s) obtained
Vrije Universiteit Brussel, Belgium2005-2007
Master, Human EcologyGreat distinction
Military Technical Institute, Vietnam2000-2003
Engineer, InformaticsSatisfaction
Hanoi University of Science, Vietnam1997-2001
Bachelor, Environmental ManagementDistinction
Based on ADB_CV-format-10June08
12.Detailed Tasks Assigned[List all tasks to be performed under this assignment]
13. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned[Among the assignments in which the expert has been involved, indicate the following information for those assignments that best illustrate the expert’s capability to handle the tasks listed in line 11.]
Name of Project Urban Observatory System in Vietnam
Year 2011
Location Vietnam (96 cities)
Client UN-HABITAT and Association of Cities of Vietnam
Main Project Features
- Set up a set of gender-based urban indicators and an urban observatory system in selected cities/towns in Vietnam to help monitor progress in poverty reduction, gender equality and sustainable urban development;
- Establish urban observatory system for selected cities/towns (96 cities);
- Increase the capacity of the national urban development agency, the Association of Cities in Vietnam (ACVN) and local government units for setting up and maintain urban observatories.
Positions Held Urban Indicator/MIS Specialist
Activities Performed
- Supporting ACVN to improve the Vietnam Urban Indicators system;
- Develop a software for Vietnam Urban Indicators management.
Name of Project Quang Nam Provincial Development Strategy and PDS Process Institutionalization. UN-Habitat Project
Year 2010 - 2011
Location Quang Nam province, Vietnam
Client UN-HABITAT
Main Project Features
- Building up a GeoDatabase system of nature and socio-economic condition in Quang Nam province;
- Building up Quang Nam Provincial Development Strategy and PDS Process Institutionalization and integrate it with spatial planning, support competitive advantages and international-agency coordination.
Positions Held GIS/MIS Specialist
Activities Performed
- Building up and managing a Geo-database which contains spatial/physical information up to district details in order to analysis the current situation of Quang Nam province, support to build up the province development strategies.
- Designing and developing a GIS Database management system for the Geodatabase;
2
2
Based on ADB_CV-format-10June08
Name of Project The scientific base of socio – economic and nature conditions for building up economical zone of South East Quang Tri
Year 2009 – 2011
Location Quang Tri province, Vietnam
Client Minister of Science and Technology
Main Project Features
The project is proposed to deal with following questions:
- Could be and Should be dredging a deep sea port at My Thuy, Quang Tri?
- Could be and should be building up an economical zone in South East of Quang Tri?
- How do My Thuy sea port and economical zone of South East Quang Tri impact on environment and socio-economic? How to reduce such impacts?
Positions Held Project director
Activities Performed
- Performing GeoSpatial mapping, analysis and analyst;
- Using transdisciplinary approach to synthetizing special subjects such as Geological, Geomorphological, Hydrological..., social and economical... to deal with project questions and to propose suitable solution to reduce impacts.
Name of Project Pilot survey on Urban Indicators in Viettri City. Cooperation Project between UN-Habitat and ACVN
Year 2009 – 2010
Location VietTri city, Vietnam
Client UN-HABITAT and Association of Cities of Vietnam
Main Project Features
Building up a MDG indicator database system in VietTri city
Positions Held GIS/MIS Specialist
Activities Performed
- Setting up an Indicator - GeoDatabase system;
- Performing GeoSpatial mapping and analysis;
- Programming and customizing Devinfo (DevInfo is a database system for monitoring human development which is developed by UN) to conform to MDG indicator database system in VietTri city; Vietnamizing the software.
Name of Project Environmental Impact Assessment for HoChiMinh
3
3
Based on ADB_CV-format-10June08
highway construction project (the section of Rach Soi–Ben Nhat–GoQuao–Vinh Thuan, Kien Giang province)
Year 2009 - 2010
Location Kien Giang and Vinh Thuan provinces, Vietnam
Client Ministry of communications and Transport
Main Project Features
Assessing the impacts of HoChiMinh highway construction project (the section of Rach Soi–Ben Nhat–GoQuao–Vinh Thuan, Kien Giang province on environmental and proposing suitable solution to reduce such impacts
Positions Held Chief Author
Activities Performed
- Spatial analyst and mapping;
- Analysing impacts of the construction project and proposing suitable solution to reduce such impacts;
- Synthetizing and writing final report.
Name of Project Planning for building an environment monitoring system for QuangTri province
Year 2007
Location Quang Tri province, Vietnam
Client Department of natural resources and environment of Quang Tri
Main Project Features
Planning for building an environment monitoring system for QuangTri
Positions Held Project Manager
Activities Performed
- Building up and managing a GIS Database system of nature condition of Quang Tri province;
- Synthetizing and writing final report
Name of Project Studying and proposing models to manage and protect environmental resources along Ho Chi Minh highway corridor
Year 2007 – 2010
Location Ho Chi Minh highway corridor (through 14 provinces in Vietnam)
Client Minister of Science and Technology
Main Project Features
- Building up a GeoDatabase system of nature and socio-economic condition along Ho Chi Minh highway corridor (The task is separated to a sub-project);
- Proposing models to manage and protect environmental resources along Ho Chi Minh highway corridor.
Positions Held GIS Sub-Project manager
4
4
Based on ADB_CV-format-10June08
Activities Performed
- Performing GeoSpatial mapping, analysis and analyst;
- Building up and managing a GeoDatabase system of nature and socio-economic condition along Ho Chi Minh highway corridor;
- Designing and developing a GIS Database management system for the Geodatabase;
Name of Project Study and development of overall solutions for the rational utility of sand lands in the coastal zone in Central region of Vietnam (provinces from Quang Binh to Binh Thuan)
Year 2002 – 2005
Location Coastal zone in Central region of Vietnam (11 provinces)
Client Minister of Science and Technology
Main Project Features
- Building up a GeoDatabase system of nature and socio-economic condition for Coastal zone in Central region of Vietnam;
- Proposing models to develop economic and manage and protect environmental resources for Coastal zone in Central region of Vietnam.
Positions Held GIS Specialist
Activities Performed
- Performing GeoSpatial mapping, analysis and analyst;
- Building up and managing a GeoDatabase system of nature and socio-economic condition for Coastal zone in Central region of Vietnam;
- Designing and developing a GIS Database management system for the Geodatabase;
Name of Project Establishing Multi-criteria analysis and Multi-layer query tool in Arcview 3.x (Internal circulation)
Year 2003 - 2004
Location This is software tools
Client Institute of Geography
Main Project Features
Programming a Multi-criteria analysis tool
Programming a Multi-layer query tool
Positions Held Leader Programmer
Activities Performed
Programming a Multi-criteria analysis tool
Programming a Multi-layer query tool
5
5
Based on ADB_CV-format-10June08
Name of Project An appropriate technology for flood inundation simulation of the catchments of the rivers in Middle Vietnam.
Year 2003 – 2004
Location Catchments of the rivers in Middle Vietnam
Client Vietnam Academy of Science and Technology
Main Project Features
- Building up a GeoDatabase system of nature condition for catchments of the rivers in Middle Vietnam;
- Stimulating flood inudation for catchments of the rivers in Middle Vietnam.
Positions Held GIS Technician
Activities Performed
- Performing GeoSpatial mapping, analysis and analyst;
- Building up and managing a GeoDatabase system of nature condition for catchments of the rivers in Middle Vietnam;
- Using Hec, HecRas, HecGeoRas, HecHMS (hydrologic and hydraulic models) intergrated with DEM (GIS models) to stimulate flood inundation.
Name of Project Establishing the scientific base for social-economic planning the West of Quang Binh province after Ho Chi Minh road construction
Year 2002 – 2004
Location QuangBinh, Vietnam
Client Department of Science and Technology of Quang Binh
Main Project Features
- Building up a GeoDatabase system of nature and socio-economic condition for QuangBinh province;
- Building up Quang Binh Provincial Development Strategy which takes advantage of HoChiMinh road (the road section in QuangBinh) after construction.
Positions Held GIS Technician
Activities Performed
- Performing GeoSpatial mapping, analysis and analyst;
- Building up and managing a GeoDatabase system of nature and socio-economic condition;
- Designing and developing a GIS Database management system for the Geodatabase.
Name of Project Applying GIS to establish a socio-economic and nature resource database support for sustainable development of QuangTri Province
Year 2000 - 2004
Location Quang Tri province, Vietnam
6
6
Based on ADB_CV-format-10June08
Client Department of Science and Technology of Quang Tri
Main Project Features
- Building up a GeoDatabase system of nature and socio-economic condition;
Positions Held GIS Technician.
Activities Performed
- Performing GeoSpatial mapping, analysis and analyst;
- Building up and managing a GeoDatabase system of nature and socio-economic condition in Quang Tri;
- Designing and developing a GIS Database management system for the Geodatabase.
Name of Project Apply Remote Sensing and Geography Information System to predict flood of Nhat Le Catchment
Year 2002 – 2003
Location NhatLe catchment, QuangBinh, Vietnam
Client Department of Science and Technology of Quang Binh
Main Project Features
- Performing GeoSpatial mapping, analysis and analyst;
- Building up a GeoDatabase system of nature condition for Nhat Le catchment
- Stimulating flood inudation for NhatLe catchment
Positions Held GIS Technician
Activities Performed
- Performing GeoSpatial mapping, analysis and analyst;
- Building up and managing a GeoDatabase system of nature condition for NhatLe catchment
- Using Hec, HecRas, HecGeoRas, HecHMS (hydrologic and hydraulic models) intergrated with DEM (GIS models) to stimulate flood inudation
Name of Project Predicting flood of Thach Han Catchment’s by using GIS
Year 2000 – 2001
Location ThachHan catchment, QuangTri, Vietnam
Client Department of Science and Technology of Quang Tri
Main Project Features
- Building up a GeoDatabase system of nature condition for Nhat Le catchment
- Stimulating flood inudation for NhatLe catchment
Positions Held GIS Technician.
Activities Performed
- Performing GeoSpatial mapping, analysis and analyst;
- Building up and managing a GeoDatabase system of nature condition for ThachHan catchment;
- Using Hec, HecRas, HecGeoRas, HecHMS (hydrologic and hydraulic models) intergrated with DEM (GIS models) to stimulate flood inudation
7
7
Based on ADB_CV-format-10June08
14. Certification:
I, the undersigned, certify to the best of my knowledge and belief− Yes No
(i) this CV correctly describes my qualifications and my experience
(ii) I am employed by the Executing or the Implementing Agency
(iii) I am a close relative of a current ADB staff member
(iv) I am the spouse of a current ADB staff member
(v) I am a former ADB staff member.
If yes, I retired from ADB over 12 months ago
(vi) I am part of the team who wrote the terms of reference for this consulting services assignment.
(vii) I am sanctioned (not eligible for engagement) by ADB.
I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.
Date: 07/04/2011 Signature of expert (Day/Month/Year)
8
8