ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence –...

12
Rob Wartenhorst PhUSE– Vienna 2015 ADaM – Our Experience

Transcript of ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence –...

Page 1: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Rob Wartenhorst PhUSE– Vienna 2015

ADaM – Our Experience

Page 2: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Introduction

–  Legacy Novartis Vaccines implemented CDASH and SDTM in 2011

– Mid 2014 a project team was formed to implement ADaM. Project team consisting of: –  ADaM Lead –  Project manager –  Statistician –  3 programmers –  Part time external CDISC expert

ADaM – Our Experience 2

Page 3: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Design

– Elements considered in the design: –  How many ADaM datasets –  How to incorporate protocol deviations –  Define.xml –  Specification writing –  Programs for ADaM dataset creation –  Programs for TFL generation

ADaM – Our Experience 3

Page 4: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Design elements

– How many ADaM datasets? –  Only for primary analysis or all analysis? –  Include support for listings?

– How to incorporate protocol deviation? –  Re-specify deviations and exclusions based on SDTM? –  Derive from a non-SDTM dataset?

– Define.xml –  Directly built from specifications document –  Coordination with team providing SDTM –  Define version 1 or version 2?

ADaM – Our Experience 4

Page 5: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Design elements

– Specification writing –  Excel for now –  Until a suitable metadata repository is in place

– ADaM dataset programs –  Small set of standard programs

–  Metadata reading –  Shell creation –  Dataset finalization

–  Each dataset is programmed using a custom program (for now) –  Initial setup of programs for a study takes between 3 and 10 days

ADaM – Our Experience 5

Page 6: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Design elements

–  TFL programming –  Building blocks

–  Setup block –  Denominator block –  Counts and percentages block –  Basic statistics block –  Reporting block

–  Custom programming for non-basic statistics

ADaM – Our Experience 6

Page 7: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Development

–  Tool development –  Building blocks and limited set of ADaM dataset program tools

development effort relatively small –  ADaM standard development

–  Version 1 based on recreation 3 existing analysis –  Challenges

–  Keeping number of population flags down –  When to create records vs creating analysis flags –  Application of CDISC standard to vaccines

–  After 6 studies still refining ADaM standard specially with respect to records vs flags

ADaM – Our Experience 7

Page 8: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Training

– Classroom training –  General principles of ADaM

– On the job training –  Internal ADaM Center of Excellence provides

–  Support with specifications for statisticians –  Programming of ADaM datasets –  Support with use of building blocks –  Maintenance of ADaM standard

ADaM – Our Experience 8

Page 9: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Rollout

– Project manager manages rollout –  Negotiates with clinical teams which studies to analyse using ADaM

(in principle all) –  Helps to adjust statistician to added tasks related to ADaM –  Lessons learned session after each completed study

ADaM – Our Experience 9

Page 10: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Conclusion

–  Factors contributing to our successful ADaM implementation and rollout –  At least one person with ADaM and vaccines experience in the team –  Formation of ADaM Center of Excellence –  Availability of project manager –  Support from top level management –  Building blocks approach for table generation

–  Challenges –  Making statisticians available earlier –  Availability of extra resources to compensate for time needed to learn something new –  Defining who should write the ADaM specifications –  Training everyone in CDISC –  Finalization of protocol deviations occurs at same time as ADaM specification writing –  Application of CDISC to vaccine studies

ADaM – Our Experience 10

Page 11: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Conclusion

–  From the lessons learned –  Over time the process is better understood and resources better managed –  ADaM support group needs to have a good understanding of the studies –  Quality of output has improved due to transparency/traceability of data –  More examples are needed to accelerate TFL programming –  Programmers pick up use of building blocks quick

ADaM – Our Experience 11

Page 12: ADaM – Our Experience · 2015. 10. 23. · – Formation of ADaM Center of Excellence – Availability of project manager – Support from top level management – Building blocks

Thank you

Any Questions?