ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project). One Stop Project History. Spring 2003 focus on improving service at IVC Consolidating all student services into one office as information center “Virtual Library” Concept Limited Bookstore function - PowerPoint PPT Presentation

Transcript of ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)

Page 1: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)

ADA Improvements on Administration ADA Improvements on Administration BuildingsBuildings

Indian Valley CampusIndian Valley Campus(One Stop Project)(One Stop Project)

Page 2: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)

One Stop Project HistoryOne Stop Project History Spring 2003 focus on improving service at IVCSpring 2003 focus on improving service at IVC

Consolidating all student services into one office as information Consolidating all student services into one office as information centercenter

““Virtual Library” ConceptVirtual Library” Concept Limited Bookstore functionLimited Bookstore function Internet Café ConceptInternet Café Concept Food Service ComponentFood Service Component

Funding Sources IdentifiedFunding Sources Identified State matching funds, expiring May 2005; for ADA ImprovementsState matching funds, expiring May 2005; for ADA Improvements Hamilton fundsHamilton funds

Page 3: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)

Building 12 ConceptBuilding 12 Concept

Renovate existing bookstore spaceRenovate existing bookstore space Architect designs & presents several alternatives for spaceArchitect designs & presents several alternatives for space Issues arise with moving/splitting administrative functions Issues arise with moving/splitting administrative functions

currently housed in building 8currently housed in building 8 Additional staffing cost issuesAdditional staffing cost issues Utilities cost issuesUtilities cost issues

Page 4: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)
Page 5: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)

Buildings 8, 9 & 10 ConceptBuildings 8, 9 & 10 Concept January 2004 with Staff input buildings 8, 9 and 10 were January 2004 with Staff input buildings 8, 9 and 10 were

identified as the One Stop Centeridentified as the One Stop Center Design drawings developed for the final schemeDesign drawings developed for the final scheme Cost estimates show significant budget overagesCost estimates show significant budget overages Decision was made to initiate project into two phasesDecision was made to initiate project into two phases

Phase 1Phase 1 - ADA, Restroom and Fire Alarm upgrades to capture expiring - ADA, Restroom and Fire Alarm upgrades to capture expiring May 2005 state matching funds for ADA improvementsMay 2005 state matching funds for ADA improvements

Phase 2Phase 2 – Renovations in Building 8 and 10, and remainder of – Renovations in Building 8 and 10, and remainder of improvements in Building 9 to be completed at a later date (TBD)improvements in Building 9 to be completed at a later date (TBD)

Page 6: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)
Page 7: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)

Initial Project Cost AnalysisInitial Project Cost Analysis Original Construction Budget $349,000Original Construction Budget $349,000

Interior ADA Improvements Interior ADA Improvements (new restrooms & support rooms)(new restrooms & support rooms) 46%46% of original budget of original budget

New Fire Alarm System in Buildings 8, 9 and 10New Fire Alarm System in Buildings 8, 9 and 10 38%38% of original budgetof original budget

Exterior ADA ImprovementsExterior ADA Improvements ADA parking stalls, signage, handrails & water fountainsADA parking stalls, signage, handrails & water fountains 16%16% of original budgetof original budget

Page 8: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)

Change Order AnalysisChange Order Analysis

Total of Five Change Orders $90,469Total of Five Change Orders $90,469 26%26% increase to original budget increase to original budget

Page 9: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)

Change Order AnalysisChange Order Analysis Unforseen Hazardous MaterialsUnforseen Hazardous Materials

10%10% of change order total of change order total Asbestos abatement in flooring materialAsbestos abatement in flooring material

Required Structural Changes at restrooms due to Dry Rot Required Structural Changes at restrooms due to Dry Rot DamageDamage 63%63% of change order total of change order total

Complete floor replacementComplete floor replacement Partial removal & replacementPartial removal & replacement New structural beams installedNew structural beams installed

Fire Alarm System changes due to unforeseen conditionsFire Alarm System changes due to unforeseen conditions 27%27% of change order total of change order total

Requested device relocations & rerouting of fire smoke damper air intake Requested device relocations & rerouting of fire smoke damper air intake ductsducts

Additional alarm devices identified in DSA final project reviewAdditional alarm devices identified in DSA final project review

Page 10: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)

Notes on Change Order WorkNotes on Change Order Work

When Dry Rot damage was discovered it was necessary to When Dry Rot damage was discovered it was necessary to perform the following work for ADA & general code perform the following work for ADA & general code compliance:compliance:

Remove & replace the damaged structural members and Remove & replace the damaged structural members and associated partitions and equipmentassociated partitions and equipment

Remove all hazardous materialsRemove all hazardous materials Restore the restrooms in building 9Restore the restrooms in building 9

Page 11: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)

Final Construction Cost AnalysisFinal Construction Cost Analysis

Interior ADA Improvements Interior ADA Improvements (new restrooms and support rooms)(new restrooms and support rooms) 51%51% of budget of budget

New Fire Alarm System in Buildings 8, 9 and 10New Fire Alarm System in Buildings 8, 9 and 10 34%34% of budget of budget

Exterior ADA ImprovementsExterior ADA Improvements ADA parking stalls, signage, handrails and water fountainsADA parking stalls, signage, handrails and water fountains 15%15% of budget of budget

Page 12: ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)

Questions & AnswersQuestions & Answers

Debra MathauConstruction Manager, Indian Valley [email protected]