SW2: Baud Rate and Parity
SW4: Dome Address
OFF (default) Not terminated
ON Terminated in 120 Ohms
Switch SW5 RS485 Termination
SW5: RS485 Termination
Typical SW2 and SW3 Switch Settings (Protocol, Baud and Parity)
DIP Switch Close Up
Scan Assembly Mainboard Switches SW2 to SW5
Parity SW2/5 SW2/6
None (PAL default) OFF OFF
Even (NTSC default) ON OFF
Odd OFF ON
SW5 is located on the opposite side from the DIP switches.
SW2 - Baud/Parity
SW3 - ProtocolSW4 - Address
SW5 on other side
Pre-installation CautionsAll types of installations must be performed by qualified technical personnel and must be in accordance with all national and local mechanical and electrical codes.
Ensure the mounting surface and installation hardware can hold the combined weight of the scan assembly, housing, lower dome and mount. Any wall or ceiling mounting of the product should follow the manufacturer’s instructions for the mount used and use best installation practice appropriate for the structure and material the mount is being attached to.
To prevent damage to the mainboard, follow standard industry precautions for electrostatic discharge sensitive devices.
Cable preparation should be completed prior to the installation. Each dome requires 24V AC at 1 A or 12V DC at 1.5 A. The power supply should be located as close to the dome as possible for service and electrical isolation purposes.
How to Use this Guide1. Follow the instructions on pages 2 or 3 for your specific installation type (indoor pendant, surface mount or in-ceiling).2. Refer to pages 1 and 4 for switch, power and wiring information, which is the same for all installations.3. Numbered steps have cross references to the insets labeled A through F.
These instructions are only a basic guide. Refer to the ACUIX ES Installation and Configuration Guide for detailed safety and installa-tion information not included here and to configure the domes. Not all models or options are shown and the step order may vary.
A
* NTSC default settings: MAXPRO-mode protocol, 9600 baud, even parity.** PAL default settings: VCL 485 protocol, 9600 baud, no parity.
1
ON SW5 RS485 Termination
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8IntelliBus™ 38400 baud, no parity OFF ON ON OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF ON
MAXPRO* 9600 baud, even parity* OFF OFF ON OFF ON OFF OFF OFF OFF ON OFF OFF OFF OFF OFF ON
VCL - RS485** 9600 baud, no parity** OFF OFF ON OFF OFF OFF OFF OFF ON ON OFF OFF OFF OFF OFF ON
VCL UTC 9600 baud, no parity OFF OFF ON OFF OFF OFF OFF OFF OFF OFF ON OFF OFF OFF OFF ON
Diamond 9600 baud, even parity OFF OFF ON OFF ON OFF OFF OFF ON OFF OFF OFF OFF OFF OFF ON
Pelco P 4800 baud, no parity (default for P-type control)
ON ON OFF OFF OFF OFF OFF OFF ON OFF ON OFF OFF OFF OFF ON
Pelco D 2400 baud, no parity (default for D-type control)
OFF ON OFF OFF OFF OFF OFF OFF OFF ON ON OFF OFF OFF OFF ON
ProtocolBaud and Parity
DescriptionSW2 - Baud and Parity Settings SW3 – Protocol Setting
Baud Rate SW2/1 SW2/2 SW2/3 SW2/4
600 OFF OFF OFF OFF
1200 ON OFF OFF OFF
2400 OFF ON OFF OFF
4800 ON ON OFF OFF
9600(default)
OFF OFF ON OFF
19200 ON OFF ON OFF
38400 OFF ON ON OFF
57600 ON ON ON OFF
115200 OFF OFF OFF ON
For most installations, leave SW3-8 ON, otherwise users can make changes from the OSD menu.
NTSC or PAL settings are based on camera model.
Binary Value/Dome Address SW4/1 SW4/2 SW4/3 SW4/4 SW4/5 SW4/6 SW4/7 SW4/8
1 (default)ON OFF OFF OFF OFF OFF OFF OFF
2OFF ON OFF OFF OFF OFF OFF OFF
3ON ON OFF OFF OFF OFF OFF OFF
4OFF OFF ON OFF OFF OFF OFF OFF
5ON OFF ON OFF OFF OFF OFF OFF
See the ACUIX ES Installation and Configuration Guide for a more extensive table.
Refer to inset
All ACUIX ES pendant/surface mount shipments include both the skirt and top cap. Use the part appropriate to the type of installation.
Installing the Indoor Pendant or Surface Mount Dome
Skirt
Wiring access hole
Surface MountB
Ceiling mount (HDCM1)
Corner adapter (HDXCMA1)
Pole mount adapter (HDXPMA1)
Lower dome
Cover
Top cap
Wall mount (HDVWM1)
Pendant Mounts and Adapters
Indoor Pendant
C
Top Cap
Skirt
Scan Assembly*
Cover
Lower Dome
* Surface mount with skirt shown
Pendant and Surface Components
2
B
C
A
F
B
C
F
Video Switch, Plugs and BNC Connector
4
3
5
6
Indoor Pendant (Using the Top Cap)Drill the mount holes into the ceiling or wall. Before securing the mount to the surface, pull the field wiring through the mount. Make sure the wires extend at least 12 inches (305 mm) past the end of the ceiling or wall mount threaded pipe.
Pull the wiring from the mount and through the top cap. Cut the cable length to 6 inches (152 mm). Screw the top cap into the wall or ceiling threaded pipe. For the wall mount, use the supplied conduit.
Surface Mount (Using the Skirt)Pull the wires through the skirt wiring access hole and mount the skirt on the ceiling.
Finish pulling the field wiring through the skirt. Cut the cable length to 6 inches (152 mm).
Both Installations (Pendant and Surface)
Set the switches on the scan assembly mainboard (SW2, SW3, SW4 and SW5) and the outside of the scan assembly (SW1). Attach the lanyard from the top cap or skirt to the scan assembly.
Remove the plugs from the scan assembly, screw the wiring (power, RS485 data, contacts) into the holes then put the plugs back. If required, connect the BNC (for coax).
Secure the scan assembly to the top cap or skirt using 8-32 0.375 Pan Phil machine screws.
Align the 3 hooks on the cover with the 3 holes on the inside of the top cap or skirt. Rotate the cover until it is secure inside the top cap or skirt.
Align the 2 holes on the lower dome with the 2 screw holes on either side of the scan assembly. Secure the lower dome to the scan assembly.
1
2
1
2
7
Pendant installed with a wall mount
C
Installing the In-Ceiling Dome into a Dropped or Hard Ceiling
Refer to inset
Lower Dome
Trim Ring
Scan Assembly and Housing
Lower dome
Cable can
In-ceiling
Turning screws and wing tabs
Trim ring
DWiring access hole and clamp
Cable Can
Components
Video Switch, Plugs and BNC Connector
Hard CeilingUsing the mounting template, cut a 7 5/8” (194 mm) diameter ceiling hole.
If the ceiling is drywall or plaster, seal the perimeter of the hole with tape or plastic channel to prevent debris from contaminating the scan assembly.
Dropped (False) CeilingRemove the ceiling panel and place the ceiling tile on the dropped ceiling plate (part number 517082-7130). Trim the ceiling tile and press it into the plate.
Using the mounting template, cut a 7 5/8” (194 mm) diameter ceiling hole flush with the hole in the center of the plate.
Both Installations (Hard or Dropped Ceiling)
If required, attach a safety cable from a building support structure to the safety cable bracket. Use a 3/32” (2.4 mm) plastic coated aircraft cable with looping sleeve.
Unsnap/remove the cable can and set the switches on the scan assembly mainboard (SW2, SW3, SW4 and SW5) and outside of the scan assembly housing (SW1).
Remove the plugs from the scan assembly housing, screw the wiring (power, RS485 data, contacts) into the holes then put the plugs back. If required, connect the BNC (for coax).
Pull all the wiring from the plugs through the cable can hole. Ensure the wiring extends at least 1 foot (0.3 m) past the end of the hole and cut the cable to 6 inches (152 mm). Tighten the wire clamp to hold the wires in place.
Attach the cable can to the top of the housing. Insert the cable can and housing through the hole in the ceiling.
Position the wing tabs. Make the space between the wing tabs and the housing flange greater than the thickness of the ceiling and stagger the wing tabs to different heights. Position flat and turn clockwise to rotate the tabs out and tighten against the ceiling.
Insert the trim ring into the housing and rotate it to secure. Secure the lower dome to the housing with the screws.
1
2
3
1
4
2
5
6
7
8
9
Safety Cable Bracket
Wing Tab
Safety Cable Bracket and Wing Tabs
Turning Screw
Stagger the Wing Tabs
E
3
A
F
E
D
E
D
D
F
Honeywell Systems Group2700 Blankenbaker Pkwy, Suite 150Louisville, KY 402991.800.796.CCTV (2288)
www.honeywellvideo.com
800-01116 Rev BOctober 2008© 2008 Honeywell International Inc.
Video, Data, Power, Contact and UTP CablingType Recommended Cable Maximum Distance
VideoCoaxial Cable - RG59/U
Connector - BNC crimp on for RG59/U1000 feet (305 m)
DataOne shielded twisted pair, RS485 cable,
can also be Cat5 or better4000 feet (1219 m)
Power 18 AWG 2-conductor See gauge chart for each unit
Contact 20 gauge unshielded twisted pair 10,000 feet (3048 m)
Unshielded Twisted Pair (UTP) Video
CAT5 or better; 1 twisted pair for data, 1 twisted pair for video
750 feet (230 m)
PIN Description
1 24V AC input A or 12V DC (+) or (-)
2 ESD (electrostatic discharge) grounding
3 24V AC input B or 12V DC (+) or (-)
4 RS485 data (-) communication signal
5 RS485 data (+) communication signal
PIN Description
1 Contact input 1
2 Contact input common
3 Contact input 2
PIN Description
1 UTP + signal
2 UTP - signal
3 Contact input 3
4 Contact input 4
5 Contact input 5
6 Contact input 6
7 Contact input 7
8 Contact input 8
9 Contact input common
Wire Gauge for Maximum Distance to Dome
P1 Power, Data and RS485 (5-pin Plug)
P2 Contact (3-pin Plug)P3 Contact (9-pin Plug)Power Supply
Wire Gauge (AWG)
mm2 Feet Meters
24 0.5 35 10
Doubled 24 0.5 x 2 70 20
18 1 145 45
16 1.5 230 70
14 2.5 360 110
24 0.5 15 5
Doubled 24 0.5 x 2 35 10
18 1 70 20
16 1.5 115 35
14 2.5 180 55
24V AC
12V DC
Wiring and Power Information
Power Supplies
SW1 Video
Video Switch SW1, Plugs and BNC Connector
F
Each dome requires a 24V AC at 1 A or 12V DC at 1.5A ± 15% power source when measured at the dome.
To maintain this at each dome, the proper wire size for the distance and the number of domes must be determined.
ON
OFF
P3
P2
Contact Wiring Plugs
Power and Data Wiring Plug
SW1 Video
PlugsP1
BNC Connector
A good earth ground must be connected at the 5-pin connector, P1, pin 2. Surge, ESD and EMC performance will be compromised if the unit is not connected to a good earth ground.
OFF (default) COAX video enabled
ON UTP video enabled
Switch SW1 Video Selection
Pendant/surface shown. In-ceiling is similar.
Application Specification
Internal - 1 per ACUIX ES24V AC 1 amp x 1, or 12V DC 1.5 amp x 1