adapto Presentation

13
adapto Productivity for Manufacturing

description

 

Transcript of adapto Presentation

Page 1: adapto Presentation

adaptoProductivity for Manufacturing

Page 2: adapto Presentation

SAMPLE SLIDES

Page 3: adapto Presentation

adapto – Productivity for Manufacturing

adapto - Feature Overview

modularaffordable

compact

flexible

Page 4: adapto Presentation

The new reality in (North American) Manufacturing

Shorter Product Life Cycles

Shorter Time Lines to bring new Products to Market

Increase of Revision Levels

Initial Production Volume is low (often with a potential, but not certain, increase in the mid or long term)

Single Product Automation

Conditions not suitable for traditional automation solutions

Amortization of automation equipment is difficult

Long Lead Times for automation machines

Ridged Machines are expensive and time consuming to retrofit

High Cost is prohibitive to allow automation on initial volume

Management is reluctant in Capital Spending

Manufacturing Challenges Automation Equipment

Page 5: adapto Presentation

The traditional automation machine

Designed for specific applicationApprox. 80% custom componentsLong Lead Time due to linear task line

DesignManufacturingBuildWiringDebugging / testing

Large InvestmentLong, difficult and expensive upgradesProject must be fully defined prior to designQuality is dependent on project team

Page 6: adapto Presentation

The adapto machine concept

Process Driven automationIndividually “working” cellsStand –alone or linkedApprox. 80% standard componentsPre-manufactured sub-assembliesShort Lead Time Cells are built parallel to each otherSimple Upgrade or exchange of cellsUser FriendlyQuality is predictable

Page 7: adapto Presentation

adapto - flexibility in every direction

Use as a manually loaded stand-alone assembly cell

Upgrade an existing cell with additional automation

Upgrade an existing machine to accommodate new or modified products

Reuse or rearrange modules or processes as they may be needed in the future

From—manually loaded stand-alone assembly cell ...

To—fully automated stand-alone assembly cell ...

To—”integrated” assembly cell to an assembly line.

grow - modify - upgrade

Page 8: adapto Presentation

adapto - Productivity for Manufacturing

adapto - a different approach

Traditional Machine Design adapto

Product Oriented Machine Concept Process Oriented

Low (traditionally 20%) Standardization High (goal 80%)

Linear Progress TimeLine Parallel

Long (5 to 12 Months) Delivery Times Medium (goal 3 to 8 Months)

Rebuild Machine while out of commission Expensive

Product Revision Upgrades

Add or Exchange Cells/Modules Reasonable Cost

Limited Automation Degree Upgrades

Start with most important Process, then add next Processes when feasible

Prototype Machine: Quality isDependant on Project Team

QualityProven Building Blocks:Quality is planned for

Page 9: adapto Presentation

adapto - Linear Motor Technology for maximum flexibility

Semi or fully automatic: loading, unloading and segregation of parts can be performed manually by an operator or automatically

Sub-Assembly: each cell assembles up to 4 component parts

Customizable: testing, measuring, and/or checking features can be easily integrated

Delivery: designed to be compact so time-to-market is greatly reduced (typical delivery time is 12 – 16 weeks)

High performance: up to 30 cycles per minute

Page 10: adapto Presentation

KONNEXIO - our strengths

Reliability- Track Record of

100% on-time delivery

- Sound Technical Solutions

Quality- Workmanship

- Innovative Solutions

Flexibility

- modular M/C

Concept

- Process Oriented

Design

Page 11: adapto Presentation

KONNEXIO - Services

KONNEXIO provides expertise and service for all your automation needs: Machine Design, Manufacturing and Construction, Service, Support and Spare Parts

as well as Machine Retrofits and Upgrades.

Mechanical Engineering & Project Management

Controls Engineering & Programming Fully Equipped Machine

Shop

On-Site Machine Support Spare & Replacement Parts

Page 12: adapto Presentation

Testimonials: QUALITY

“The technical solutions you implemented were innovative, robust, and well engineered. It has proven to meet the performance that we mutually agreed [to].”

Prad LadEngineering Manager

Multimatic Inc.

“… your highly adaptable machine design allowed our engineers to work closely together with you to modify and improve our product during the machine construction phase.”

Jeff Greene,Business Unit Manager

Global Fluid SystemsCooper Standard Automotive

Page 13: adapto Presentation

Testimonials – Delivery Reliability

“In light of the numerous modifications and changes that our product underwent along with the production demands of our customer, Konnexio was still able to meet every deadline and milestone goal and completed the project within the agreed timeframe.”

Jeff Greene,Business Unit Manager

Global Fluid SystemsCooper Standard Automotive

“Konnexio was able to maintain every deadline and milestone goal and in doing so, completed the work in our facility in Britain in an organized and timely fashion, with complete professionalism, and in the timeframe you promised.”

Prad LadEngineering Manager

Multimatic Inc.

ID Task Name Duration Start Finish

1 409007 - TimeLine 69 days? Tue 17.03.09 Fri 19.06.091 Customer Input 49 days? Tue 17.03.09 Fri 22.05.09

2 Customer PO 1 day? Tue 17.03.09 Tue 17.03.09

3 3D CAD Models 12 days? Tue 17.03.09 Wed 01.04.09

4 Sample Parts 15 days Mon 27.04.09 Fri 15.05.09

5 Leak Tester 15 days Mon 04.05.09 Fri 22.05.09

6 Grease Pail 10 days Mon 11.05.09 Fri 22.05.09

7

8 Mechanical Design 23 days Wed 18.03.09 Fri 17.04.09

9 309003 - Tooling Design 8 days Wed 18.03.09 Fri 27.03.09

10 309002 - Tooling Design 7 days Mon 30.03.09 Tue 07.04.09

11 Frame / Guarding 8 days Wed 08.04.09 Fri 17.04.09

12

13 Parts Procurement 45 days Mon 30.03.09 Fri 29.05.09

14 Machining in house 35 days Mon 30.03.09 Fri 15.05.09

15 Surface Treatment 2 days Mon 18.05.09 Tue 19.05.09

16 Finish Parts after hardening 2 days Wed 20.05.09 Thu 21.05.09

17 Purchased Parts 27 days Thu 23.04.09 Fri 29.05.09

18 Misumi 10 days Mon 11.05.09 Fri 22.05.09

19 MK - Frame Material 10 days Mon 04.05.09 Fri 15.05.09

20 Hi-Lift - Hydraulic Lift 15 days Thu 23.04.09 Wed 20.05.09

21 Festo//Destaco 5 days Mon 18.05.09 Fri 22.05.09

22 Grease System 15 days Mon 11.05.09 Fri 29.05.09

23

24 Machine Build 15 days Mon 18.05.09 Fri 05.06.09

25 Frame / Guarding (2x) 10 days Mon 18.05.09 Fri 29.05.09

26 309002 - Tooling Plate 5 days Mon 25.05.09 Fri 29.05.09

27 309003 - Tooling Plate 5 days Mon 01.06.09 Fri 05.06.09

28

29 Electrical Tasks 40 days Mon 20.04.09 Fri 12.06.09

30 Electrical Design & Programming 15 days Mon 20.04.09 Tue 19.05.09

31 Electrical Material 10 days Wed 13.05.09 Tue 26.05.09

32 Electrical Panel Building 10 days Wed 20.05.09 Tue 02.06.09

33 Display Panel Building 3 days Wed 27.05.09 Fri 29.05.09

34 309002 - Electrical Installation 5 days Mon 01.06.09 Fri 05.06.09

35 309003 - Electrical Insallation 5 days Mon 08.06.09 Fri 12.06.09

36

37 Grease Tools 17 days? Thu 14.05.09 Fri 05.06.09

38 Machining 12 days Thu 14.05.09 Fri 29.05.09

39 Assembly 3 days Mon 01.06.09 Wed 03.06.09

40 Testing 1 day Thu 04.06.09 Thu 04.06.09

41 Delivery 1 day? Fri 05.06.09 Fri 05.06.09

42

43 Debugging 4 days Mon 15.06.09 Thu 18.06.09

44

17.03

05.06

11121314151617181920212223242526272829303101020304050607080910111213141516171819202122232425262728293001020304050607080910111213141516171819202122232425262728293031010203040506070809101112131415161718192021222324252627282930010232 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48