ADA Transition Project2016
![Page 2: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/2.jpg)
Purpose• Collect inventory of non-compliant ADA ramps and sidewalks• Bring non-compliant ramps to be compliant ADA ramps• Conduct ADA Transition Plan
![Page 3: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/3.jpg)
Materials
• Smart Tool• Measuring Tape• iPad
![Page 4: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/4.jpg)
Materials: Smart Tool
• Slope in Percentage %• Calibrating
– Instructions: • SmartTool Calibration• Video: Calibration Demo
![Page 5: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/5.jpg)
Process
• ODOT Form– Extra information we do
not need– Only use a few standards
ODOT ADA InspectionForm
![Page 6: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/6.jpg)
Process (Continue)What component of the ramp was measured
• Running Slope (1,2,3)• Cross Slope (1,2,3)• Landing Width (X,Y)• Clear Width• Counter Slope• Differential Slope • Wing (Left, Right)
![Page 7: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/7.jpg)
Process (Continue)
• iPad– Modified ODOT form– GIS location tracking
![Page 8: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/8.jpg)
Process (Continue)
• Google Maps– To locate and verify
ramps before making trip
– Street view– Aerial view
![Page 9: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/9.jpg)
Process (Continue)• GIS Field Data Map
– Blue icon= Ramps not completed
– Red icon= Ramps completed
– Blue circle icon =Comment
![Page 10: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/10.jpg)
Process (Continue)
• GIS Field Data Map– Plot existing ramps– Simplify trips– Inventory of all the
ramps in the county– Know how many ramps
are completed
![Page 11: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/11.jpg)
Process (Continue)
![Page 12: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/12.jpg)
iPad Demonstration
![Page 13: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/13.jpg)
GIS Maps
![Page 14: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/14.jpg)
GIS Maps (Continue)
![Page 15: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/15.jpg)
Development Plan
• Requirements for Plan1. List of barriers (GIS Map)2. Outline of methods to remove barriers3. Schedule for removal4. Name of official responsible for plan
![Page 16: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/16.jpg)
Development Plan
• Comparing cities plan– City of Portland– City of Eugene (Best)
• Time line• Complete new GIS map (End of August)• Complete written Transition Plan (October 31, 2016)
![Page 17: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/17.jpg)
Benefits
• Obtain the county’s ramp inventory• Develop ADA Transition Plan• Begin constructing new ramps
![Page 18: ADA Transition Plan Presentation-FINAL](https://reader036.fdocuments.net/reader036/viewer/2022062401/58ed147b1a28abfd7b8b466f/html5/thumbnails/18.jpg)
How to improve
• Google and GIS Field Data Map- sync
• Prevent Application Crash
• 2 workers